Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-289/96-07
ML20133E943
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/06/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: James Knubel
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 9701140009
Download: ML20133E943 (2)


See also: IR 05000289/1996007

Text

..

._

_. ._ _ _.

_ _ _ . _ . _

_ . - _ . . _ - _ _ . - _ . _ . . - . . , . _ _ - _ _ _ . - - . _ . . - _

!

.

.

1

I

!

!

January 6,1997

l

Mr.' James Knubel

I

Vice President and Director, TMI

l

GPU Nuclear Corporation

l

Three Mile Island Nuclear Station

'

P. O. Box 480

Middletown, PA 17057-0191

SUBJECT:

INSPECTION REPORT NO. 50-289/96-07

.

j

Dear Mr. Knubel:

l

This letter refers to your December 24,1996 correspondence, in response to our

'

December 6,1996 letter.

Thank you for informing us of the corrective and preventive actions documented in your

letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Peter W. Eselgroth, Chief

Projects Branch 7

Division of Reactor Projects

Docket No. 50-289

cc: w/o cy of Licensee's Response Letter

J. C. Fornicola, Director, Licensing and Regulatory Affairs

M. J. Ross, Director, Operations and Maintenance

J. S. Wetmore, Manager, TMI Licensing Department

cc: w/cy of Licensee's Response Letter

TMI-Alert (TMIA)

l

E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

Commonwealth of Pennsylvania

i

\\g

9701140009 970106

PDR

ADOCK 05000289

'

G

PDR

hi

-.

-

-

-

-

-

..

._

. _ _

_

_

..

. . _ . _ _ . . _ _ _

. . _ .

_

_

_

_ _ .

_

.

1

.

.

Distribution w/cv of Licensee Resoonse Letter

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC

NRC Resident inspector

,

D. Screnci, PAO

l

P. Eselgroth, DRP

D. Haverkamp, DRP

B. Welling, DRP

C. O'Daniell, DRP

W. Dean, OEDO

J. Norris, PD l-4, NRR

J. Stolz, PD l-4, NRR

R. Correia, NRR

l

l

R. Frahm, Jr., NRR

inspection Program Branch, NRR (IPAS)

.

I

<

DOCUMENT NAME: G:\\ BRANCH 7\\TMl9607.RPY

Ta receive a copy of this document, indicate in the box:

"C" = Copy without attachment / enclosure

"E* = Copy with anachment/ enclosure

"N" = No copy

OFFICE

Rl/DRP

,y

Rl/DRP

/

l

l

l

NAME

PEselgrothlgW

DATE

01/06/97 I

OFFICIAL RECORD COPY

I

l

l

.

.

.

.

j

GPU Nuclear, Inc.

Route 441 South

(

Post Office Box 480

NUCLEAR

M4ddletown. PA 17057 0480

Tel 717-944-7621

.

(717) 948-8005

December 24, 1996

6710-96-2420

U.S. Nuclear Regulatory Commission

Attn: Document Control Desk

'

Washington, DC 20555

l

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50

Docket No. 50-289

Response to Notice of Violation (NOV) 96-07-01

l

Enclosed is the GPU Nuclear response to Notice of Violation 96-07-01 which cited GPU Nuclear

for the failure to comply with the scaffold construction procedure which is considered a violation

of TMI-l Technical Specification 6.8.1.a. Please contact J. Schork, TMI Licensing at (717) 948-

8832 should you have any questions regarding this response.

Sincerely,

'f%

-

J. Knubel

Vice President and Director,TMI

JSS

Enclosures: 1) Notice of Violation 96-07-01

2) Response to Notice of Violation 96-07-01

cc:

Region I Administrator

TMI-l Senior Project Manager

TMI Senior Resident Inspector

lflib!&@O/$5^

.

.

.

,

.

l

Enclosure 1

Page1

.

NOTICE OF VIOLATION

GPU Nuclear Corporation

Docket No. 50-289

'

Three Mile Island Nuclear Station, Unit 1

License No. DPR-50

During an NRC inspection, conducted September 29,1996 - November 18,1996, a violation of

NRC requirements was identified. In accordance with the " General Statement of Policy and

Procedure for NRC Enforcement Actions," NUREG 1600, the violation is listed below:

Technical Specification (TS) 6.8.1 states, in part, that " Written procedures shall be implemented

covering the items referenced in Appendix 'A' of Regulatory Guide 1.33, Revision 2, February

1978. Regulatory Guide 1.33, Appendix ' A', section 9.0 references " Procedures for Performing

Maintenance," that can affect the performance of safety related equipment. Specifically,

corrective maintenance procedure 1440-Y-3," Scaffold Construction / Inspection and Use of

Extension Ladders," section 5.8 states, in part, that " scaffolding shall not be tied off or supported

by pipe hangers or pipe supports without prior engineering evaluation and approval." In addition

section 8.14.2 states, in part, that "if scaffold is constructed inside the protected areas of the plant,'

have operations department sign the scaffold inspection tag verifying that the scaffold will not

i

endanger emergency safeguard system equipment or operation."

Contrary to the above,

1.

On September 29,1996, a scaffold was tied-off and supported by a safety related pipe

support for the nuclear river water system without prior engineering evaluation and

approval.

2.

On November 5.1996, a scaffold was used to lift the motor off of valve MU-V-14A,

inside the protected area, before the operations department reviewed and approved that

the scaffold's final installation would not endanger emergency safeguards equipment.

