ML20133B966

From kanterella
Jump to navigation Jump to search
Licensed Operating Reactors Status Summary Report.Data as of July 31,1985.(Gray Book I)
ML20133B966
Person / Time
Issue date: 09/30/1985
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0020, NUREG-0020-V09-N08, NUREG-20, NUREG-20-V9-N8, NUDOCS 8510070175
Download: ML20133B966 (440)


Text

{{#Wiki_filter:- _ - - - - - - ___-- _ __ - - - - - ---- _ - - - - _ _ - . - l NUREG-0020

Vol. 9, No. 8 l August 1985 i

i ! LICENSED OPERATING REACTORS - t STATUS

SUMMARY

REPORT l DATA AS OF 07-31-85 i 1 l l } i I UNITED STATES NUCLEAR REGULATORY COMMISSION

       /                      "'*   8510070175 850930 20 R                         PDR o*                            E i
                                /                                                                                                                                    '

i

7 Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Of fice Washington, D. C. 20402 A year's subscription consists of 12 issues for this publication. Single copies of this publication are available from National Technical } Information Service, Springfield, VA 22161 Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C. 20555 O

i NUREG-0020 1 Vd. 9, No. 8 l August 1985 j i

;             LICENSED OPERATING REACTORS l

i STATUS

SUMMARY

REPORT

DATA AS OF 0731-85 i

l Manuscript Completed: September 1985 , Date Published: September 1985 j 0FFICE OF RESOURCE MANAtiEMENT j U.S. NUCLEAR REGULATORY COMMIS$10N

WASHINGTON, D.C. 20555
t I

F

                      )

I, t r f 1 I 1

                                                                                                                                                                                                                                                             'I 4                                                                                                                                                                                                                                                               ,

l- i i l 1 AUTHORIZATION AND CLEARANCE I

2 The U.S. Nuclear Regulatory Commission's Office of Resource Management publishes this month status report "as part of the '

reporting requirements in Section 50.36 of 10 CFR Part 50 under . CAO Clearance Number B-180225, with an expiration date of September 30, 1981 " as stated in the October 3, 1978 letter from John M. Lovelady Assistant Director, General Covernment Division. U.S. General Accounting Office, to J.M. Felton, Director Division [ of Rules and Records, U.S. Nuclear Regulatory Commission  ; ) i i i l l

  • Extended to September 30,1985 by OMB Directive 3150-0011.

1' i I i i i

)

i i l l I i 4 p I i l

STATEMENT OF PURPOSE The U.S. Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data en the operation of nuclear units as timely and accurately as possible. This information is collected by one O f fice of fl eiou rc e M enessaiens, te am the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data ccncerning operation of the units is provided by the utility operators less than two weeks af ter the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from prewtously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices. IE Head-Quarters and the Utilities; and the third section i s an appendix for miscellaneous information such as spent fuel storage capability, reactor years of esperience and non power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the ve.* dor capacity factors on page 1-7, and actual vs. notential energy producticn on Page 1-2 are computed using actual data for the period

        ,f consideration. The percentages listed in power generation on Page 1-2 are computed as an arithmetic averago.             The factors for the life-span of each unit (the " Cumulative" coluen) are reported by the utility and are not entire 13 re-cceputed by NRC. Utility power production data is checked for consistency with previously submitted statistics.

It is hoped this status report proves informative and helpful to all agencies and individuals interested in analyzing trends in the nuclear I industry which might have safety impitcations, or in maintaining an awareness of the U.S. energy situation as a whole.

i i TABLE OF C 0 N T E C) T 5 a i i PAGE GLOSSARY 11 } INDEX TO LICENSED UNITS wil i

I a

1 SECTION 1 - CURRENT DATA SUMMARIES f l MONTHLY HIGMLIGHTS OF COMMERCIAL NUCLEAR POWER UNITS t-2 f Licensed Power Reactors 1-2 Power Generation t-2 Actual vs. Potential Energy Production 1-2 , Outage Data e-z  ! Reasons for Shutdown 1-3 ' ] Derated Units 1-3 i Shutdowns Greater Than 72 Hours Each 1-3 ) UNIT AVAILABILITY, CAPACITY, AND FORCED OUTAGE RATE PLOT t-4 l ] AVERAGE DAILY POWER LEVEL FOR ALL COMMERCIAL OPERATING UNITS 1-5  ; AVERAGE CAPACITY FACTORS BY VENDOR Vendor Plot 1-6 Statistics 1-7 I ( MEMORANDA - SPECIAL INFORMATION 1-4 I l ERRATA - CORRECTIONS TO PREVIOUSLY REPORTED DATA 1-9 SECTION 2 - OPERATING POWER REACTORS ARKANSAS 1 THROUGH ZION 2 2432Wwogpt 2410 1 I For each reactor > Operating Status f 4 Average Daily Pewer Level (MWe) Plot Unit Shutdowns /Redections Summary i Facility Data Inspection Status i Licensee Reports i [ SECTION 3 - APPENDIY i STATUS OF SPENT FUEL STCRAGE CAPASILITY 3-2 REACTOR-YEARS OF OPERATION 3-4 i NON-PCWER REACTORS IN THE U.S. 3-5 i i  ! i i l I PAGE i  ! 1 - I

GL055ARY CVERAGE DAILY POWER LEVEL The not electrical energy generated during the (MWe) day (measured from 0008 to 2400 hours inclusive) in megawatts hours, divided by 24 *iaurs. LICENSED THERMAL POWER The maximum thermal power of the reactor authorized (MWt) by the HRC, expressed in megawatts. DATE OF COMMERCIAL OPERATION Date unit was declared by utility owner to be available for the regular production of electricity; usually related to satisfactory completion of qualification tests as specified in the purchase I contract and to accounting policies and practicas of utility. DESICM ELECTRICAL RATING The nominal net electrical output of the unit (DER) (HET MWe) specified by the utility and used for the purpose of plant design. FORCED OUTAGE An outage required to be initiated no later than

!                                                                   the weekend following discovery of an offnormal condition.

l FORCED CUTAGE HOURS The clock hours during the report period that a unit is unavailable due to forced outages. GROSS ELECTRICAL ENERGY Electrical output of the unit during the report GENERATED (MWH) period as measured at tFe output terminals of the turbine generator, in megawatts hours. GROSS HOURS The clock hours from the beginning of a specified i situation until its end. For outage durations, the clock hours during which the unit is not in power production. GROSS THERMAL ENERGY GENERATED The thermal energy produced by the unit during the (MWH) report period as measured or computed by the licensee in megawatt hours. HOURS GENERATOR ON-LINE Also, " Unit Service Hours." The total clock hours in the report period during which the unit operated with breakers closed to the station bus. These hours added to the total outage hours experienced by the unit during the report period, shall equal the hours in the report period. HIURS IN REPORTING PERIOD For units in power ascension at the end of the period, the gross hours from the beginning of the period or i the first electrical production, whichever comes last, I to the end of the period. I For units in commercial operation at the end of the i period, the gross hours from the beginning of the period or of commercial operations whichever comes last, to the end of the period cr decommissioning, whichever comes first. i PAGE il

GLD55ARY (continued) HOURS REACTOR CRITICAL The total clock hours in the report period during which the reactor sustained a controlled chain reaction. MAXIMUM DEPENDASLE CAPACITY Dependable main unit gross capacity, winter or summer, (GROSS) (M3C Gross) (Gross MWe) whichever is smaller. The dependable capacity varies because the unit efficiency varies during the year due to cooling water temperature variations. It is the gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions (usually summer). MAXIMUM DEPENDABLE CAPACITY Maximum Dependable Capacity (Gross) less the normal (NET) (MDC Net) (Net MWe) station service loads. CAMEPL ATE RATING The nameplate power designation of the generator in (Gross MWe) segavoit amperes (MVA) times the nameplate power factor of the generator. NOTE: The nameplate rating of the generator may not be indicative of the maximum or dependable capacity, since some other item of equipment of a lesser rating (e.g., turbine) may limit unit output. , CET ELECTRICAL ENERGY GENERATED Gross electrical output of the unit measured at the output terminals of the turbine generator during the reporting period, minus the normal station service electrical energy utilization. If this quantity is less than zero, a negative number should be recorded. , DUTAGE A situaticn in which no electrical production takes place. CUTAGE DATE As reported on Appendix D of Reg. Guide 1.16, the date of the start of the outage. If continued from a previous minth, report the same outage date but change " Method of Shutting Dawn Reactor" to "4 (continuations)" and add a no.a: " Continued from previous month." CUTAGE DURATICN The Total clock hours of the outage measured from the beginning of the report period or the outage, whichever comes last, to the end of the report period I or the outage, whichever comes first. i QUTAGE NUM3ER A number unique to the outage assigned by the licensee. ' The same number is reported each month in which the outage is in progress. One format is "76-05" for the

                                                                  *ITLh outage to occur in 1975.

PERIOD HCURS See " Hours in Reporting Period.' ' PCWER REDUCTICN A reduction in the Average Daily Power Level of more r than 20% from the previous day. All power reductions are defined as outage of zero hours durations for the purpose of coeputing unit service and availability factors, and forced outage rate. PAGE ill

i GL0$$ARY (esntinued) REACTOR AVAILABLE HOURS The Total clock hours in the report period during which the reactor was critical or was capable of being made critical. (Reactor Reserve Shutdown Hours + Hours Reactor Critical.) REACTOR AVAILABILITY FACTOR Reactor available Hours w 100 Period Hours REACTOR RESERVE SHUTDCWN The cessation of criticality in the reactor for administrative or other sim61ar reasons when operation could have been continued. [ REACTOR RESERVE SHUTDOWN HOURS The total clock hours in the report period that t the reactor is in reserve shutdown mode. HOTE No credit is given for NRC imposed shutdowns. i REACTCR SERVICE FACTOR Hours teactor Critical x 100 1 Period Hours I REPORT PERICD Usually, the preceding calender month. Can also be the preceding calend.e year. (Year-to-Date), or the life span of a unit (cumulative). , 1 RESTRICTED PCWER LEVEL Maximum net electrical generation to which the unit L is restricted during the report period due to the i state of equipment, external conditions, administrative reasons, or a direction by NRC. SCHEDULED OUTAGE Planned removal of a unit from service for refueling, inspection, training, or maintenance. Those outages which do not fit the definition of " Forced Outage" perforce are " Scheduled Outages." STARTUP AND PCWER ASCENSICM Period following initial criticality during which the TEST PHASE unit is tested at successively higher levels, culmin-ating with operation at full power for a sustained period and completion of warranty runs. Following this phase, the utility generally considers the unit to be available for commercial operation. UNIT The set of equipment uniquely associated with the i reactor, including turbine generators. and ancillary equipment, considered as a single electrical energy , production facility. + j UNIT AVAILABLE HOURS The total cicek hours in the report period during which the unit operated on-line or was capable of such operation. (Unit Reserve Shutdown Hours + Hours Generator On-Line.) PAGE iv i

l [ GL055ARY (continued) i UNIT AVAILABILITY FACTOR Unit Available Hours w 100 Period Hours UNIT CAPACITY FACTORS i

           - Using Licensed Thermal Power Gross Thermal Enerow Generated w 100 Period Hours x Lic. Thermal Power
           - Using Mameplate Rating                                                  Gross Electrical Enerov Generated w 100                                                                                                            !

Period Hours x Mameplate Rating

           - Using DEP                                                               Net Electrical Enerav Generated w 100                                                                                                              i Period Hours x DER                                                                                                                             i
           - Using MDC Gross                                                         Gross Electrical Enerow Generated w 100                                                                                                            r Period Hours x MDC Gross
           - Using MDC Met                                                           Net Electrical Enerav Generated w 100                                                                                                              f Persod Hours x MDC Met NOTEa if MDC GROSS and/or MDC NET have not been determined. the DER is                                                                                                                                                           !

substituted for this quantity for Unit Capacity Factor calculations. [ UNIT FORCEO DUTAGE RATE Forced Outaae Hours unst Service Hours + forced Outage Hours [ f UNIT RESERVE SHUTDOWN The removal of the unit from ori-Iine operation for economic or other similar - reasons when operation could have been  ! continued. UNIT RESERVE SHUTDOWN HOUR $ The total clock hours in the report [ period during which the unit was in reserve 6 shutdown mode. - I UNIT SERVICE FACTOR Unit Service Hours w 100 [ Period Hours I I UNIT SERVICE HOURS See " Hours Generator On-Line."  ; i o I NOTF: At the end of each statement in the Enforcement Summary for any given facility msy be found numbers = in parentheses. These numbers are related to the ;.wuen, e4 8111 (the 11th inspection of the plant in 1981); and the severity level, et 4 (severity level IV). Violations are ranked by severity levels from [ l through V writh level I being the most serious. The severity level is used i s the determination of any resutteg enforcement action. Gray Book lists severity level by Arabic numbers corresponding to the Roman numerals. Details on the various severity levels and enforcement actions can be found in Appendix C to l 13 CFR Part 2 publahed in the Federal Register of March 9.1982 pages 9987 through 9995, and as corsocaed April 14.1982. PAGE v i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . . . . _ . _ _ _ _ _ _ _ -.__.___.______________m _ _ - _ _ . . _ l INDEX TO OPERATING POWER REACTORS PAGE PAGE

,                                                  ARKANSAS 1                                                          2-002                        NINE MILE POINT 1                                                    2-202 1

AREA 8BSAS 2 2-006 NORTH ANNA 1 2-206 BEAVER VALLEY 1 2-012 NORTH ANNA 2 2-210 BIG ROCK POINT 1 2-016 OCONEE 1 2-214 BRetess FERRY 1 2-020 OCONEE 2 2-220 BRetetS FERRY 2 2-026 OCONEE 3 2-224 i BRetetS FERRY 3 2-032 OYSTER CREEK 1 2-228 BRUIRSWICK 1 2-038 PALISADES 2-232 BRUIISMICK 2 2-042 PALO VERDE 1 2-236 BYROM 1 2-046 PEACH BOTTOM 2 2-242 CALLAMAY 1 2-052 PEACH BOTTOM 3 2-246 0 CALVERT CLIFFS 1 2-056 PILGRIM 1 2-250 CALVERT CLIFFS 2 2-060 POINT BEACH 1 2-254 , CATAMBA 1 2-064 POINT BEACH 2 2-260

!                                                  COOK 1                                                              2-070                        PRAIRIE ISLAND 1                                                      2-264 4

COOK 2 2-074 PRAIRIE ISLAND 2 2-270 COOPER STATI0tt 2-078 OUAD CITIES 1 2-274 CRYSTAL RIVER 3 2-082 GUAD CITIES 2 2-278 BAVIS-BESSE 1 2-088 RANCHO SECO 1 2-282 BIABLO CAtlYOtt 1 2-092 ROBINSON 2 2-288 BRESSEN 2 2-098 SALEM 1 2-292 BRESSEN 3 2-102 SALEM 2 2-296 j asamar AR900LB 2-106 SAN ONOFRE 1 2-300

,                                                   FARLEY 1                                                           2-110                        SAN ONOFRE 2                                                          2-306

! FARLEY 2 2-114 SAN ONOFRE 3 2-312 i FITZPATRICK 2-118 SE000YAH 1 2-318 4 FORT CALHOUII 1 2-122 SE000YAH 2 2-324 4 FORT ST VRAIN 2-126 ST LUCIE 1 2-330 GIIONA 2-130 ST LUCIE 2 2-334 j GRAND GULF 1 2-134 SUfetER 1 2-338 4 MABBAM 80ECK 2-138 SURRY 1 2-342 } MATCM 1 2-142 SURRY 2 2-348 NATCM 2 2-146 $USOUEHANNA 1 2-352 INDIAN POINT 2 2-150 SUSOUEHANNA 2 2-356 INDIAN POINT 3 2-154 THREE MILE ISLAND 1 2-360 t KEMAustEE 2-158 TROJAN 2-364 i LA CROSSE 2-16 2 TURKEY POINT 3 2-368

LASALLE 1 2-166 TURKEY POINT 4 2-374 I

LASALLE 2 2-170 VERMONT YANKEE 1 2-380 LIMERICK 1 2-174 MASHINGTON NUCLEAR 2 2-384 Malt 6E YAteKEE 2-178 HATERFORD 3 2-390 MCGUIRE 1 2-182 NOLF CREEK 1 2-394 9tCGUIRE 2 2-186 YANKEE-ROME 1 2-398 MILLST000E 1 2-190 ZION 1 2-402 MILLST000E 2 2-194 ZION 2 2-406 1 MOIITICELLO 2-198 1 4 i l PAGE vil

l l l i 1  ? i i SECTION 1 , 1 I ' i s l i  : i i i i \ \ l 'l l ! CURRENT l I i DATA t r 4 I SUMMARIES l t L 1 l 1 I i l  ! ! I i i i (

M0NTHLY HIOMLIOHTS nummaanusammana 46 IN C0000ERCIAL OPERATION . . . . . . . . . . 69,750 CAPACITY MNe (Net) - Based upon maximum dependable u LICENSEB u (a) 5 IN PONER ASCENSION. . . . . . . . . . . . 5.771- capacitys design elec. ratino u PONER u - used if MDC not determined u REACTORS E (b) 91 LICENSED TO OPERATE . . . . . . . . . . . . 75.521 TOTAL munemannenmuunu (c) 3 LICENSEB FOR FUEL LOADING ANS LON PONER TESTINO I MBC leet DER DATE DER (a) BYRON 1 . . . 1120 ( b) Excludes these plants 1. DRESDEN 1...... 200 (c) DI ABLO CANYON 2 . 04/26/85 . 1106 WATERFORD 3 .... 1104 licensed for operation 2. HUMBOLDT SAY. . . . 6 5 LIME RICK 1 . . . . . . . . 10/26/84 . 1065 PALO VERDE 1 .... 1304 which are shut down 3. TMI 2.......... 906 SHOREHAM . . . . . . . 07/03/85 .. 820

.i                    WOLF CRE EK 1                              ....          indefinitely EhAMX) FERA012 ... 1150                          10g3 REPORT MONTH                          PREVIOUS MONTH     YEAR-TO-DATE mannumammusumuu                                        1. OROSS ELECTRICAL (fedME) . . .. . . .                               . .          35,782,384                           30,562,896         221,445,702 m           PONER                              u      2. NET ELECTRICAL (IGdHE). . . . . . . . . . . 34,015,153                                                                 29,032,999         210,815,935 m GEhERATION u                                        3. AVG. UIIIT SERVICE FACTOR (2). . . . . . . .                                                 75.1                          68.0                      68.8 mannummunnenunu                                       4. AVG. UIIIT AVAILABILITY FACTOR (x) . . . . .                                                 75.1                          68.6                      69.2
5. AVG. UIIIT CAPACITY FACTOR (MDC) (x) 68.1 63.5 64.3
6. AVG. UIIIT CAPACITY FACTOR (DER) (x) . . .. .. . . 66.5 61.9 62.6
7. FORCEB OUTAGE RATE (x). . . . . . . . . . . 10.7 10.2 9.6 x 0F POTENTIAL PRODUCTION numanuenummunum 1. ENERGY ACTUALLY PRODUCED DURING THIS REPORT PERIOD. . . 34,015,153 NET 65.5 m ACTUAL VS. m u POTENTIAL a 2. ENERGY NOT PRODUCED DUE TO SCHEDULED OUTAGES (NET). . . . 8,426,354 MNHe 16.2 m ENERGY u u PRODUCTIOIf u 3. ENERGY NOT PRODUCED DUE TO FORCED OUTAGES (NET) . . . . . 5,665,844 PG4He 10.9 musumauemmununu
4. EIIERGY NOT PRODUCED FOR OTHER REASONS (NET) .. . . . . . 3,786,650 MNHe 7.3

. POTENTIAL EIBERGY PRODUCTIOsl IN THIS PERIOD BY UNITS IN C0fstERCIAL OPERATION 51,894,000 MNHe 100.0x TOTAL (Using Maximum Dependable Capacity Net)

5. EIIERGY NOT PRODUCED DUE TO NRC-REGUIRED OUTAGES . . . . . 714,488 MNHe
6. ENERGY IIOT PRODUCED DUE TO NRC RESTRICTED POWER LEVELS. . ....... MNHe 0 UNIT (S) NITH NRC RESTRICTION ____

PERCENT OF pedHE LOST unenmusmanaamme NUMBER HOURS CLOCK TIME PRODUCTION u OUTAGE u 1. FORCEB 8.7*.GES BURING REPORT PERIOD . . . . 53 6,564.4 10.3 5,665,844 u BATA a 2. SchEDULEB OUTAGES DURING REPORT PERIOD. . . 25 9,395.6 14.7 8,426,354 3 muumanaammuseau --- --- TOTAL 78 15,960.0 24.9 14,092,197 feeIE LOST PRODUCTIOII = Boesn time X maximum dependable capacity not Report Period JtfL 1985 PAGE 1-2 1 i i

i j l. I f , MJNTHLY HIGHLIGHT $ , I l NUMBER HOURS LOST ' neuuuuuuuuuuuum A - Equipme.it Failure . . . . . . . ... . . . . 42 4,705.8 u REASONS u 5 - Maintenance or Test . . . . . . . . . . . . . to 672.3 i D FOR u C - Refueling . . . . . . . . . . . .. . . . . . 15 8.518.3 E SHUTDOWNS u D - Regulatory Restriction. . . . . . . . . . . . 2 965.2 , n=muuuuuuuuuuuu E - Operator Training & License Examination . . . 0 0.0 > F - Administratlwo. . .. . . . . . . . . . . . . t 744.0 0 - Operational Error . . . . . . . . . . . . . . 6 299.2 M - Other . . . . . . . . . . . . . . . . . . . . 2 62.2 , I TOTAL 78 15,960.0

cumuuuuuuuuuuum MDC (MWe Nat) POWERLIMITkMWeNet) ThPE I

n DERATED u FORT ST VRAIN 330 280 Self-imposed

  • i n UNITS u SAN ONOFRE t 436 390 Self-imposed  !

n=uuuuuuuuuuuum NASHINGTON NUCLEARu u00 775 Self-imposed t i i numannusunuuunu UNIT REASDN UNIT REASON UNIT R EASON UNIT REASON ' u SHUTDOWNS u BROWNS FERRY t C BROWNS CERRY 2 C BROWNS FERRY 3 F BRUNSWICK 1 C i a GREATER u CALVERT CLIFFS 1 C CALVERT CLIFFS 2 A COOK 1 C COOK 2 A 1 u THAN 72 HRS u COOPER STATION C CRYSTAL RIVER 3 C DAVIS-BESSE 1 A DUANE ARNOLD C J n EACM u FORT ST VRAIN A,G HATCH 1 A INDIAN POINT 3 C LASALLE 1 A

,                         ununumuuunununu LASALLE 2                                               B      MCGUIRE 2                                                     A           MILLSTONE 2                               A,C    NORTH ANNA 2                                         A
.                                              OCONEE 2                                           A      OYSTER CREEK 1                                                D           PEACH BOTTOM 2                            C      PEACH BOTTOM 3                                       C 7

RANCHO SECO 1 C SALEM 2 A SEQUOYAH 1 A SUSQUEHANNA 2 A i THREE MILE ISLAND 1 D TROJAN A,C TURKEY POINT 3 A,C 1 1 i  ! I i l I j i I I .1 j i Report Period JUL 1985 PAGE 1-3 [ { i t

Unit Availability, Capacity, Forced Dutage Avg. thit PW as of 87-31-85 Pe e 15 Avetlability Footer 5 - 5 - Capacity ' Footer 00 0 3 - S g / \ f % > % f/\f/\/ #

 ~
      ,,,,                       E g /

y' Footer GE3D Fad I - Dutogo Ret.

                  =

m _ gg

                                                                                                .N,           -% y-                   .         -N e             i             .     .       .i,.,,,

g i i e i i i JAN APR Jlt DCT JAN APR Jll DCT JAN APR Jll OCT JAN APR Jtt OCT JAN APR Jlt JAN 1981-Jtt 1985 Report Period JUL 1985 PAGE 1-4 1

AVERAGE DAILY POWER LEVEL FOR ALL COMMERCIALLY OPERATING UNITS R. sun r noc - 6s750 (100x) Ri .g Thio chart depicts the average daily power level for I' the units in commercial operation during the month. The ctraight line on the graph labelled " SUM OF MDC" -- S - 10 pistted at the value shown by summing the separate @] maximum dependable capacities of the commercially 25 - epercting units (in Het MWe). The plot shown below at E- -E the line is calculated by summing the separate average daily power levels of the same units for each day of yj ', o the month. I S-The scale on the left vertical axis runs in 1,000 h5 gq MHe increments from 0 to 55,00C MHe (Net). The right 10% increments, verticci axisofshows up to 100% the "S'JM the Ohercentage MDC". in g3 LJ E; "E c3 H . o It thould be reco ized that the 100% line would be - c.btaincble only i all of the commercially operating w Z N1 unito coerated at 100% capacity, 24 hours per day, for hl the entire month. A other words, since any power generotor must occaelonally shut down to refuel and/or gg R-perf:rm needed maintenance, and also since 100% 3- .g c pacity production is not always required by power demaxda, the 100% line is a theoretical goal and not F* R - o prcctical one. hl 5$ N1 H o p m.

                                                                                        ~.                                               .g S

m-O , , , , , , O O 5 10 15 20 25 30 DAYS JA.Y 1985 Report Period JUL 1985 PAGE 1-5

Vendor Average Capacity Factors Ao 0F 87-31-95 Percent, 15 h1 Electeto 98 -

                                 ,      y / ' / 's\          -

s

                                                         . __  ~.

M $ % - --- 8 Viloon *]g .

