ML20133G647

From kanterella
Jump to navigation Jump to search
Requests That Westinghouse Owners Group Technical Rept WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs, Be Withheld from Public Disclosure Pursuant to 10CFR2.790
ML20133G647
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/10/1997
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9701160109
Download: ML20133G647 (4)


Text

_ _ _ _ _. _

_ g--

- ----- - ------ -- [ 3 h i

g l

@ ~ Mi f'"'%,4 l

g UNITED STATES p

l g

j NUCLEAR REGULATORY COMMISSION i

o

'4 WASHINGTON, D.C. 20066-0001 January 10, 1997 i

Mr. Nicholas J. Liparulo

)

Manager of Regulatory &

l Engineering Networks l

Westinghouse Electric Corporation i

P. O. Box 355 l

Pittsburgh, Pennsylvania 15230-0355

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2

)i

Dear Mr. Liparulo:

By letter dated November 26, 1996, Southern Nuclear Operating Company submitted a Westinghouse Owners Group technical report WCAP-14750, "RCS Flow i

Verification Using Elbow Taps at Westinghouse 3-Loop PWRs," for NRC review and approval. By application dated September 26, 1996'(CAW-96-1015), and l

affidavit dated November 15, 1996, you requested that the technical report be withheld from public disclosure pursuant to 10 CFR 2.790.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse j

constitutes a competitive economic advantage over other companies.

2.

The information used by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have S

determined that the submitted information sought to be withheld contains

- 9 proprietary commercial information.

t Therefore, the Westinghouse Owners Group technical report WCAP-14750, "RCS

)([

Flow Verification Using Elbow Taps at Westinghouse 3-Loop PWRs," marked as C

proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need l

arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

i 4

d 9'701160109 970110 f*

hh 4

PDR ADOCK 05000348 I

p PDR

Mr. Nicholas J. Liparulo,

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of-Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, n-Jacob I. Zimmerman, Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc:

See next page Licensee 1

o l

Mr. Nicholas J. Liparulo January 10, 1997 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a' Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Original signed by:

Jacob I. Zimmerman, Project Manager Project Directorate 11-2

^

l Division of Reactor Projects - I/II Office'of Nuclear Reactor Regulation i

Docket Nos. 50-348 and 50-364 uc:

See next page f

Licensee i

DISTRIBUTION Docket File PUBLIC PDII-2 Reading

)

SVarga JZwolinski HBerkow JZimmerman LBerry MPSiemien,0GC t

EMerschoff,RII PSkinner,RII 4

4 hk PDII/fNh 0FFICE PDII-28)t PDII-2/ lad OGC i

NAME J.ZJhERhAN L. BERRY h M.P.SIEMIEN HIERh-

\\Y/

)f0 '/g'6

) / > /99

'// 5 /99 DATE

/ h [ h /96 9

M NO

[ES)N0 N) N0 YES NO COPY S

DOCUMENT NAME:

G:\\FARLEY\\WCPld750. WIT j

OFFICIAL RECORD COPY l

1 4

4

Southern Nuclear Operating Joseph M. Farley Nuclear Plant Company, Inc.

cc:

Mr. R. D. Hill, Jr.

l General Manager -

l Southern Nuclear Operating Company l

Post Office Box 470 Ashford, Alabama 36312 Mr. Mark Aj1 uni, Licensing Manager Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 1710 Sixth Avenue North Birmingham, Alabama 35201 Mr. J. D. Woodard Executive Vice President Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319 Mr. D. N. Morey l

Vice President - Farley Project j

l Southern Nuclear Operating Company Post Office Box 1295 i

j Birmingham, Alabama 35201-1295 l

'