ML20133D000
| ML20133D000 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/20/1996 |
| From: | Lieberman J, Satorius M NRC OFFICE OF ENFORCEMENT (OE) |
| To: | |
| References | |
| EA-96-255, EN-96-095, EN-96-95, NUDOCS 9701080165 | |
| Download: ML20133D000 (1) | |
Text
___
December 20, 1996.
)
l EN 96-095 0FFICE OF ENFORCEMENT 4
i NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
Entergy Operations, Inc.
(EA 96-255) 1 Waterford 3 Docket No.
050-382 Sub.iect:
PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty will be issued on or about December 26, 1996, to Entergy Operations, Inc. The l
' action is based on an inspection performed at the licensee's Waterford 3 facility that identified two Severity Level III violations involving the inservice test (IST) program.
The first violation involved the actual design configuration of the containment vacuum relief (CVR) system being different from that described in the plant's Final Safety Analysis Report (FSAR). which resulted in certain valves not being properly tested to ensure they fulfilled the cnotainment isolation function. The second violation involved the failure to promptly evaluate and correct known discrepancies in the IST program.
In accordance with the Enforcement Policy, a base civil penalty in the amount of $50,000 is L
considered for a Severity Level III violation. The staff considered whether the licensee should be given credit for identifying the violation and for its corrective actions. Credit was not warranted for the first Severity Level III violation for the factor of identification, because, although it was eventually identified by the licensee, significant NRC involvement was necessary to prompt the licensee into identifying the issue.
Credit was warranted for the factor of identification in the second violation, because the licensee identified the violation. Credit was warranted for the factor of corrective action for both violations because the licensee's corrective action was considered both prom)t and I
comprehensive.
These considerations resulted in a civil penalty of $50,000 3eing proposed for the first violation and no civil penalty for the second violation.
In addition to these two Severity Level III violations, a third violation involving a failure to follow valve line-up procedures, cited at Severity Level IV is being proposed.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Notice December 26, 1996 Telephone Notification of Licensee December 26, 1996 The State of Louisiana will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC avaluation of the response, the civil penalty may be remitted, mitigated or imposed by 3rder.
Contacts:
M. Satorius, OE. 415-2747 J. Lieberman. OE, 415-2741 i
l ! Distribution 0WFN OWFN _
MN Regional Offices 4
Chairman Jackson EDO OC RI RIV Comm. Rogers DEDR AE00 RII WCF0 P nComm. Dicus DEDS OP CTR RIII
$wgComm. Diaz OE NMSS jd i Comm. McGaffigan 0GC IRM mal lo,,,gI gSECY NRR OIG NUDOCS i OCA 01 RES PUBLIC l
l Sn. I PA SP ACRS IP PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL Ig 33 VERIFICATION THAT LICENSEE HAS RECEIVED ACTION 0800bu.
of,
.