ML20133D008
| ML20133D008 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 09/25/1985 |
| From: | Taylor J DAIRYLAND POWER COOPERATIVE |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20133D011 | List: |
| References | |
| LAC-11167, NUDOCS 8510070560 | |
| Download: ML20133D008 (1) | |
Text
_
,,;, a 1
)
I D DA/RYLAND COOPERAT/VE po BOX 817 2615 EAST AV SOUTH
- L A CROSSE WISCONSIN 54601 i
(60s) 788 4 000 September 25, 1985 4
i
}
In reply, please refer to LAC-11167 ERICRITYRouttuc p
7g utI 4n w
i h)5 2 $fsZ Mr. James G. Keppler, Regional Administrator pgs' f l E 2/ Z U. S. Nuclear Regulatory Commission E
3 Region III FIQ~
799 Roosevelt Road Glen Ellyn, IL 60137 s
SL'3 JECT: DAIRYLAND POWER COOPERATIVE
{
LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45
}
REVISED RADIOACTIVE EFFLUENT REPORT j
FOR THE PERIOD JANUARY THROUGH JUNE 30 1985 l
4 i
Dear Mr. Keppler:
I In accordance with 10 CFR 50,36a(a)(2), this letter serves to transmit to you the Revised Radioactive Effluent Report for the La Crosse Boiling Water Reactor (LACBWR) for the period January 1 through June 30, 1985. This report j
contains the Sr 89/90 results previously not sent.
If you have any additional questions, please contact us.
Sincerely, i
DAIRYLAND POWER COOPERATIVE t
hhotV i
James W. Taylor Cent.ral Manager 4
f FL LLNedh i
Enclosures
' h r
ll I
cc - Mr. James M. Taylor (10 copies) d#.
I Document Control Desk (3 copies)
'f, j
NRC Resident Inspector J
i NRC Project Manager (J. Strang)
.SEP 30 BBS D. Sherman, ANI Library 8510070560 850925 PDR ADOCM 05000409 M
-