Responds to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. Outlier Resolution Schedule,Provided
ML20133C501
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/31/1996
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9701070201
Download: ML20133C501 (3)


Text

.-

Northern States Power Company Prairio Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089

)

December 31,1996 Generic Letter 87-02 i

U S Nuclear Regulatory Commission t

Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Nos. DPR-42 50-306 DPR-60 Followup Response to Generic Letter 67-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Ooerating Reactors. Unresolved Issue (USD A-46 By letter dated November 20,1995, we submitted to the NRC a Summary Report, as outlined by the SQUG Generic implementation Procedure (GlP). This letter also provided our commitment to an NRC submittal of an outlier resolution schedule within 90 days of the end of the Unit 1 refueling outage. We submitted that schedule by letter dated May 31,1998.

We provided the following schedule:

MECHANICAL AND RELAY OUTLIERS 1

For those outliers where the resolution has been determined to be j}

additional engineering analysis, the required analysis will be completed no later than December 31,1996.

For those outliers where the resolution is a modification, non-outage modifications will be completed no later than December 31,1997.

[]

Unit 1 outage-related modifications will be completed during the

. t refueling outage for Cycle 20 reload scheduled for Spring 1999. Unit 2 outage-related modifications will be completed dunng the refueling outage for Cycle 19 scheduled for Fall 1998.

9701070201 961231 PDR ADOCK 05000282 P

PDR

e USNRC NORTHERN STATES POWER COMPANY December 31,1996 Page 2 OTHER Also identified in the Summary Report, was the issue regarding charging pump speed control. Reviews and evaluations are still being conducted to determine the resolution of this issue. We commit to having a resolution and submitting a schedule of implementation by December 31,1996.

We have completed all analyses as discussed for the mechanical and relay outliers.

The implementation for required modifications will proceed per the schedule as originally outlined. Analysis regarding the charging pump speed control has been performed and the determination made that no changes are necessary.

In this letter we have made no new Nuclear Regulatory Commission commitments.

Please contact Jack ' eveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.

i f)$$

Y Michael D Wadley i

i Plant Manager l

Prairie Island Nuclear Generating Plant 1

c: Regional Administrator - Region Ill, NRC Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg

Attachment:

Affidavit 2

]

i 8702-03. DOC

_. -. ~..

.. - - - ~

4 4

j

.a

{

i i

l UNITED STATES NUCLEAR REGULATORY COMMISSION i

l l

I NORTHERN STATES POWER COMPANY i

ll PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50-282 l

DOCKET NO. 50-306 Response to Generic Letter 87-02, Supplement 1 i

Verification of Seismic Adequacy of Mechanical and Electrical i

i Equipment in Operating Reactors, Unresolved issue (USI) A-46

}

i i

Northem States Power Company, a Minnesota corporation, by this istter dated December 31,1996 l

hereby submits information required by Generic Letter 87-02, Supplement 1 for the Prairie Island Nuclear i

Generating P! ant.

1 This letter contains no restricted or other defense information.

l f

4 1

i NORTHERN STATES POWER COMPANY By Ab LObCH l

j-Michael D Wadley Plant Manager.

j.

Prairie Island Nu Generating Plant l

l r

e-l On this e--

day o OJ before me a notary public in and for j

said County, personally appearsii, Michael D Wadley, Pisnt Manager, Prairie Island Nuclear Generating l

Plant, and being first duty swom acknowledged that he is authorized to execute this document on behalf of Northem States Power Company, that he knows the contents thereo, and that to the best of his

- knowledge, inf n, and belief statemen made in it are true and that it is not interposed for delay.

i Ohd (2, lyto

^

w l

' = = : = = = = :: = :::: :::e l

L%RCIA K. LaCORE f:0TARYMJ8UC W!!MMA OlNEP9f COUf47Y I'y C=.J:elos Ex;dras J:n,31,220 l !

l wswswAMrww...v::. :':::::: ;

}

i t

w--+mr

.--e

.=

w

  • e ww e-m yr 7 -'

t-

+*e--

- +

r-

~

~

T w

e

  • ?