Advises of Planned Insp Effort Resulting from Vermont Yankee PPR Review.Insp Plans for Next Six Months & Tentative Plan Beyond Encl
ML20133K848
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/10/1997
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9701210370
Download: ML20133K848 (5)


Text

e l

JAN?tO, 1997 Mr. Donald A. Reid Vice President, Operations Vermont Yankee Nuclear Power Corporation RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - VERMONT YANKEE

Dear Mr. Reid:

On November 7,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Vermont Yankee. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Vermont Yankee involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period July to October 1996.

i PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Vermont Yankee PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six months and tentative plan beyond. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident core inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact me at 610-337-5183.

Sincerely, Richard J. Conte, Chief Reactor Projects Branch No. 5 3

j 9701210370 970110 Division of Reactor Projects PDR ADOCK 05000271

[

l G

PDR I

(L{ V t

Enclosure:

Inspection Plan

__ _ _ _ _. _ _. _.. _.. ~, _ _.. _. _,. _ _ _.. _ _ _. _.. _. _. _ _. _ _

i*

1 h

Donald A. Reid 2

4 a

Docket Nos. 50-271 License Nos. DPR-28 j

cc w/ encl:

R. McCullough, Operating Experience Coordinator - Vermont Yankee i,

R. Wanczyk, Plant Manager i

J. Duffy, Licensing Engineer, Vermont Yankee Nuclear Power Corporation

)

J. Gilroy, Director, Vermont Public interest Research Group, Inc.

4 D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire 2

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts R. Gad, Esquire G. Bisbee, Esquire l

T. Rapone, Massachusetts Executive Office of Public Safety State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee

)

i 1

I I

k.-

1 I

i i

i 4

i i

I 1

1 4

1 f.

Donald A. Reid 3

Distribution w/ encl:

Region 1 Docket Room (with concurrences)

PUBLIC Nuclear Safety Information Center (NSIC)

J. Wiggins, DRS R. Conte, DRP H. Eichenholz, DRP M. Oprendek, DRP D. Beard, DRP R. Bough, DRS W. Dean, EDO DRS Branch Chiefs Distribution w/enci (VIA E-MAIL):

P. McKee, NRR D. Dorman, NRR W. Dean, OEDO W. Cook, SRI Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: S:\\PPRVY\\PPRLTR.B96 To recdve a copy of this document, indicate in the bos:

"C" = Copy without attachment / enclosure "E* = Copy with attachment / enclosure

  • N" = No copy 0FFICE DNMS/RI l

MJ l

l l

m NAME WCook j"/F RConte#'/V DATE 01//#/97 /

01//O /9T 01/

/97 01/

/97 01/

/97 0FFICIAL RECORD COPY

E o

VERMONT YANKEE INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction (Safety issues Portion of Inspection Program)

Core Inspection - Minimum NRC Inspection Program (mandatory all plants) i INSPECTION TITLE /

NUMBER OF PLANNED TYPE OF INSPECTION -

PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES Tl 2515-109 Inspection Requirements for 1

1/13-17/97 Area of Emphasis - Part 2 of Tl Generic Letter 89-10; S/R involves evaluation of MOV Valve Testing and implementation by sampling of Surveillance; Rev.1 (Part 2)

MOVs for detailed review 82302 Review of Exercise Scenario 2

1/13/97 Core inspection IP 82301 Evaluation of Exercises for 3

3/17-21/97 Core Inspection & Followup on Power Reactors TSC Ventilation Adequacy IP 92904 Followup - Plant Support IP 92903 Followup-Engineering 1

3/24-28/97 &

Regional Initiative -

4/7-11/97 Focus on HPCl/RCIC space heaters and AOG deficiencies and related matters IP 93801 Safety System Functional 4

5/5-16/97 Region Initiative Team -

Inspection Design Bases Documentation May be replaced with Architect Engineer (A&E) Team inspection in June 1997 IP 81700 Physical Security Program for 1

5/27-30/97 Core Inspection (First)

Power Reactors

f INSPECTION TITLE / PROGRAM AREA NUMBER OF PLANNED TYPE OF INSPECTION -

INSPECTORS INSPECTION COMMENTS DATES IP 37550 Engineering 1

6/2-6/97 Core inspection (First)

IP 42001 Emergency Operating 1

CQ 97-3 Regional Initiative -

Procedures Review VY written response detailing root cause and corrective actions on EOPs IP 64704 Fire Protection Program 1

CQ 97-3 Core inspection IP 84750 Radioactive Waste Treatment, 1

7/14-18/97 Core inspection (Environment and Effluent and Environmental Part)

Monitoring IP 62706 Maintenance Rule inspection 4

8/4-8/97 Maintenance Rule Team inspection IP 84750 Radioactive Waste Treatment, 1

9/22-26/97 Core inspection (Effluent and Effluent and Environmental Part)

Monitoring IP 64150 Post Safe Shutdown Capability 1

10/1/97 Regional Initiative -

Review Eng. Support for design inadequacies, corrective action modifications and other measures to meet App. R IP 37550 Engineering 2

12/1-12/97 Core inspection

~

(Second) t m

-