ML20133K869

From kanterella
Jump to navigation Jump to search
Safeguards Insp Rept 99990080/85-03 on 851007 & 09.No Noncompliance Noted.Major Areas Inspected:General Performance objectives,in-transit Performance,Security Organization & Audit.Details Withheld (Ref 10CFR73.21)
ML20133K869
Person / Time
Issue date: 10/18/1985
From: Belanger J, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133K860 List:
References
99990080-85-03, 99990080-85-3, NUDOCS 8510220331
Download: ML20133K869 (1)


Text

.q' U.S. NUCLEAR REGULATORY COMMISSION REGION III Report No. 99990080/85003(DRSS)

Docket No. 70-1426 License No. XSNM 02143 Licensee: Transnuclear, Incorporated One North Broadway White Plains, NY 10601 Inspection At: Last Terminal in the United States Inspection Conducted: October 7 and 9, 1985 Type of Inspection: Routine Safeguards Inspection of Nuclear Material I

Inspector: .' B 1 /d//3Mi Physical Security Inspector Date Approved By: . R. Creed, Chief afeguards Section

/ /#M Date Inspection Summary Inspection on October 7 and 9, 1985 (Report No. 99990080/85003(DRSS))

Areas Inspected: Included a review of General Performance Objectives; In-Transit Performance; General Physical Protection System Requirements; Security Organization and Audit; Response and Contingency Plan / Procedures; Access Control; Road Shipment Requirements; and Delivery and Receiving Requirements. The inspection involved nine hours onsite by one NRC inspector.

The inspection began during the day shift period.

Results: The licensee was found to be in compliance with NRC requirements within tne areas examined during the inspection.

(Cetails - UNCLASSIFIED SAFEGUARDS INFORMATION) 85102203g 35g 8pec A., closure contains IE__

w g A_0Aeo PDR SAFEGUARDS INFORMATIS upon separation this page is D> controlled