                                               /
                                                                        '~~,     s  '   N N                          y / , / y. _/./' -- - - ,
                                                                 /\
                                                                          %                ~~    N *-- ---. 4,', y 5      -
                                                    /
                                                                             \                   ~N/                A M41on Engineering
                                                                                                              /          \

N ___ _ _ _ _ s m s 4 - Westinghouse 5 - 3 _ 18 - g . . i i i . DEC JAN FEB MR APR MAY Jim Jtt Jll 1985 NOTE: This display of average capacity factors provides a general performance comparison of plants supplied by the four nuclear tteam supply system vendors. One must be careful when drawing conclusions regarding the reasons for the performance levels indicated, included forsinceeach plant vendors performance (2) turbinemay be affected

                                                          / generators     by(unspecified and                factors such
3) different architect as s (1) are
                                                                                                        / engineers various plant designs and models are also involved.

Report Period JUL 1985 PAGE 1-6 i

AVERAGE CAPACITY FACT 0RS BY VEND 0RS unununununununu CFMDC CFMDC CFMDC CFMDC u GENERAL u 0.0 BROWNS FERRY 1 0.0 BROWNS FERRY 2 0.0 BROHNS FERRY 3 0.0 BRUNSHICK 1 m ELECTRIC u 83.6 BRUNSHICK 2 0.0 C00.*ER STATION 88.6 DRESDEN 2 87.2 DRESDEN 3 unnuunununununu 16.4 DUANE ARNOLD 85.1 FITZPATRICK 78.3 GRAND GULF 1 70.8 HATCH 1 100.8 HATCH 2 32.3 Lt.SALLE 1 18.4 LASALLE 2 96.7 MILLSTONE 1 94.6 MONTICELLO 95.4 HINE MILE POINT 1 56.5 OYSTER CREEK 1 24.8 PEACH BCTTOM 2 28.1 PEACH BOTTOM 3 96.9 PILGRIM 1 93.9. QUAD CITIES 1 96.2 QUAD CITIES 2 98.5 SUSQUEHANNA 1 73.9 S0SQUEHANNA 2 90.8 VERMONT YANKEE 1 45.2 HASHINGTON NUCLEARu

                                                                         .___ _                                            __--. ._==                                                                      __ -- ___                              _

unuunnunuuununu CFMDC CFMDC CFMDC CFMDC u BAPCOCK & u 97.0 ARKANSAS 1 0.0 CEYSTAL RIVER 3 0.0 DAVIS-EESSE 1 95.0 DCONEE 1 m HILCOX u 63.3 OCONEE 2 78.2 OCONEE 3 0.0 RANCHO SECO 1 0.0 THREE MILE ISLAND 1 unnunununununum

                                                                         .                                                       __ -                _= ______--                                                                                                    __

unuuuuuuuuuuuuu CFMDC CFMDC CFMDC CFMDC u CDMBUSTIOK u 81.9 ARKANSAS 2 0.0 CALVERT CLIFFS 1 74.4 CALVERT CLIFFS 2 97.7 FORT CALHOUN 1 m ENGINEERING u 85.4 MAINE YANKEE 61.3 MILLSTONE 2 114.8 PALISADES 99.6 SAN ONOFRE 2 unuuununuunxuum 48.8 SAN ONOFRE 3 100.1 ST LUCIE 1 98.1 ST LUCIE 2

                                                                                                                                                                                                        =-. __                             .=_ ___

ununuunuunnunum CFMDC CFMDC CFMDC CFMDC u HESTINGHOUSEM 90.5 BEAVER VALLEY 1 85.0 CALLAHAY 1 76.0 CATAMBA 1 0.0 COOK 1 unuuuuuuuuuuuun 38.7 C80K 2 97.9 DIABLO CANYON 1 93.9 FARL EY 1 92.8 FARLEY 2 101.0 GINNA 93.5 HADDAM NECK 97.9 INDIAN POINT 2 0.0 INDIAN POINT 3 103.6 KEWAUNEE 88.0 MCGUIRE 1 34.6 MCGUIRE 2 99.0 NORTH ANNA 1 80.5 NORTH ANNA 2 100.7 POINT BEACH 1 99.4 POINT BEACH 2 98.6 PRAIRIE ISLAND 1 96.3 PRAIRIE ISLAND 2 101.9 ROBINSON 2 99.7 SALEM 1 57.0 SALEM 2 83.5 SAN ONOFRE 1 83.8 SEQUDYAH 1 96.3 SEQUOYAH 2 99.5 SUMMER 1 90.8 SURRY 1 62.0 SURRY 2 55.4 TROJAN 11.0 TURKEY POINT 3 91.7 TURKEY POINT 4 101.3 YANKEE-ROHE 1 95.7 ZION 1 67.2 ZION 2 Units excluded aret unununununuunnu BIG ROCK POINT Capacity factor in this page, denoted as CFMDC, is a function of the net maximum u OTHER INFO u DRESDEN 1 dependable capacity. See the corresponding definition in the glossary. The unnunununununum FORT ST VRAIN vendor averages are computed by the formula: HUMBOLDT BAY LACROSSE Net Electrical Energy Produced by Vendor x 100% THREE MILE ISLAND 2 ----------------------------------------------------- Potential Electrical Production by Vendor in this Month GE BNRs Nest PHRs Comb PHRs B8H PHRs ALL PHRs NET ELECTRICAL --- --- --------- -------- -------- PRODUCTION.......... 9,608,494 17,051,454 5,176,417 2,116,965 24,344,836 MDC NET................ 23,471 30,008 9,078 6,746 45,832 CFMDC.................. 55.0 76.4 76.6 42.2 71.4 Report Period JUL 1985 PAGE 1-7

MEM0RANDA THE FOLLOWING' UNITS USE WEIGHTED AVERAGES TO CALCUL ATE CAPACITY FACTORS ITEM 22 ITEM 22 8 23 BIG ROCK POINT 1 GINNA CALVERT CLIFFS 1 8 2 HADDAM NECK (CONNECTICUT YANKEE) FARLEY I MAINE YANKEE FITZPATRICK MILLSTONE 2 FORT CALHOUN 1 OCONEE t. 2. 8 3 INDIAN POINT 2M YANKEE-ROWE 1 KEWAUNEE OYSTER CREEK 1 POINT BEACH 182 THREE MILE ISLAND 1 TURKEY POINT 3 8 4 uCOMPUTED SINCE 7/t/74. THE DATE OF COMPLETION OF A 100 DAY - 100% POWER OPERATION TEST. THE FOLLOWING UNITS USE THE DATE OF FIRST ELECTRICAL GENERATION INSTEAD OF COMMERCIAL OPERATION, FOR THEIR CUMULATIVE DATA ITEMS 20 THROUGH 24 ITEM 24 ONLY COOK 1 82 BIG ROCK POINT I BEAVER VALLEY I SAN ONOFRE I Reput Punod JUL 1995 PAGE l-8

                       ._s_. .._ _ . _ . _ . . . . . _ _ -   . . _ _ _ _ . _ _ _ _ _ .               . _ _ . _ . . ._ _       . _   _ . _ _ _ _ _ _ _ _ __ _ _   - _ . . _ . _ _

l' I i T ERRATA CORRECTIONS TO PREVIOUSLY REPORTED DATA RQlEt THESE CHANGES ARE REFLECTED IN THE DATA CONTAINED IN 1HE CURRENT REPORT  ! REVISED MONTHLY HIGHLIGHTS

  • 6 s
                                                                  ,1 N O N E N O N E N O N E L

I r Report Period JUL 1985 I 1

1 l l N E at: _ cc M H LaJ C I C A-4 M gU W \ U W M $$ a. L w Q E I

1. Docket: 50-313 0PERATING pTATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ARKANSAS 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
                  ~
3. Utility

Contact:

H. E. CONVERSE (501) 964-3188 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2568 ARK 8NSRS 1
5. Nameplate Rating (Gross MHt): 1003 X 0.9 = 903
6. Design Electrical Rating (Not NHe): 850
7. Maximum Dependabic Capacity (Gross MWe): 883 1500 1
8. Maximum Dependable Capacity (Net MWe): 836 [ESIGN ELEO. MTING - 860
                                                                              ~~~~~*      *              *     *
9. If Changes Occur Above Since Last Report, Give Reasons NONE
10. Power Level To Which Restricted. If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5.087.0 93.066.0
13. Hours Reactor Critical 744.0 3.898.5 62.556.0 ----------------.-- - -------
                                                                                                                                                         -100h
10. Rx Reserve Shtdwn Hrs .0 .0 5.044.0
15. Hrs Generator On-Line 744.0 3.786.0 61.189.5 -so
10. Unit Reserve Shtchn Hrs .0 .0 817.5 9,256.460 145.609.271 h
                                                                    ~-
17. Gross Therm Ener (MHH) 1.882.937
18. Gross Elec Ener (MHH) 630.910 3.112.969 48.075.24G
19. Het Elec Ener (MHH) 603.618 2.953.690 45.816.212 j *
20. Unit Service Factor 100.0 74.4 65.7
21. Unit Avail Factor 100.0 74.4 66.6 58.9 -20
22. Unit Cap Factor (MDC Net) 97.0 69.5
23. Unit Cap Factor (DER Net) 95.4 68.3 57.9
20. Unit Forced Outage Rate .0 15.7 15.2 o , , , , ,. , o 0 5 to 15 20 25 30 _
25. Forced Outage Hours .0 703.2 10.956.1 DAYS
20. Shutdowns Sched Over Next 6 Months (Type,Date Duration):

l l AAY 1985 NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-002

MMMMMMMMMMMMMNNMMMMMMNNNNNNNMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS N ARKANSAS 1 'M NMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNNNNMM No. Date E Hours Reason Method LER Number h Comoonent Cause & Corrective Action to Prevent Recurrence 85-08 07/05/85 F 0.0 A 5 SJ P POWER REDUCTION TO 40% FOR REPAIR TO "B" MFH PUMP CONTROL SYSTEM. 1 n=MMMMMMMMM ARKANSAS 1 OPERATED HITH 1 REDUCTION FOR EQUIPMENT FAILURE DURING JULY. 5

SUMMARY

M MEMMMMMMMMM Tvom Reason Method System 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                            & License Examination        9-Other                        (LER) File (NUREG-0161)

PAGE 2-003

M44MEMummuMMWENMMuuuuMMMMMMuummuMMMW u ARKANSAS 1 M munuuusuunnunnummununnunnumwMu*ummun FACIL ITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTItITY A CONTRACTOR INFORMATION LOCATION UTILITY STATE., .............. .. ARKANSAS LICENSEE.. ..... .. . . ARKANSAS POWER & LIGHT COUNTY................ .. POPE CORPORATE ADDRESS. ..... NINTH & LOUISIANA STREETS LITTLE ROCK, ARKANSAS 72203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 6 MI HNH OF CONTRACTOR RUSSELLVILLE, AR ARCHITECT / ENGINEER.... ..BECHTEL TYPE OF REACTOR....... ....PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... AUGUST 6, 1974 CONSTRUCTOR. .. .. . . ..BECHTEL DATE ELEC ENER IST GENER... AUGUST 17, 1974 TURBINE SUPPLIER. .... ..HESTINGHOUSE DATE COMMERCIAL OPERATE.. . DECEMBER 19, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE. ..IV CONDENSER COOLING HATER....DARDANELLE RESERVOIR IE RESIDENT INSPECTOR......B. JOHNSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. VISSING COUNCIL............ .... 50UTHHEST POWER POOL DUCKET NUMBER... ... ... 50-313 LICENSE & DATE ISSUANCE....DPR-51, MAY 21, 1974 PUBLIC DOCUMENT ROOM....... ARKANSAS TECH UNIVERSITY RUSSELLVILLE, ARKANSAS 72801 INSPECTION STATUS IN3PECTION

SUMMARY

INSPECTION CONDUCTED APRIL 1-30, 1985 (85-07) ROUTINE, UNANNOUNCED INSPECTION INCLUDING OPERATIONAL SAFETY VERIFICATION, MAINTENANCE, SURVEILLANCE, FOLLOHUP DN PREVIOUSLY IDENTIFIED ITEMS, FOLLOHUP DN IE INFORMATION NOTICES, EMERGENCY PREPAREDNESS EXERCISE, AND FOLLOHUP DN GENERIC LETTER (GL) 83-28. HITHIN THE AREAS INSPECTED, NO VIOLATIONS HERE IDENTIFIED INSPECTION CONDUCTED APRIL 22-26, 1985 (85-12) ROUTINE, UNANNDUNCED INSPECTION OF THE SECURITY PLANS, MANAGEMENT EFFECTIVENESS, SECURI1Y PROGRAM AUDIT TESTING AND MAINTENANCE, PHYSICAL BARRIERS - PROTECTED AREA (PA) AND VITAL AREA (VA), LIGHTING, COMPENSATORY MEASURES, ASSESSMENT AIDS, ACCESS CONTROL-PERSONNEL, VEHICLES AND PACKAGES, AND DETECTION AIDS IN PAS AND VAS. HITHIN THE AREAS INSPECTED, THREE VIOLATIONS HERE IDENTIFIED (INADEQUATE MANAGEMENT CONTROL, INADEQUATE SECURITY MAINTENANCE, AND PERSONNEL ACCESS CONTROL). INSPECTION CONDUCTED MAY 1-31, 1935 (85-13) ROUTINE, UNANNOUNCED INSPECTION INCLUDING OPERATIONAL SAFETY VERIFICATION, MATINTENANCE OBSERVATIONS, SURVEILLANCE, OPERATOR REQUALIFICATION TRAINING, MAINTENANCE RECORDS REVIEH, FOLLOHUP CN PREVIOUSLY IDENTIFIED ITEMS, AND FOLLOHUP DN IE BULLETINS. PAGE 2-004 i m

NNNNNNNNNNNNMMMNNNNNNNWMMMMMMNNNMMNN Report Period JUL 1985 INSPECTION 5TATUS - (CONTINUED) M ARKANSAS 1 M NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN INSPECTION SUIWGARY WITHIN THE AREAS INSPECTED, NO VIOLATIONS WERE IDENTIFIED. ENFORCEMENT SUIW4ARY INADE00 ATE MANAGEMENT CONTROLS. SAFEGUARDS INADEOUATE SECURITY MAINTENANCE. SAFEGUARDS PERSONNEL ACCESS CONTROL. SAFEGUARDS CONTRARY TO TECHNICAL SPECIFICATION 3.7.11. FIRE DOORS 213 AND 255 NERE FOUND TO BE AJAR. CONTRARY TO 10 CFR PART 55, APPENDIX A AND PROCEDURE 1863.88, LICENSED OPERATORS FAILED TO REVIEN ALL ABNORMAL AND EMERGENCY OPERATING PROCEDURES. CONTRARY TO APPENDIX Ro SECTION III.6,THERE WERE h0 3-NOUR RATED FIRE BARRIERS BETHEEN SAFETY RELATED FIRE AREAS (CONTROL ROOM HVAC ROON, THE PROCESS INSTRUMENT AND ROD POSITION ROOM AND THE CABLE SPREADING ROOM). (5501 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): l NONE l l MANAGERIAL ITEMS: l l NONE 1 PLANT STATUS: PDMER OPERATION LAST IE SITE INSPECTION DATE: MAY t-31, 1985 INSPECTION REPORT NO: 50-313/85-15 REP 0RTS FR0M LICENSEE E==3E==2EEEE3==3332EEE23233EEEEEE23533333333333E33333333==333333333E3333333333333==3==3333E3333=====33======3g3====g=g333333g==g=g NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-004-00 5/31/85 7/1/85 REACTOR TRIP FOLLOWING SPURIOUS CLOSURE REHEAT / INTERCEPT VALVES. 33EE333222==3=EEEEE==E=EEEE=3E.=33333333333=EE=3E=====E=====EE===32233S=EEEE2=E==E2333=E233E==3=E233EE33EE2=3333=E=3E===EE======E2 PAGE 2-005

1. Dock et 50-363 0PERATING STATUS u n u n u u nusunnusunnmmunnusuzucuusan=za a ARKANSAS 2 M Outage + On-line Hrst 744.0 mmWMMMMuwMumwouunumungszwuumwwwwwwmm
2. Reporting Period: 07/01/85
3. Utility

Contact:

D. F. HARRISON (501) 964-3743 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2815 MMSRS 2
5. Nameplate Rating (Gross MWe)* 945
6. Design Electrical Rating (Net MWe): 912
7. Maximum Decendable Capacity (Gross MHe): 897 1500 858 MIGN ELEO. fWITINS - 912
3. Maximum Dependable Capacity (Net MWels
                                                                           ---      fWlX. EMPDC. Or. -                    SES (100%)
9. If Changes occur Above Since Last Report Give Reasons:

NOME

10. Power Level To Nhich Restricted. If Any (Net MWe):
11. Reasons for Restrictions. If Any MONE 1000-MONTH YEAR CUMULATIVE 'on am se emuunun namet arrassa. seerftes
12. Report Period Mrs 744.0 5.087.0 46.895.0 698.1 3.374.4 32.679.0 -\ -- - -~ ----
                                                                                                                                   - - 100 g
13. Hours Reactor Critical
14. Rx Reserve Shtchan Mrs .0 .0 1.430.1
15. Hrs Generator On-Line 690.7 3.098.2 31.491.4 - so L
16. Unit Reserve Shtdwn Mrs .0 .0 75.0
17. Gross Thern Ener (PG4H) 1.685.594 7.494.916 79.548.594 -80 20-
18. Gross Elec Ener (MNH) 551.718 2.496.445 26.013.201
19. Net Elec Ener (MMM) 522.532 2.352.781 24.762.694
                                                                                                                                       ~
20. Unit Service Factor 92.8 60.9 67.2
21. Unit Avail Factor 92.8 60.9 67.3
                                                                                                                                       -30
22. Unit Cap Factor (MDC Net) 81.9 53.9 61.5
23. Unit Cap Factor (DER Net) 77.0 50.7 57.9
24. Unit Forced Outage Rate 7.2 7.7 16.5 0 . , , , , , a 0 5 10 15 20 as 30
25. Forced Outage Hours 53.3 260.t 6.228.5 ORYS l
26. Shutdows Sched Over Next 6 Months (Type.Date, Duration)*
                                                                                              .ALY 1985 NOME
27. If Currently Shutdown Estimated Startup Date: 08/15/85 PAGE 2-006 l

l

NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period JUL 1985 UNIT 5HUTD0WN$ / REDUCTION $ N ARKANSAS 2 N NNNNNNNNNNNNNNNNNNNNNNNNNENNNNENMENN No. Date M G Reason Method LER Number System Comoonent Cause & Corrective Action to f-event Recurrence 3584 87/14/85 F 26.5 A 3 85-014 JC XXXXXX REACTOR TRIP DN LON DNBR DURING PPS MATRIX TESTING DUE TO A LOSS OF POWER TO THE CEAS. PPS TESTING MAS COMPLETED AND THE UNIT PLACED BACK 0N LINE. 3549 87/24/85 F S.0 A 5 ZZ ZZZZZZ THE UNIT NAS REDUCED TO 30% FULL POWER DUE TO CONDENSER TUBE LEAKS. THE HATER 50XES NERE ISOLATED, THE TURES NERE PLUGGED, AND THE UNIT RETURNED TO 100% FULL POWER. 3518 87/38/85 F 26.8 3 5 85-016 JC XXXXXX REACTOR TRIP DN LON DNBR. DURING TESTING OF "D* CPC A CEA POSITION DEVIATION SIGNAL HAS GENERATED BY CEAC-2, NHICH HAS FED THROUGH TO THE OTHER ON-LINE CPCS, CAUSING THEN TO GENERATE HIGH PENALTY FACTORS. l l t cccccNNNNNN ARRANSAS 2 OPERATED WITH 2 OUTAGES FOR EQUIPMENT FAILUPE DURING JULY AND SHUT DOWN FOR MAINTENANCE D

SUMMARY

N ON JULY 31ST. c c==NNNNNN Tvom Rea ann Method Svsta= 8 Co-aanant F-Farced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched S-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination        9-Other          (LER) FlIe (NUREG-0161)

PAGE 2-007

un=ummunannmummanuunnuunnamannumnsuu u ARKANSAS 2 m c=cmunusunumanumanumanamanennuunamma FACILITY DATA Report Period JUL 1985 FACitITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ARKANSAS LICENSEE................. ARKANSAS POWER & LIGHT CCUNTY...................P0PE CORPORATE ADDRESS........ NINTH & LOUISIANA STREETS LITTLE ROCK, ARKANSAS 72203 DIST AMD DIRECTION FROM NEAREST POPULATION CTR.. 6 MI WNH OF CONTRACTOR RUSSELLVILLE, AR ARCHITECT / ENGINEER.......BECHTEL TYP E O F R EACT OR . . . . . . . . . . . . PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... DECEMBER 5, 1978 CONSTRUCTOR..............BECHTEL DATE ELEC ENER tST GENER... DECEMBER 26, 1978 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. . . . MARCH 26, 1980 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER IE REGION RESPONSIBLE......IV CONDENSER COOLING WATER....DARDANELLE RESERVOIR IE RESIDENT INSPECTOR. . . . . .W. JOHNSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. LEE COUNCIL................. 50UTHWEST PDWER POOL DOCKET NUMBER........... 50-368 LICENSE & DATE ISSUANCE....HPF-6. SEPTEMBER 1, 1978 PUBLIC DOCUMENT ROOM.......ARKAN**S TECH UNIVERSITY RUSS- .VILLE, ARKANSAS 72801 INSPECTION STATUS INSPECTION SUfWtARY INSPECTION CONDUCTED APRIL t-30, 1985 (85-07) ROUTINE, UNANNOUNCED INSPECTION INCLL' DING CPERATIONAL SAFETY VERIFICATION, MAINTENANCE, SURVEILLANCE, FOLLOWUP DN PREVIOUSLY IDENTIFIED ITEMS, FDLLONUP DN LICENSEE EVENT REPORTS (LERS), FOLLOWUP ON IE INFORMATION HOTICES, SPENT FUEL POOL ACTIVITIES, EMERGENCY PREPAREDNESS EXERCISE, FOLLOWUP DN GL 85-28. FACILITY MODIFICATIONS, REFUELING ACTIVITIES, AND PIPE SUPPORT AND RESTRAINT SYSTEMS. WITHIN THE AREAS INSPECTED. TWO VIOLATIONS WERE IDENTIFIED (FAILURE TO FOLLOW REQUIREMENTS FOR A RADI0 LOGICALLY POSTED AREA, AND FAILURE TO INSTALL A FIRE DOOR (FD) IN ACCORDANCE WITH AN APPROVED PLANT DESIGN CHANGE). l INSPECTION CONDUCTED MAY 13-14, 1985 (85-08) RCUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADIDACTIVE MATERIAL (RAM) TRANSPORTATION ACTIVITIES, LOW-LEVEL RADI0 ACTIVE WASTE (LLRW) MANAGEMENT PROGRAM AND LLRN ONSITE STORAGE FACILITIES. WITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED. INSPECTED CONDUCTED APRIL 22-26, 1985 (85-12) ROUTINE, UNANNOUNCED INSPECTION OF THE SECURITY PLANS, MANAGEMENT EFFECTIVENESS, SECURITY PORGRAM AUDIT, TESTING AND MAINTENANCE, PAGE 2-008

___.__..____._.__-,_,_m________ . -.. . _ . _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _m i Report Period JUL 1985 NNNNNNNENNNNENNENNENNNNNNENNNNNNNENN IN$PECTION 5TATUS - (CONTINUED) N ARKANSAS 2 N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN INSPECTION SUNGARY

'                               PHYSICAL BARRIERS - PROTECTED AREA (PA) AND VITAL AREA (VA), LIGHTING, COMPENSATORY MEASURES, ASSESSMENT AIDS, ACCESS CONTROL-PERSONNEL, VEHICLES AND PACKAGES AND DETECTION AIDS IN PAS AND VAS.

