Rev. 1 - 6/4/85 OPERATING DATA REPORT 50-346 DOCKET NO.
DATE June 7, 1985 COMPLETED BY Bilal Sarsour TELEPHONE (419) 249-5000 OPERATING STATUS Davis-Besse Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period:
Anril 1985
- 3. Licensed Thermal Power (MWt):
2772 915
- 4. Nameplate Rating (Gross MWe):
- 5. Desagn Electrical Rating (Net MWe):
906
- 6. Maximum Dependable Capacity (Gross MWe):
904
- 7. Maximum Dependable Capacity (Net MWe):
860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
To obtain an acceptable offset from the Reactor Protection System (RPS) trip setpoints.
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr. to-Date Cumulative g
- 11. Hours in Reporting Period 719 2.879.0 59,184.0
- 12. Number Of Hours Reactor Was Critical 385.7 1,952.8 34,984.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4,014.I 1l
- 14. Hours Generator On-Line 370.1 1.846.0 33,487.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 1.732.5
- 16. Gross Thermal Energy Generated (MWH) 846.236 4,196,587 79,182,009
- 17. Gross Electrical Energy Generated (MWH) 277,850,_,
t.386,654 26,232,998
- 18. Net Electrical Energy Generated (MWH) 253.655 1.284.068 24,574,324
- 19. Unit Service Factor 51.5 64.1 56.6
- 20. Unit Availability Factor 51.5 64.1 59.5
- 21. Unit Capacity Factor (Using MDC Net) 41.0 51.9 48.3
- 22. Unit Capacity Factor (Using DER Net) 38.9 49.2 45.8
- 23. Unit Forced Outage Rate 8.1 1.8 16.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achie$ed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION 8500090544 850607 PDR ADOCK 05000346 PDR N/77)
R