ML20133D946

From kanterella
Jump to navigation Jump to search
Confirms 850426 Telcon Re Backfilling Number of Excavations of Site.Excavations Left Open Due to Removal of Temporary Freezewall Apparatus Last Fall.M Sinclair Response to Aslab 850423 Order & Svc List Encl
Date released: 05/26/2020 Download: ML20133D946


Response to Aslab 850423 Order.Aslab Should Cancel OL Application & CPs Because Compliance W/Nrc Basic Requirements Not Met
ML20133D948
Person / Time
Site: Midland
Issue date: 05/13/1985
From: Sinclair M
SINCLAIR, M.P.
To:
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
Download: ML20133D948 (7)
Confirms 850426 Telcon Re Backfilling Number of Excavations of Site.Excavations Left Open Due to Removal of Temporary Freezewall Apparatus Last Fall.M Sinclair Response to Aslab 850423 Order & Svc List Encl
ML20133D942
Person / Time
Site: Midland
Issue date: 05/07/1985
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: SHAFER W D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-#385-978
Download: ML20133D942 (6)