WITHIN THE AREAS INSPECTED, THREE VIOLATIONS HERE IDENTIFIED (INADEQUATE MANAGEMENT CONTROL, INADEQUATE SECURITY MAINTENANCE, AND PERSONNEL ACCESS CONTROL). INSPECTION CONDUCTED MAY t-31, 1985 (85-13) ROUTINE UNANNOUNCED INSPECTION INCLUDING OPERATIONAL SAFETY VERIFICATION, MAINTENANCE OBSERVATIONS, SURVEILLANCE, OPERATOR REQUALIFICATION TRAINING, MAINTENANCE RECORDS REVIEW, FOLLONUP DN PREVIOUSLY IDENTIFIED ITEMS, FOLLONUP DN IE BULLETINS, AND l FOLLONUP ON LICENSEE EVENT REPORTS. ' WITNIN THE AREAS INSPECTED, THQ VIOLATIONS WERE IDENTIFIED (FIRE DOORS LEFT OPEN, AND IMADEGUATE EMERGENCY AND ABNORMAL PROCEDURE REVIENS BY LICENSED OPERATORS). ENFORCEMENT SUFW94RY

NONE I

OTNER ITEMS

!                              SYSTEMS AND CCMPONENT PRCELEMS:

NOME I FACILITY ITEMS (PLANS AND PROCEDURES)* NONE MANAGERIAL ITEMS , NONE l PLANT STATUS: SHUTDONN FOR MAINTENANCE. LAST IE SITE INSPECTION DATES MAY t-31, 1985 INSPECTION REPORT NO: 50-368/85-13 l I l 1 i PAGE 2-009 I i

NMMMMWNMWNMMMNNMMMNNNNMMMMMMWNNNNNNN Report Period JUL 1985 REPORTS FR0M LICENSEE M ARKANSAS 2 M mununummunununumwwummununuwwwwmunwww

                                  ==2===     ==E333=33 3E E 333333E3323 33 3 E3 3 3 3 3 3 E33 EE 3 3 33 =33 33 E E E EE3EE 3 EEEE 3 3 33 3 33EE E3 3 3 33EESE333 3 E=33 33EE 3 E333 33 33E3 EE E EEEEEE E E3ES E333EE3 NUMBER     DATE OF        DATE OF         SUBJECT EVENT          REPORT NONE 3=3E=EE=3EEEEEEEE===333E=EEE3=3RZ2E33333333333333E=3E3333E32=3=33E=E233333333333E3333333333323E333333EEE=333EEE=35EEEEEEEEEEEEE=33 4

l t PAGE 2-010

                      -2     --   .a+ - - - - - -- --4m                  - -- -..

p O t N W O

                                                                                         =C A

hf 3 4 _a M

                 >=

6 W

                 .d b
                 .a ad uC E

O M 2 W

                >=

E M l&J O

                *C A

W9 E

                >=

i -( i i I

1 i u

1. Docket 50-334 0PERATING STATUS nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu a BEAVER VALLEY t M i namununummmmmmunummmmmmmmunummmmmmmx
2. Reporting Period: 07/01/85 Outace + On-line Hrst 744.0
3. Utility

Contact:

P. A. SMITH (412) 643-1825 AVERAGE DAILY POWER LEVEL (MHe) PLOT f

4. Licensed Thermal Power (MHt)* 2660 ggy gg
5. Nameplata Ratino (Gross MHe): 1026 X 0.9 = 923-
6. Desion Electrical Rating (Net MHe) 855 l 7. Ptaximum Dependable Capacity (Gross MWe)* 860 1500
                                                                                                                                                                                                  -DESIGN ELEO. HRTING = 835

{

8. Maximum Dependable Capacity (Net NHe): 8t0
                                                                                                                                                                                                       *               *         *~                             '
                                                                                                                                                                                  ~
9. If Changes occur Above Since Last Report. Give Reasonst NOME
10. Power Level To Which Restricted, If Any (Het MHe):

' 11. Reasons for Restrictions. If Any ' 2 NOME j 1000 - f MONTH YEAR CUMULATIVE

12. Report Period Mrs 744.0 5.087.0 81.095.C WC mm K cmEng tamm grf!NL Omelfles I
13. Hours Reactor Critical 705.1 4.729.8 42.089.4 ^ - --- . goo
 ),
                                                                                                                                                                                  # ^#                  .((g                                                                              j
14. Rx Reserve Shtchn Hrs .0 .0 4.482.7
  • i 1

1

15. Mrs Generator On-Line 702.4 4.585.4 40.668.4 g i i
                                                                                                                            .0            .0
15. Unit Reserve Shtchn Mrs .0 '
17. Gross Thern Ener (MHH) 1.815.511 11.085.646 94.484.151 500 - -80 ,

j 18. Gross Elec Ener (MHM) 581.000 3.560.000 30.054.440

19. Net Elec Ener (MHH) 545.570 .3.336.530 27,97t.283 1
                                                                                                                                                                                                                                                                     ~#
20. Unit Service Factor 94.4 90.1 52.5 94.4 90.1 52 5
21. Unit Avail Factor
                                                                                                                                                                                                                                                                     -30
22. Unit Cap Factor (MDC Net) 90.5 81.0 46.1

}..

23. Unit Cap Factor (DER Net) 87.8 78.6 44.7 8.2 25.2 0 , , , a
24. Unit Forced Outage Rate 5.6 , ,

15 30 25 30 0 5 to 41.6 411.6 18.283.7 Days

25. Forced Cutace Hours
26. Shutdones Sched Over Next 6 Months (Type.Date, Duration):

JULY 1985 i MOWE pggg 7 012 i

27. If Currently Shutdown Esti.-ated Startup Datet N/A E

1

}

I i ._ _ . _ _ _ _ . , _ _ _ _ . . - _ . _ _ . . _ _ . _ . __ _ _ __

Report Period JUL 1985 UNIT mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmanum S H U T D 0 68 N 5 / REDUCTIONS m BEAVER VALLEY 1 m mamanummmmmmmmmmmmmmmmmmmmmmmmmmmmmm En. Bate E %murs Reason Method LER W " - System Connonant _ Cause & Corrective Action to Prevent Recurrence 25 87/04/85 F 0.8 3 5 MJ PUMPXX MEATER DRAIN PUMP SD-P-1A NAS REMOVED FROM SERVICE FOR MAINTENANCE. TME PUMP NAS REPAIRED AND RETURNED TO SERVICE. 26 87/06/85 F 41.6 A 3 85-013 NC HTEXCH SECONDARY SIDE HIGH CONDUCTIVITY LEVELS CAUSED BY LEAKING CONDENSER TUBES REGUIRED THE STATION TO BE TAKEN OFF LINE AT 2232 HOURS. THE LEAKING CONDENSER TUBES HERE PLUGGED AND STM. THE STATION RETURNED TD SERVICE AT 1605 HOURS ON THE 27 87/28/85 5 8.8 3 5 CD VALVEX THE STATION REDUCED POWER TO PERFORM THE MAIN STEAM TRIP VALVE TEST. THE TEST RESULTS HERE SATISFACTORY AND THE STATION NAS RETURNED TO A NOMINAL 108 PERCENT POWER LEVEL. 28 87/29/85 F S.8 A 5 HJ PUMPXX POWER LEVEL NAS REDUCED TO INVESTIGATE POTENTIAL PACKING PROBLEM OF MEATt.? DRAIN PUMP SD-P-1A . PROBLEM RESOLVED AND POWEk ESCALATION BEGAN AT ' 1615 NOUR$ 04 TME 29TM. l l l c==rmammann BEAVER VALLEY t CPER.ATED WITH 1 CUTAGE AND 3 REDUCTIONS DURING JULY. I n StMcARY a cn==ammuuan l Tyne Reason Method System a Coscenent ' F-Ferced A-Equip Failure F- Admin t-Manual Exhibit F & H 5-Sched 8-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refuelino N-Otter 3-Auto Scran Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet , E-Operator Trainino 5-Redaced Load Licensee Event Report lr

                                                   & License Examination                                                   9-Other         (LER) File (NUREG-0161)

PAGE 2-013 t

l as:cemannensessmanneemananmuusumauem n BEAVER VALLEY t a nsscuummunnaamanannamanneenemanummun FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTICM UTILITY 4 CONTRACTOR INFORMATION LOCATICM UTILITY ST A T E . . . . . . . . . . . . . . . . . . . . P ENN5Y L V AN I A LICENSEE.................DUQUE5NE LIGHT C0t."4TY. . . . . . . . . . . . . . . . . . . B EAVE R CCRPCRATE ADDRESS........CNE 0xFORD CENTRE, 501 GRANT STREET PITTSBURGH, PENNSYLVANIA 15279 DIST AND DIRECTICM FRC?t NEAREST PCPULATICM CTR.. 5 MI E OF COMTRACTOR E. LIVERPCOL, CH ARCHITECT / ENGINEER. . . . . . 5TCNE & 14EBSTER TYP E C F R EACT C R. . . . . . . . . . . . PWR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY f0, 1976 CD45TRUCTCR............. 5 TONE & WEBSTER v DATE ELEC EMER tST GEMER...JUME 14, 1976 TURBINE SUPPLIER.........HESTINGHOUSE DATE CCMPTERCI AL CPERATE. . . .CCTOBER 1, 1976 REGULATORY INFCDMATICM CC%CEASER CCCLING METHO3...CCOLING TCHER IE REGICM RESPCMSIBLE......I CC%:EMSER CCCLING HATER....CHIO RIVER IE RESIDENT INSPECTCR......W. TR05K00KI ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....P. TAM COUNCIL.................. EAST CENTRAL AREA COCKET kUMBER........... 50-334 RELIABILITY CCORDIKATICM AGREEMEMT LICENSE & DATE 155UANCE....CPR-66, JULY 2, 1976 PUB L IC DOCU?"ENT ROOM. . . . . . . B . F. JONES MEMCRIAL LIBRARY 633 FRANKLIN AVENUE ALIQUIPPA, PA 15C01 IN5PECTION 5TATUS TMPECTTCM SUWARY , E3 IM5PECTIS4 IMPUT PROVIDED. EWC8CE*!MT St*"'2 RY ATLE i CT 9 YTE*5  ! s SYSTEMS AM CC?*PC%ENTS: l , r l m3 IkPUT PRTdICE2. FACILITY ITEMS CPLARS AX3 PROCEOURES): E3 IMPUT PRTdI:ED. PAGE 2-014

                        . _ _ _ . -_.                 .      --.         ~-                              -               . . - .                    _-                       -. - - - _ - - - _ . . - - _ - - - - - . - -         -

( H H m Q Q 5t , N

                ***                                                                        N 84 N

N 2 E N N W i

    !           M            S                                                             N                                            N m a                                                                        N Q             [

B E se g N N b a a N es t ll i 1 M N 09 E

  • N N i E S M N t f M#5 N N 3

2 S N N Eyn N N l

,              EwS                                                                         N                                            N
  • E ad t M N

} E&W H 90 m at a N N 838 N 04 W W to N

               $NW                                                                        H                                             H m ha m                                                                     M                                            N m>m                                                                        M                                            N 2%S M aw S N

N N N i WGE N N

    )          W            W                                                             N                                            N W            $                                                             H                                            H E            S                                                             N                                            N l         E            E                                                             N                                            90 W            W                                                             N                                            N                                                                                               I B            9                                                             N                                            N W            G                                                             N                                            N M            9                                                             N                                            N EEE                                                                        N                                            N N                                            N N                                            N N                                            90 l-                                                                                       N                                             N
N N 4 W N N a

Q W $N N N W H N N

.                   P                                                                    #                                            M l                   X                                                        3           N                                            N i                   M                                                                    N                                            N
                    >=

N W N N N N U U N N U N N ene M N to N N ad N N

,l' 0                                                                   W                                            H N                                            N N                                            N d                                                        E           N                                            te I

N N i D O N N N N

                   >                                                         N           N                                            N i                                                                                        et                                           M l              st                                                        4           N                                            N J                                                                                        N                                            N
                   >=                                                                    N                                            N N                                            N

' H H H N N N

                                                                             >           N                                            se N                                            N i

i N N N N N E O N N

  • N N O O L M N W N N M M W M N M N N
                   >                                        y                N           N                                            N
                                                            %)                           N                                            N U                                        u                           N                                             N b          e                 H         >=                                 N W                                               Q                    N          U                                  N WW                          N          kJ                                 N b                                               A                    es         at                                 M M                    N          SID                               N H                                               De                   M          D                                  N
,                                                           M      C3                   N          M                                  N 1                  E                                               N                    N                                             N Q b                         N                                             N M                                         R                           N                                             H H                                            H M          hk                                 N                                                                                                l
                                                            *=

n UN N W N O N ,i >= M N Wb N j N kW H N 8" " N 1 O N N { sw ** H H e w n N

  • N et U g N 4 O N GP *
  • W H U ke W N
                  **                      n   Q         R b        >e                   N                N                C5         N i                                              y         W H N                           N          WW                    M           N

! e4 Le MM N Ne y y N Q M M M N $ tas W #

                  *)                      >= >    a     p          b                    N          u                     N           N M (1 M f4 W W                                 N                                b           N

- S gg D N >= N N

                   @                      me b >=       4. M      M                    N                                >=          N                                                                                                 t

[ *so et sit M u N N ' i g . M k >= M N M se ' w J N H WH H W N j b >= bJ M U N M 88 M >= kJ N N f

                  #                           M   R     M >*       4.                   H                                Q           N b                  N           M                                     N                                 N          N I                  Y W

h$$$gg ee M N N - l N D

_ _ _ _..__ _ _ _ m _. _ _ ._ _ __ _

t. Docketz 59-155 0 P E R A T I at G $TATUS ....................................
                                                                                                                                                                     .                 B
2. Reporuno Period = 7ain5 ouia e . On-une urs. 744.. . . . . . . . . . . I.G.R
                                                                                                                                                                                            . .......OCE PO I.N. T. . .t . . . . .. . . . . . m l

l 3. Utility Contacts tIMOA 22tCM (614) 547-4537 AVERAGE DAILY POWER LEVEL (fede) PLOT

4. Licensed Thermal Po c (stat): 24o BIG ROCK POINT 1
5. Kameplate Rating (Gross fede): 70.6 x 0.85 = 6e
6. Desicro Electrical Rating (Net PG4e): 72
7. Naisus. Dependable Capacity (Gross 99de): 73 1300 ,
3. Maximum Dependable Capacity (Met 794e): 69 ESIS8 E WI4 - 72 fe4K. EPDC. Gr. - 00 (100E)
9. If Changes occur Above Since Last Report Give Reasonst 40%E
18. Fomeer Level To tetich Restricted. If Any (Met fede):

S t. Reascas for Restrictions. If Any noeE  ! sees - l 340MTM YEAR C::79ULATIVE

12. Report Feriod Mrs 744.9 5.087.9 195.159.0
13. Mours Reactor Critical 744.9 4.549.9 139,242.2 g 1D. R R.s.r. 5,.t s .. .. ..
15. Mrs Generator On-Line 744.0 4.585.8 836.704.5 g i 16.13 nit Reserve Shten.m Mrs .9 .9 .8
17. Gross Thern Ener (Ptet) 129.839 378.727 25.731.230 W-
13. Gross Elec Ener (308:1 33.395 232.7e9 s.139.949 l *?. Met Elec Ener (Ptet) 36.493 267.211 7.696.944 l

. 22. Unit Service Factor tes.e 33.4 69.8

21. hit Avail Factor 183.0 33.4 49.3
22. Unit Cap Factor (PtSC Net) 79.9 75.7 58.5 i
25. Unit Cap Factor (CER Net) 48.0 73.6 54.6 100
24. Unit Forced Cutage Rate .8 1.2 15.5 0 . . . . . . o O S to 15 20 as 30
25. Forced Outace hours .8 52.7 St.187.7 DRYS 2's. Shutdames Sched Over Next 6 Months (Type.Date. Duration):

l . ALT 1985 40*s E

27. If Currently Shutdo.m Estimated Startup Cate s 4/A . Ites calculated .sith a Heighted Average PAGE 2-016

jl l f <I 7 - 1 0 ams 2 - _ n a u s e E s s c G s s n A u s e P m s r a u r s m u

 .         s s                c u s                e n1e             R a s aTs              t mNa                n mIm               e mOa                v mPs               e m      s          r                                                                                        .

mKn P _ mCn uOa o _ sRm

-                          t
.          e      s sGs               n sIe               o                                                                                        _

uSs i _ e s t _ - n n m u e a A c _ s n e a n v _ m a i mm t aaa c e _ r r

              $             o C

N O . e I s Y u L U T a J ) C 1 C G t6 U N r1 _

  -                                                             I                             o0 D                                                  R t

a p-eG _ E D e r tRE a o e R _ _ R t S ffetU , N H oh nN _

              /

a e C I m &nn s S e( v T C o o yE e 5 w., C U R Fiir tttei l - D c E , t c a n eF - N C e i urEs R t bra it p a eR n) N . R s hsetcE e C <

.            0          t                                                        xnraiL
                                                                         $    EIPDL(

s, S D E .

 -                      5                                      G                            d T                                                                      m A                    a        a
-            U           r                                     T                    rg o
._                       e                                     U                    cadL H          b                                      O                  Sre                                -

m cud S u 3 llSne

-                     h                                        N               aa icr d      uuotae le                                         H T

e nntndh aauoet T E 6 . t I + e MMACRO I M - 8' 125459 N d D E

-                       e                                    T                     r U         5                                       A                    o
                      +                                      R e                                                          r
 -                                                           E                     r M                                        P                    E n                                     C                n rn n                                 _

c 1 ireo mehi o s dott i t _ a T e ACCc a . s N - ion _

.                                                            I               FGHrni

= s O ti m r P sna et ei x _ E rs RaE - 5 M C ue r 3 O lT yT e 9 R i gr s 1 G arnorn F eit o e

.           L U

G I E a atelai inuurL latc J uif c e d e e caeeo& o t a EMRRC a e - - i r c

  • a. R ASC3E _

- e ' eY _ P - sR d t r uA. sPe. et ed ce o E rh p e sU. oc eS FS R e m  % L v ae. T m F5

                                                                       )
i.i , 4 4! Ir 1iI. : t. ! !$: ll )1  ;  ;:i ;it,

_____._______________m _ ., _ __ _ _ _ _ _ _ .___.__ _ - - _ _ _ . - _ _ _ _ __. _ .-_ _ _. _ _ . i l r i I i i I '

 \           n........................                                       ........

O P . ' e..:..... RIG ... RSCE.e.SINT

                                             ..                 t
                                                  ............en...                                                                          FACILITY                                         BATA                                                        Reperi Period JUL 1985
 !,          FACILITY BE5CRIPTIGII                                                                                                                                              UTILITY 8 CauTRACTSR IMFeAnATION                                                                                                     !

l L9CATISE UTILITY

;                      STAIE....................RICMIGAN                                                                                                                                 L I CENSEE. . . . . . . . . . . . . . . . .CCN5'JMt*5 POMER I
)                      CSUMTY. . . . . . . . . . . . . . . . . . .CMARL EWSIX                                                                                                            CORPORATE A30RE55....... 212 HEST MICMIGAN AVEuuE i

JACE58N, MICMIGAN 49201  ; DIST Amt BIRECTION FE M

.taaF%T P9PULATISM CTR.. 4 MI NE SF CauTRACTOR j CHARLEVOIX, MICM ARCMITECT/ ENGINEER...... 9ECMTEL 1

TYPE OF REACTOR............aam muc STEAM SYS SUPPLIER...GDIERAL ELECTRIC '

)

i BATE IMITIAL CRITICALITY.. 5EPTDGER 27, 1962 Con 5TRUCTOR..............SECMTEL t i j BATE ELEC DIER SST GDeER.. 3ECEMBER 3. 1962 TURBINE SUPPLIER.........GDIERAL ELECTRIC [ BATE CassuERCIAL SPERATE....le&RCM 29. 1965 REGULATORY IteFONIATION Can30tSER CSOL!sIG METM03...SesCE THRU IE REGIOel RESP 08 5 ISLE......III i Cass30s5ER CacLIIeG MATER....LARE MICMIGAN IE RESIDENT INSPECTOR......$. GUTMRIE

  !               ELECTRIC RELIABILITY                                                                                                                                                 LICEmsInG PROJ teAMAGER.....T. ROTELLA i                    CDUseCIL.................. EAST CENTRAL AREA                                                                                                                      DOCKET huMBER...........                    58-155                                                                           s t

i RELIABILITY COORBIRATION j AGRED40tT LICENSE & BATE 155UAleCE... 3PR-6, AUGUST 30, 1962 [ PUBLIC DOCUMDIT B00M...... 900RTM CENTRAL MICHIGAI6 COLLEGE I 1515 MOWARD STREET PETOSEEY, MICHIGAN 49778 l INSPECTION 5TATUS ) IMSPECTION SupstRSY l 1 i ment ( I l ElsFSACDENT SupstREY 1 I [

                  "                                                                                                                                                                                                                                                                                                  [
'                                                                                                                                                                                                                                                                                                                    I 3                                                                                                                                                                                                                                                                                                                     ,

f CTteER ITDes t I

!                 SYSTEMS Am3 CapurosIDET PROSLDC:

I l IsenE 1

;                 FACILITY ITDES (PLAm3 Am3 PROCEDURE 53:                                                                                                                                                                                                                                                            i MosE PAGE 2-014       I t

1 i 1

                                           .                                                                                                                                                                                                                                                                           I i

4 ' __ _ _ _ _ _ _ _ _ _ _ _ - , - ~ . __ _ _ _ __ _ _ _ ___ ___ _ __ _ . _ _ _,__ _ _ _ _ _ _ _ _ , _ _ _ .

                                                                                                                     . - . - - - - ~ ~ - - - . - . = - -                                            - - - - - - . . . - - -

1 l sessesseusessesseessessessessensenen Resort Period JUL 1985 IN5PECTION 5TATU$ - (CONTINUES) e SIG ROCE POINT 1 e semanesesseeeeeeeeeeeesseeeeeeeessee STMR ITEMS f naammarav&L ITE9ts: EONE PL MT STATUS: SPERATING ASWTINELY t LAST IE SITE Ih5PECTISE MTE: JULY 34 - SEPTEMBER 58, 1945 INSPECTION REP 9ET NB 85814 REPORTS FROM LICENSEE 3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 ' I NNMBER MTE OF MTE OF SUBJECT t EVENT REP 9ET f 85-85 85/31/85 37pstf35 REACTOR DEPRES$URIZATION SYSTEM CONSTANT SUPPORT MANGER FOUND IMPROPERLY TEN 5!ONED i 3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333 l i i i i l 1 I PAGE 2-819 , I I l

_ _ - . . . _ _ _ _ _ _ . . _ _ -______.____._____._._______.m._ ._ _ - _ _ _ _ . _ . - _ . . _ _ . _ _ _ _ _ . - - l I i

1. Docket: 57-25* OPERATING 5TATUS maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmans ,

I a BROWNS FERRY t a j 2. Reporting Period 07/0t/35 Cutage + Cn-line Mrs: 744.0 maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmuna i i 5. Utility

Contact:

TED TWJM (2551 729-0834 AVERAGE DAILY POWER LEVEL (P54e) PLOT l j 4. Licensed Thermal Po ec (P54t): 3293 BROWNS FERRY 1 f 5. Nameplate Rating (Gross PO441s 1280 Y 0.9 = 1152

6. Design Electrical Rating (Net Pr.4e): 1065
7. Ptaximum rependable Capacity (Gross #94e): 1993 1:::30

) 5. Ptauimusa Dependable Capacity (het PHe) 9065 IE3!1N (LEC. IIPTING - 1085  ;

9. If Chances Cccur Above Since Last Report. Give Reasons:

7W0[. MPDC. Cfr. - 1085 (10023 I , l MCME j

18. Poe.er Level To Which Restricted, If Any (Net 394e)
I 4

j 11. Reasons for Restrictions. If Any: 70 PCT POKR OUTPUT THIS rtCWTH j

                                                                                                                                                                                                                                                           ' 100 1                           E2ME                                                                                                                                                                                                                                                              t i                                                                                                                                                                                    1080-PCNTH                     YEAR         CUMULATIVE
;l                    12. Report Period Mrs                                                          744.0             5.087.0                  96.433.0                  O                                                                                                                  i 1
13. Hours Reactor Critical .0 1.647.7 59.520.9 -so l
14. Ex Reserve Shteen Mrs .0 512.t 6.996.8
15. Mrs Generator On-Line .0 1.426.6 53.276.4
                                                                                                               .0            .0                                        .0
                                                                                                                                                                                                                                                           -se            a.
16. Unit Reserve Shteen Mrs .

l

17. Gross Thern Ener (Ptet) 0 4.959.821 167.963.338 h  !

l SAO-ts. Gross Elec Ener (seet) 0 1.652.650 55.398.130 l

                                                                                                                                                                                                                                                           -40                               6
19. Met Elec Ener (Ptol) -7.410 9.575.196 53.749.017
23. Unit Service Factor .0 32.0 60.4
21. Unit Avail Factor .0 32.0 60.4 i
                                                                                                                                                                                                                                                           -20 I                      22. Unit Cap factor (MDC Net)                                                            .0         29.1                                       52.5
23. Unit Cap Factor (DER Net) .0 29.1 52.3
24. Unit Forced Cutace Rate .0 55.1 23.6 o I
                                                                                                                       ,,994,4                   ,g,e4,,,

8 5 1h 15 s s so f 1

25. Forced Outace Noves .0 onTS 1 25. Shutcsones $ched Ovec Next 6 Pbaths (Type.Date. Duration)-

acur .AA.T 1885 l

 -                    27. If Currently Shuth Estimated Startup Date s                                                                           C9et4/86                                                                                                                    PAGE 2-020 4

i t j  ! 1 i _ - - - . _ _ - - - , . ,.- . - - . _ . - - -- - -- . - - - . - - - , - . - . . - - , - . . . - , - - - - -. . . . . , . . . - , . ~ . . .

maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu Bewert Period JUL 1985 UNIT 5NUTSOMN5 / REBUCTION5 m SROMMS FERRY 1 m maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmen En. Bate G Mmmars Raanen Mathed L ER thamber 1rstam Cannenunt Cause a correctIva Action to Prewent Recurrence l 315 86/8t/85 5 744.8 C 4 RC FUELXX EMB 0F CYCIE 6 REF'JEL OUTACE CONTINUES. sammamannen 3Reness FEBRY t RDIAINS SMUTBONN IN A CONTINUING REFUELING / MAINTENANCE DUTAGE. n SupWEARY a mammenneman Two.e Raa - Met hod Syst em & e-- =t F-Forced A-Espain Failure F-Admi n 1-Manual Exhibit F&N 3-Sched B-Maint er Test G-Sper Error 2-Manual Scrae Instructions for C-Refueling N-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Sata Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                    & License Emasination                                               9-Other                           (LER) File (NUREG-81613 PAGE 2-021

c==ummmmmmmunammmmmmmmmmuummmmmmmens u BROWNS FERRY 1 a cn=mmusaammmmmmmmemmuummmmmmmmmuaman FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . A L A B AMA LICENSEE................. TENNESSEE VALLEY AUTHORITY COUNTY...................LIMESTCNE CCRPCRATE ADDRESS....... 500A CHESTNUT STREET TOWER II CHATTANGOGA, TENNESSEE 37409 DIST AND DIRECTION FRCM NEAREST PCPULATICN CTR...to MI NW OF CONTRACTCR DECATUR, ALA ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY TYP E OF REACTCR . . . . . . . . . . . . BHR WUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... AUGUST 17, 1973 CCNSTRUCTOR. . . . . . . . . . . . . . TENNESSEE VALL EY AUTHORITY DATE ELEC ENER tST GENER...CCTOBER 15, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE CCPPERCI AL CPERATE. . .. AUGUST 1, 1974 REGUtATC#Y INFCEMATICN CCNDENSER CCOLING METHOD...CNCE THRU IE REGION RESPONSIBLE......II CCNDENSER CCCLING WATER.... TENNESSEE RIVER IE RESIDENT INSPECTOR......J. PAULK ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. CLARK COUNCIL..................SCUTHEASTERN ELECTRIC DOCEET NUM3ER........... 50-259 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-33, DECEMBER 20, 1973 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND F00 REST ATHENS, ALABAMA 35611  ;

                                                                                                                       $TATUS IN$PECTION INSPECTICN St**'ARY                                                                                                                                                                                                   i
   + INSPECTICM MAY 26 - JUNE 20 (85-323: THIS ROUTIME INSPECTICM INVCLVED 33.5 RESIDENT INSPECTOR-HOURS IN THE AREAS OF CPERATIONAL SAFETY. MAINTENANCE OBSERVATICN. REPCRTABLE CCCURRENCES. LICENSEE ACTICM CM PREVICUS ENFORCEMENT ITEMS, AND REVIEW OF LICENSEE                                                                                      l IDENTIFIED DEFICIENCIES. No VICLATICNS CR DEVIATICNS HERE IDENTIFIED.                                                                                                                                               l INSPECTION JUNE 17-21 (85-33): THIS ROUTINE, UNAN' 3eNCED INSPECTION ENTAILED 11.5 INSPECTCR-HOURS CMSITE IN THE AREAS OF REACTOR CCCL ANT PIPING. SPECIAL WELDING APPLICATICMS AND INSERVICE INSPECTICM - OSSERVATICM OF HORK ACTIVITIES. CNE VIOLATION HAS IDENTIFIED - VISUAL Ah3 ULTRASCNIC EIAMINATIONS OF CVERLAY REPAIR HELD GR-2-15 NERE NOT ADEQ'JATELY CCNTROLLED TO INSURE A MEANINGFUL EXAMINATICM - PARAGRAPM 6.A.

