PLEASE NOTE: This letter is being reissued under the same 2NRC Letter Number to correct affadavit.
74 L.
4 5 2NRC-5-093 (412) 787-5141 (412)923-1960 Nuclear Construction Division Telecopy (412) 787-2629 Robinson Plaza. Building 2. Suite 210 Pittsburgh. PA 15205 July 15, 1985 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thomas E. Murley Administrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Gould 480 V Morot Control Centers Significant Deficiency Report No. 84-02, Final Report Gentlemen:
This final report is in reference to the po t ent ially reportable Significant Deficiency relating to the wiring workmanship on the Gould 480 V Motor Control (MCCs).
This item has been reviewed by the BV-2 Senior NRC Res ide nt inspector.
The results of this review have been documented in NRC Ins pe ct ion Report 85-04, dated April 23, 1985, wh ich fo rmally closes the item.
The basis for closure is detailed in the inspection report, but can be summarized as fo l lows.
The co r rect ive ac t ions to remedy the deficiency have been fo rmalized by ins pect ion plan (1.P.)
8.5.5,
" Inspection of Ve ndo r Interal Wiring" and by Appendix N to engineering spec. 2BVS-931, " Workmanship Program fo r Ve ndo r, Internal, Class LE Low Voltage, instrumentation and Control Wiring, Inspection, Acceptance, and Repair / Rework Co nt r o l. "
The program is about 82 percent complete, with scheduled completion set for the the requirements of 10CFR50.55(e), it is anticipated end of June. Pursuant to that this will be the final report on this matter.
DUQUESNE LIGHT COMPANY SUBSCRIBED AND,Sy0RN TO BEFORE ME THIS
/j DAY OF v/Alip-1985.
[
M6&_
By
/
/
Notary Public J././Carey V
SMllLA M. FATTORE. 50 TART PuttlC Vice/ President SWFPINGroti 5080. MAvta COUNTY uY Comul5510N EXPitt$ StPT.16,1985 Member. Peasebania Association of Notaries y3jyjg cc:
Mr. R. DeYoung, Director (3)
Mr. B. K. Singh, Project Manager Mr. G. Walton, NRC Resident Inspector INP0 Records Center NRC Document Control Desk
$[ DQ 2
3
ca.
.4 United States Nuclear Regulatory Commission Dr. Thomas E. Murley Significant Deficiency Report No. 84-02, Final Report Page 2 COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF BEAVER
)
On this
/
day of M
/hc9, before me, a
[ommonw[alth and County, personally appeared Nc,L ory Public in and fo r said J.
J. Carey, who being duly sworn, deposed and said that (1) he is Vice Pres ident of Duquesne Light, (2) he is duty authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.
L udado
/ m
/
Notary Public
$NilLA N.FAITORE IIOTAtf PU8 tlc
$HIPPINSPORT 8000. OfAVER C00mTY Nf C05545560A EAPlefs SEPT.16,1985 5 ember.Pennsylvmie Associationof Notaries