ML20133J116
| ML20133J116 | |
| Person / Time | |
|---|---|
| Issue date: | 01/14/1997 |
| From: | Orr F NRC (Affiliation Not Assigned) |
| To: | Lyons J NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9701170402 | |
| Download: ML20133J116 (2) | |
Text
.
jpn nic o
[".
4 UNITED STATES NUCLEAR HEGULK. JHY COMMISSION j
k... + pf WASHINGTON. D.C. 2055!M)o01 o
January 14, 1997 MEMORANDUM TO:
James E. Lyons, Acting Chief Reactor Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation th, FROM:
Frank R. Orr Reactor Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE)
DATE AND TIME:
January 15, 1997 10:00 a.m. - COB LOCATION:
ABB-CE Offices 12300 Twinbrook Parkway Suite 330 Rockville, Maryland 20852 PURPOSE:
To discuss ABB-CE's response to the NRC staff's October 1, 1996, request for additional information on ABB-CE's small break loss-of-coolant accident evaluation model topical report (CENPD-137, Supplement 2-P).
PARTICIPANTS:
NRC ABB-CE F. Orr E. Jageler S. Magruder J. Cleary W. Arcieri (Scientech)
N. Lee D. Prelewicz (Scientech)
L. Ward cc w/ att:
See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on h
Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.
However, portions of this staff meeting may be closed to protect ABB-CE proprietary information. Members of the public who wish to attend should contact Stewart Magruder (NRC) at (301) 415-3139, or Ernest Jageler (ABB-CE)
Q at (860) 285-2289.
i g g n;i
- . g 170027 x
9701170402 970114
// A IW q p C PDR TOPRP EMVC-E C
O cc:
Mr. Charles B. Brinkman, Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
Post Office Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. Ian C. Rickard, Director Operations Licensing ABB-Combustion Engineering Nuclear Operations Post Office Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 DISTRTRUTION:
F0rr MChatterton JLyons PDR SMagruder DMatthews PDR Central File NRR Mailroom (012G-18)
ACRS (10)
GPA/PA (02G-5)
Guard Desk (0WFN)
JSouder (T-6D4) (Form 549 goes to this person)
PMNS (T-604)
SRXB R/F NRC PDR OTSB (011E-21)
FMiraglia (012G-18)
AThadani (012G-18)
BSheron (012G-18)
LReyes (012C-18)
DCrutchfield (0llH-21)
Ho a
.V rg lio (08E-2)
$h k Nt I AChaffee (011A-1)
EAdensam (013F-4)
Glainas (070-26)
JZwolinski (014H-3)
OGC-WF1 (05B-18)
' Dross 0(T40-18)4
-