MEETING MAY 23 (85-35)* THE CUARTERLY MEETING TO REVIEW THE STATUS CF THE REGULATCRY PERFORMANCE IMPROVEMENT PROGRAM (EPIP) HAS HELD AT THE BRCWh5 FERRY SITE MAY 25. 1985. THE REVIEW INCLUDED THE OVERALL STATUS OF THE RPIP, EVALUATION OF ADDITIONAL PERSCENEL AD:ED TD EACM SHIFT, EMPLOYEE INYCLVEMENT SESSICMS AND PLANNED ACTIVITIES. ENrceCE**ENT SLv AeV FAILURE TO ADEGUATELY TRAIN SMIFT ENGINEERS IN PROTECTIVE ACTICM DECISICN"AKING. (5532 4) PAGE 2-022

I mumummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm Report Period JUL 1985 IN5PECTION 5TATUS - (CONTINUED) m BRCHNS FERRY t a ' maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm ENFORCE **ENT SLPMARY TECHNICAL SPECIFICATION 6.5.A.6 REQUIRES THAT DETAILED WRITTEN PROCEDURES COVERING SURVEILLANCE AND TESTING REQUIREMENTS BE l ACHERED 10. CONTRARY TO THE AB0VE. THE LICENSEE FAILED TO ADHERE TO BATTERY SURVEILL ANCE INSTRUCTIONS ESTABLISHED TO SATISFY THE i SURVEILLAMCE REQUIREMENTS OF TECHNICAL SPECIFICATION 4.9.A.2 IN THE FOLLCHING EXAMPLES 2 (1) ALTHOUGP SURVEILLANCE INSTRUCTI0ta SI 1 4.9. A.2. A

  • AUXILIARY ELECTRICAL EQUIPMENT - BATTERY CHECK
  • SPECIFIES IN STEP 4.5 THAT THE REVIEHING ENGINEER INITIATE ANY t NECESSARY CCERECTIVE ACTION SHOULD THE ACCEPTANCE CRITERI A NOT BE MET. NO CORRECTIVE ACTION HAS INITIATED FOLLOWING COMPLETION OF l
,                         SK 4.9.A.2.A DN FEBRUARY st. 1985. (2) SECTION 3.0 0F SURVEILLANCE INSTRUCTION SI 4.9.A.2.A REQUIRES RECORDING PILOT CELL i

UOLTAGES AND SPECIFIC ORAVITIES OF THE UNIT BATTERIES. SHUTDOHN BOARD BATTERIES AND DIESEL GENERATOR BATTERIES. THE PILOT CELLS HERE h0T CHECKED DURIN" THE PERFORMANCE OF SI 4.9.A.2.A CN FEBRUARY 25, 1985. (3) STEP 3.7 0F SURVEILLANCE INSTRUCTION SI 4.9.A.2.5 " AUXILIARY E.ECTRICAL ECUIPMENT - BATTERY ANALYSIS

  • REGUIRES THAT THE VOLTAGE OF ALL BATTERY CELLS BE VERIFIED TO BE H2 THIN PLUS CR MINUS 3. t VOLT OF AVERAGE BATTERY CELL VOLTAGE. THIS VERIFICATION HAS NOT CORRECTLY PERFORMED DURING SI 4.9.A.2.B CON 00CTED ON THE 250 VOLT MAIN BATTERY NO. 2 CN FEBRUARY 20, 1985. CCNTRAnY TO THE ABOVE, PLANT STANDARD PRACTICE BF 14.25.

CLEARANCE PRCCECURE. HAS NOT FOLLCHED IN THAT ALL ELECTRICAL POWER HAS NOT ISCLATED FROM THE 2DA LOH PRESSURE COOLANT INJECTION (LPCI) MOTOR-GENERATOR SET UNDER HOLD ORDER 35-150A. THE MOTOR WAS REMOVED WITH VOLTAGE (18 VOLTS) STILL APPLIED TO THE THERMISTOR LEADS. ADDITIONALLY. IT HAS FCUND THAT THE NUMBER THREE TAG FOR HOLD CRCER 85-150A FOR THE 2DA LPCI MOTOR-GENERATOR ' SET WAS HUNG CN THE 2EM LPCI MOTOR GENERATOR SET (HOLD CRDER 85-113) AND VICE VERSA. (8502 5) CTHER ITE"5 SYSTEMS AND CC.PONENT " PROBLEMS: ENVIRCNMENTAL GUALIFICATION WORE. FACILITY ITEMS (PLAMS AND PROCEDURES): NCNE. MANAGERIAL ITEMS: NOME. i PLANT STATUS: l SHUTDCHN FOR REPAIRS CN 05/19. LAST IE SITE INSPECTICM DATE: JUNE 17-21, 1985 + INSPfCTICM REPCRT NO: 50-259/85-33 + , 1 J I PAGE 2-D23 i (

___ _ _ _ _ _ _ _ _ . __________..___.m_... _ _ __ _ .. - . i i F munununuununumammmmmmmmmmmmmmmmmmmmm a Report Period JUL 1985 REPORT $ FR0R LICENSEE a DROWNS FERRY t a  ; nummumummmmmmmmmmmmmmmmmmmmmmmmmmmum 1 7 l z==========ss=================sasazzazzazzssazasamassamassamasasszasazzassamasassazzamazassazzas s=ssamassassassassazzasazzasssans i 4 MUMBER MTE OF MTE OF SusJECT l EVENT REPORT  ;

  +                                                                                                                                                                                                                                                                              l 1

85-821 86/04/85 97/92/85 CONTAINMENT ISOLATION INITIATION, THE BLones FUSE MAS REPLACED, THE RELAY FAILURE IS CONSIDERED  ! RANDOR.

==================z============miz:::: ==============================sammassasasssssssasazzass======sazzasssssssssas===ssssszas

( t 1 t i l t 1 j  ! 1 I 4 4 4 4

 }

1 ) 1 -i I i I 4 1 i 'I i

i. i l

~ ) *

 .                                                                                                                                                                                                                                                                                 l l                                                                                                                                                                                                                                   ,

4 4

 !                                                                                                                                                                                                                                                       PAGE 2-024 4
                                                                                                                                                                                                                                                                                   }

-i I ]

 --------__,--,----------.%_-.m._ __, ,,___. ___,a     _   .

_m,, , __. % ,_ _m_ #_. .,,., m..., am.. g r.w.e . . ____,_-. ,e__. --w -4.-- - -. -+ ,. +*- +b -4 ..%. h 4 , m> t i l I i THIS PAGE INTENTIONALLY LEFT BLANK

                                                                                                                                           /

h r PAGE 2-025 r

1. Docket 50-260 0PERATING STATUS nummuunnununununununumusunnummuuzwux u BROWNS FERRY 2 x
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744,0 MMMMuuuuuumMmMMMMMMuwNuuumuMNNNNMunu
3. Utility

Contact:

TED THOM (205) 729-0834 AVERAGE DAILY POWER LEVEL (MHe) PLOT O. Licensed Thermal Power (MHt): 3293 BROWNS FERRY 2

5. Nameplate Rating (Gross MWe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Net MWe): 1065
7. Maximum Dependable Capacity (Gross MHe): 1098 1500
8. Maximum Dependable Capacity (Net MHe): 1065 OESIGN M. WING = 1006
                                                                                                                        .... PRX. OEPDC. Cfr. - 1085 110023
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE ! 10. Power Level To Hhich Restricted, If Any (Net MHe):

11. Reasons for Restrictions, If Any, NO NET PO6 OUTPUT THIS t10 NTH
                                                                                                                                                                    -100 NONE 1000-MONTH        YEAR         CUMULATIVE
13. Report Period Mrs 744.0 5,087.0 91.344.0
                                                                                                                                                                    '80
13. Hours Reactor Critical .0 .0 55.859.6 h
10. Rx Reserve Shtdwn Hrs .0 .0 14,200.4
15. Hrs Generator On-Line .0 .0 54.338.5
10. Unit Reserve Sht&an Hrs .0 .0 .0
17. Gross Thern Ener (P54H) 0 0 153.245,167 500-
18. Gross Elec Ener (MHH) 0 0 50,771,798
                                                                                                                                                                    - to
19. Net Elec Ener (MHH) -1,966 -17.567 49,285,406
20. Unit Service Factor .0 .0 59.5
21. Unit Avail Factor .0 .0 59.? -20
22. Unit Cap Factor (MDC Net) .0 .0 50.7
23. Unit Cap Factor (DER Net) .0 .0 50.7
24. Unit Forced Outage Rate .0 .0 23.0 0 , , , , , , 0 0 5 to 15 30 25 30
25. Forced Outace Hours .0 .0 16,304.4 ORYS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

I NONE

37. If Currently Shutdown Estimated Startup Date: 02/24/86 PAGE 2-026
  - - _ _ _ _ _ - - - . .. . . - ~ . . -                      .         .. - -        .   -.     - . . .    .   .- . _ , . - . . . - . . - - . . -                                  ~       .-.
                                                                                                                                                                                                                       -i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985                                UNIT      SHUTD0WNS / REDUCTIONS                                                  M         BROWNS FERRY 2                         M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.            Date     E G Reason                      LER Number svates Connonent                                    Cause 8 Corrective Action to Prev en t Recurrence 305             09/15/84     5 744.0      C           4                                           EOC-5 REFUEL DUTAGE CONTINUES.

I 4 1 1 4 l l i n=MMMMMMMMM BROWNS FERRY 2 REMAINS SHUTDOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. , u SUNtARY M EMMMMMMMMMM Tvom Rea son Method Svntem 8 Comoonent F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                               & License Examination              9-Other          (LER) File (NUREG-0161)

PAGE 2-027

  • s 4
                                                                    -                                  --                   - - ~

MEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u BRONNS FERRY 2 M uuMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY $ CONTRACTOR INF0EMATION LOCATION UTILITY STATE.................... ALABAMA LICENSEE.... ......... .. TENNESSEE VALLEY AUTHORITY COUNTY................... LIMESTONE CORPORATE ADDRESS..... . 500A CHESTNUT STREET TONER II CHATIAN00GA, TENNESSEE 37401 DIST AND DIRECTION FROM NEAREST POPUL ATION CTR. . 10 MI NH OF CONTRACTOR DECATUR, ALA ARCHITECT / ENGINEER... .. TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY. . . JULY 20, 1974 CONSTRUCTOR. . . . . . . . . . . . . . TENNESSEE VALL EY AUTHORITY DATE ELEC ENER 1ST GENER... AUGUST 28, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 1, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... TENNESSEE RIVER IE RESIDENT INSPECTOR......J. PAULK ELECTRIC RELIABILITY LICENSING PROJ MANAGER. ...R. CLARK COUNCIL.... ............. SOUTHEASTERN ELECTRIC DOCKET NUMBER.......... .50-260 RELIABILITY C.0UNCIL LICENSE & DATE ISSUANCE....DPR-52, AUGUST 2, 1974 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611 IN5PECTION 5TATyS IMSPECTION

SUMMARY

     + INSPECTION MAY 26 - JUNE 20 (85-32): THIS ROUTINE INSPECTION INVOLVED 33.5 RESIDENT INSPECTOR-MOURS IN THE AREAS OF OPERATIONAL SAFETY, MAINTENANCE OBSERVATION, REPORTABLE OCCURRENCES, LICENSEE ACTION ON PREVIOUS ENFORCEMENT ITEMS, AND REVIEH OF LICENSEE IDENTIFIED DEFICIENCIES. NO VIOLATI0t . , .          -                ~            .-.        - , , , - ~ = - . > - - ~ -.        n ~...~ ~ =   n-      - . -                  --. a na-.~ ._ =-=-._             - ~ ~ - - - -

t .s! N l N g M $ H M M $ H O 0 N 4 88 sa n N XXX H I N W X X N II X X H H Q t - X X H i It ( j X X H I 16 A

 ;           X         X H                          I             N X         X N                       8                M I
  • X H H X X 80 48 X X 80 N
;            X         X H                                        H I

X X 00 88 . I { XMM It H t- X X N H X >= X M H XMM N N-XMM N H 1 X 4AJ X 10 l II I EbX N i H { X X H II j XMM N u , XZX H N 4 X3X H H XOX

~

H H EMX tl H MSX H H 3 X X N 08 X X N N X X tt H X X 08 at

,            X         X N                                        Il j             X         X 90                          I            il X         X N                           I            H i            X         X te                                       N X        X M                                        N XXX         N                                        N H                                        H i,                       N                                        n                                                                                                                                             J
,                        H                                        N                                                                                                                                              '

H tt H I H j Bf 4 10 d ' M j N N 1 N N -

 ]                       H                                        N I                    H                                        H
   .                      N                      4'               M l                 W      H                                        H                                                                                                                                              i N                                        N

] g W at - 88

 '.                      to                                       se j                  M      N                            I           le 1                       N                           I           It i                2      88                           i           N 4                         N                                        N 1                  W       H                           !           M N

l II Q H N

  • to .

N j M N I N te 1 Is - of M N ] r 18 I H H H

  • a I4 H d

E It Il n H O N t N N N j M M N r N N lb H N l N N H gg N u

'                 M       N                                       H N                                       H
                  >=      N                                       98 N                                        N                                                                                                                                            e M       N                                        N as                                       Is O       N                                        N se                                      38 A       N          )=                            10 N           Q                            H
,                 W       H           W                           n                                                                                                                                             1 i-M           9                            se M       N           M                            N                                                                                                                                            j N           D                i           H
!-                        80          M                I           H t0                                       te H                                        H

} 4 H H p 'j tl If $ H . k >= l M H CM- H k i y N Q' It ') el WA H. l H >= laJ H H at M I N H D H i H H

$                         f4                                       N f                          lC                                      H I                 M       N                                        N

{ ao e N N 6= o se H

  • N 2 N
'                          It         W IAJ              .         It J        N                                       H j,                 o        H - >=     <Wo. A ll                 .

, 7 u -A e- m H I H T H $' It O N 'l 18

as. N I. 30 l, L M M II O N W -* It A es a W es i

N E E H 4 4f M 3 O el r L es E E- 'I 4 O M N

                    &-     M                                        N O

M

THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-037

1. Do ck et 50-325 0PERATING STATUS wmuuuuuuwmMwwwwwwwwuuuuuuuuumnwwwwwu M BRUNSHICK 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMWNMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

FRANCES HARRIS 0N (919) 457-9521 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2436 BRUNSHICK 1
5. Nameplate Rating (Gross MHe): 963 X 0.9 = 867
6. Design Electrical Rating (Net MWe): 821
7. Maximum Dependable Capacity (Gross MHe): 815 1500 790 DESIM m.WIM- 821
8. Maximum Dependable Capacity (Net MHe): ......rmX. DEPDO. Cfr. - 790 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 73.392.0 0
13. Hours Reactor Critical .0 2.079.0 45.500.8
                                                                                                         ' " " " " " " " ~ ~           ~~~""""""~              ~*

h 1,647.1

14. Rx Reserve Shtdwn Hes .0 .0
15. Hrs Generator On-Line .0 2,064.4 42.954.4
10. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 0 3,521.597 87.570,785 500 - #
18. Gross Elec Ener (MHH) 0 1,180.426 28,922.520
19. Het Elec Ener (MHH) -1.310. 1.130.730 27,776.504
20. Unit Service Factor .0 40.6 58.5
21. Unit Avail Factor .0 40.6 58.5 4
22. Unit Cap Factor :MDC Net) .0 28.1 47.9
23. Unit Cap Factor (DER Net) .0 27.1 46.1 0 . 0
24. Unit Forced Outage Rate .0 2.2 18.4 -

g

25. Forced Outage Hours .0 47.1 9,598.5 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Date 11/05/85 PAGE 2-038

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0NNS / REDUCTIONS M BRUNSWICK 1 M MMMMMMMMMMMMMMMMMMMMMMMMM)(MMMMMMDMM No . . Date 1533 Hours Reason Method LER Number $vstem Connonent Cause & Corrective Action to Prevent Racurrence 85-006 03/29/85 S 744.0 C 4 RC FUELXX REFUELING / MAINTENANCE OUTAGE CONTINUES. i i i EMM:MMMMMMM BRUNSHICK 1 REMAINS SHUTDOHN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. u

SUMMARY

M EMEEMMMMMkN Tvon Reason Met hod System & Comoonent i F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                  & License Examination         9-Other          (LER) File (NUREG-0161)

PAGE 2-039

- - _ _ - _ - _ . -- _. . - _ . _ _ _ _ - _- . - =__ - . - _ - - EM5MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u BRUNSHICK 1 M M=uMMMMMMMMMMhAMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... NORTH CAROLINA LICENSEE................. CAROLINA POWER & LIGHT COUNTY.. ...............BRUNSHICK CORPORATE ADDRESS........P. O. BOX 1551 RALEIGH, NORTH CAROLINA 27602 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 3 MI N OF CONTRACTOR SOUTHPORT, NC ARCHITECT / ENGINEER....... UNITED ENG. & CONSTRUCTORS TYPE OF REACTOR............BWR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 8, 1976 CONSTRUCTOR..............BROHN & ROOT DATE ELEC ENER IST GENER... DECEMBER 4, 1976 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 18, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING MATER.... CAPE FEAR RIVER IE RESIDENT INSPECTOR......H. RULAND ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. GROTENHUIS COUNCIL.......... ....... SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-325 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-71. NOVEMBER 12, 1976 PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSHICK COUNTY LIBRARY 108 H. MOORE STREET SOUTHPORT, NORTH CAROLINA 28461 INSPECTION STATUS INSPECTION

SUMMARY

                      + INSPECTION JUNE 17-21 (85-12): THIS ROUTINE, Ut4 ANNOUNCED INSPECTION INVOLVED 32.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF LIQUID AND GASEOUS RADHASTE MANAGEMENT AND RADIOLOGICAL ENVIRONMENTAL PROTECTION PROGRAMS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.

INSPECTION JUNE 1-30 (85-16): THIS ROUTINE SAFETY INSPECTION INVOLVED 150 INSPECTOR-HOURS ON SITE IN THE AREAS OF FOLLOHUP DN PREVIOUS ENFORCEMENT MATTERS, MAINTENANCE OBSERVATION, SURVEILLANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, ONSITE REVIEH Cont 1ITTEE, ONSITE LICENSEE EVENT REPORT REVIEH, FOLLOHUP DN INSPECTOR IDENTIFIED AND UNRESOLVED ITEMS, PLANT MODIFICATIONS, AND REFUELING ACTIVITIES. A VIOLATION HAS IDENTIFIED - INADEQUATE SURVEILLANCE TEST PROCEDURE FOR THE REFUELING HOIST SLACK CABLE INTERLOCK. INSPECTION JUNE 24-28 (85-17)* THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 26 INSPECTOR-HOURS AT THE SITE, IN THE AREAS OF ORGANIZATION AND MANAGEMENT CONTROLS, EXTERNAL EXPOSURE CONTROL AND PERSONNEL DOSIMETRY, INTERNAL EXPOSURE CONTROL, SURVEYS, MONITORING AND CONTROL OF RADIDACTIVE MATERIALS, PROGRAM TO MAINT AIN RADI ATION EXPOSURES AS LOW AS REASONABLY ACHIEVABLE ( AL ARA), AND SOILD HASTE. THE INSPECTOR ALSO REVIEHED THE LICENSEE'S EVALUATIf5N OF ERR 0NEOUS THERM 0 LUMINESCENT DOSIMETER (TLD) READINGS CAUSED BY EXPOSURE TO HYDROGEN SULFIDE. ONE VIOLATION FOR FAILURE TO HAVE ADEQUATE PROCEDURES AS REQUIRED BY TECHNICAL SPECIFICATION 6.8.1 TO DETERMINE PRIOR TO SHIPMENT THAT A PACKAGE OF HASTE CONTAINED NOT MORE THAN 1% FREE STANDING HATER. INSPECTION JUNE 24-28 (85-19): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 16.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF MECHANICAL MAINTENANCE ASSOCIATED WITH MODIFIED AND NEHLY INSTALLED PIPE SUPPORT AND RESTRAINT SYSTEMSr PIPE SUPPORT BASEPLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS; AND INSPECTOR FOLLOHUP ITEMS. TWO VIOLATIONS HERE IDENTIFIED - DEFICIENCIES IN PAGE 2-040

   - _ - -       . - - - - - - - ..- .           . . -       - _ -.- --.-._                             ...~ ..    -   ~-..   --.---                   . - - - . - . . - - - - . . - .

Report Period JUL 1985 INSPECTION NMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM STATUS - (CONTINUED) M BRUNSHICK 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMME INSPECTION

SUMMARY

PIPE SUPPORT AND ANCHOR BOLT INSTALLATION AND INSPECTION; AND FAILURE TO MEET CODE REQUIREMENTS IN PIPE SUPPORT HELD DESIGN - PARAGRAPH 6.5. t ENFORCEMENT

SUMMARY

NONE I i OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:

  • NONE.

FACILITY ITEMS (PLANS AND PROCEDURES): j NONE.

  • MANAGERIAL ITEMS:

NONE. PLANT STATUS: ROUTINE OPERATION, ' LAST IE SITE INSPECTION DATE: JUNE 24-28, 1985 + 4 INSPECTION REPORT NO: 50-325/85-19 + REPORTS FR0M LICENSEE 3333333EE3333322E33333333E==3323E33EE3=33E===EE23:3EEEEEE3==2EEEE==EEEEEEEEEEEEEEEEEEEEEEEEEEEEE=EEE==EEEEEEE=EEEEEE3=E==EE=3EEEEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-034 06/05/85 07/01/85 PRIMARY CONTAINMENT GROUP 8 ISOLATI N OF REACTOR SHUTDOHN COOLING, DUE TO AN ACCIDENTAL BUMPING.