This is a Severity Level IV violation (Supplement IV).

.

-

.

-, .

.

- - _. --

--

- - - -

. . - -

.. - --

.

.

.

.

,

Enclosure 1

Page 2

l

Pursuant to the provisions of 10 CFR 2.201, GPU Nuclear Corporation is hueby required to

submit a written statement or explanation to the U. S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 70555 with a copy to the Regional Administrator,

Region I, and a copy to the NRC Resident Inspector at the Facility that is the subject of this

Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violation" and should include: (1)

the reason for the violation, or, if contested, the basis for disputing the violation, (2) the

corrective steps that have been taken and the results achieved, (3) the corrective steps that will be

taken to avoid further violations and (4) the date when full compliance will be achieved. Your

response may reference or include previous docketed correspondence,if the correspondence

!

l

adequately addresses the required response. If an adequate reply is not received within the time

l

specified in this Notice, an order or a Demand for Information may be issued as to why the license

should not be modified, suspended, or revoked, or why such other action as may be proper should

l

not be taken. Where good cause is shown, consideration will be given to extending the response

time.

I

Because your response will be placed in the NRC Public Document Room (PDR), to the extent

possible, it should not include any personal privacy, proprietary, or safeguards information so that

it can be placed in the PDR without reaction. However,if you find it necessary to include such

information, you should clearly indicate the , specific information that you desire not to be placed in

the PDR, and provide the legal basis ia support your request for withholding the information from

the public.

Dated at King of Prussia, Pennsylvania

this 6th day of December,1996

l

l-

g

-- - --. . .

-

.

Enclosure 2

Page1

GPU Nucienr Resoonse to the Notice of Violation

GPU Nuclear agrees the violation occurred as stated in the notice of violation.

'

I.

Reason for the Violation

The violation occurred because workers dai not fully carry out their assigned responsibilities in

accordance with Maintenance Procedure 1440-Y-3 Scaffold Construction / Inspection and Use of

Extension Ladders.

In the September 29,1996 event, scaffold erection workers apparently did not recognize that the

pipe support to which the scaffold was secured was a safety-related pipe support. The prohibition

against attaching a scaffold to safety-related components without an engineering evaluation is

clearly addressed in 1440-Y-3. In addition, maintenance scaffold erection personnel are given

initial and continuing training on the requirements for scaffold erection and use. Nonetheless, the

scaffold was erected and attached to a safety-related pipe support. In addition, the Operations

inspection of the scaffold failed to identify that the scaffold was attached to a safety-related pipe

support.

The root cause of the September 29,1996 event was lack of attention to detail on the part of the

workers who erected the scaffold and the Operations personnel who inspected the scaffold.

Specifically, neither the erection crew nor the Operations inspector identified that the scaffold was

secured to a safety-related pipe support.

In the November 5,1996 event, Utility workers erected a scaffold on November 1,1996 in

support of planned maintenance for MU-V-14A, attached a scaffold inspection tag to the scaffold

and then called Plant Operations to get the scaffold inspected. Plant Operations inspected the

scaffold and determined that the scaffold required modification prior to use. Plant Operations was

concerned because a portion of the scaffold was in close proximity to compressed air lines. Plant

Operations informed the on-shift maintenance foreman of the need to have the scaffold modified.

The on-shift maintenance foreman decided to have the scaffold modified by the next day shift

crew. Despite not being approved for use, the scaffold inspection tag remained attached to the

scaffold.

On November 5,1996, Electrical maintenance workers arrived at the scaffold in order to remove

the motor of MU-V-14A. The workers saw the scaffold had an erection tag but they failed to

observe that the scaffold had not been approved by Operations. The crew used the scaffold to

remove the motor for MU-V-14A.

l

The root cause of the use of the MU-V-14A scaffold prior to approval for use by Plant

Operations was the lack of attention to detail on the part of the Electrical maintenance crew.

j

Specifically, the crew failed to adequately review the scaffold inspection tag prior to using the

scaffold.

_ _ _ _

_ .

. _ _ _

_____

. _ _

_

_ __

_ _ _

,

.

. . .

D

l

l

!

l

Enclosure 2

l

Page 2

II.

Corrective Steos That Have Been Taken and the Results Achieved

The scaffold that had been attached to a safety-related pipe support was detached from that pipe

support the same day that the discrepancy was identified by the NRC. The scaffold over MU-V-

14A was inspected by Operations and approved for use the same day that the lack of an

Operations approval signature was identified.

!

(

III.

Corrective Steps That Will be Taken to Avoid Further Violations

Utility and Electrical Maintenance supervision has reviewed each scaffold problem in shop

!

meetings with Utility and Electrical maintenance workers. The procedure requirements were

reviewed and the need to comply with procedures in all aspects was emphasized. In addition,

these events will be incorporated into the next continuing maintenance training cycle on

j

scaffolding as a lessons-learned topic.

'

The September 29,1996 event will be discussed with all Operations Shift Foremen and Shift

l

Supervisors. The need to ensure that scaffolds are not secured to safety-related equipment unless

l

there is an engineering evaluation will be emphasized. In addition, this event will be reviewed for

possible inclusion into the lessons-learned portion of operator requalification training.

!

l

l

IV.

Date of Full Compliance

Full compliance with the requirements of 1440-Y-3 was achieved with the correction of the

violating scaffold conditions.

l

l

/