ML20133D846

From kanterella
Jump to navigation Jump to search
Forwards Full-Scale Plant Safety & Availability Assessment: Demonstration of Go Sys Analysis Methodology, Vol 1, Plant-Level Models & Vol 2, App - Sys-Level Detailed Models, Final Rept,Per License Condition 2 F
ML20133D846
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/02/1985
From: Shell R
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20133D849 List:
References
NUDOCS 8510090200
Download: ML20133D846 (2)


Text

%. 4 3s TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II October 2, 1985 Director of Nuclear Reactor Regulation Attention:

Ms. E. Adensam, Chief Licensing Branch No. 4

. _ Division of Licensing U.S. Nuclear Regulatory Conunission Washington, D.C.

20555

Dear Ms. Adensam:

In the Matter of

)

Docket ros. 50-327 Tennessee Valley Authority

)

50-328 Operating license condition 2.F for unit 2 of our Sequoyah Nuclear Plant reads as follows:

-TVA will provide a report prepared by the Kaman Sciences Corporation (KSC) on a full scale nuclear safety and availability analysis within

'six months from the date of the KSC report.

As stated in L. M. Mills's March 22, 1983 letter to you, KSC was replaced by Pickard, Lowe, and Garrick, by the Electric Power Research Institute (EPRI),

y to perform the nuclear safety and availability analysis for Sequoyah.

Enclosed are three copies of the required report.

We, therefore, consider this license condition, 2.F for unit 2 at Sequoyah, to be satisfied.

We further request that you provide acknowledgement that this license condition has been satisfied by way of a revision to the operating license. A preferred method for revising the operating license to reflect those license conditions that have been satisfied, has been discussed with the NRC project manager.

Very truly yours, TENNESSEE VALLEY AUTHORITY PE*;*salII*gooeE g,g.JAaf P

R. H. Shell Nuclear Engineer Sworn M a d subscri be ore me

{this J

-day of 1985 Notary Public h

l My Commission Expires

-Enclosure (3) l cc: See page-2 i'

An Equal Opportunity Employer t

i

. Director of Nuclear Reactor Regulation October 2, 1985 cc:

U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Carl Stahle Sequoyah Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 s