                                                                                                                                                                                          ~

j 85-035 06/09/85 07/09/85 FAILURE TO VERIFY SETPOINT OF SLACK CABLE CUTOFF FOR REFUELING MAST FUEL GRIPPER, ATTRIBUTED TO 4 4 INADEQUATE TECH REVIEW DURING DEVELOPMENT. f E=3==3E=3EEEE=E==E=333==3EEE=EE3333333=223333333333333==2:3=32333====EESEE=EE=z=333=EEE=EEE33ESEEEE=2EEEEEEES=33333======3E=EE==EE i i I PAGE 2-041 f. I l m -

                  ,         ,         _                                     - - . . - - - - , - 3                    y                     .  . _ . .                                       - - - , _ . - -
1. Docket: 50-324 0PERATING STATUS nummwwwummuunuwammuummuumunununnunum M BRUNSHICK 2 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMuwmuunnummusummuummunumwww
3. Utility

Contact:

FRANCES HARRISON (919) 457-9521 AVERAGE DAILY POWER LEVEL (MWe> PLOT J 4. Licensed Thermal Power (MWt): 2436 BRUNSWICK 2

5. Nameplate Rating (Gross MWe): 963 X 0.9 = 867
6. Design Electrical Rating (Net MWe): 821
7. Maximum Dependable Capacity (Gross MHe): 815 1500
8. Maximum Dependable Capacity (Net MHe): 790 DESIGN ELEC. RRTING - 821 3
                                                                                                                                          . .       PmX. DEPDC. Cfr. - 790 (100%)

i 9. If Changes Occur Above Since Last Report, Give Reasons: NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restr* ctions, If Any*

NONE 1000-I MONTH YEAR CUMULATIVE ]

12. Report Period Hrs 744.0 5,087.0 85.416.0 h
13. Hours Reactor Critical 744.0 4,658.8 52,036.2
                                                                                                                                         ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ " ~ ~ ~ ~ ~ ~ ~              ~I" h
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 744.0 4r$9 M 48,615.3 g '"
15. Unit Reserve Shtchn Hrs .0 .0 .0 1.565,455 1LJ18,841 93,629,700 h
17. Gross Thern Ener (MHH)
                                                                                                                                                                                                  ~#
18. Gross Elec Ener (MHH) 507,8856 3,485.951 E 087,655 I
19. Net Elec Ener (MHH) 491,221 3,376,420 29.796,694 100.0 90.2 56.9 -#
20. Unit Service Factor
21. Unit Avail Fsctor 100.0 90.2 56.9 83.6 84.0 44.2 -20
22. Unit Cap Factor (MDC Net)
23. Unit Cap Factor (DER Net) 80.4 80.8 42.5
24. Unit Forced Outage Rate 0 4.4 17.0 0 . . . . . . O o 5 to 15 20 25 20
25. Forced Outage Hours .0 211.2 10,359.4 DAYS
26. Shutdowns Sched Over Next 6 Months (Type Date, Duration):

m 1985 REFUELING /MAINT. DUTAGE - 12/01/85 - 31 HEEKS

27. If Currently Shutdown Estis.ated Startup Date N/A PAGE 2-042

_ . _ _ . _ _ m . _. . _ . _ _ _ ._ _ ___ Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / REDUCTIONS M BRUNSHICK 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM A Data E Hours Reason Method LER Number $vstem Comoonent Cause & Corrective Action to t* r ev en t Recurrence 85-045 07/18/85 F 0.0 A 5 28 REACTOR FEED PUMP TRIPPED -- 2B CIRC. HATER INTAKE PUMP TRIPPED. 85-046 07/19/85 F 0.0 3 5 REDUCED POWER TO CHANGE OUT TH0 BRUSHES ON 2A RECIRC. MG SET. COMPLETED PT-15.1 AND PT-14.1. 85-047 07/23/45 F 0.0 5 5 REDUCED P0HER TO 60% TO ALLON ISC TO MAKE REPAIRS TO 2A 8 'D' PUMP. 85-048 07/26/85 S 0.0 B 5 DECREASE P0HER FOR VARIOUS PTS AND BRUSH REPLACEMENT ON 2A REACTOR RECIRC. MG SET. 85-049 07/30/85 F 0.0 5 5 DECREASED POWER TO 60% DUE TO FAILURE OF HEST MSR DRAIN VALVES. 4 i c:MMMMMMMMM U

SUMMARY

u BRUNSHICK 2 OPERATED WITH 5 REDUCTIONS FOR EQUIPMENT FAILURE AND MAINTENANCE / TESTING DURING JULY. , 1 EIMMMMMMMMM Tvna Reason Met ho d System & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 3 H 3-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refu eli ng H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Trainino 5-Reduced Load Licensee Event Report

                                          & License Examination                          9-Other         (LER) FIIe (NUREG-0161)

PAGE 2-043

___ _ - . _ _ _ - . .m __.-m . _ _ . _ _ , _ . _ mm .__._..___m___ _ _ _ _ _ . _ _ . _ - _ _ _ ___..._mm_,. __._m. MEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M BRUNSHICK 2 M uuMMMMMMMuMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION EllL[TY a CONTRACTOR INFORMATION LOCATION UTILITY ' STATE.................... NORTH CAROLINA LICENSEE................. CAROLINA POWER & LIGHT COUNTY...................BRUNSHICK CORPORATE ADDRESS....... 4tt FAYETTEVILLE STREET , RALEIGH, NORTH CAROLINA 27602  ! I DIST AND DIRECTION FROM i NEAREST POPULATION CTR.. 3 MI N OF CONTRACTOR ' SOUTHPORT, NC ARCHITECT / ENGINEER....... UNITED ENG. & CONSTRUCTORS 4 , TYPE OF REACTOR............BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 20, 1975 CONSTRUCTOR..............BROHN & ROOT DATE ELEC ENER IST GENER... APRIL 29, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . NOVEMBER 3, 1975 REGULATORY INFORMATION  ; CONDENSER COOLING METHOD. . .ONCE THRU IE REGION RESPONSIBLE......II j , CONDENSER COOLING HATER.... CAPE FEAR RIVER IE RESIDENT INSPECTOR. . . . . .H. RUL AND ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. GROTENNUIS COUNCIL................. 50UTHEASTERN ELECTRIC DOCKET NUMBER........... 50-324 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-62, DECEMBER 27, 1974 I PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSHICK COUNTY LIBRARY 108 H. MOORE STREET l SOUTHPORT, NORTH CAROLINA 28461  ; IN5PECTION STATUS t ) INSPECTION

SUMMARY

                             + INSPECTICN JUNE 17-21 (85-12): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 32.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF LIQUID AND GASEOUS RADHASTE MANAGEMENT AND RADIOLOGICAL ENVIRONMENTAL PROTECTION PROGRAMS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.

INSPECTION JUNE 1-30 (85-16): THIS ROUTINE SAFETY INSPECTION INVOLVED 150 INSPECTOR-HOURS ON SITE IN THE AREAS OF FOLLOHUP DN PREVIOUS ENFORCEMENT MATTERS, MAINTENANCE OBSERVATION, SURVEILLANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, DNSITE REVIEW l COMMITTEE, DNSITE LICENSEE EVENT REPORT REVIEH, FOLLOHUP DN INSPECTOR IDENTIFIED AND UNRESOLVED ITEMS, PLANT MODIFICATIONS, AND l REFUELING ACTIVITIES. A VIOLATION HAS IDENTIFIED - INADEQUATE SURVEILLANCE TEST PROCEDURE FOR THE REFUELING HOIST SLACK CABLE INTERLOCK. i INSPECTION JUNE 24-28 (85-17): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 26 INSPECTOR-HOURS AT THE SITE, IN THE AREAS OF i ORGANIZATION AND MANAGEMENT CONTROLS, EXTERNAL EXPOSURE CONTROL AND PERSONNEL DOSIMETRY. INTERNAL EXPOSURE CONTROL, SURVEYS, MONITORING AND CONTROL OF RADI0 ACTIVE MATERI ALS, PROGRAM TO MAINTAIN RADIATION EXPOSURES AS LOW AS REASONABLY ACHIEVABLE ( ALARA), AND $0ILD HASTE. THE INSPECTOR ALSO REVIEHED THE LICENSEE'S EVALUATION OF ERR 0NEOUS THERM 0 LUMINESCENT DOSIMETER (TLD) READINGS  ! CAUSED BY EXPOSURE TO HYDROGEN SULFIDE. ONE VIOLATION FOR FAILURE TO HAVE ADEQUATE PROCEDURES AS REQUIRED BY TECHNICAL I SPECIFICATION 6.8.1 TO DETERMINE PRIOR TO SHIPMENT THAT A PACKAGE OF HASTE CONTAINED NOT MORE THAN 1% FREE STANDING HATER. I i INSPECTION JUNE 24-28 (85-19): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 16.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF MECHANICAL MAINTENANCE ASSOCIATED HITH MODIFIED AND NEHLY INSTALLED PIPE SUPPORT AND RESTRAINT SYSTEMS; PIPE SUPPORT BASEPLATE i I DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS; AND INSPECTOR FOLLOHUP ITEMS. TWO VIOLATIONS HERE IDENTIFIED - DEFICIENCIES IN PAGE 2-044 i I i _ - - _ - _ _ _ _ _ _ _ _ _ . , - . - . - _ , ---__ , _ _ - _ . _ - - - . _ . - _ _ - - _ . _ . _ _ _ _ _ _ _ _ _ _ _ .r ~ -. - , _. . _

_ _ __. _ _. . _ _ _ . _m...__.___ _ _ _ _ . . . _ _ . _ . _ . _ . . . Report Period JUL 1945 INSPECTION NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNN STATU$ - (CONTINUED) N BRUNSWICK 2 N NNNNNNNNNNENNNNNNNNNNNNNNNNNNNNNNNNN , INSPECTION SUPWIARY ' PIPE SUPPORT PARAGRAPN 6.5. AND ANCNOR BOLT INSTALLATION AND INSPECTION: AND FAILURE TO MEET CODE REQUIREMENTS IN PIPE SUPPORT HELD DESI ENFORCEMENT SUfWtARY NONE OTNER ITEMS i SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NOME. MANAGERIAL ITEMS: i

NONE.

PLANT STATUS: NORMAL OPERATION. < LAST IE SITE INSPECTION DATE: JUNE 24-28, 1985 + J INSPECTION REPORT NO: 50-324/85-19 + r l REPORTS FROM LICENSEE 2333333333333333333333333333333332E223E==3E==333333333333333333E=333333333333333E=333323333333E=323==E33333333333E=E=3333E=3333EEE NUMBER 0 ATE OF DATE OF SUBJECT EVENT REPORT

                                                                                                                                          . _ _ _ _ . _ _ _ _ .              = - - -        _ . _ - _

NONE. 333333333333333333333333E=EE333EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE=EE33253333333333333333E33333333E==EEEEE=E=33==EEEEEEEEE=EEE==EEEEEE l PAGE 2-045

1. Dock et 50-454 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u BYRON 1 m
2. Reporting Period: 07/01/85 Outage + On-line Hrs 744.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
3. Utility Contact s CRAIG BERSAK (815) 234-5441 EXT 2341 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MWE): 3411 BYRON 1
5. Nameplate Rating (Gross MWe): 1975
6. Design Electrical Rating (Net MWe): 1120 t 1175 1500
7. Maximum Dependable Capacity (Gross MWe):
  • I" ~ IIE  ;

l 8. Maximum Dependable Capacity (Net MWe): 1929 fWLX. OEPDC. (FF. - 1129 1100%)

9. If Changes occur Above Since Last Report, Give Reasons:
10. Power Level To Which Reskricted If Any (Net MWe):

_____________________________ ____ _ _ 3ag i

11. Reasons for Restrictions, If Any  !

I t N0nE ,, MONTH 744.0 YEAR 3.649.5 CUMULATIVE 3,649.5 g -so

12. Report Period Hrs
!                               13. Hours Reactor Critical                           213.5               2.321.4               2,321.4                                                                                                                 h
14. Rx Reserve Shtchn Hrs .0 .0 .0 EE 2,125.0 2,125.0 -so
15. Hrs Generator On-Line 201.4 f
16. Unit Reserve Shtchn Hrs .0 .0 .0 568,273 3.904.280 3.904,280
17. Gross Thern Ener (MWM) 1,217,753 1.217,753 - to
18. Gross Elec Ener (MWH) 187.804 162.297 1,065.987 1.065,987
19. Net Elec Ener (MWH)
20. Unit Service Factor
                                                                                                                                                                                                                                             - 30
31. Unit Avail Factor NOT IN COMMERCIAL
22. Unit Cap Factor (MDC Net)
23. Unit Cap Factor (DER Net) OPERATION 0 0
24. Unit Forced Outage Rate g g gg g g g g
25. Forced Dutage Hours 236.1 643.5 643.5 Df4S j
20. Shutdowns Sched Over Next 6 Months (Type Date, Duration):

JULY 1986 NONE

27. If Currently Shutdown Estimated Startup Date: 08/02/85 PAGE 2-046

m-- - - . . _ . . . . . , _ _ = _ _ _ m..... _. _ .. - . m m.-- ..__m, . . _ , _ _ - . . . - , _ . _ . . _ _ . . . . _ . . _ _ _ _

                                                                                                                                                                                                                                                         ?

I a Report Period JUL 1985 MMMMMMMMMMMhMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / REDUCTIONS M BYRON 1 M MMMMMMMMMMMMYWMMMMMMMMMMMMMMMMMMMMMM t No. Date 15gj Hours Reason Method LER Number system Component Cause & Corrective Action to Prevent Recurrence 20 86/27/85 5 296.5 A 4 SCHEDULED STARTUP TESTING OUTAGE. 21 87/08/85 F 14.1 A 2 A MANUAL TURBINE TRIP HAS INITIATED AT 8% REACTOR POWER f DUE TO MISALIGNMENT OF CONTROL ROD P-8. A REACTOR TRIP RESULTED. t i 22 07/12/85 F 10.7 B 3 THE REACTOR TRIPPED DURING PERFORMANCE OF THE 50% LOAD REJECTION TEST. 23 07/t3/85 F 211.3 A 3 THE REACTOR TRIPPED DUE TO HIGH NEGATIVE FLUX RATE WHICH HAS CAUSED BY LIGHTNING.

!       24      07/27/85         S   100.0                 3     2                                                                   100% REACTOR TRIP STARTUP TEST.                                                                                     I I

i I l. usuMMMMMMMM BYRON 1 OPERATED WITH 5 OUTAGES, SHUTTING DOWN ON JULY 27TH FOR REACTOR TRIP STARTUP TEST. 4 W

SUMMARY

M , Un=MMMMMMMM Tvon Reason Met hod Svstem 8 Comoonent F-Forced A-Equip Failure F- A dmi n 1-Manual Exhibit F & H 5-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for j 3-Auto Scram 1 C-Refueling H-Other Preparation of  ! D-Regulatory Restriction 4-Continued Data Entry Sheet I E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) Flie (NUREG-0161)

PAGE 2-047 i

t MCCuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum n BYRON 1 m ru=uuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum FACILITY DATA Report Period JUL 1985 i FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY I STATE....................ILLIN0IS LICENSEE.................COMMONHEALTH EDIS0N t COUNTY.................. 0GLE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FRDM NEAREST POPULATION CTR.. 17 MI SH OF CONTRACTOR ROCKFORD, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITI AL CRITICALITY. . .FE3RUARY 2, 1985 CONSTRUCTOR..............COMMONHEALTH EDISON  ! DATE ELEC ENER IST GENER... MARCH 1, 1985 TURBINE SUPPLIER.........HESTINGHOUSE  ! DATE CDMMERCI AL OPERATE. .. .uuuuuuuuuuuuuuuuun REGULATORY INFORMATION ] CONDENSER COOLING METHOD. . .CC HNDCT IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... ROCK RIVER IE RESIDENT INSPECTOR. . . . . .J. HINDS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....L. OLSHAN i COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-454 INTERTOOL NETWORK 4 LICENSE 8 DATE ISSUANCE....NPF-37, FEBRUARY 14, 1985 PUBLIC DOCUMENT ROOM....... LIBRARIAN , BUSINESS SCIENCE 8 TECHNOLOGY DEPT. [ ROCKFORD PUBLIC LIBRARY - I 4 215 NORTH HYMAN STREET RDCKFORD ILLINOIS 61101 INSPECTION STATUS INSPECTION SUfMARY INSPECTION DN JUNE 10-13 (85015): ROUTINE, ANNOUNCED INSPECTION OF THE BYROM NUCLEAR GENERATING STATION'S EMERGENCY PREPAREDNESS  ! EXERCISE, INVOLVING OBSERVATIONS BY SEVEN NRC REPRESENTATIVES OF KEY FUNCTIONS AND LOCATIONS DURING THE EXERCISE. THE INSPECTION i INVOLVED 155 INSPECTOR-HOURS ONSITE BY THREE NRC INSPECTORS AND FOUR CONSULTANTS. NO ITEMS OF NONCOMPLIANCE, DEFICIENCIES, OR ' DEVIATIONS HERE IDENTIFIED. H0HEVER, ONE EXERCISE HEAKNESS HAS IDENTIFIED AS SUMMARIZED IN THE APPENDIX. INSPECTION ON MAY 22 THROUGH JUNE 28 (85024): ROUTINE, ANNOUNCED SAFETY INSPECTION TO REVIEH LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS; LICENSEE ACTION ON LICENSE CONDITIONS: STARTUP TEST RESULTS EVALUATION: STARTUP TEST RESULTS VERIFICATIONS AND STARTUP TEST WITNESSING. THE INSPECTION INVOLVED 75 INSPECTOR-HOURS ONSITE INCLUDING 3 INSPECTOR-HOURS ONSITE DURING OFFSHIFTS AND 12 INSPECTOR-HOURS IN OFFICE BY ONE INSPECTOR. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON JUNE 4 - JULY 1 (85025): ROUTINE, UNANNOUNCED SAFETY INSPECTION BY THE RESIDENT INSPECTORS OF LICENSEE ACTION ON l 1 PREVIOUS INSPECTION FINDINGS; LERSs LOCATION OF MANUAL TRIP CIRCUIT IN SOLID-STATE PROTECTION SYSTEM; MAINTENANCE; SURVEILLANCEs OPERATIONAL SAFETYs STARTUP TESTINGS HEADQUARTERS REQUESTS: REGION III REQUESTS EVENT FOLLOHUP; ALLEGATIONSs AND OTHER l l ACTIVITIES. THE INSPECTION CONSISTED OF 157 INSPECTUR-HOURS ONSITE BY 3 NRC INSPECTORS INCLUDING 27 INSPECTOR-HOURS DURING ' OFF-SHIFTS. OF THE 11 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN 10 AkEAS DNE VIOLATION HAS IDENTIFED IN THE REMAINING AREA (FAILURE TO PERFORM TECHNICAL SPECIFICATION SURVEILLANCES HHEN REGIURED). THE VIOLATION CITES 2 INSTANCES OF MISSED SURVEILLANCES HHICH HERE REQUIRED BY TECHNICAL SPECIFICATI0NSs HOWEVER, EXAMINATION OF THE STRIP CHART RECORDS INDICATED PAGE 2-048 l

Report Period JUL 1985 INSPECTION MMMNMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM STATUS - (CONTINUED) M BYRON 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SUPMARY THAT THE PARAMETERS HERE MAINTAINED HITHIN THEIR TECHNICAL SPECIFICATION LIMITS AT ALL TIMES; THEREFORE, THE PUBLIC HEALTH AND SAFETY HERE NOT AFFECTED. INSPECTION ON JUNE 3, 19-20, AND 24-25 (85026)* OF REACTOR VESSEL INTERVALSs RECORD REVIEN OF SAFETY-RELATED STRUCTURES: UNANNOUNCED SPECIAL SAFETY INSPECTION OF STEAM GENERA AND REVIEN OF RADIOGRAPHS AND REPORTS OF FIELD PIPING HELDS. THE INSPECTION INVOLVED A TOTAL OF 36 INSPECTOR-HOURS BY ONE NRC INSPECTOR. NO VIOLATIONS OR DEVIATIONS HERE INSPECTION 50.55(E) ON JUNE 19 AND 20 (85029): ROUTINE, ANNOUNCED SAFETY INSPECTION BY A REGIONAL INSPECTOR OF LICENSEE ACTIONS ON REPORTS, IE BULLETINS, AND UNIT 2 HORK ACTIVITIES ASSOCIATED WITH INSTALLATION OF INSTRUMENTS AND ASSOCIATED FITTINGS. THE INSPECTION DEVIATIONS HEREINVOLVED A TOTAL OF 13 INSPECTOR-HOURS ONSITE AND 3 INSPECTOR-HOURS OFFSITE BY ONE NRC INSPECTOR. IDENTIFIED. NO VIOLATIONS OR ENFORCEMENT SUPW9ARY NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: l NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: l START-UP TESTING LAST IE SITE INSPECTION DATE: AUGUST 2 - SEPTEMBER 3, 1985 INSPECTION REPORT NO: 85036 i PAGE 2-049

NNNNMMNNNNMMMMMMMNNNNNMMMNNNMMMMMMMM Report Period JUL 1985 REPQRTS FR0M LICENSEE M BYRON 1 N NMMNNNNMMMMMMMMMMMMNNNNNNNNNNNNNNNNM azzassssasassassssssssssssssssazzazzassansssssazzassassassazazasszzszassazzasssssssssssazassasssazzassssaamazzassasssazzzzzazzassa NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __

                                     ---.        _~_                        __                          _ . .           ..                                                                              __

85-60 04/ 16/85 07/16/85 RHST TEMPERATURE ABOVE 100 DEGREES F , 85-61 06/24/85 07/24/85 REACTOR TRIP 85-62 06/27/85 07/27/85 OVER TEMPERATURE DELTA T REACTOR TRIP / LOSS OF TWO CIRC HATER PUMPS 85-64 07/04/85 07/25/85 UNIT 1 CONTAINMENT VENTILATION ISOLATION zassssazzzazasaz=zzzazzzzzazzazzassassaz=sssazzzazzsazzazassassazzszzazzssazzzassazzassasss=sazzzzzzzzzzzzazzzazzzasssazzzzzazzass 4 I i i PAGE 2-050 i i

THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-051

1. Docket 50-483 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M CALLAHAY 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

ROB G00DENON (314) 676-8460 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 m y3
5. Nameplate Rating (Gross MHe): 1236
6. Design Electrical Rating (Net MWe): 1171
7. Maximum Dependable Capacity (Gross MWe): 1174 1500
8. Maximum Dependable Capacity (Net MHe): 1120 DESIGN E2EO. ItRTING - 1171
                                                                                                                    ... fWlX. DEPDO. Cfr. - 1120 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:
10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any ' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -100 NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 5,389.5 699.5 4,600.5 4,903.0
13. Hours Reactor Critical h
14. Rx Reserve Shtdwn Mrs .0 .0 .0
15. Hrs Generator On-Line 691.7 4,505.8 4,808.3
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Thers: Ener (MHH) 2,204.437 13,939,999 14,941,524 500 -
18. Gross Elec Ener (MHH) 745,763 4.719.036 5,058.216 ,. g
19. Net Elec Ener (MHH) 708.206 4.474,965 4,797.988
20. Unit Service Factor 93.0 88.6 89.2
21. Ur.it Avail Factor 93.0 88.6 89.2 -30
23. Unit Cap Factor (MDC Net) 85.q 78.5 79.5
23. Unit Cap Factor (DER Net) 81.3 75.1 76.0
24. Unit Forced Outage Rate 7.0 5.9 54 0 ,. .. , , 0 0 5 to 15.. 20.. 25 30
25. Forced Outage Hours 52.3 284.9 281d DP.YS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NOME # IE

37. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-052 I

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M Call.AHAY 1 M-MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date IEEE Rouri reason Method LER Number System Comoonent _ Cause & Corrective Action to Provent Recurrence 13 07/05/85 S J.0 5 5 LOAD REDUCED FOR SECONDARY PLANT EQUIPMENT MAINTENANCE AND CONDENSER TESTING. 14 37/18/85 F 43.0 A 3 85-034-00 REACTOR TRIP FROM 100% P0HER DUE TO ROD CONTROL RECTIFIER FAILURE. 15 07/31/85 F 9.3 G 3 85-036-00 REACTOR TRIP FRCM 100% POWER DUE TO INADVENTENT CLOSURE OF MFIV. s t u===MMMMudM CALLAMAY 1 OPERATED HITH 1 REDUCTION AND 2 OUTAGES DURING JULY. u

SUMMARY

M ECOMMMMMMMM Tvne Reason Met hod Svstem & Comoonent I- F-Fseced A-Eoulp Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                      & License Examination          9-Other                 (LER) File (NUREG-0161)

PAGE 2-053

_ _ - _ . _ . . . . _ _ . . . _ _ . . . - . _ _ _ _ _ - . _.m. _ , _ _ . . ,_ . , _ , _ _ _ . . . _ _ _ _ _ _ . _ _ _ , _ _ . . _ _ . _ ._ ._._.m.,,_ m. _ . - _ _ I DDr.MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM j O ' CALLAWAY 1 M , . DOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY

                                           ' STATE....................MISS0URI                                                                                        LICENSEE................. UNION ELECTRIC COUNTY...................CALLAHAY                                                                                         CORPORATE ADDRESS........P.O. BOX 149

' ST LOUIS, MISSOURI 63166 DIST AND DIRECTION FROM , NEAREST POPULATION CTR.. 10 MI SE OF CONTRACTOR FULTON, MD ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...NESTINGHOUSE DATE INITIAL CRITICALITY.. 0CTOBER 2, 1984 CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER IST GENER...DCTOBER 24, 1984 TURBINE SUPPLIER......... GENERAL ELECTRIC I~ DATE COMMERCIAL OPERATE.... DECEMBER 19, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER IE REGION RESPONSIBLE......III CONDENSER COOLING MATER.... MISSOURI RIVER IE RESIDENT INSPECTOR......B. LITTLE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. ALEXION COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-483 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....NPF-30, OCTOBER 18, 1984 PUBLIC DOCUMENT ROOM.......FULTON CITY LIBRARY 709 MARKET STREET FULTON, MO 65251 INSPECTION STATUS i INSPECTION

SUMMARY

i INSPECTION ON MAY 28-31 AND JUNE 14 (85014): ROUTINE ANNOUNCED INSPECTION OF LICENSEE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION FINDINGS; PUMP AND VALVE INSERVICE TEST PROGRAM IMPLEMENTATION; AND RESIEUAL HEAT REMOVAL PUMP TESTING. THE INSPECTION INVOLVED A TOTAL OF 20 INSPECTOR-HOURS ONSITE (INCLUDING 2 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS) AND 12 INSPECTOR-HOUP.S OFFSITE. IN THE THREE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN TH0 AREAS; ONE VIDLATION HAS IDENTIFIED IN THE REMAINING AREA (FAILURE TO MEET TECHNICAL SPECIFICATION 3.5.2 FOR ECCS SYSTEMS). i ENFORCEMENT

