ML20133N525

From kanterella
Jump to navigation Jump to search
Special Rept Spr 85-007:on 850605,area Temp for Svc Water Pumphouse Exceeded 102 F Limit for Approx 10 Minutes.Caused by Combination of High Environ Ambient Temps & Thermal Loads within Bldg.Cooling Coil Sys Installed.Part 21 Related
ML20133N525
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/03/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-85-359-000 PT21-85-359, PT21-85-359-000, SPR-85-007, SPR-85-7, NUDOCS 8508130514
Download: ML20133N525 (2)


Text

.

~

SOUTH CAROLINA ELECTRIC; & GAS COMPANY POST OFF4CE 764 COLuusiA, SoufM CAROLINA 29218 g..

CD O. W. DinoN. Ja.

July 3, 1985 Ei vice rarsioewr NUCLean OPsaatioNS a

p t.o Dr.

J.

Ne lson Grace Regional Administrator

[]l U.S.

Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323

SUBJECT:

Virgil C.

Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 85-007)

Dear Dr. Grace:

Attached is a Special Report for the Virgil C.

Summer Nuclear Station.

This Special Report is submitted pursuant to the requirements of Action Statement (a) of Technical Specification 3.7.11

" Area Temperature Monitoring."

Sh ou ld there be any questions, please call us at you r convenience.

Very truly yours, bS 0.

W.

D xo Jr CJM:0WD/ led Attachment cc:

V.

C.

Summer K.

E.

Nodland T.

C.

Nichols, Jr./0.

W.

Dixon, Jr.

R.

A.

S t ou gh E.

H.

Crews, Jr.

G.

Pe r c iv a l E.

C.

Roberts C.

W.

Hehl W.

A.

Williams, Jr.

J.

B.

Knotts, Jr.

D.

A.

Nauman S.

D.

Hogge Group Managers I&E Washington O.

S.

Bradham Document Management C.

A.

Price Branch S.

R.

Hunt INPO Records Center J.

F. Heilman ANI Lib r ary C.

L. Ligon (NSRC)

NPCF File

~

8508130514 850703 PDR ADOCK 05000395 S

PDR

'i'JCE7/f

e

(

Dr.

J.

Nelson Grace SPR 85-007 Page Two July 3, 1985 EVENT DESCRIPTION On June 5, 1985 the area temperature for the Service Water Pumphouse (SWPH) exceeded the 102*F limit, established in Technical Specification 3.7.11, " area temperature monitors," for a period of approximately ten (10) hours.

The limit was exceeded between 1400 and 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> with an ob served maximum temperature of 105'F.

Temperature monitoring was performed on an hourly basis.

The c omb in a t ion of high environmental a mb i e n t temperatures and thermal loads (within the building) caused the t e mpe ra tur e excursion.

The h ig h a mb i e n t t emp e r a tu r e s in s id e the SWPH hav e been evaluated and found to h ave no adverse effect on the equipment or its environmental qualifications.

CORRECTIVE ACTION TO PREVENT RECURRENCE To preclude a potential recurrence, the Licensee is presently installing a once thr ou gh cooling coil system in the SWPH ventilation' intake.

The modification is scheduled to be complete prior to July 15, 1985.

l l

l l

f l-t