_ .

Georgia Power Company

  • Route 2, Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Cornpany Services, Inc.

Post Office Box 2625 Birrningham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect., ,

October 7, 1985 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Ms. Elinor G. Adensam, Chief Log: GN-713 Licensing Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 REF: GENERIC LETTER 85-06, dated 4/16/85 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENhdATING PLANT - UNITS 1 AND 2 ANTICIPATED TRANSIT tCS WITHOUT SCRAM (ATWS)

Dear Mr. Denton:

The referenced letter established the QA guidance for nonsafety-related ATWS equipment. Current regulation, 10 CFR 50.62(d) requires that each licensee develop. and submit to the Director of the Office of Nuclear Reactor Regulation (NRR) a proposed schedule for meeting the requirements of 10 CFR 50.62(c)(1) through (c)(5) within 180 days after issue of the QA guidance.

Georgia Power Company (GPC) is a member of the Westinghouse Owners ' Group (WOG) which developed a program for an ATWS Mitigating Actuation Circuitry (AMSAC) system that should satisfy the requirements of 10 CFR 50.62. The results of the program were submitted to the NRC by the WOG on July 25, 1985 (WCAP-10858, AMSAC Generic Design Package). In order for GPC to establish a specific installation schedule, an evaluation of each of the AMSAC designs needs to be evaluated in light of the NRC issued SER on WCAP-10858. It is therefore respectfully requested that GPC be allowed to inform you of the VEGP installation schedule to comply with the ATWS rule within 90 days after the SER on WCAP-10858 is issued.

'If your staff requires any additional information, please do not hesitate to contact me.

Sincerely,

.k.

J. A. Bailey Project Licensing Manager ,

f5] g[ 4 A

=

4 Director of Nuclear Reactor Regulation File: X7BC35 October 7, 1985 Log: GN--713 Page 2 JAB /sm

Attachment xc
D.-0. Foster G. Bockhold, Jr.

R. A. Thomas T. Johnson

, J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire L. Fowler M. A. Miller (2) W. C. Ramsey B. Jones Vogtle Project File L. T. Gucwa i