ML20133F988

From kanterella
Jump to navigation Jump to search
Forwards Revised Chapter of Fundamental Nuclear Matl Control Plan,Completing Revs Needed to Eliminate Need for Independent Measurements for UF6 Receipts.W/O Encl
ML20133F988
Person / Time
Site: 07000036
Issue date: 09/23/1985
From: Eskridge H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Brown W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
25854, NUDOCS 8510150084
Download: ML20133F988 (1)


Text

'

70- 3 6 m

PDR: LTR. ONLY o

A

RECDVED, J

~

COIWIBUSTION ENGINEERING g

DCT 4 198 3 3 ;9 September 23, 1985

" 6.S.NUCitARREGULATORY CCMMISS10:8 Malls on oni

=

W. B. Brown, Chief Safeguards Material Licensing and International Activities Branch Division of Safeguards, NMSS U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Brown:

Enclosed is a revised chapter of our Fundamental Nuclear Material Control Plan. The revisions were made pursuant to discussions with Mr. Ray Jackson of your staff, and should complete the revisions needed to eliminate the need for independent measurements for UF receipts. The required fee for 6

this change has been paid.

Other minor editorial and updating changes covered by 10 CFR 70.32(c) have also been made.

Substantive changes and new text are denoted by an asterisk in the margin.

Please advise if additional information is required.

Very truly yours, COMBUSTION ENGINEERING, INC.

k s

H. E. Eskridg Mce Supervisor, Nuclear Licensing, 6

usnac 41985 > $ afety and Accountability CT

/eg 9

Enclosure

atygyg7, y

y DOCKET CLERlt R__qL.

MrP/

I' f B510150084 850923 DR ADOCK 070 6

i: Ly((yYl AAAM&

07 sono 345T0/{

Power Systems Post Office Box 107 (314) 937-4691 Combustion Engineenng, Inc.

Highway P (314) 296-5640 Hematite, Missouri 63047

-