Text
.
e.- -
g e
- fhsh ' 'y Federal Emergency Manageme O
Washington, D.C. 20472 s
4 0(T, I 51985 g
M
$V MEMORANIXM FOR: Edward L. Jordan Director, Division of Emergency Preparedness and Engineerirg Ibsponse Office of Inspection and Enforcenent U.S,
clear.
latory Commission FRCM:
/
c%'rd. ibimm Assistant Associate Director Office of Natural-and Technological Hazards STJECT:
Perry Atomic Safety and Licensing Board Conditions Related to Offsite Emergency Preparedness l
i Attached is a status report on the.two renainirn offsite energency preparedness licensity conditions for the Perry haclear Power Plant (NPP). 'Ihese conditions were identified in the Perry Atomic Safety and Licensing Board's (ASIB) Concluding Partial Initial Decision issued on Septanber 3,1985.
On Septanber 25, 1985, your office requested the Federal Emergency ManxJement Agency (FENA) to provide the Nuclear Regulatory Comnission (NRC), by October 15, 1985, with a status report on two licensing con-ditions related to offsite preparedness. 'Ihe conditions arose from the following two contentions:
(1) 'Ihere are no letters of agreement regardirn the availability of school buses (Contention 0); and, (2) reception centers 'do not have the means or facilities for handling contaminated property (Contention U).
FEMA Region V staff contacted the Ohio Disaster Services Agency (ODSA) to determine the current status. 'Ihe information provided by ODSA is con-tained in the attached nemorancknn with attachments fran FEMA Region V.
Following the Region's submittal of the status report to FEMA Headquarters, ODSA provided the enclosed follow-up written confirmation, dated October 11, 1985. While the conditions have not been totally resolved, the State has informed FEMA that (1) copies of the letters of agreenent will be provided to FEMA Pagion V by Novenber 27, 1985; (2) all personnel performing emergency response d.ities in the care centers will be trained by November 20, 1985; and, (3) equipment and personnel decontamination kits are being assenbled and will be in the care centers by November 15, 1985.
FEMA Region V will monitor the progress of these scheduled actions and notify FEMA Headquarters when these actions have been coupleted.
If you have any questions, please contact Mr. Robert S. Wilkerson, Chief, Technological Hazards Division, at 646-2861.
Attachnents As Stated 8510210216 851015 PDR ADOCM 05000440 F
I i Federal Emergency Management Agency Region V 300 South Wacker,24th Floor, Chicago,IL 60606 (312) 353-1500 October 9, 1985 t
Memorandum To Richard W. Krima Assistant Associst e Director Offica of Natuial and Technological Hazards l
Attn b Tur r s -
Y44.
From:
a', lace J. Veaver, Chief t
Technological Hazards Branch Subject Perry Atomic Safety and Licensing Board Conditions Raiated I
to Offsite Preparedness.
(
i I
The following information represents the status of the two remaining offsite emergency preparedness licensing conditions (contentions Q and U) issued by
[
the Atomic Saf ety and Licensing Board ( ASLB) in their Sept ember 3,1985 Concluding Partial Initial Decision regarding emargency planning for the Perfy Nucleat Power Plant.
~
(1) Status relative to contention Q: "There are no lettars of agreement regarding the availability of school buses."
r The Ohio Disaster Services Agancy (0DSA) reports that all letters of i
agreement referred to by the plans for use of school buses to evacuata personnai are t o be signed by the appropriate of ficials by November 1, i
1985. ODSA anticiparas that they will have received and reviewed each of
(
thasa documents for inclusion into the plans by November 20, 1985. Copies l
of thesa' letters will be furnished to FEMA by Novanber 27, 1985.
j l
(2) Status relative to centention Ut " Reception Centers do not have tha means or facilities for liandling co,ntaminated property."
For the purpose of this report, status is reported in two areast Training I
and Equipment.
i Traininst l
ODSA indicated to FEMA Region V staff recently that each cara center (including decontamination functions in these areas) will be st!affed with a i
minimum of four (4) staff members which have received at least 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of certified instrumentation training. In addition, each center will have at I
least three (3) personnel which have received trainirig in the proceduras for l
f the decontamination of personnel and equipment. ODSA reports that all the personriel parforming emergency responsa duties in the cara centers have been or will have been trained by' November 20, 1985. Attachment 1 is a projection of this. training schedule.
l
o JEquipment:
Each care center will be provided with a kit containing tha necessary supplies to affectively decontaminate personnel and another kit with the itema necessary to decontaminate equipment. The stata has indicated that these kits are being assembled and that each care center will receive these kits by November 15, 1985. saa attachment 2 squipment and Personnel 4
Decontamination Lists.
