Notice of Violation from Insp on 850318-0717
ML20133N303
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/06/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133N301 List:
References
50-454-85-11, 50-455-85-08, 50-455-85-8, NUDOCS 8508130444
Download: ML20133N303 (2)


See also: IR 05000318/2007017

Text

,

,.

.

'

!

l

Appendix

l

NOTICE OF VIOLATION

The Commonwealth Edison Company Docket No. 50-454

Docket No. 50-455

g As a result of the inspection conducted March 18-21, 25-27, April 3-4, 9-11,

16-19, 22-23, May 15-16, 28, and July 1-3, 16-17, 1985, in accordance with the

General Policy and Procedures for the NRC Enforcement Actions (10 CFR Part 2,

Appendix C), the following violations were identified:

1. 10 CFR 50 Appendix B, Criterion IX, as implemented by the CECO Quality

Assurance Program, requires that special processes be controlled and

be accomplished by qualified personnel using qualified procedures in

accordance with applicable codes, standards, specifications, criteria,

and other special requirements.

l Contrary to the above, the following examples of failure to control

special processes were identified:

a. Reliable Sheet Metal welding procedures did not properly address the

required preheat in accordance with AWS D1.1, and attachments to

structural members were welded without the required preheat

(454/85011-02(a)(DRS)).

b. A Reliable Sheet Metal welder having insufficient records to justify

qualification in accordance with AWS DI.1 performed welds on heavy

plate (454/85011-02(b)(DRS)).

This is a Severity Level IV violation (Supplement II).

2. 10 CFR 50 Appendix B, Criterion XVI, as implemented by the CECO Quality

Assurance Program, requires that conditions adverse to quality be

promptly identified and corrected.

Contrary to the above, weld quality and inspection problems identified

concerning the Reactor Containment Fan Cooler installations were not

addressed in a timely manner in that four years elapsed between

identification and resolution of the problems (454/85011-03(DRS)).

This is a Severity Level IV violation (Supplement II).

8500130444 050006

PDR ADOCK 05000454

G PDH

- -

,

.

.

Appendix 2 -

Pursuant to the provisions of 10 CFR 2.201, you are reqyired to submit to

this office within thirty days of the date of this Notice a written statement

or explanation in reply, including for each violation: (1) corrective action

taken and the results achieved; (2) correction action to be taken to avoid

further violations; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause

shown.

. u AA, 4.)Wf

'

. # W

Dated ( C.W.Papriello, Director

Division of Reactor Safety