AECM-85-0321, Forwards Grand Gulf Nuclear Station Unit 1 Post-Warranty Run,Operational Readiness Review. Rept Documents Full Compliance W/License Condition 2.C.(4a)

From kanterella
(Redirected from ML20133G666)
Jump to navigation Jump to search

Forwards Grand Gulf Nuclear Station Unit 1 Post-Warranty Run,Operational Readiness Review. Rept Documents Full Compliance W/License Condition 2.C.(4a)
ML20133G666
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/10/1985
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20133G668 List:
References
AECM-85-0321, AECM-85-321, TAC-59910, NUDOCS 8510160073
Download: ML20133G666 (2)


Text

T j

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi M

P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 39215-1640 October 10, 1985 NUOLE AR UCENSING & SAFETY DEPARTMENT U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.

20555 Attention:

Mr. Harold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 File: 0260/L-860.0 Post Warranty Run Operational Readiness Review AECM-85/0321 Mississippi Power 6 Light (MP6L) is submitting the attached report entitled " Grand Gulf Nuclear Station Unit 1 Post Warranty Run Operational Readiness Review" as required by Operating License Condition 2.C.(4a).

The Grand Gulf Nuclear Station (GGNS) warranty run was completed on August 23, 1985. The report documents the Safety Review Committee (SRC) Special Subcommittee's review and evaluation of GCNS Unit 1 operational readiness following completion of the 100-hour warranty run.

The report has been reviewed and endorsed by the full SRC.

The subcommittee conducted the review consistent with the seven areas identified in the 1fcanaa condition. The subcommittee concluded that by observing normal procedural controls, the plant and personnel are ready to continue with commercial operation. MP&L considers that the attached report satisfies the final requirement and documents full compliance with Operating License Condition 2.C.(4a).

Yours truly, f.

L. F. Dale Director 8510160073 851010 MLC/JGC:bms PDR ADOCK 05000416 P

PDR Attachment cc:

(See Next Page)

Ao \\

IW J16AECM85100301 - 1 Member Middle South Utilities System

a AECM-85/0321 Page 2 cc:

Mr. J. B. Richard (w/a)

Mr. O. D. Kingsley, Jr. (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. C. Butcher (w/a)

Mr. James M. Taylor, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 l