FEMA Region V will continue to monitor the progress of these actions to resolve these concerns and will advisa FEMA Headquarters when the actions taken have been completed.
\\
Attachments: Training Schedule & Care Center Status Equipment Decontar.ination Kit List Tarsonnel Decontamination Kit List 1
t
?
i a
4 S
?
_. - - ~,
r, _ - _ _
ATr/C M NT 1 pe Perry Nuclear P e r Plant Page i of 2 Source: Chio Disasi Mrvices Agency October 1983 TRAINING SCHEDULE GEAUGA COURT 1:
BAINBRIDCE 11-19-8517:00 pm DECON & S0P CHESTERIAND 10-21-8518:00 pm DECON & SOP NIDDLETIED 11 3-85;7:30 pm DECON & SCP NEWBURE 11-19-85)7:30 p DECON & SCP ASHTABULA COUNTI:
ASRTABUZA CTZI 10(28,29,30)8Si9:00m DECON & SCP ASHIABULA TWP.
10(21,22,23)BS11:00 pm DECON & BCP CONNEAUT 10(28,29,30)8Ss1:30 pm DECON & S0P LAXE COUNT!
CONCORD 11-10-86;6:00 pm DECON & SOP EASTLAKE 11(4,5,6)S511:00 pm DECON & SCP XIRIZAND 10-16-86;?:00 pm DECon & SCP WICE IFFE 11(11,12,13)8619:00 m DECON & SCP VILLOUGHBX 11(11,12,13)8511:30 pm DECON & SOP WILLOWICK 11-4-8519:00 m DECON & SOP 11-12-8517:00 p DECON & S0P 11-20-8637:00 pm DECON & SCP 16 ROUR INSTRubENTATION TRAINING COURSE WHEN: ?,8,14,16 OCT 85 TIM: 7:00 pm PLACE: JEFFERSON FIRE DEPARTMNT ATTENDEES:
MDDLETIELD FD AUSTINBURG FD JEFFERSON ED S(TBROOK FD ASR. TWP. ED 9
6
(
Re: Perry Nuclear Power Plant ATTAClirsliT 1 Source: Ohio Disaster Services Agency Page 2 of 2 CARE CENTERS 16 HOUR DECON SCP EQUZP.
DECON CTR DEPT MNPOWER CERTIFIED
_ TRAINED ISSUED HARBOR H.S.
ASH CITY ED y5 y
-Q-,
XENT STATE ASH CITI FD BRADEN EEN.
_g,
~g.
EDGEWOOD R.S.
ASB TWP. FD CONNEAUT H.S.
CONN. FD LAXEVIEW E EN.
CO?lN. FD
- I RC W.IR. H.S.
CONN. ED
]
h~
_g-S. EAST EEN.
CONN. FD CRESTNUT ELEN.
CONN.' FD WICE IFFE SR. H.S.
WICKIFFE ED gg g
,g_
_o_
WICEIFFE MIDDLE WICEIFFE FD WILLOWICX MDDLE WILLOWICX FD ly
.g.
-0~
g5 B0ZALVIEW ELEM.
WILLOWICX FD g5 3(
~0*
~G~
NORTH H.S.
EAS:LAXE FD LONGEELLOW ELEN.
EASTLAXE FD SOUTH H.S.
WILLOUGHBY FD 68 I3 ll
~g~
XIR: LAND H.S.
XIRTLAND FD 31 14 d'
'O~
KENSTON H.S.
BAINBRIDGE FD 74
~O~
~O~
gg KENSTON MJDDLE BAINBRIDGE FD BERXSHIRE H.S.
BURTON FD 31
/0 lO
~O' NOTRE DAME ACAD, wNSON FD 30
//
-O-
~O-yg g
~O-
~O' WST G. H.S.
CHESIF.RLAND FD WEST. G.sTR. H.S.
CHESTERLAND FD CARDINAL H.S.
MDDLEFIELD FD 3
~0" CARDINAL M DDLE NIDDLETIED FD NEVBURI H.S.
NEWBURY FD 30 4
-O-
, c)
- t 1
4 n.-
- -. ~.,, _ -. - -,. -, - -
Bc: Perry Nuclear Power Plant Source: Ohio Disaster Services Agerry ATDOMGTI 2 Page 1 of 3 EQUIPMENT DECONTAMINATION KIT
.1JTIM QTY ITEM DESCRIPTION EE 1.