SUMMARY

I' i i NONE I i OTHER ITEMS ' 4 SYSTEMS AND COMPONENT PROBLEMS: NONE ) PAGE 2-054 I 4

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS- (CONTINUED) M CALLAHAY 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS 4 FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: AUGUST 5-9, 1985 INSPECTION REPORT NO: 85019 l REPORTS FR0M LICENSEE 3 3E=3E==E===R=E2233EE=EE=E=33ECEES==EEEEE333====E=SEEEEEEE=E==2EEEE==3===EEEE==E===E=E=E=3====3=====E=E=E=E=E===3=E=E==EEEEEEEEEE NUMBER DATE DF DATE OF SUBJECT EVENT REPORT ______ .. _ _ _ _ _-= __ _ .__. _ _ _ _ _ ____ 85-28 05/29/85 07/11/85 TECHNICAL SPECIFICATION VIOLATION 85-29 06/07/85 07/11/85 FAILURE TO MEET SURVEILLANCE REQUIREMENT 85-30 06/17/85 07/17/85 TECHNICAL SPECIFICATION VIOLATION 85-31 06/20/85 07/17/85 LO Lo STEAM GENERATOR LEVEL REACTOR TRIP 85-33 07/16/85 07/29/85 FAILURE TO SURVEILL TECH SPEC FIRE DOOR a==========E:=========E=======En::: ===sE===========E==E==============E=======E:E===E====================E======================== i PAGE 2-055

1. Dock et 50-517 0PERATINO STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M CALVERT CLIFFS 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

EVELYN BEHLEY (301) 787-5365 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2700 CALVERT CLIFFS 1
5. Nameplate Rating (Gross MWe): 1020 X 0.9 = 918
6. Design Electrical Rating (Net MWe): 845
7. Maximum Dependable Capacity (Gross MWe): 860 1500
8. Maximum Dependable Capacity (Net MHe): 825 DESIGN DIC. RRIING - 845
                                                                                                    ~~~~                              *            *
9. If Changes Occur Above Since Last Report, Give Reasons NONE
10. Power Level To Hhich Restricted, If Any (Net MHe):

11 Reasons for Restrictions, If Any NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 89,700.0 p
13. Hours Reactor Critical .0 ___2,282.6 69,780.5 ,_ _ , _ _ _ _ _ _ , _ _ _ _ _ _ , , , , _ _ _3g, g
14. Rx Reserve Shtdwn Hrs .0 14.3 1.999.2
15. Hrs Generator On-Line .0 2.184.2 68.355.0 ft)

E -80

16. Unit Reserve Shteen Hrs .0 .0 .0 17.-Gross Therm Ener (MHH) 0 5,792.566 169,575,305 500- -30
18. Gross Elec Ener (MHH) 0 1.968.684 56,012.064
19. Het Elec Ener (MHH) 0 1.882.872 53,439.439
                                                                                                                                                                  ~#

20 Unit Service Factor .0 42.9 76.2

31. Unit Avail Factor .0 42.9 76.2
32. Unit Cap Factor (MDC Net) .0 44.9 72 1M - 30

- 23. Unit Cap Factor (DER Net) .0 43.8 70 1 24.. Unit Forced Outnge Rate .0 4.2 8.3 0 , ,. , _, , _, O O 5 10 15 30 25 30

25. Forced Outage Hours .0 94.8 6,075.4 DfiYS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE JLA.Y 1985

27. If Currently Shutdown Estimated Startup Date: 08/06/85 M Item calculated with a Heighted Average PAGE 2-056

k MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R port Period JUL 1985 U.N I T SHUTD0WNS / REDUCTIONS M CALVERT CLIFFS 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvon Hours Reason Method LER Number System Comoonent Cause & Corrective Action to Provent Recurrence 85-03 04/05/85 S 744.0 C 4 RC FUELXX THE 7TH SCHEDULED REFUELING OUTAGE IS CONTINUING DUE TO INSULATION FAILURE ON THE MAIN GENERATOR STATOR AND FAILED UPPER AND LOHER SHAFT SEALS ON 11B REACT 00R COOLANT PUMP. THE MAIN GENLHATOR REPAIRS HERE COMPLETED ON JULY 29TH, 1985. MuxuMMMMMMM CALVERT CLIFFS 1 REMAINS SHUTDOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. M

SUMMARY

M KNEMMMMMMMM Tvon Rea so n Met hod Svutem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                     & License Examination           9-Other         (LER) File (NUREG-0161)

PAGE 2-057

I UZMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M CALVERT CLIFFS 1 M cMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... MARYLAND LICENSEE................. BALTIMORE GAS 8 ELEC COUNTY...................CALVERT CORPORATE ADDRESS........P.O. BOX 1475 BALTIMORE, MARYLAND 21203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI S OF CONTRACTOR ANNAPOLIS, MD ARCHI T ECT/ ENGINEER. . . . . . . BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 7, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... JANUARY 3, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....MAY 8, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CHESAPEAKE BAY IE RESIDENT INSPECTOR. . . . . .T. FOL EY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. JAFFE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-317 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-53, JULY 31, 1974 PUBLIC DOCUMENT ROOM.......CALVERT COUNTY LIBRARY FOURTH STREET PRINCE FREDERICK, MARYLAND 20678 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-058 f 4 b

4 ' MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

                           -Report Period JUL 1985                                  INSPECTION                    STATUS - (CONTINUED)                                             M         CALVERT CLIFFS 1                   M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS:

NO INPUT PROVIDED.

                                      . PLANT STATUS:

NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. l REPORTS FROM LICENSEE j 3==3==E==3=ES=32=3:3=333333=3=====E======3=======333333333333333333333=======3333=3=3E===3=33E=3=3:3=3===3=333=3===3===333===333=3 NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED. 3033==EEEE==3=3333=EEE==333=E3333333 3====E=ES=33=3:3=3======E33===333333=333=5333E=33333E=E323==3333333==3=3E==3=E33==========EEE a T 1 i 1 1 1 l PAGE 2-059 4

1. Dock et 50-318 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M CALVERT CLIFFS 2 x
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact EVELYN BEHL EY ( 310) 787-5365 AVERAGE DAILY POWER LEVEL (MHe) PLOT
0. Licensed Thermal Power (MHt): 2700 CRLVERT CLIFTS 2
5. Nameplate Rating (Gross NHe): 1012 X 0.9 = 911
6. Design Electrical Rating (Net MHe): 845
7. Maximum Dependable Capacity (Gross MHe): 860 1808 DESIGN E120. NRTIMO = 845
8. Maximum Dependable Capacity (Net MHe): 825 MRX. OEPDE3. Orr. - 825 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 75.055.0 rec suas se rua==a e erreu. contrisme
13. Hours Reactor Critical 553.8 4.527.9 61.085.9 --- - _- --------- -tooh

_ v-

14. Rx Reserve Shtdwn Hrs 190.2 190.2 1.158.5 60,130.3
15. Hrs Generator On-Line 553.3 4.511.9 f _go
13. Unit Reserve Shtchn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 1.468.212 1f.960.830 150.689.766 ,
18. Gross Elec Ener (MHH) 476.765 3.967.950 49.626,153
19. Net Elec Ener (MHH) 456.393 3.795.937 47.338,145
                                                                                                                                                                -40
20. Unit Service Factor 74.4 88.7 82.3
21. Unit Avail Factor 74.4 88.7 82.3
                                                                                                                                                                - 20
23. Unit Cap Factor (MDC Net) 74.4 90.4 78.9M
23. Unit Cap Factor (DER Net) 72.6 88.3 76.7 8
20. Unit Forced Outage Rate .0 7.9 6.2 0 5 1'o l's do is do
35. Forced Outage Hours .0 384.4 3.981.5 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                                                  .AA.Y 1985 REFUELING OUTAGE - 10/19/85 TO 12/22/85
37. If Currently Shutdown Estimated Startup Date: 08/06/85
  • Item calculated with a Helchted Average PAGE 2-060

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JU1 1945 UNIT SHUTD0NN$ / REDUCTIONS M CALVERT CLIFFS 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Bate E Maurs Reamon Method LER Number system Connonent Cause & Corrective Action to Prevent Recurrence 45-96 07/11/85 5 0.8 B 5 MA VALVEX LOAD HAS REDUCED TO ALLON MAIN TURBINE CONTROL VALVE TESTING AND CONDENSER TUBE BULLETING. 85-87 07/24/85 S 198.7 A 1 CC PIPEXX THE UNIT HAS SHUT DONN TO REPAIR COLD REHEAT PIPING. STARTUP IS BEING DELAYED HHILE REPAIRS ARE MADE TO 21 MAIN STEAM ISOLATION VALVE HYDRAULIC SYSTEM. 1 i i I n = MMMMMMM CALVERT CLIFFS 2 SHUTDONN ON JULY 24TH FOR MAINTENANCE. n SufMARY M n M MMMMMMM l Tvne Raaman Method Svetem & Camocnent F-Farced A-Equip Failure F-Admi n 1-Manual Exhibit F S H 1 S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                              & License Examination                              9-Other                 (LER) File (NUREG-0161)

PAGE 2-061

_ _ - . _ _ _ _ _ - - - = . . . - - ._ __ _. .- - . - - _ - - .. _ _ _ . _ _ _ _ _ _ . . - - - - _ - _ - _ _ . - . _ . _ _ _ - __ l EECMMMMMMMMMMMNNNNNMMMMMMNNMWMMMMMMM n CALVERT CLIFFS 2 m n==muunnummuummununnunununuMMMMMuunu FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . MARYL AN D LICENSEE................. BALTIMORE GAS & ELEC l l COUNTY...................CALVERT CORPORATE ADDRESS........P.O. 30X 1475 BALTIMORE, MARYLAND 21203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI S OF CONTRACTOR ) ANNAPOLIS, MD ARCHITECT / ENGINEER.......BECHTEL j TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING  ; ) DATE INITIAL CRITICALITY... NOVEMBER 30, 1976 CONSTRUCTOR... ..........BECHTEL DATE ELEC ENER IST GENER... DECEMBER 7, 1976 TURBINE SUPPLIER.........NESTINGHOUSE DATE COMMERCIAL OPERATE.... APRIL t, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING MATER.... CHESAPEAKE BAY IE RESIDENT INSPECTOR......T. FOLEY ELECTRIC RELIABILITY LICENSING TdOJ MANAGER.....D. JAFFE COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-318 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-69, NOVEMBER 30, 1976 i PUBLIC DOCUMENT R00M.......CALVERT COUNTY LIBRARY FOURTH STREET PRINCE FREDERICK, MARYLAND 20678 5 INSPECTION SUMARY i NO INSPECTIDM INPUT PROVIDED. ENFORCEMENT SUrmARY NONE I OTHER ITEMS SYSTEMS AND CDMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. [ PAGE 2-062 i

           - - - . _ . .             - - - - . . . - - .            ~ _ - . - . . . . . ~ . - . - - - - - . - . - . -                                     . . - .       . _ - . . . - - - . - - . ~ . . - . - - - . . - . - -

i. 1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M CALVERT CLIFFS 2 M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM } OTNER ITEMS e MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: , , NO INPUT PROVIDED. r LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE 33 3333= 333 3 33 333= 3 3 3 =3 3 3 E = 3 3 3=3 3 3 3 3 333 33 33 3 33 3 3 3 = 3 3 3 3 3 3 3 3 3 3 3 = 3 33 3 E 3 333 3 33:3 E3 3 3 3 3 3 3 3 3 = 3 3 3 3 3 3 3 3 3 E = E E 3E = = E = = = = 3 3 3 8 E3 E 5 3 E 3 3 3 3 3 3 3 3 3 3 3 3 5 '; NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ __ ..=-- __ l NO INPUT PROVIDED. j i 3333 ====33=====3==__. ..=3===========333s=33====3==33=3= ================== =----- ====-

]                                                                                                                                                                                                                                                   i.

T 1 i t

 ,                                                                                                                                                                                                                                                  i 1

i i 1 r l a a f i i t k l PAGE 2-063 " i i ! l s  !

1. Docket 50-413 0PERATING STATUS wuunummununuununuwuuuvuwwumunununwum M CATAWBA 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrst 744.0 MENMMMMMMMMMMMMMMuumMMMMMMMMMMMMwwMM
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 CATAMBA 1
5. Nameplate Rating (Gross MWe): 1205
6. Design Electrical Rating (Net MHe): 1145
7. Maximum Dependable Capacity (Gross MHe): 1145 15c0
                                                                                                                                              "       I
8. Maximum Dependable Capacity (Net MWe): 1145 ,

O. If Changes Occur Above Since Last Report, Give Reasons i

10. Power Level To Which Restricted, If Any (Net MHe) *
                                                                                                                                                                 -100
11. Reasons for Restrictions, If Any8 -

NONE 1000 - MONTH YEAR CUMULATIVE o

                                                                                                                                                                  - 80
12. Report Period Hrs 744.0 792.0 792.0 hl
13. Hours Reactor Critical 708.2 756.2 756.2 h
14. Rx Reserve Shtdwn Hrs .0 .0 .0 25 [
                                                                                                                                                                  -80
15. Hrs Generator On-Line 646.9 694.9 694.9 f

1

16. Unit Reserve Shtchn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 2,050,633 2,213.082 2.213.082 1
                                                                                                                                                                  - 40
18. Gross Elec Ener (MHH) 693.354 749,638 749,638
19. Het Elec Ener (MHH) 647.442 700,663 700,643
20. Unit Service Factor 86.9 87.7 87.7 86.9 87.7 87.7 - 30
21. Unit Avail Factor
22. Unit cap Factor (MDC Net) 76.0 77.3 77.3
23. Unit Cap Factor (DER Net) 76.0 77.3 77.3 0

Y 0

24. Unit Forced Outage Rate 13.1 12.3 12.3 .- . .- . . ,

0 5 to 15 ao as so

25. Forced Outage Hours 97.1 97.1 97.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date. Duration):
                                                                                                                                .AA.Y 1985 NONE
27. If Currently Shutdown Estimated Startup Date: 08/04/85 PAGE 2-064

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMkMM UNIT SHUTD0WNS / REDUCTIONS M CATAHBA 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date E Hours Reason Method LER Number Svstem domoonent Cause & Corrective Action to Prevent Recurrence ! 1-P 07/04/85 F 0.0 A 5 HH PUMPXX REDUCTION TO SECURE BOTH 'C' HEATER DRAIN PUMPS FOR i STEAM LEAK REPAIR. l 2-P 07/05/85 F 0.0 A 5 HH PUMPXX REDUCTION TO RESTORE BOTH 'C' HEATER DRAIN PUMPS AFTER STEAM L EAK REPAIR. 3-P 07/06/85 F 0.0 A 5 CH TURBIN CONDENSATE FEEDHATER PUMP TURBINE VENT LINE REPAIR. 4-P 07/06/85 F 0.0 F 5 RC FUELXX QUADRANT POWER TILT RATIO EUT OF SPEC. i 1 07/10/85 F 37.3 0 3 IA INSTRU CHANNEL OF NUCLEAR INSTRUMENTATION INADVERTENTLY ISOLATED DURING TEST. l 5-P 07/19/85 S 0.0 F 5 CC VALVEX TURBINE STOP VALVE TCSTING. 6-P 07/27/85 S 0.0 F 5 CC VALVEX CONTROL VALVE MOVEMENT TEST. 2 07/28/85 F 35.3 A 1 HC HEATEX CONDENSER TUBE LEAK REPAIRS. l 7-P 07/30/85 F 0.0 F 5 HH ZZZZZZ FEEDWATER CHEMISTRY OUT OF SPEC (CONDUCTIVITY AND CATION). 8-P 07/30/85 F 0.0 F 5 HH ZZZZZZ FEEDHATER CHEMISTRY DUT OF SPEC (CONDUCTIVITY AND CATION). 3 07/30/85 -F 24.5 A 1 CH PUMPXX FEEDWATER PUMP TRIP DUE TO HIGH PUMP DISCHARGE PRESSURE. n===MMMMMMM CATAMBA 1 OPERATED WITH 8 REDUCTIONS AND 3 OUTAGES IN JULY, SHUTTING DOWN FOR EQUIPMENT REPAIRS u

SUMMARY

M ON JULY 30TH. REEMMMMMMMM Tvee Reason Method System & Cocoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                              & License Examination               9-Other          (LER) File (NUREG-0161)

PAGE 2-065 l l

CCCZEMMMMMMEMMMMMMMMMMMMMMMMMMMMMMMM U CATAHBA 1 M ren==MMMMMMxMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICENSEE................. DUKE POWER COUNTY................... YORK CORPORATE ADDRESS........ POWER BLDG., BOX 2178 CHARLOTTE, NORTH CAROLINA 28201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 6 MI NNH OF CONTRACTOR ROCK HILL, SC ARCHITECT / ENGINEER....... DUKE POWER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JANUARY 7, 1985 CONSTRUCTOR.............. DUKE P0HER DATE ELEC ENER 1ST GENER... JANUARY 22, 1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 29, 1985 REGULATORY INFORMATION CONDENSER COOLING METHOD. . .HNDCT IE REGION RESPONSIBLE. ....II CONDENSER COOLING HATER.... LAKE HYLIE IE RESIDENT INSPECTOR......P. SKINNER ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....K. JABBOUR COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-413 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-35, JANUARY 17.1985 PUBLIC DOCUMENT R00M....... YORK COUNTY LIBRARY 138 E. BLACK STREET ROCK HILL, SOUTH CAROLINA 29730 INSPECTION STATUS INSPECTION

SUMMARY

          + INSPECTION APRIL 26 - MAY 25 (85-20): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 105 INSPECTOR-HOURS ONSITE IN THE AREAS OF SITE TOURS (UNITS 1 AND 2); FOLLOHUP OF LICENSEE AND NRC IDENTIFIED ITEMS (UNITS 1 AND 2); REVIEW OF NONCONFORMING ITEM DOCUMENTATION (UNIT 2); FOLLOHUP OF IE INFORMATION NOTICES (UNITS 1 AND 2); INSTRUMENTATION (COMPONENTS AND SYSTEMS) - OBSERVATION OF HORK (UNITS 1 AND 2); COMPARISON OF AS-BUILT PLANT TO FSAR DESCRIPTION (UNIT 2); MAINTENANCE DBSERVATIONS (UNIT 1);

SURVEILLANCE OBSERVATIONS (UNIT 1); REVIEW OF NON-ROUTINE EVENT REPORTS (UNIT 1); AND PLANT OPERATIONS REVIEW (UNIT 1). OF THE to AREAS INSPECTED. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN 8 AREAS; ONE APPARENT VICL ATION HAS FOUND IN ONE AREA- (FAILURE TO MAINTAIN CLEANLINESS CONTROL IN THE DIESEL GENERATOR ROOM - PARAGRAPH 5.C.), AND ONE APPARENT DEVIATION HAS FOUND IN ONE AREA (FAILURE TO MEET COMMITMENT TO REMOVE TEFLON TAPE - PARAGRAPH 3.D). INSPECTION MAY 26 - JUNE 25 (85-26): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 80.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF SITE TOURS (UNITS 1 AND 2); FOLLOHUP OF LICENSEE IDENTIFIED ITEMS (UNITS 1 AND 2); SAFETY-RELATED PIPE SUPPORT AND RESTRAINT SYSTEMS (UNIT 2); MAINTENANCE OBSERVATIONS (UNIT 1); SURVEILLANCE OBSERVATIONS (UNIT 1), REVIEW OF NONROUTINE EVENTS (UNIT 1); PLANT OPERATIONS REVIEW (UNIT 1); AND FOLLOHUP OF PREVIOUS IDENTIFIED INSPECTION FINDINGS (UNIT 1). OF THE EIGHT AREAS INSPECTED, NO VIOL ATIONS OR DEVIATIONS HERE IDENTIFIED IN SEVEN AREAS; ONE APPARENT VIOLATION HAS FOUND IN ONE AREA (FAILURE TO FOLLOW PORCEDURES HHILE PERFORMING OPERATING EVOLUTIONS, PARAv2APHS 9 AND 10. INSPECTION JUNE 7-8 (85-27): THIS SPECIAL, ANNOUNCED INSPECTION ENTAILED 12 INSPECTOR-HOURS ONSITE (4 HOURS ON BACKSHIFT) REVIEHING THE CIRCUMSTANCES OF A LICENSEC REPORTED PHYSICAL SECURITY EVENT AND VERIFYING CORRECTIVE ACTIONS. ONE VIOLATION OF REGULATORY REQUIREMENTS HAS IDENTIFIED - FAILURE TO PROVIDE POSITIVE ACCESS CONTROL TO A VITAL AREA. PAGE 2-066

_ _ . _. _. .m . _ . . . _ _ _ _ . _ . ._ __ _ . _ _ . . . _ . . _ _ _ . _ _ _ _ _ . . . . _ _ _ _ . . _ _ . . . _ _ _ _ . . . - . . _ . . . _ _ . . Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l INSPECTION STATUS - (CONTINUED) M CATAWBA 1 N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SU19tARY INSPECTION JUNE 24-28 (85-IS): THIS ROUTINE. UNANNOUNCED INSPECTION ENTAILED 27 INSPECTOR-HOURS ONSITE IN THE AREAS OF REVIEH OF COMPLETEL STARTUP AND SURVEILLANCE TEST PROCEDURES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 24-28 (85-30): THIS ROUTINE. UNANNOUNCED INSPECTION ENTAILED 34 INSPECTOR-HOURS ONSITE IN THE AREAS OF DESIGN CNANGES AND TESTS AND EXPERIMENTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NOME OTHER ITEMS SYSTEMS AND COMPONENT PR08LEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES) NONE. MANAGERIAL ITEMS NONE. PLANT STATUS: NOME. LAST IE SITE INSPECTION DATE: JUNE 24-28, 1985 + INSPECTION REPORT NO: 50-413/45-30 + i PAGE 2-067 l _ _ _ _

_ - _ _ _ _ _.._ _. . ._. _ _ . . _ _ _ . . _ _ _ . - . _ . _ _ _ _ _ _ _ _ _ _ _ _ __.m._ _ __ _. . . _ _ _ _ . _ _ _.,____ _ _ _ _ . ._ ) i l i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 REP 0RTS FR0M LICENSEE M CATAWBA t M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM $ ==m a=E====zazzazas 3ama:Em ammz = === == saz=ammas sasa zzas sam m a ss33= = =z z== === ssas smasa zz=m3 zzzz= sas=s3 33sssm azzzzz3sazz asa s=sassE3s = 1 NUMBER DATE OF DATE OF SUBJECT I EVENT REPORT l l 85-035 05/28/85 06/27/85 MOTOR DRIVEN AUXILIARY FEEDWATER PUMP AUTOMATIC START. THE NUCLEAR CONTROL OPERATOR ! INAPPROPRIATELY VERIFIED THE POSITION OF VALVE. 85-036 05/10/85 06/27/85 INCORRECT CALIBRATION OF UHI LEVEL INSTRUMENTATION. THIS INCIDENT IS CLASSIFIED AS A PROCEDURAL i DEFICIENCY. 85-038 01/10/85 07/03/85 RETEST NOT PERFORMED FOLL0HING CORRECTIVE MAINTENANCE ON ISOLATION VALVE. THE PLANNER DID NOT FOLLOW THE APPROPRIATE PROCEDURE. l 85-039 05/23/85 07/05/85 REMOVAL OF SEISMIC SPACERS RENDERS VITAL BATTERY BANK INOPERABLE. THE TECHNICIAN FAILED TO REINSTALL THE SEISMIC SPACERS. 85-040 06/05/85 07/05/85 FAILURE TO VERIFY ALTERNATE POWER SOURCE AVAILABILITY, DUE TO PERSONNEL ERROR. 3 33 333 2==33=3 333 E2E2:E =E =3E 33 3 3 33 3333 33 33 33 33 3 3 33333 =3 3 33E 3 33 3 3 3 E 3 333 3 33 353 5 33 3 3 3 3 3 E =33 3 333 3 E33 3 3 3 3 33 3 3 33 33 3 3 3 33 3 33 33 3 33 3 3 33 33 33 3 3 a J l 4 6 1 PAGE 2-068 { 4 i 4

  * - - +   . ..- , . m 4 -

sw.A .__m.p. ~__L. - _&.- -.A 4.s_h.- . -a . ..L. - * --. - 6 ~. - - -* --. A 4 ---- L - -* - e t THIS PAGE INTENTIONALLY LEFT BLANK 1 1 PAGE 2-069 I 2

1. Docket
  • 50-315 0PERATING STATUS unmusammunusunnusunnusunummmmmmmmuum a COOK 1 m
2. Reporting Period: 07/01/8. Outage + On-line Mrs: 744,0 numammusumunumannusuwwwwumunamammuun
3. Utility

Contact:

H. T. GIttETT (616) 465-5909 AVERAGE DAILY P0HER LEVEL (MWe) PLOT 4- Liconsed Thermal Power (MHt) 3250 COOC 1

5. Nameplate Rating (Gross MWe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Net MWe): 1030 1"
7. Maximum Dependable Capacity (Gross MWe): 1056 (ESI98 ELEC. IWITINS = 1030
8. Maximum Dependable Capacity (Not MHe): 1020 g ,
                                                                                                                                                                                        , gg g
9. If Changes occur Above Since Last Report, Give Reasons:

f I NOME I to. Power Level To Which Restricted, If Any (Net MWe): St. Reasons for Restrictions. If Any: NO PE'T P06ER OUTPUT THIS MONTH NOME --------------------------------------- - 300 2000-MONTH YEAR CUMULATIVE

12. Report Period Mrs 744.0 5.087.0 92.759.0
13. Hours Reactor Critical .0 1.868.0 67.572.1 , so
14. Rx Reserve Shtchn Mrs .0 .0 463.0
15. Hrs Generator On-Line .0 1.856.2 66.217.7 h
                                                                                                                                                                                                     -ec
16. Unit Reserve Shtchn Mrs .0 .0 321.0
17. Gross Thern Ener (tb?t) 0 5.418.521 193.587.995 gaa.
13. Gross Elec Ener (Mtat) 0 1.761,840 63.533.730
                                                                                                                                                                                                     -40
19. Net Elec Ener (MWH) 0 L.iaL 8t}.} 61.125.948 i
20. Unit Service Factor .0 36.5 73,0 l
21. Unit Avail Factor .0 36.5 75.0 -
                                                                                                                                                                                                     .ao
22. Unit Cap Factor (MDC Net) .0 32.7 66.t
23. Unit Cap Factor (DER Net) .0 32.3 63.5
24. Unit Forced Outage Rate .0 .0 7.2 0 5 s'o t's 2IO ais 50 i 4.499.4 OMS
25. Forced Outage Hours .0 .0
25. Shutcbuns Sched Over Next 6 Months (Type,Date Duration):

JLY 1985 , MONE

27. If Currently Shutdown Estimated Startup Date: 09/01/85 PAGE 2-070  ;

l

l l I Sepect Period JUL 1985 n u m m m m m m m mm m m m m m m m m m m m m m m m m mm m m m m m m UNIT SMUTB0NN5 / REDUCTIONS m COOK 1 m unumammmmmmmmmmmmmmmmmmmmmmmmmmmunna No. Bate E E Reanna hthod LER haber b utam domannant Cauen a Carrective Actinn to Prawant Recurrenca  ! 2M 94/96/85- S 744.0 C 4 ZZ ZZZZZZ THE UNIT MAS REMOVEB FROM SERVICE FOR THE SCMEDULED " TEN-YEAR ISI ANS CYCLE VIII - IV REFUELING OUTAGE. THE CORE MAS BEEN RELOADED. THE DUTAGE MAS SEEN

  • EXTENDED TO COMPLETE MAJOR REGUIRED DESIGN CHANGES. l THE ESTIMATED RETURN TO SERVICE BATE 15 SEPTEMSER t, 1945.

