January 13, 1997

~

Mr. Bruce D. Kenyon President and Chief Executiv6 Officer Northeast Nuclear Energy Company c/o Terry Harpster P. O. Box 128 Waterford, Connecticut 06385-0128 l

SUBJECT:

MAINTENANCE RULE BASELINE INSPECTION FOR MILLSTONE UNIT 3 1

Dear Mr. Kenyon:

In a telephone conversation on January 9,1997, between Mr. J. Gionet and Mr. J. Williams, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Millstone Unit 3. The inspection is planned for the week of March 17,1997.

The inspection objective is to evaluate your performance to support compliance with the requirements of 10 CFR 50.65, " Requirements for monitoring the effectiveness of maintenance at nuclear power plants." The inspection will be conducted using Inspection Procedure 62706, " Maintenance Rule" and will involve a team of at least 4 inspectors.

l The team will require information about your program for their in-office preparation for the inspection. This information is identified in the enclosure to this letter. Please provide this information to Mr. Williams by February 19,1997. Mr. Gionet has been advised of this request.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211 or E-mail address GWM@NRC. GOV.

Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety I

g o\\ 1) I Docket No. 50-423 9701210388 970113 PDR ADOCK 05000423 G

PDR i

- -. - - ~. - _.

t Mr. Bruce D. Kenyon 2

cc w/ encl:

]

T. C. Feigenbaum, Executive Vice President - Chief Nuc! car Officer i

J. Cowan, Unit 3 Recovery Officer D. M. Goebel, Vice President, Nuclear Oversight J. K. Thayer, Recovery Officer, Nuclear Engineering and Support P. D. Hinnenkamp, Director, Unit Operations i

H. F. Haynes, Director, Nuclear Training j

M. H. Brothers, Nuclear Unit Director, Unit 3 J. F. Smith, Manager, Operator Training F. C. Rothen, Vice President, Work Services L. M. Cuoco, Esquire

]

J. R. Egan, Esquire V. Juliano, Waterford Library Department of Public Utility Control l

S. B. Comley, We The People State of Connecticut SLO Designee 1

I

(

E i

J 3

1 1

i e

1 1

i Mr. Bruce D. Kenyon 3

3 Distribution w/ encl:

Region 1 Docket Room (with concurrences)

W. Lanning, Deputy Director of Inspections, SPO, R1 M. Kalamon, SPO, RI NRC Resident inspector Nuclear Safety Information Center (NSIC)

PUBLIC 4

l D. Screnci, PAO (1) l J. Williams, DRS DRS File (1) f D. Screnci, PAO N. Sheehan, Field-Public Affairs Officer, RI J. Anderson, PM, SPO, NRR W. Dean, OEDO j

P. McKee, Director, Deputy Director of Licensing, SPO, NRR G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR l

L. Plisco, Chief, SPO, NRR S. Dembek, PM, SPO, NRR D. Mcdonald, SPM, SPO, NRR M. Callahan, OCA l

R. Correia, NRR R. Frahm, Jr., NRR 4

k i

1 DOCUMENT NAME: A: MAINRULE.MS3 l

To receive a copy or this document, indicate in the box: "C" = Copy without attachment enclosure "E' = Copy with au.hment/ enclosure

'N' = No copy

/

0FFICE RI/DRS

(////// l RI/DRS l

RI/

l RI/

l RI/

l NAME,

JWilliams//T

GMeyer

\\ ns DATE 01/10/97 '

01/(1,/97 V 01/

/97 01/

/97 01/

/97 l

0FFICIAL RECORD COPY

j f

i j4

+

REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION

  • 1.

Copy of Maintenance Rule Program and all related procedures including those -

relating to expert panels, PRA, risk assessments and ranking, and scoping, a

i

  • 2.

List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.

i r

I

  • 3.

List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.

  • 4.

List of maintenance preventable functional failures (MPFFs) for the current operating.

cycle with any repetitive failures identified.

1 a

  • 5.

List of risk significant and standby systems.

6.

Assessments of risk significant and risk rankings.

  • 7.

Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.

i 8.

Background explanations for SSCs currently assigned to the (a)(1) category.

9.

Cc,py of any internal or external maintenance rule assessments.

l

10. Current maintenance rule trending data, i
  • 11. Current performance criteria and goals for SSCs. If PRA used, provide PRA information.

}!

12. Qualifications and backgrour cs for Expert Panel Members.

i 3

13. Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency j

results, if applicable.

l e

i j

ltems identified with asterisk (*) are needed for in-office review prior to the inspection on i

site.

l I

i 4