ML20133F078

From kanterella
Jump to navigation Jump to search
Corrects Undated Ltr Re Annual Update to Fsar.Date Should Be 851004
ML20133F078
Person / Time
Site: Pilgrim
Issue date: 10/04/1985
From: Harrington W
BOSTON EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
BECO-85-177, NUDOCS 8510100112
Download: ML20133F078 (1)


Text

- -.

CO2 TON EDIDON COMPANY 800 BovLETON STREET BOSTON, M AS S ACHUSETTS D 219 9 wi t.Lt AM O. H AR RIN GTC *4

' s a *.,e = vec s em e s s os a.t

  • ,wc6asa October 4, 1985 6ECo 85-177 Pr. barold R. Denton, Director Office cf Nuclear Reactor Regulation U. S. Nuclear Regalatory Commission Washington, D.

C'.

20555 License DPR-35 Docket 50-293

Reference:

(a)

Boston Edison Company Letter (W. D. Harrington) to NRC (H. R. Denton) dated July 19, 1985

Dear Sir:

In Reference (a) the annual update to the Pilgrim Station Final Safety Analysis Report (FSAR) was transmitted to you in accordance with 10 CFR 50.71 (e).

.A rev!ew of tne updated FSAR has been conducted, and we have discovered that eight.pages were not included in each of the thirteen sets sent to you.

Inis submittal contains one signed original and twelve (12) sets of additional pages.

These pages are part of Reference (a) and shculd be inserted into the F5AR per the enclosed Change Instruction Notice.

Shculd you have any questions, please contact me.

Very truly yours, 1

$Y TFF/ns Attachments

& f,4(}052/ A9WU$

il$

, 3 g g hzaruy a

D J

n n y cm~L

.