ML20133E408

From kanterella
Jump to navigation Jump to search
Responds to Informing That Licensee Certified That Permanently Ceased Operations at Plant & Fuel Has Permanently Offloaded from Reactor
ML20133E408
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/27/1996
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To: Kenyon B
NORTHEAST UTILITIES SERVICE CO.
References
NUDOCS 9701130031
Download: ML20133E408 (3)


Text

_-. ___ _ _ _ _ _ _

! Mr. B. D. Keny:n December 27, 1996 President - Nuclear Grcup Northeast Utilities Service Company  ;

c/o Mr. Terry L. Harpster i Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385 l

SUBJECT:

DOCKETING 0F CERTIFICATION OF PERMANENT CESSATION OF POWER l OPERATION AND REMOVAL OF FUEL FROM REACTOR l

Dear Mr. Kenyon:

In a Deces'er b 5, 1996, letter, the Connecticut Yankee Atomic Power Company certified that (1) it has permanently ceased operations at the Haddam Neck Plant, and (2) the fuel has been permanently offloaded from the reactor.

Your letter was submitted pursuant to 10 CFR 50.82, which states that upon  :

docketing of these certifications, the 10 CFR Part 50 license no longer authorizes operation of the reactor.or emplacement or retention of fuel into the reactor vessel. For your information, this letter was: docketed by the NRC I on December 11, 1996. -

' Sincerely, >

0riginal signed by:

Stephen Dembek, Project Manager Special , Projects Office - Licensing Office of Nuclear Reactor Regulation l

Docket No. 50-213 J

cc w/encls: See next page DISTRIBUTION: i Docket File l PUBLIC  !

SP0 Reading WTravers {

PMcKee SDembek LBerry 0

OGC 1

ACRS JDurr, RI i

[

DOCUMENT NAME: G: O n w....n.em. m \DEMBEK\DECOM.LTR

. w . m m. wn: c . con enui .e.cwnti.new.ur. r co,, with ni)ncio.ur. n - No caey 0FFICE SPO-L:PM , l _

SP0-L:LA h- h SP0-L:DD OGC' C7 lF NAME SDembek / /)w M LBerry V(\/ PMcKeedfl(/n.\f4 em c cefre._

DATE 12//6/96 12/ )'h/96

\

12/9/96 i 12/,;23/96 12/ /96 0FFICIAL RECORD COPY 130011 tBrra* COPY 9701130031 961227 .

.t 3 PDR ADOCK 05000213 P PDR

aus y uq\ UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066H001 e ~!

l

.....+ December 27, 1996  !

l Mr. B. D. Kenyon .

President - Nuclear Group

. Northeast Utilities Service Company c/o Mr. Terry L. Harpster Director - Nuclear Licensing Services P.O. Box 128 Waterford, CT 06385

SUBJECT:

DOCKETING OF CERTIFICATION OF PERMANENT CESSATION OF POWER ,

OPERATION AND REMOVAL OF FUEL FROM REACTOR l

Dear Mr. Kenyon:

]

, In a December 5, 1996, letter,'the Connecticut Yankee Atomic Power i Company certified that (1) it has permanently ceased operations at the Haddam Neck Plant, and (2) the fuel has been permanently offloaded from the reactor.

Your letter was submitted pursuant to 10 CFR 50.82, which states that upon docketing of these certifications, the 10 CFR Part 50 license no longer i

j authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. For your information, this letter was docketed by the NRC l on December 11, 1996.

. Sincerely, Stephen Dembek, Project Manager Special Projects Office - Licensing Office of Nuclear Reactor Regulation Docket No. 50-213 cc w/encls: See next page j

i J

.- Northeast Utilities Service Company Haddam Neck Plant cc:

Lillian M. Cuoco, Esq. Regional Administrator Senior Nuclear Counsel Region I 3 Northeast Utilities Service Company U.S. Nuclear Regulatory Commission ,

P.O. Box 270 475 Allendale Road l Hartford, CT 06141-0270 King of Prussia, PA 19406  !

l Mr. Kevin T. A. McCarthy, Director Board of Selectmen  !

Monitoring and Radiation Division Town Office Building l Department of Environmental Protection Haddam, CT 06438 79 Elm Street Hartford, CT 06106-5127 Resident Inspector Haddam Neck Plant Mr. Allan Johanson, Assistant Director c/o U.S. Nuclear Regulatory Commission Office of Policy and Management 361 Injun Hollow Road l Policy Development and Planning Division East Hampton, CT 06424-3099 80 Washington Street l Hartford, CT 06106 Mr. James S. Robinson '

Manager, Nuclear Investments and Mr. J. J. LaPlatney Administration Haddam Neck Unit Director New England Power Company Connecticut Yankee Atomic Power Company 25 Research Drive 362 Injun Hollow Road Westborough, MA 01582 East Hampton, CT 06424-3099 Mr. G. P. van Noordennen Mr. F. C. Rothen Manager - Nuclear Licensing Vice President - Work Services Northeast Utilities Service Company Northeast Utilities Service Company 362 Injun Hollow Road P. O. Box 128 East Hampton, Connecticut 06424-3099 Waterford, CT 06385 Mr. D. M. Goebel Vice President - Nuclear Oversight Northeast Utilities Service Company P. O. Box 128 Waterford, Connecticut 06385 Mr. J. K. Thayer Recovery Officer, Nuclear Engineering and Support Northeast Utilities Service Company P. O. Box 128 Waterford, Connecticut 06385 Mr. T. C. Feigenbaum Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company P. O. Box 128 Waterford, Connecticut 06385