2 EA.
RECEPTACLE, CONTAM. WASTE CONTAM. WASTE /KITST 2.
2 SETS CDV-777-1 MONITORING EQUIPMENT CONTAM. DETECTION 3,
10-EA.
" RADIATION AREA" SIGNS AREA CONTROL
[
4.
1 ROLL
" RAD. AREA" BARRIOR TAPE (1000')
AREA CONTROL f
5, 1 BOX LINERS, TRASH, 20 GAL (10/B0x)
CONTAM. WASTE 6.
1 ROLL
" RAD. MATERIAL" LABELS / TAPE CONTAM. WASTE MARKING 7.
2 EA.
2h GALLON BUCKET, PLASTIC DECON.
8.
4 EA.
SPONGE, CAR WASH DECON.
9.
2 EA.
BRUSH, LONG-HANDLED (2')
DECON.
10.
2 GAL.
SOAP, POWDER DECON.
11.
50 EA.
PAPER TOWELS, LARGE DECON.
12.
2 EA.
HOSE, GARDEN (50' x k")
DECON.
I 13.
2 EA.
N0ZZLE ASSEMBLY, ",SE DECON.
14.
1 ROLL PLASTIC SHEETING d000' x 3')
FIXFD CONTAM COVER
[
15, 2 ROLLS MASKING TAPE (2")
PLASTIC SHEETING
[
16, 2 EA.
CLIPBOARDS, LETTER SIZE ADMIN. USE 17.
1 BOX PENS, BLACK (12/Bcx)
ADMIN. USE I
18.
250 EA.
" EQUIPMENT DECON. RECOPD" CONTAM. RECORD FORM 19.
4 EA.
RESPIRATOR, HEPA PERSONNEL PROTECTION 20.
4 EA.
CARTRIDGE, SPARE HEPA PERSONNEL PROTECTION
[
21, w 20 PR.
COVERALLS W/ HOOD, TYVEK PERS0hNEL PROTECTION 22, w20 PR.
GLOVES, SURGICAL, INNER PERSONNEL PROTECTION
- 23. e 20 PR.
GLOVES, NEOPRENE, OUTER PERSONNEL PROTECTION 24 r20 PR.
BOOT COVERS, DISPOSABLE PERSONNEL PROTECTION I
(
l l
l
ATTACllMENT 2 Re: Perry Nuclear Power Plant Source: Ohio Disaster'Gervices hJency Page 2 of 3 4
j PERSONNEL DECONTAMINATION KIT
.lJR1
.QIl 1 TEM DESCRIPTION EE l.
1 EA.
FOOTLOCKER, LOCKABLE KIT / VALUABLES STORAGE 2.
4 EA.
RECEPTACLE, CONTAM. WASTE CONTAM. WASTE 3.
1 ROLL KRAFT PAPER (81000'/ ROLL)
FLOOR COVERING 1
4.
4 SETS CDV-777-1 MONITORING EQUIP.
CON' RAM. DETECTION 5.
10 EA.
RADIATION AREA" SIGNS AREA CONTROL 6.
1 ROLL
" RAD. AREA" BARRIOR TAPE (1000') AREA CONTROL 7,
2 B0xES LINERS, TRASH, 20 GAL (10/B0x)
CONTAM. WASTE 8.
2 BOXES BAGS; ZIPLOCK, QT SIZE (50/ Box)
CONTAM. VALUABLES
)
9.
2 ROLLS
" RAD. MATERAL" LABELS / TAPE CONTAM. WASTE MARKING 10.
1 BOX BLANK LABELS (250/B0x)
VALUABLES MARKING 11.
4 ROLLS MASKING TAPE, 2" KRAFT PAPER TAPE DOWN i
12.
2 BTTL.
PHISODERM SKIN CLEANSING 13.
4 BARS SOAP, BAR, IVORY SKIN CLEANSING
'14, 2 BARS SOAP, BAR, LAVA SKIN CLEANSING 15, 2 BTTL.
SHAMPOO, HAIR HAIR CLEANSING 16, 100 EA.
COTTON SWABS, 0-TIPS BODY CAVITY CLEAtlSING 17, 2 BAGS COTTON BALLS (100/ BAG)
SKIN CLEANSING 18, 2 BOXES COTTON PADS (12/B0x)
INJURY COVERING 19.
2 EA.
SCISSORS, BLUNT END GENERAL USE 20.
2 EA.
TWEEZERS DECON/ GROOMING 21.
2 EA.
FINGERNA!L CLIPPERS DECON/ GROOMING 22.
