Text
OPERATING DATA REPORT Docket No.50-272 Date August 10, 1985 Telephone 935-6000 Completed by J.
P.
Ronafalvy Extension 4455 Operating Status Corrected Copy #2 1.
Unit Name Salem No. 1 Notes 2.
Reporting Period July 1985 3.
Licensed Thermal Power (MWt) 3338 4.
Nameplate Rating (Gross MWe) 1170 5.
Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (Gross MWe) 1124 7.
Maximum Dependable Capacity (Net MWe) 1079 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 5087 70896
- 12. No. of Hrs. Reactor was Critical 744 5069.6 40893.1
- 13. Reactor Reserve Shutdown Hrs.
0 0
3088.4
- 14. Hours Generator On-Line 744 5066.7 39225.3
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (BGGI) 2489858 16856249 119624246
- 17. Gross Elec. Energy Generated (M9GI) 833550 5740870 39656920
- 18. Net Elec. Energy Generated (MWH) 800369 5518268 37616250
- 19. Unit Service Factor 100 99.6 55.3
- 20. Unit Availability Factor 100 99.6 55.3 i
- 21. Unit Capacity Fac tor (using MDC Net) 99.7 100.5 49.2
- 22. Unit Capacity Factor (using DER Net) 98.7 99.5 48.7
- 23. Unit Forced Outage Rate 0
.4 30.2
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 Page of hydOO90192850923 ADOCK 05000272 R
.-