ML20133L818

From kanterella
Jump to navigation Jump to search
Submits List of Deliveries of UF6 & UO2 Made Between 961211 & 970115,IAW Requirements of Convention on Physical Protection of Nuclear Matls
ML20133L818
Person / Time
Site: 07001252
Issue date: 01/15/1997
From: Condrey D
EDLOW INTERNATIONAL CO.
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9701220144
Download: ML20133L818 (1)


Text

_ _ _

4 summe M

N 7 -OM$a Edlow International Company 1666 Connecticut Ave., N.W., Suite 201 Washington, D.C. 2tXX)9 U.S.A.

l Tel (202) 4M3-4959 Fax (202) 483-4840 c-nail: edlowco@ aolxom January 15, 1997 U.S. Nuclear Regulatory Commission Division of Safeguards and Transportation Mail Stop:

0-6 F-18 Washington, D.C.

20555 Attn: Ms. Gloria M. Bennington Dear Ms. Bennington The following list of deliveries made between December 11.1996 and January 15, 1997. This list is provided in accordance with the requirements of the Convention on the Physical Protection of Nuclear Materials.

OUR REF#

SHIPMENT DESCRIPTION CONSIGNEE DATE RECEIVED i

USEC-E-25B 22,100 Kgs UF6 (e)

U.S. Enrichment Corp 12/27/96 SAMDO-E-29 2,059 Kgs'UF6 (e)

Korea Nuclear Fuel Co 12/30/96 i

GNSS-E-35 55,000 Kgs UO2 (e)

Westinghouse Elec. Corp 12/30/96 j

We trust that the above infortmation is satisfactory.

Sincerely, l

EDLOW INTERNATIO t COMPANY ij

}

aren Con ref Operations Mana er (e) = enriched (n) = natural l

9701220144 970115 O

D PDR ADOCK 07001252 C

PDR