The Commonwealth Edison Company
Docket No. 50-454
Docket No. 50-455
g
As a result of the inspection conducted March 18-21, 25-27, April 3-4, 9-11,
16-19, 22-23, May 15-16, 28, and July 1-3, 16-17, 1985, in accordance with the
General Policy and Procedures for the NRC Enforcement Actions (10 CFR Part 2,
Appendix C), the following violations were identified:
1.
10 CFR 50 Appendix B, Criterion IX, as implemented by the CECO Quality
Assurance Program, requires that special processes be controlled and
be accomplished by qualified personnel using qualified procedures in
accordance with applicable codes, standards, specifications, criteria,
and other special requirements.
l
Contrary to the above, the following examples of failure to control
special processes were identified:
a.
Reliable Sheet Metal welding procedures did not properly address the
required preheat in accordance with AWS D1.1, and attachments to
structural members were welded without the required preheat
(454/85011-02(a)(DRS)).
b.
A Reliable Sheet Metal welder having insufficient records to justify
qualification in accordance with AWS DI.1 performed welds on heavy
plate (454/85011-02(b)(DRS)).
This is a Severity Level IV violation (Supplement II).
2.
10 CFR 50 Appendix B, Criterion XVI, as implemented by the CECO Quality
Assurance Program, requires that conditions adverse to quality be
promptly identified and corrected.
Contrary to the above, weld quality and inspection problems identified
concerning the Reactor Containment Fan Cooler installations were not
addressed in a timely manner in that four years elapsed between
identification and resolution of the problems (454/85011-03(DRS)).
This is a Severity Level IV violation (Supplement II).
8500130444 050006
ADOCK 05000454
G
PDH
-
-
,
.
.
Appendix
2
-
Pursuant to the provisions of 10 CFR 2.201, you are reqyired to submit to
this office within thirty days of the date of this Notice a written statement
or explanation in reply, including for each violation:
(1) corrective action
taken and the results achieved; (2) correction action to be taken to avoid
further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause
shown.
W
u AA,
4.)Wf
.
.
Dated (
C.W.Papriello, Director
'
Division of Reactor Safety
i
i
!
!
.
.
.
.
. . -