I b l i l I l i l cucummennen COOK 1 REMAINS SMUTBOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. u supseARY a necumammann Twan Ramana Met hod Svetas R Cnananant F-Ferced A-Ecosip Failure F-Admin 1-Manual Exhibit F & H 5-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of B-Regulatory Restriction 4-Continued Data Entry Sheet I E-Operator Training 5-Reduced Load Licensee Event Report

                                               & License Examination                                                   9-Other                                      (LER) File (NUREG-0161)                                                                                                      t PAGE 2-07*                   [

4 s i ccommmmmmmmmmmmmmmmmmmmmmmmmmmmmanum

 !                     n                            COOK t                               a
 !                     ccummmmmmmmmmmmmmmmmmmmmmmmmmmmmanum                                                       FACILITY                           DATA                                                      Report Period JUL 1985 FACILITY DESCRIPTION                                                                                               UTILITY & CONTRACTOR INFORMATION i

LOCATION UTILITY

 '                                 STATE....................MICMIGAN                                                                              LICENSEE................. INDIANA & MICHIGAN ELECTRIC COUNTY.................. 5ERRIEN                                                                               CORPORATE ADDRESS........t RIVERSIDE PLAZA COLUMSUS, DMIO 43216 BIST AND DIRECTION FROM NEAREST PDFULATION CTR...tt MI $ OF                                                                        CONTRACTOR i                                                                           SENTON MARDOR, MI                                                   ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP.

TYF E OF REACTOR. . . . . . . . . . . . PHR NUC STEAM SYS SUPPLIER...WESTINGMOUSE

]

DATE INITIAL CRITICALITY... JANUARY 18, 1975 CONSTRUCTOR..............AMERICAN ELEC. PONER SERVICE CORP.

 !                           DATE ELEC ENER 1ST GENER... FEBRUARY 18, 1975                                                                        TURBINE SUPPLIER......... GENERAL ELECTRIC
  )

BATE Com4ERCIAL OPERATE.... AUGUST 27, 1975 REGUL ATORY INFORMATION CONDENSER COOLING METHOB...ONCE THRU IE REGION RESPONSIBLE......!!! CONDENSER COOLING WATER....LAEE MICHIGAN IE RESIDENT INSPECT 08t... . . 3. JURGENSEN 1 ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. WIGGINTON 1 COUNCIL.................. EAST CENTRAL AREA DOCKET NUMBER........... 58-385 l RELIABILITY C00ADINATION

!                                                                                   AGREEMENT                                                  LICENSE & DATE ISSUANCE....DPR-54, DCTOBER 25, 1974
.                                                                                                                                              PUBLIC DOCUMENT R00M.......MAUDE PRESTON PALENSEE MEMORIAL LIBRARY l                                                                                                                                                                                   500 MAREET STREET

{ ST. JuSEPM, MICHIGAN 49845 j IMSPECTION $TATUS i INSPECTTON SUNGARY INSPECTION ON APRIL 22, MAY 15-17, MAY 23-24, AND JUNE 19 (85051)* ROUTINE, UNANNOUNCED INSPECTION OF TME RADIATION PROTECTION i PROGRAM DURING A REFUELING AND MAINTENANCE OUTAGE INCLUDING: CMANGES IN ORGANIZATION, PERSONNEL, FACILITIES, EGUIPMENT, PROGRAMS, I AND PR3CEDURES; AUDITS AND APPRAISALS: PLANNING AND PREPARATION; TRAINING AND GUALIFICATIONS OF NEW PERSONNELs INTERNAL AND EXTERNAL EXPOSURE CONTROLS CONTROL OF RADIDACTIVE MATERI ALS AND CONTAMINATION, SURVEYS, AND MONITORING; AND THE ALARA PROGRAM. ', ALSD, CERTAIN TMI ACTION PLAN ITEMS. OPEN ITEMS, RADIATION PROTECTION ORGANIZATION AND STAFF STABILITY, A CONTAINMENT AIRBORNE RADI0 ACTIVITY INCIDENT, AND AN ALLEGATION SY A FORMER EMPLOYEE HERE REVIEWED. THE INSPECTION INVOLVED 71 INSPECTOR-MOURS ONSITE BY TWO NRC INSPECTORS. THREE VIOL ATICMS WERE IDENTIFIED (FAILURE TO CCP'tY HITH A TMI ACTION FLAN CONFIRMATORY ORDER, FAILURE TO POST AND BARRICADE A MIGN RADIATION AREA, FAILURE TO PERFORM NECESSARY SURVEYS). INSPECTICM CN JUNE 18 AND 19 (8501838 INCLUDED AR REVIEW OF TWO SECURITY EVENTS / INCIDENTS, PERTAINING TO VITAL AREA ACCESS CCNTROL AND CNE EVENT PERTAINING TO REPORTING AN INCIDENT TO TME hRC. THE INSPECTION It*VOLVED 13 INSPECTOR-MOURS SY CNE NRC i INSPECTOR. l

Eur0RCEMENT SUN 4ARY

! NONE PAGE 2-072 1 1 1

_ _ . _ - . . _ _ _ _ _ _ _ _ _ _ - . . . __.._.__.m_ _ _ _ _ _ _ _ _ _ _ _ _ . _ l i l l l Report Period JUL 1985 nummmmmmmmmmmmmmmmuummmmmmmmmmmmmmmu INSPECTION $TATUS - (CONTIIIUED) u COOK 1 m nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu STMR ITDes SYSTEMS Aass C8MPSNENT PROSLERS: user FACILITY ITEMS (PLANS AND PROCEDURES): IIGSIE 8e4ItaGERIAL ITEMS: IISIIE PLAalT STATUS: UIBIT IS IN REFUELIIIG/MAINTEMAseCE OUTAGE. LAST IE SITE INSPECTIOlt BATE: SEPTEMBER 3-6. 1985 INSPECTIDst REPORT Nes 35024 REP 0RTS FR0M LICENSEE 3333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333133333333333333333333333333333333333 MNGER MTE OF DATE OF SUBJECT EVENT REPORT 85-27 96/94/85 87/85/85 INOPERABLE FIRE BARRIERS 45-28 06/13/85 97/12/45 INOPERABLE FIRE BARRIER 45-29 86/24/85 87/24/85 IIIOPERABLE FIRE B00ES 33333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333=3333333333 PAGE 2-073

1. Dockets 58-316 0PERATING STATUS nummmmmmmmmmmmmmmmmanummmmmmunuunuma a C00tC 2 m
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 nummumummmmmmmmmmmmmmmmmusummmmmmmum
3. Utility

Contact:

W. T. CIttETT (616) 465-5901 AVERAGE DAILY POWER LEVEL (Ptee) PLOT

4. Licensed Thermal Power (ftet): 3411 COtX 2
5. Nameplate Rating (Gross fede): 1333 x 0.85 = 1933
6. Desi m Electrical Rating (Net Ptee): 1900 1100 888
7. Maximum Dependable Capacity (Gross rede):
                                                                                                                                                                                                       *EN~          IIOO
8. Maximus Dependable Capacity (Net fede): 1060 3HE. MPEB83. INP. - IIM3 (100E3
9. If Changes occur Above Since Last Report. Give Reasons:

MOME

10. Power Level To mich Restricted. If Any (Net Ptee): 9 tt. Reasons for Restrictions. If Any:
                                                                                                                                                          >=- )

NOME It0 NTH YEAR CUMULATI'uE A t I

12. Report Period Mrs 744.0 5.087.0 66.455.0
13. Hours Reactor Critical 357.2 4.409.2 47.489.2
                                                                                                                                                                                                                                 ~88 h
14. Ex Reserve Shtchn Mrs .0 .0 .0
15. Mrs Generator Cn-Line 357.0 4.390.5 46.389.4 f ~
14. Unit Reserve Shtchn Mrs .0 .0 .0
17. Gross Thern Ener (Ptet) 1.049.002 14.576.669 150.053.576 g,,
13. Gross Elec Ener (MWH) 318.510 4.755.440 48.543.690 j -40
19. Net Elec Ener (Pt4M) 305.215 4.592.984 46.810.700
20. Unit Service Factor 48.0 86.3 72.6
21. Unit Avail Factor 48.0 86.3 72.6 -as
22. Unit Cap Factor (MOC Net) 33.7 85.2 69.1
25. Unit Cap Factor (DER Net) 37.3 82.1 67.7 0 . . , , , , o 13.7 12.7
24. Unit Forced Outace Rate 52.0 e 5 to 15 an as 3 '
25. Forced Outage Hours 387.0 696.5 6.757.0 DMS
25. Shutdcwis Sched Over Next 6 Months (Type.Date Duration): ,
                                                                                                                                                                                                    .AA.Y 10M                                                        i SEFUELING 8 FAINT.: 11/07/E5 - 5 FOMTHS
27. If Currently Shutdowri Estinated Startup Date: 05/07/85 PAGE 2-074 f
  - _  _ ~ - . _   - _ - - - .            . . - - - . . . - _ .                 . _ - . - - - -              . _ _ _ _ _

_ , _._ _ ,__ _ . _ . _ . _ . _ _ _ _ _ _ _ - - . - _ - . - ._ - . ~ _ - _ - . ___ Report Perled JUL 1985 maammmmmmmmmmmmmmmmmmmmmmmmmmmmmunen UNIT SMUTB0NN3 / RE3UCTION$ m COOK 2 m muumummmmmmmmmmmmmmmmmmmmmmmmmmmmmma Ra. Bate M h Reason Method LER n' * -- Srstem domannant Cause R CarrectIva Actinn en Prawant Recurrence 16 1 87/83/85 F 8.3 A 5 RS INSTRU REACTOR POWER WAS REDUCED TO 47% DUE TO AN INDICATED i MISALIGNED GROUP OF RODS IN CONTROL BANK 'D'. THE l MISALIGNMENT HAS FOUND TO BE CAUSED BY ROD CONTROL l PROBLEMS. WHILE AT THE REDUCED POWER. THE MAIN FEED

PUMP TURBINE CONDENSERS WERE CHECKED FOR CONDENSER TUBE LEAES. REACTOR PONER MAS RETURNED To 100% ON 354794.

16 2 07/15/85 F 347.8 A 1 CC MTEXCH i THE UNIT MAS REMOVEB FROM SERVICE AT 2100 HOURS ON 858715 i DUE TO AN INCREASE IN THE CALCULATED STEAM GENERATOR PRIMARY TO SECONDARY LEAK RATE. ONE LEAKING TUBE HAS IDENTIFIED AND EDDY CURRENT TESTING IDENTIFIED ONE TUBE WITH 94% DEGRADATION. SOTH TUBES HERE MECMANICALLY PLUGGED. AT THE END OF THE REPORTING PERIOD THE REACTOR COOLANT SYSTEM MAS IM. i I i c::=runn emen COOK 2 OPERATED WITH t REDUCTION AND 1 DUTAGE DUE TO EQUIPMENT FAILURE, AND SHUTDOWN FOR REPAIRS n SupetARY a 04 JULY 15TM. l' cm rummanum Twem Raamaa Method S< stem 8 Commonent i F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H 3-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueli ng M-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Lvent Report

                            & License Examination                           9-Other                (LER) FIIe (NUREG-0161)

PAGE 2-075

_ _ _ _ _ _ . - _ . _ _ _ . _ _ _ . _ _ _ _ _ __ _ m _ _ _ _ _ _. - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . i

                    ==..................................                                                                                                                                                                                    !
 !                  u                                                                                                                                                                                       Report Period JUL 1945 1                   ra: . . . . . . . . . . . .C.00Et.2.
                                                     ..     . . . . . . . . . . .. . . . .. FACILITY                          DATA                                                                                                      l FACILITY DESCRIPTION                                                                             UTILITY & CONTRACTOR INFORMATION i,                                                                                                                                                                                                                                         i j                         LOCATION                                                                                      UTILITY j                             STATE.................... MICHIGAN                                                          LICENSEE................. INDIANA & MICHIGAN ELECTRIC COUNTY...................BERRIEN                                                            CORPORATE ADDRESS....... 1 RIVERSIDE PLAZA l
 ,                            DIST AND DIRECTION FROM                                                                  CONTRACTOR                                                                                                          l
<                             NEAREST POPULATION CTR...tt                   MI $ OF BENTON HARBOR, MI                                    ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP.                                                     i 1

f I TYPE OF REACTOR............PWR NUC STEAM SYS SUPPLIER... WESTINGHOUSE i

;                        DATE INITIAL CRITICALITY... MARCH 18, 1978                                                       CONSTRUCTOR..............J. A. JONES CONSTRUCTION                                                                l 1

DATE ELEC ENER 1ST GENER. . . MARCH 22, 1978 TURBINE SUPPLIER......... BROWN BOVERI i REGULATORY INFORMATION  ; DATE CoretERCIAL OPERATE.... JULY 1, 1978 i CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING MATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......B. JURGEN3EN t ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....B. WIGGINTON COUNCIL.................. EAST CENTRAL AREA DOCKET hUMBER........... 50-316 i i RELIABILITY COORDINATION AGREEMENT LICENSE a DATE ISSUANCE....DPR-74, DECEMBER 25, 1977 PUBLIC DOCUMENT ROOM.......MAUDE PRESTON PALENSKE MEMORIAL LIBRARY s ) 500 MARKET STREET l ST. JOSEPH, MICHIGAN 49085 i 4 INSPECTION 5TATUS  ;

!                     INSPECTTON SUfetARY l

I INSPECTION DN APRIL 22 MAY 15-17 MAY 23-24, AND JUNE 19 (85011): ROUTINE, UNANNOUNCED INSPECTION OF THE RADIATION PROTECTION PROGRAM DURING A REFUELING AND MAINTENANCE OUTAGE INCLUDING: CHANGES IN ORGANIZATION, PERSONNEL, FACILITIES, EGUIPMENT, PROGRAMS, i AND PROCEDURES: AUDITS AND APPRAISALSs PLANNING AND PREPARATIO4; TRAINING AND QUALIFICATIDMS OF NEW PERSONNELs INTERNAL AND ( i EXTERNAL EXPOSURE CONTROL CONTROL OF RADIDACTIVE MATERIALS AND CONTAMINATION, SURVEYS, AND MONITORINGs AND THE ALARA PROGRAM. + ALSD, CERTAIN TMI ACTION PLAN ITEMS, OPEN ITEMS, RADIATION PROTECTION ORGANIZATION AND STAFF STABILITY, A CONTAINMENT AIPSORNE  ; i RADI0 ACTIVITY IFCIDENT, AND AN ALLEGATION SY A FORMER EMPLOYEE WERE REVIEWED. THE INSPECTION INVOLVED 71 INSPECTOR-HOURS ONSITE l BY TWO NRC INSPECTORS. THREE VIOLATIONS NERE IDENTIFIED (FAILURE TO COMPLY WITH A TMI ACTION PLAN CONFIRMATORY ORDER, FAILURE TO 1 POST AND BARRICADE A HIGH RADIATION AREA, FAILURE TO PERFORM NECESSARY SURVEYS). i INSPECTION ON JUNE 18 AND 19 (85819): INCLUDED AP REVIEW OF TWO SECURITY EVENTS / INCIDENTS, PERTAINING TO VITAL AREA ACCESS I CONTROL AND ONE EVC TERT AINING 10 REPORTING AN INCIDENT TO THE NRC. THE INSPECTION INVOLVED 13 INSPECTOR-HOURS BY ONE NRC t

!                         INSPECTOR.

t I ENFORCEMENT Supe %RY NONE s i  ; 1 PAGE 2-076 &

)

I i

1 r

I

l l l f l Report Period JUL 1985 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum IN3PECTION $TATUS - (CONTINUEB) m COOK 2 m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuman STRIER ITDis SYSTDtS ANS CefFONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MNAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY LAST IE SITE INSPECTION DATE: SEPTEMSER 3-6, 1985 INSPECTION REPORT NO: 85824 REP 0RT$ FR0M LICEN5EE E33333333333333333333333333333333333333333333333333333333333E33333333333333333333333333333333E3333E=3EE333333E33333333333333333333 NUMBER DATE OF DATE OF SUBJECT EVENT REPORT E33333333323EE33333333333ESSEEEEE33EE3333333333E333EE333333333EE333333333333EEE3EEEEEE3333EE33333EEE333333IEEE3EEE3EE333333 gEggggg P PAGE 2-877

1. Docket 50-298 0PERATING STATUS unnunummunusununummuununummununummum u COOPER STATION N
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 unusunnummununununnununnummunummmmmu
3. Utility Contacts J. K. SALISBURY (402) 825-3311 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (Psit): 2381 COWTR STRTION
5. Nameplate Rating (Gross MWe): 983 X 0.85 = 836
6. Desim Electrical Rating (Net 704e)* 778
7. Maximum Dependable Capacity (Gross MWels 787 1seo I"
  • EI" ~ ##8
8. Maximum Dependable Capacity (Net MWe): 764 fMK. IEPDC. INF. - 794 1100K3
9. If Changes Occur Above Since Last Report Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net 704e):
11. R.asons for Restrictions. If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Mrs 744.0 5.087.0 97.176.0
15. Hours Reactor Critical .0 .0 72.955.6 NO PET N (XJTPtJT THIS M k
                                                                                                          .0              *------=== ======--- -- -- -----------                         -100
14. Rx Reserve Shtdwn Mrs .0 .0 71 820.6
15. Hrs Generator On-Line .0 .0 l -88
15. Unit Reserve Shtchn Mrs .0 .6 .0
17. Gross There Ener (Pt4H) 0 0 141.440.011
                                                                                                                                                                                         -80
18. Gross Elec Ener (P5dH) 0 0 45.024.496
19. Net Elec Er ar (PG4H) 0 0 43.386.612
                                                                                                                                                                                         - 40
20. Unit Service Factor .0 .0 73.9
21. Unit Avall Factor .0 .0 73.9
                                                                                                                                                                                         -30
22. Unit Cap Factor (ItDC Nat) .0 .0 58.4
25. Unit Cap Facter (DER Net) .0 .0 57.4 0

' 24. Unit Forced 'Astage Rate .0 .0 3.7 0, g g g g g g

25. Forced Outage Hours .0 .0 2.090.7 DRYS
26. Shutdooms Sched Over Next 6 Months (Type,Date Duration):
                                                                                                                                                 .ALY 1985 NOME
27. If Currently Shutdoom Estimated Startup Date: C8/11/85 PAGE 2-078

Repo-t Period JUL 1985 NEENENNNNEEENMNNNNNEENNEENENNNNNNNEN UNIT SHUTD0WN$ / REDUCTIONS m COOPER STATION N MMNNNWMNNWMMMMMMNNNNMENNNNMENNENNNNM No Date }335 Hours ERJson Method LER Number Systen Comoonent Cause & Corrective Action to Prevent Recurrence 84-7 09/16/84 5 744.0 C 4 RC FUELXX REFUELING & MAINTENANCE CONTINUES. l l l i l [ l 1 l cr:NunnumNu CDOPER STATICN REMAINS SHUTDOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. n

SUMMARY

a caramannunu Tvee Re a son Met hod Svstem 8 Cocoon en t F-Forced A-Eauip Failure F- A dmi n 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Coerator Training 5-Reduced Load Licensee Event Report

                   & License Examination                   9-Other          (LER) File (NUREG-0161)

PAGE 2-079

I n . Report Period JUL 1985

                   .. ...... ..C.O.O.PE.R.S.T. ..         .A.T.      I O.N
                                                               .............                                FACILITY                     DATA FACILITY BESCRIPTION                                                                                        UTILITY & CONTRACTOR INFORMATION LOCATION                                                                                                  UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . MEBRASRA                                                  LICENSEE................. NEBRASKA PUBLIC POWER DISTRICT
!                         COUNTY...................NEMANA                                                                           CORPORATE ADDRESS........P.O. BOX 499 COLUMBUS, NEBRASKA 68681 BIST EMS DIRECTION FROM NEANEST POPULATION CTR.. 25 MI $ OF                                                                    CONTRACTOR NEBRASKA CITY, NES                                       ARCHITECT / ENGINEER....... BURNS & ROE TYPE OF REACTOR............BWR                                                                               NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE IMITIAL CRITICALITY... FEBRUARY 21, 1974                                                                CONSTRUCTOR.............. BURNS & ROE l                       BATE ELEC ENER tST GEMER...MAY 10, 1974                                                                      TURBINE SUPPLIER......... WESTINGHOUSE a

DATE CopetERCI AL OPERATE.... JULY 1, 1974 REGUtATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU . IE REGION RESPONSIBLE. . . . . .IV CONDENSER COOLING MATER.... MISSOURI RIVER IE RESIDENT INSPECTOR......D. DUSOIS l ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. SYLVESTER j COUFCIL . . . . . . . . . . . . . . . . . .MI D-CONT I NENT AR EA DOCKET NUMBER........... 50-298

>                                                                                RELIA.ILITY COORDINATION j                                                                                AGREEMENT                                       LICENSE & DATE ISSUANCE....DPR-46, JANUARY 18, 1974 PUBLIC DOCUMENT KCOM....... AUBURN PUBLIC LIBRARY                                                     ,

t118 15TM STREET AUBURN, NEBRASKA 68305 IN5PECTI0N 3TATUS INSPECTION SupWWLRY j $ INSPECTION CONDUCTED MAY t-31, 1985 (85-16) ROUTINE UNANN0UNCED INSPECTION OF OPERATIONAL SAFETY VERIFICATION, MONTHLY SURVEILLANCE AND MAINTENANCE OBSERVATIONS, LICENSEE l i ACTION CM PREVIOUS INSPECTION FINDINGS, NONDESTRL*CTIVE EXAMINATION ACTIVITIES ASSOCIATED HITH RECIRCULATION, CORE SPRAY, AND REACTOR HATER CLEANUP SYSTEMS PIPING REPLACEMENT, AND DESIGN CHANGES AND MODIFICATIONS. THO VIOLATIONS HERE IDENTIFIED (INADEGUATE PROCEDURES, AND INCOMPLETE TEST RECORDS). I IMSPECTION CONDUCTED MAY 6-10, 1985 (85-173 ROUTINE. UNANNOUNCED INSPECTION OF THE PHYSICAL SECURITY PLAN (PSP) AND IMPLEMENTING PROCEDURES, SECURITY ORGANIZATION, MANAGEMENT i EFFECTIVENESS. TESTING AND MAINTENANCE, PHYSIS 4L BARRIERS - PROTECTED AND VITAL AREAS, AUDITS, COMPENSATORY MEASURES, ASSESSMENT l AIDS, CQpWOUNICATIONS, GutRD TRAINING AND GUALIFICATIONS, DETECTION AIDS - PROTECTED AND VITAL AREAS, AND ALARM STATION'a. [ I NO VIDLATIONS HERE IDENTIFIED. h PAGE 2-888 i

 -- . _ . - . _ - . _ . _ _ _ -          - - -        _ _ - - _ _ - -                  . .     - _ _ - . - - - - - _ - - - , . -                      ~      -- . _ - _ - . .          -      . . . . .     .. .-

s. Report Period JtE 1985 NNNNENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN IN$PECTION 5TATUS - (CONTINUED) N COOPER STATION N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN gyFn4 MMENT SUfWtARY IMABILITY TO DOOONSTRATE HEAPJds GUALIFICATION INADEGUATE SECURITY SYSTEM MAINTENANCE (8541 4) i C04.TRARY TD 18 CFR PART 58. APPENDIX 3. CRITERION XVII. THE LICENSEE FAILED TO PROVIDC ALL REQUIRED INFORMATION ON, AND ACCEPl ASILITY STATUS OF. RADIOGRAPNIC READER SNEETS. CONTRARY TO le CFR PART 50. APPENDIX 5, CRITERION V, THE LICEN58EE FAILED TO FOLLON CNS PROCEDURE 8.5. (C58t 5) I OTHER ITEMS ! l i SYSTEMS AND COMPONENT PROBLEMS: 900NE FACILITY ITEMS (PLANS AND PROCEDURES): t II000E ' MANAGERIAL ITEMS:

