Text

,t pm af cor.

UNITED STATES

.. p-t NUCLEAR REGULATORY COMMISSION o

g, z

RECloN IV g.

611 RYAN PLAZA DRIVE, SUlTE 400 0

g*.e*#

AR LINGToN, TE XAS 76011 8064 i

JAN 6 1997 A

il Michael B. Sellman, Vice President Operations - Waterford Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

SUBJECT:

SECURITY TRAINING AND QUALIFICATION PLAN REVISION 6 FOR TRANSFER TO HEADQUARTERS j

Dear Mr. Sellman:

This letter acknowledges receipt of your letter dated September 25,1996, which transmitted changes to the Security Training and Qualification Plan for the Waterford 3 Steam Electric Station submitted under the provisions of 10 CFR 50.54(p).

Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approvalis required for some of the changes, in accordance with 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

However, some changes appear to be inconsistent with the criteria of 10 CFR 50.54(p) or involve policy issues and are being referred to our Office of Nuclear Reactor Regulation.

The changes are identified in the enclosure to this letter.

The enclosure to your letter contains proprietary information as specified in 10 CFR 2.790(d)(1) and is being withheld from public disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, without your enclosure, will be placed in the NRC Public Document Room.

Sincerely,

/

Thomas. Gwynn, Director Division of Reactor Sa Docket No. 50-382 License No. NPF-38 9701130095 970106 PDR ADOCK 05000382 F

PDR l

J

s 1

Entergy Operations, Inc. ~

Enclosure:

Changes referred to the Office of Nuclear Reactor Regulation l

cc:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

. P.O. Box 31995 Jackson, Mississippi 39286-1995 l

Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 i

Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director Nuclear Safety

'Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

)

Entergy Operations, Inc. Williarn H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President -

l~

St. Charles Parish P.O. Box 302 l

Hahnville, Louisiana 70057 i

Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.

l Washington, D.C. 20005-3502 i

l l

l l

i j

j Entergy Operations, Inc. I bec to DMB N O

bec distrib. by RIV:

l l

L. J. Callan Resident inspector DRP Director

)

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief DRS/PSB MIS System RIV Docket File Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Elaine Koup (NRR/DRPM/SGB, MS: 011E-22)

8. Manili (NRR/DRPM/SGB, MS: 011 E-22)

NRR/DRPM/PSGB NRR Docket File DRS/PSB Security File (Goines)

RITS Coordinator (Elke) j DRS Al File DRS Al 96-S-OOO6 i

DOCUMENT NAME: G:\\DRSLTRS\\WT96006.REV To receive copy of document. Indicate in box: "C" = Copy without enclos,ures "E" = Copy with enclosures "N" = No copy SPSS:PSB lE C:PSB l,

D:DRS b/s /

l l

a TWDexter:cg T4)

BMurray T)

TPGwynn 9

(/ /

12/3ll96 V2/ Wl9t\\

32.J -f)b7a -7

~

gg 0FFICIAL' RECORD COPY lJ0039 i \\

l l

I Entergy Operations, Inc. j i

bec to DMB (IE53) f bec distrib. by RIV:

L. J. Callan l

Resident inspector DRP Director I

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief DRS/PSB MIS System RIV Docket File Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Elaine Koup (NRR/DRPM/SGB, MS: 011E-22) l B. Manili (NRR/DRPM/SGB, MS: 011 E-22)

NRR/DRPM/PSGB j

NRR Docket File i

DRS/PSB Security File (Goines)

RITS Coordinator (Elko) 1 DRS Al File DRS Al 96-S-0006 N

l i

i i

DOCUMENT NAME: G:\\DRSLTRS\\WT96006.REV To receive copy of docurt.ent, Indicate in box: "C" = Copy without enclos,ures "E" = Copy with enclosures "N" = No copy SPSS:PSB lE C:PSB l,

0:DRS

.aR /

l l

1 TWDexter:cg i'@

BMurray T)

TPGwynn 7 (/ /

12/3l/96 W/ N/98\\ - 12A -/%74 -y gg 0FFICIAL' RECORD COPY i

i ENCLOSURE Chances Referred to the Office of Nuclear Reactor and Reaulation Docket 50-382 Specific words have been highlighted for emphasis only.

TRAINING AND QUAllFICATION PLAN PROPOSED CHANGE:

Item 8 of the licensee's 10 CFR 50.54(p) change to their security training and qualification plan indicated that they have: (1) deleted the handgun qualification course of fire from the plan and stated that the course of fire is described in the security implementing procedure detailing the Security Force Training Program and (2) removed the specific amounts of ammunition available for each weapon and the amounts of ammunition stored on cite for i

each weapon and describes these amounts in security implementing procedures.

REGULATORY REQUIREMENTS:

10 CFR Part 73.55, paragraph (b)(4)(ii) states, "Each licensee shall establish, maintain, and follow an NRC-approved training and qualification plan outlining the processes by which guards, watchmen, armed response persons, and other members of the security organization will be selected, trained, equipped, tested, and qualified to ensure that these individuals meet the requirements of this paragraph.

10 CFR 73.55, paragraph (b)(3)(i) states, in part, that written security procedures document the structure of the security organization and detail the duties of guards, watchmen, and other individuals responsible for security.

10 CFR 73, Appendix B, Section V.A.4.(b) requires the licensee to maintain ammunition available on site at two (2) times the amount required in Section V.A.4(a) of Appendix B for each type of weapon.

GL 95-08, titled: "10 CFR 50.54(p) Process For Changes To Security Plans Without Prior Approval," states, that a change made pursuant to 10 CFR 50-54(p) cannot delete or replace any of the regulatory capabilities as described in paragraphs (b) through (h) of 10 CFR 73.55 or Appendixes B and C of 10 CFR Part 73.

4 i

==

Conclusions:==

A licensee can change security implementing procedures without NRC review or approval. Therefore, (1) licensee weapons training courses can be changed to any course the licensee desires, including no live firing of weapons at all and (2) ammunition may not be maintained at the required inventory.

These changes appeared to be a decrease in the NRC approved Security Training and Qualification Plan and are being referred to the Office of Nuclear Reactor Regulation, for further resolution.

..