Q Ctmmonwrith Edison
') one First National Plaza. Chicago. Ilknois O
O Address Reply to. Post Office Box 767 Chicago, Illinois 60690 July 31, 1985 Mr. James G. Keppler Regional Administrator U.
S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
SUBJECT:
Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-08 Final Report Ventilation Housings and Air Risers NRC Docket Nos. 50-456/457 References (a):
E. D. Swartz letter to J. G. Keppler dated July 18, 1984 (b):
D. H. Smith letter to J. G. Keppler dated October 9, 1984 (c):
D. H. Smith letter to J. G. Keppler dated December 12, 1984.
(o):
D.H. Smith letter to J. G. Keppler dated March 21, 1985.
Dear Mr. Keppler:
References (a), through (d) provided information concerning a deficiency reportable pursuant to 10 CFR 50.55(e) regarding the adequacy of installation and inspection of the quarter-inch liner plates for the Auxiliary Building Ventilation (VA) Exhaust Filter l
Housings, the Unit 1 and 2 Reactor Containment (VP) Fan Cooler Housing, and the Unit 1 and 2 eighty-four inch Return Air Risers at i
our Braidwood Station.
The purpose of this letter is to provide an updated status of the corrective actions taken to resolve this issue.
This letter is considered to be a Final Report.
i Sargent & Lundy's field verification of the VA Exhaust
[
Filter Housings and the Unit 1 VP system (RCFC) housings & risers is complete.
Field verification for the Unit II VP system (RCFC) l housings & risers is on hold to allow concentration of Sargent &
Lundy's manpower on identified Unit 1 field problems.
As-built drawings for the VA and the Unit 1 VP systems have been issued.
Pullman Sheet Metal's documentation review and record reorganization efforts are complete.
Pullman Sheet Metal (PSM) has started configuration / welding quality inspections.
8500090675 850731 AUG 1g PDR ADOCK 05000456 y
S PDR a
4 et 4
The expected completion date for corrective action for the Unit 1 VP system.(RCFC) housings and risers is November 15, 1985.
The completion date for the VA Exhaust Filter Housings is March 1986.
The completion date for Unit 2 VP system (RCFC) housings and risers is expected by Unit 2 Fuel Load.
Please address any questions that you or your staf f may have concerning this matter to this office.
Very truly yours, M
A.D.
osi Nuclear Licensing Administrator
/klj cc:
NRC Resident Inspector - Braidwood Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 0434K c