2 EA.
FINGERNAIL FILES DECON/ GROOMING 23, 10 EA RAZORS, DISPOSABLE SHAVING DECON/ GROOMING 24.
2 CANS SHAVING CREAM DECON/ GROOMING 25, 2 EA.
BRUSH, SURGE 0N'S SOFT BRISTLE DECON/ GROOMING
- 26., 10 EA.
COMB, HAIR DECON/ GROOMING 27.
10 EA.
TOOTHBRUSH DECON/ GROOMING 28.
' 2 TUBES TOOTHPASTE DECON/ GROOMING 29.
2 ROLLS PAPER TOWELS, HAND DECON/ GROOMING I
30.
50 EA.
PAPER TOWELS, SHOWER DECON/ GROOMING
)
Ec: Perry Nuclear Power Plant ATTACIMNT 2 Source: Ohio Disaster Services Agency Page 3 of 3
[
PERSONNEL DECONTAMINATION _ KIT r
JJgg
.QT1 ITEM DESCRIPTION D.SE i
31.
4 PADS WRITING PAPER, LETTER SIZE ADMIN. USE 32.
1 BOX PENS, BLACK (12/ BOX)
ADMIN. USE' l
33.
4 EA.
CLIPBOARE% LETTER SIZE WRITING SURFACE l
34.
250 EA
" RAD. ACCIDENT PATIENT TAGS" CONTAM. RECORD FORM 35, 250 EA.
" PROPERTY RECEIPT FORM" CONTAM. VALUABLE RECE!PT 36.
2 EA.
FLASHLIGHT, D CELL GENERAL USE 37, 12 EA BATTERIES, D CELL FLASHLIGHT 38, 6 EA.
RESPIRATOR, HEPA PERSONNEL PROTECTION 39, 6 EA.
CARTRIDGE, SPARE HEPA PERSONNEL PROTECTION 40.
20 PR.
COVERALLS W/ HOOD, TYVEK PERSONNEL PROTECTION 41, 20 PR.
GLOVES, SURGICAL, INNER PERSONNEL PROTECTION 42, 20 PR.
GLOVES, NEOPRENE, OUTER PERSONNEL PROTECTION 43, 20 PR.
BOOT COVERS, DISPOSABLE PERSONNEL PROTECTION e
8 OCT.11 '8513:01 FD1A REGION V CHICAGO 1 P.01 STATB 0F ONIO ADNTANT 88MEAAL'8 DEPAPTM8N1'.
sans warrenemau aoaa WORnemeWL eMO 480esens DISASTER 55RY1CES AGENCY AG0H-DS-N00 Octotor 11, 1985 Mr. Robert Ehapiro P.E.M.A., Region Y 74 N. Washington 5t.
Battle Creek, MI 49016 h u Bobs the information you requested on SeptemberI have included with thir corr 24, 1985.
trained in the 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> instrtamentation program.The Care Center Listing i
As a minimum, four people per care /Decon Center must receive this training. As you will see, three departments do not have a sufficient number of personnel trained at this time, ne Ashtabula Twp. Fire Department and Middle-field Fire Department are scheduled to participate in the course effered on 7 OCT 85.
course for the Conneaut Fire Department.We are currently in the process of sche This training will be completed prior to November 15, 1985. no column identified as "Decos SOP Trained" shows few people trained to date.
The training course is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in length and includes specific actions to be taken at the care center.
the training schedule shows, each department requiring the course willAs receive it prior to November 15.
Willovick, Newbury and Bainbridge.There are three exceptions; they are You also requested an inventory of supplies available at each care kit and the equipment decontamination kit.I have provided two lists showing bot center.
There will be one of osch of these located at every care center.
The equipment kit will be used for the decontamination of vehielos while the personnel kit will be for use inside the care center for evacueet.
Please note, there may be a change in the quantity of items 21.22, 23'4 24 The ntamber of these items will probably be revised.in the equipment decontamin kit.
been assured that all letters will be signed by November 1, 1985.C I have complete copies of the Geauga County I.etters of Agreement.. Pres 6ntly to have copies of all letters by November 20th and will provide them to you I expect by November 27, 1985.
g OCT.11 '65 13:02 FEMA REGION V CHICAGO 1 P.02 I personally fool that all contentions will be satisfied by aid November.
A tremendous amoent of effort has been put forth by the counties involved and the utility to meet this target date.
If you need additional inforuttion, please give no a es11.
And if any conditions change, I'll let you know.
(/
E1H 2. COLI Nuclear Operations officer KBCipjb Encis: As stated.