Requests Commission Amend 840612 Order to Extend Submittal Date for Dcrdr Summary Rept & Implementation Schedule to 860228.Extension Required for Completion of Final Summary Rept,Schedule Preparation & Internal Review
ML20133J554
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/07/1985
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
JPN-85-62, NUDOCS 8508120057
Download: ML20133J554 (2)


Text

c~

i 123 Main Street Wtute Piams. New Wrk 10001 914 681.6240 I

  1. D NewWrkPbwer C,U";":_,e,,,

4# Authority

~ ~ -

August 7, 1985 JPN-85-62 I

Director of Nuclear Reactor Regulation

]

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B.

Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Detailed Control Room Design Review (DCRDR)

Request for Schedular Extension

References:

1.

NYPA letter, J.

P.

Bayne to D.

B. Vassallo, dated October 24, 1983 (JPN-83-90).

2.

NYPA letter, J.

P.

Bayne to D. B. Vassallo, dated March 28, 1984 (JPN-84-20).

3.

NRC Order dated June 12, 1984 confirms schedule for submittal of DCRDR Summary Report.

Dear Sirs:

The Authority submitted a Program Plan for the FitzPatrick Detailed Control Room Design Review via Reference No.

1.

We also committed to submit a summary report by November 15, 1985.

In Reference No.

2, we amended this commitment to include the submittal of a schedule for implementing the recommendations of the final summary report.

The NRC confirmed this commitment via Order dated June 12, 1984 (Reference No. 3).

The Authority has made a good faith effort to adhere to the 18 month schedule included in our program plan.

However, the Authority cannot meet its November 15, 1985 commitment for several reasons.

When we submitted our program plan, a DCRDR contractor had not been selected.

After reviewing the work scope with the selected DCRDR contractor, we found that we underestimated both the complexity of the work required and the amount of time necessary.

/0OS 8508120057 850BO7 PDR ADOCK 05000333 F

PDR

I n

In addition, as late as one year ago, Authority personnel were still discussing the methodology required for an acceptable task analysis with the NRC staff.

Two months earlier, members of the NRC's Human Factors Engineering Branch met with the BWR Owners Group to discuss the relation between task analysis and Emergency Procedure Guidelines.

Statements made by NRC staff members at these and other meetings held about the same time precipitated changes to our program plan.

By implementing an accelerated schedule, the contractor has committed to complete the DCRDR Summary Report not later than December 31, 1985.

The Authority requires an additional two months to review the summary report and prepare schedules for the completion of any resulting plant modifications.

Therefore, the Authority hereby requests that the Commission amend its June 12, 1984 Order (Reference No. 3) to extend the submittal date for the DCRDR summary report and implementation schedule to February 28, 1986.

This three and one-half month extension is required for completion of the final summary report, schedule preparation and internal Authority review.

If you have any questions regarding this request, please contact Mr. J. A.

Gray, Jr. of my staff.

Very truly yours, John C.

Brons Benior Vice President

,Nuclear Generation cc:

Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 136 Lycoming, NY 13093