ML20133G368

From kanterella
Jump to navigation Jump to search
Submits Wpps Quarterly Status Rept Re Deferred WNP-1 Project.No Change to Status of Project Since 961002 Status Rept
ML20133G368
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/07/1997
From: Reynolds N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN
To: Bloch P, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#197-18131 OL, NUDOCS 9701160016
Download: ML20133G368 (1)


Text

/gt31 WINSTON & STRAWN 00CKETED USHRC 35 WEST WACKER DRIVE 1400 L STREET, N W.

s. Rue ou CIROUE CHICAGO. ILLINOIS 60001 9703 WASHINGTON. D C. 63502 me NRtS FRANCE

'96 JM 10 PJvu.7AsccurER si trs WATER srREET (202) 371 5700 NEW YORK, NY 10038-4941 RlYADH 11495. SAUDI ARABIA FACSIMILE (202) 3715950 0FFiCf e-e r e.

,m 00ChETidcin'Q!!W@,uND NICHOLAS S. REYNOLDS (202) 371-5717 3;l Ag.]

January 7, 1997 Peter B.

Bloch, Esquire Chairman, Atomic Safety and Licensing Board U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 David R.

Schink Department of Oceanography Texas A&M University College Station, Texas 77843 Subj:

Washington Public Power Supply System (WPPSS Nuclear Project No. 1) Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1993, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System (" Supply System") hereby submits its quarterly status report regarding the deferred WNP-1 project.

There has been no change to the status of the WNP-1 project since our October 2, 1996, status report.

We will keep the Licensing Board apprised of any further developments on this matter.

Sincez ly td '

IiS../eynolds Nichola R

Counse Eor-splicant cc:

Service List 9701160016 970107 PDR ADOCK 05000460 02 G

PDR