              .MGME PLANT STATUS:

SHUTDOWN FOR BWR RECIRCULATION SYSTEM PIPING REPLACEMENT LAST IE SITE INSPECTION DATEt MAY 6-10, 1985 INSPECTION REPORT NO: 50-298/85-17 ' REP 0RT$ FR0M LICEN5EE ST33333333333333333333333333333333333333333333333333333333333=3333333333333333333333333333333333333333333333333333=331333?"333==33 NUMBER DATE OF DATE OF SUBJECT ' EVENT REPORT l 85-035 5/28/85 7/5/85 SETPOINT DRIFT OF SAFETY AND SAFETY RELIEF VALVES. l L PAGE 2-081 i I

t. Docket 50-302 0PERATING STATUS unnuuuuuuuuumuuuuuuuuuuuuuuuuuuunnun u CRYSTAL RIVER 3 u
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 ununymuuuuuuuuuuuuuuuuuuuuuuuuuunnun
3. Utility

Contact:

D. GRAHAM (904) 795-3802 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MWt): 2544 CRYSTfL RIVER 3
5. Nameplate Rating (Gross MHe): 989 X 0.9 = 890
6. Design Electrical Rating (Net MWe): 825 I"
7. Maximum Dependable Capicity (Gross MWe): 860 OESIGN E120. MFtf1NS - 825
8. Maximum Dependable Capacity (Net MWe): 821 _- MPIX. OEPEND. ORP. - 821 1100X3
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted. If Any (Net NWe):
11. Reasons for Restrictions. If Any NONE 1000-HONTH YEAR CUMULATIVE
12. Report Period Mrs 744.0 5.087.0 73,511.0
                                                .0      1,608.3     47,524.8                                                       gaa h
13. Hours Reactor Critical
14. Rx Reserve Shtdwn Hrs .0 .0 1,275.5
15. Mrs Generator On-Line .0 1,606.5 44.524.4 -80
15. Unit Reserve Shtchn Hrs .0 .0 .0 g
17. Gross Thern Ener (MHH) 0 2.924,173 104.586.053 gag.
18. Gross Elec Ener (794H4 0 1.014,639 35.741.438
19. Net Elec Ener (MHH) .0 954,730 33.950,741
                                                                                                                                 -m
20. Unit Service Factor .0 31.6 63.3
21. Unit Avail Factor .0 3f.6 63.3
                                                                                                                                 ~
22. Unit Cup Factor (MDC Net) .0 22.9 56.3
23. Ualt Cap Factor (DER Net) .0 22.7 56.0 0
25. Unit Forced Outace Rate 0 .0 20.1 g 's io ts do is' in
                                                              .0     11.689.2                            OOYS
25. Forced Outage Hours .0
26. Shutdowns Sched Over Next 6 Months (Type.Date. Duration):

JA.Y 1986 NONE i 27. If Currently Shutdown Estimated Startup Date: 08/06/85 PAGE 2-082

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 19E5 UNIT SHUTD0NNS / REDUCTIONS M CRYSTAL RIVER 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Bate TvEE Unuta Reamon LER Number 'jystem Comoonent Cause 8 Corrective Action to Prevent Recurrence 85-04 03/04/85 S 744.0 C 4 REFUELING OUTAGE CONTINUES. t I i n=rMMMMMMMM CRYSTAL RIVER 3 REMAINS SNUTDOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. u

SUMMARY

M C32MMMMMMMM i Tven Reamon Method System 8 Connanent F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H j S-Sched B-Maint or Test G-Oper Error . 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                        & License Examination                                    9-Other                  (LER) File (NUREG-0161)

PAGE 2-083 ^

                                      . _                  . _ . _ -        .    -~-             -                       . _

C050MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM n CRYSTAL RIVER 3 M c2:nMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITf P CONTRACTOR INFORMATION L DCATION UTILITY STATE.................... FLORIDA LICENSEE................. FLORIDA PDHER CORPORATION COUNTY................... CITRUS CORPORATE ADDRESS....... 3201 34TH STREET 4 SOUTH ST PE1ERSBURG, FLORIDA 33733 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 7 MI NH OF CONTRACTOR CRYSTAL RIVER, FLA ARCHITECT / ENGINEER. . . . . . .GIL BERT ASSOCI ATES TYPE OF REACTOR. . . . . . . . . . . .PHR HUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITI AL CRITICALITY. . . JANUARY 14, 1977 CONSTRUCTOR..............J. A. JONES CONSTRUCTION DATE ELEC ENER 1ST GENER... JANUARY 30, 1977 TURBINE SUPPLIER.........NESTINGHOUSE DATE COMMERCIAL OPERATE.... MARCH 13, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING NATER.... GULF OF MEXICO IE RESIDENT INSPECTOR......T. STETKA i ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. SILVER COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-302 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-72, JANUARY 28, 1977 PUBLIC DOCUMENT RODM....... CRYSTAL RIVER PUBLIC LIBRARY 663 N.H. FIRST CRYSTAL RIVER, FLORIDA 32639 INSPECTION STATUS INSPECTION

SUMMARY

       + INSPECTION MAY 28-31 (85-24):              ROUTINE, UNANNOUNCED INSPECTION INVOLVED 24 INSPECTOR-HOURS ONSITE (4 ON BACKSHIFT). AREAS INCLUDED: AUDIT, PHYSICAL BARRIERS (PROTECTED AND VITAL AREAS), ILLUMINATION AND ASSESSMENT AIDS, INDEPENDENT INSPECTION ACTIVITY AND CORRECTIVE ACTION TO PRIOR VIOLATION. NO VIOLATIONS OR REGULATORY REQUIREMENTS HERE IDENTIFIED.

INSPECTION MAY 25 - JUNE 25 (85-26): THIS ROUTINE INSPECTION INVOLVED 139 INSPECTOR-HOURS ONSITE Ef TWO RESIDENT INSPECTORS IN , THE AREAS OF PLANT OPERATIGNS, SECURITY, RADIOLOGICAL CONTROLS, LICENSEE EVENT REPORTS AND NONCONFORMING OPERATIONS REPORTS, FACILITY MODIFICATIONS, REFUELING ACTIVITIES, IE INFORMATION NOTICES, AND LICENSEE ACTION ON PREVIOUS INSPECTION ITEMS. NUMEROUS ' FACILITY TOURS HERE CONDUCTED AND FACILITY OPERATIONS OBSERVED. SOME OF THESE TOURS AND OBSERVATIONS HERE CONDUCTED ON BICESHIFTS. THIS INSPECTION ALSO INCLUDES A SPECIAL INSPECTION OF THE LICENSEE'S STATION BATTERY. TWO VIOLATIONS HERE IDENTIFIED. (FAILURE TO ADHERE TO PROCEDURES, PARAGRAPH 5.B.(8)(A); FAILURE TO PERFORM PLANT MODIFICATI0h5 IN ACCORDANCE HITH MODIFICATION PRDCEDURES AND FAILURE TO CONDUCT AN ADEQUATE QUALITY CONTROL INSPECTION, PARAGRAPH 7). ICSPECTION . LUNE 17-21 (85-27): THIS ROUTINF, UNANNOUNCED IN>PECTION ENTAILED 50 INSPECTOR-HOURS ONSITE IN THE AREAS OF REFUELING ACTIVITIES, SPENT FUEL POOL ACTIVITIES AND THE FOLLOHCP DN IEB S4-03. ONE VIOLATION HAS IDENTIFIED - FAILURE TO COMPLY HITH THE LIMITING CONDITION FOR OPERATION (LCO) AS SPECIFIED BY TS 3.v.2(A) REGARDING THE AUDIBLE SOURCE RANGE COUNT RATE IN THE CONTROL ROOM DURING CORE ALTERATION (PARAGRAPH 5). INSPECTION JUNE 18-20 (85-28): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 17 INSPECTOR-HOURS ONSITE IN THE AREAS OF PIPE SUPPORT BASEPLATE DESIGNS USING CONCRETE EXPANSION ANCMORS (IES 79-02) AND SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING PAGE 2-084

i MMMMMMMMMMMMMMMMMMMMMMMMMMMMNNMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) N CRYSTAL RIVER 3 M NMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SUf91ARY SYSTEMS (IEB 79-14). NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT SUf91ARY TECHNICAL SPECIFICATION 6.8.1 STATED THAT HRITTEN PROCEDURES SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED FOR CERTAIN ACTIVITIES INCLUDING APPLICABLE PROCEDURES IN APPENDIX "A" 0F REGULATORY GUIDE 1.33, 1972. APPENDIX "A" DF REGULATORY GUIDE 1.33, NOVEMBER 1972, REQUIRED PROCEDURES FOR SURVEYS AND MONITORING. CHEMISTRY AND RADIATION PROTECTION PROCEDURE RSP-101, BASIC RADIOLOGICAL SAFETY INFORMATION AND INSTRUCTIONS FOR " RADIATION HORKERS," STEP 3.1.4 REQUIRED THAT, "HHEN EXITING THE AUXILIARY BUILDING "RCA." A HHGLE BODY FRISK MUST BE PERFORMED IN ACCORDANCE HITH SECTION 3.3." SECTION 3.3. DELINEATED THE " GUIDELINES FOR CONDUCTING A "HHOLE BODY FRISK" USING A RM-14 HITH HP-210 PROBE." CHEMISTRY AND RADIATION PROTECTION PROCEDURE RP-101, RADIATION PROTECTION MANUAL, STEP 4.8.4.E RECOMMENDED THAT, " PRIOR TO DONNING PERSONAL CLOTHING, ALL INDIVIDUALS SHOULD CONDUCT A HHOLE BODY FRISK AT THE NEAREST FRISKING STATION" AND 4.8.5. A REQUIRED THAT "ALL PERSONNEL SHALL CONDUCT A HHOLE BODY FRISK PIOR TO EACH EXIT FROM THE 95 FOOT ELEVATION CONTROL COMPLEX RCA." DETAILED FRISKING RECOMMENDATIONS SIMILAR TO THOSE DESCRIBED IN PROCEDURE RSP-101 ARE ALSO CONTAINED IN THIS PROCEDURE. CONTRARY TO THE ABOVE, PROCEDURES RSP-101 AND RP-101 HERE INADEQUATE IN THAT THEY FAILED TO ASSURE THE IMPLEMENTATION OF THE RESPECTIVE PRDCEDURAL REQUIREMENT THAT HHOLE BODY FRISKING "SHALL" OR "MUST" BE PERFORMED IN ACCORDANCE HITH THE STATED GUIDELINES AND ON MARCH 26-29, 1985, PERSONNEL HERE NOT PERFORMING ADEQUATE HHOLE BODY FRISKS TO PERMIT DETECTION OF CONTAMINATION AT LICENSEE ACTION LEVELS. FAILURE TO FOLLDH HELD PROCEDURE REQUIREMENT. (8501 4) 10 CFR 19.11 REQUIRED THAT CERTAIN DOCUMENTS, NOTICES OR FORMS BE CONSPICUOUSLY POSTED TO PERMIT THEIR BEING OBSERVED BY INDIVIDUALS ON THEIR HAY TO OR FROM LICENSED ACTIVITIES. CONTRARY TO THE ABOVE, ON MARCH 26, 1985, THE REQUIRED DOCUMENTS, NOTICES OR FORMS HERE NOT CONSPICUOUSLY POSTED TO PERMIT OBSERVATION BY INDIVIDUALS ENGAGED IN LICENSED ACTIVITIES IN THAT: (A) THE REQUIRED DOCUMENTS, NOTICES OR FORMS ON THE BULLETIN BOARD LOCATED ON THE AUXILIARY BUILDING 95 FOOT ELEVATION HEAR THE HEALTH PHYSICS OFFICE HERE OBSCURED FROM VIEH BY OTHER MATERIALS POSTED ON TOP OF THE REQUIRED POSTING. (B) THE BULLETIN BOARDS IN THE RUSTY BUILDING AND THE TURBINE BUILDING ENTRANCE DID NOT HAVE ALL THE REQUIRED MATERIALS POSTED. 10 CFR 20.203(F) REQUIRES EACH CONTAINER OF LICENSED MATERIAL TO BEAR A DURABLE, CLEARLY VISIBLE LABEL IDENTIFYING THE RADIDACTIVE CONTENTS. THE LABEL SHALL BEAR THE RADIATION CAUTION SYMBOL AND THE HORDS " CAUTION - RADI0 ACTIVE MATERIAL" AND SHALL PROVIDE SUFFICIENT INFORMATION TO PERMIT INDIVIDUALS HANDLING OR USING THE CONTAINERS OR HORKING IN THE VICINITY THEREOF, TO TAKE PRECAUTIONS TO AVOID OR MINIMIZE EXPOSURES. CONTRARY TO THE ABOVE, A YELLOW BAG HHICH CONTAINED A CONTAMINATED HOSE MEASURING APPROXIMATELY 8 MREM /HR ON CONTACT HAS DETERMINED TO CONTAIN A QUANTITY OF RADIDACTIVE MATERIAL GREATER THAN THAT LISTED IN 10 CFR 20, APPENDIX C, AND THE BAG LABEL DID NOT INCLUDE THE RADIATION CAUTION SYMBOL. (8501 5) CONTRARY TO TECHNICAL SPECIFICATION 6.8.3, A TEMPORARY CHANGE TO A SURVEILLANCE PROCEDURE HAS MADE AND IMPLEMENTED HITHOUT THE APPROVAL OF TWO MEMBERS OF THE PLANT MANAGEMENT STAFF, AT LEAST ONE OF HHOM HOLDS A SENIOR REACTOR OPERATORS LICENSE. CONTRARY TO 10 CFR 50 APPENDIX B, CRITERIA V, THE LICENSEE FAILED TO FOLLDH HELDING PROCEDURES SPECIFICATION REQUIREMENTS RELATED TO TORCH GAS ON TH0 OCCASIONS. (8502 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NOME. PAGE 2-085

t 0 0 6 3 3 8 3 = 0 3 _ s - 3 _ = 2 MMM 3 _ = M M 3 = E M M 3 z G M M = . = A M M = S : P M M = Y z M M = A z M M E L a M M 3 E s M M 3 R = M M 3 s M M 3 E s M3M = V = M M 3 I = MRM 3 T s MEM 3 C s MVM E E 3 MIM 3 T s MRM 3 O E M M 3 R = MLM 3 P = MAM 3 z MTM 3 3 a MSM = s MYM 3 F a MRM = 0 s MCM E = M M 3 2 = M M 3 z M M = N = M M R O = M M E m M M = S = M M 3 D = M M 3 A = MMM = E s E L = S s 3 G s 3 N a 3 I s E = T s E F =

     )                                      E =              I     z D                                          E            L     =

E S = = U E Y s N N 3 B 3 I 3 = T E 3 D = N 3 E 3 O C 3 S = C = U s ( I E A s

                                                =            C =

L 3 =

      -                                         3              , =

_ 3 - G = 3 - D = S M 3 E = 3 a U 0 E N s

                                                =      -     A s T                                      R   3                  =

3 F z A F 3 O a

                                                =                  s T                                          3            N =

3 O = S S 3 I =

                                   +            3            T     s T   3            A =

5 3 U 3 8 R 3 T s 9 3 C s N 1 O 3 A a 3 s O , P 3 O s 5 3 T E I 2 E 3 U z 3 A z T E R E z N E D = C U E E s J = T N = E R C N z

                                    -           =   E        A =

P  : . 3 J L s

            )   5                  5 +          =   B        P a S       S 8                    2            E   U        N s E /                        6        3   S        U =

N R 9 Y 2 = = U / A - E s I D 3 M 5 3 - = E 8 3 5 = _ C F / 3 FI 8 = OO  : 2 = O / = R E 0 = 8 = P S T 3 E E 2 s A A - 3 T / = D D 0 = A 6 = N E 5 3 D 0 s A G N 3 a A O 3 z S T I  : 3 s 5 N U T O = 5 = 8 A O C N = F 8 a 9 L E = O / = 1 P G  : . P T = 8 s ( N S E S R 3 E 0 s L I M G N O 3 T / = U S L E I P = A 5 = J M E T  : A T E = D 0 = E U I S U E R = = d T F U D T 3 s o I E L T I N = = i S R A A G S O 3 _ z r M Y I T N I E R _ 5 = e E T K R S I E T 3 E _ 0 z P T I E E L I C = B 0 z I L E D . T E E = M _ - z _. t I W A E N U T P S U . 3 s r R C N N A F S S = N . 7 = _ o p E A 0 A O L E A N = ~ a H F 2 M N P R L I 3 . m _ e T R O

THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-087

1. Docket 50-346 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu u DAVIS-BESSE 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MuunununuuuuuuuuuuuuuuuuuuuuuuuuuuMM
3. Utility Contact BILAL SARSOUR (419) 259-5000 X384 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2772 DMIS-gESSC 1
5. Nameplate Rating (Gross MWe): 1969 X 0.9 = 962
6. Design Electrical Rating (Net MWe): 906
7. Maximum Dependable Capacity (Gross MHe): 904 1500
8. Maximum Dependable Capacity (Net MWe): 860 MIM M. MIM- SOS tmX. DEFDC. OFF. ~ 800 (1001)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
91. Reasons for Restrictions. If Any:

NONE 1000-MONTH YEAR CUMULATIVE N0 IET P06ER OUTPUT THIS F10 NTH

12. Report Period Hrs 744.0 5.087.0 61.392.0
                                                                                                    ~ ~ ~ ~ ~ " - " " " - - " "
13. Hours Reactor Critical .0 2.846.6 35.878.0 ~ I" h
10. Rx Reserve Shtdwn Hrs .0 44.7 4.058.8
15. Hrs Generator On-Line .0 2.730.5 34,371.8 g -so
16. Unit Reserve Shtdwn Hrs .0 .0 1.732.7
17. Gross Thern Ener (MHH) 0 6.312.177 81.297.599 80
18. Gross Elec Ener (MHH) 0 2.087.278 26.933.622
19. Het Elec Ener (MHH) 0 1.942.921 25.233,177
                                                                                                                                       -to
20. Unit Service Factor .0 53.7 56.0
21. Unit Avail Factor .0 53.7 58.8
                                                                                                                                       ~
22. Unit Cap Factor (MDC Net) .0 44.2 47.8
23. Unit Cap Factor (DER Net) .0 42.2 45.4
24. Unit Forced Outage Rate 100.0 33.2 18.9 0,- ,- g, - is aio ' 3Is ~ in
25. Forced Outage Hours 744.0 1.357.3 8.618.8 OMS
20. Shutdowns Sched Over Next 6 Months (Type Date, Duration):

NOME

27. If Currently Shutdown Estimated Startup Date: 08/15/85 PAGE 2-088

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M DAVIS-BESSE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TvEe Hours Reason hethod LER Number System Component Cause & Corrective Action to P rev en t Recurrence 7 06/09/85 F 744.0 A 4 85-013 JK SC THE UNIT REMAINED SHUTDOHN FOLLONING THE REACTOR TRIP DN JUNE 9, 1985 DUE TO MAIN FEED PUMP CONTROL PROBLEMS. MM MMMMMMMM DAVIS-BESSE 1 REMAINS SHUTDOWN IN A CONTINUING REPAIR DUTAGE. n

SUMMARY

M MCEMMMMMMMM Tvoo R ea son Met hod System 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Renulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                    & License Examination                               9-Other         (LER) File (NUREG-0161)

PAGE 2-089

M%2MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u DAVIS-BESSE 1 M MMuMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION !- LOCATION UTILITY

STATE................... 0HID LICENSEE................. TOLEDO EDISDN COUNTY.................. 0TTANA CORPORATE ADDRESS....... 300 MADISON AVENUE TOLEDO, OHIO 43652 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 21 MI E OF CONTRACTOR TOLEDO, OH ARCHITECT /EhGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... AUGUST 12, 1977 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... AUGUST 28, 1977 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 31, 1978 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TONER IE REGION RESPONSIBLE......III CONDENSER COOLING MATER.... LAKE ERIE IE RESIDENT INSPECTOR. . . . . .H. ROGERS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....A. DEAGAZIO COUNCIL.................. EAST CENTRAL AREA DOCKET NUMBER........... 50-346 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....NPF-3, APRIL 22, 1977 PUBLIC DOCUMENT R0uM. . . . . . .L"lIVERSITY OF TOL EDO LIBRARY GOVERNMENT DOCUMENTS COLLECTION

' 2C01 NEST BANCROFT AVENUE TOLEDO, OHIO 43606 IN$PECTION STATUS INSPECTION

SUMMARY

CONE ENFORCEMENT

SUMMARY

ONE VITAL AREA PORTAL HAS INADEQUATELY LOCKED. (8501 4) I OTHER ITEMS 4 SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-090

MMMMMMMMMAWMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATU$ - (CONTINUED) M DAVIS-BESSE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS UNIT SHUTDOWN FOR REPAIRS TO A CONTROL ROD DRIVE ON 3/21/85 AND IS PRESENTLY IN A MAINTENANCE OUTAGE. MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS IN COLD SHUTDOHN FOR INCETERMINATE PERIOD. L AST IE SITE INSPECTION DATE: AUGUST 6 - SEPTEMBER 3, 1985 INSPECTION REPORT NO: 85025 REP 0RTS FR0M LICENSEE

                     ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _____==. _______________________________ _ _ _ _ _ _ _ _ _ _ - - . - _ _ = - - __- _ _ _ _ _ _ _ _ _ _ _ _ - _ - - . _ _ 85-11 06/02/85 07/02/85 TURBINE / REACTOR TRIP D*JRING TURBINE CONTROL VALVE TESTING 85-12 06/03/85 07/02/85 AUXILIARY FEEDHATER CONTROL ROOM PANEL INDICATOR HIRING ERROR 85-13 06/09/85 07/09/85 REACTOR TRIP AND LOSS OF FEEDNATER EVENT AT DAVIS-BESSE ON JUNE 9, 1985 85-14 06/05/85 07/12/85 INOPERABLE FIRE BARRIER DOOR 8318

                     ==================================================================================================================================

PAGE 2-091 l

1. Dock et 50-275 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DIABLO CANYON 1 M
2. Reporting Period. 07/01/85 Outage + Dn-line Hrs 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact BOB KANICK (805) 595-7351 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 3338 DIABLO CANYON 1
5. Nameplate Rating (Gross MWe): 1137
6. Design Electrical Rating (Not MWe): 8086
7. Maximum Dependable Capacity (Gross MWe): 1125 1500
8. Maximum Dependable Capacity (Net MWe): 1073 N M. WIM - 1006 tmX. OCPDC. Cfr. - 1073 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):

tec aus et m-m taent cPT2Wu. coe272mse

11. Reasons for Restrictions, If Anyt -_ _ _.--

__ - .. 100 NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 2.061.3 2.061.3
                                                                                                                                                                  -so
13. Hours Reactor Critical 744.0 2.021.3 2.021.3
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 744.0 2.010.5 2.010.5 f -so
10. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 2.435.846 6.354.855 6.354.855
18. Gross Elec Ener (MHH) 819.500 2.136.732 2.136.732
19. Het Elec Ener (MHH) 781.386 2,032.566 2.032.566
20. Unit Service Factor 100.0 97.5 97.5
21. Unit Avail Factor 100.0 97.5 97.5 . ao
22. Unit Cap Factor (MDC Net) 97.9 91.9 91.9
23. Unit Cap Factor (DER Net) 96.7 90.8 90.8 2.5 2.5 0 0
24. Unit Forced Outage Rate .-
                                                                        .0                                                                 .          .       .

0 s 10 15 20 as so

25. Forced Outage Hours .0 50.8 50.8 DAYS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JA.Y 1985 NONE

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-892

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M DIABLO CANYON 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date E Hours Reason Method LER N -her $vstem domeonent Cause & Corrective Action to Prevent Recurrence NONE unu MMMMMMM DIABLO CANYON 1 OPERATED MITH NO OUTAGES OR REDUCTIONS DURING THE JULY REPORT PERIOD. H SUM 4ARY M ELEIEMMMMMMM Tvon Reason Method Svstem 8 Co-nanent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

              & License Examination       9-Other         (LER) File (NUREG-0161)

PAGE 2-093

H%M%MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u DIABLO CANYON 1 M m%EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE................. .. CALIFORNIA LICENSEE....... ......... PACIFIC GAS & ELECTRIC COUNTY................. . SAN LUIS UBISPD CORPORATE ADDRESS. . . . . . . 77 BEAL E STPEET SAN FRANCISCO, CALIFORNIA 94106 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 12 MI HSH OF CONTRACTOR SAN LUIS OBISPO ARCHITECT / ENGINEER....... PACIFIC GAS & ELECTRIC TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 29, 1984 CONSTRUCTOR.............. PACIFIC GAS & ELECTRIC DATE ELEC ENER IST GENER... NOVEMBER 11, 1984 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE....MAY 7, 1985 REGULATORY INFORMATION CONDENSER COOLING NETHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING HATER.... PACIFIC OCEAN IE RESIDENT INSPECTOR......M. MENDONCA ELECTRIC RELIABILITY LICENSING PROJ MANAGER. ...H. SCHIERLING COUNCIL..................HESTERN SYSTEMS DOCKET NUMBER...... .... 50-275 COORDINATING COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-80, NOVEMBER 2, 1984 PUBLIC DOCUMENT ROOM....... ROBERT F. KENNEDY LIBRARY CALIFORNIA POLYTECHNIC STATE UNIVERSITY SAN LUIS OBISPO, CA. 93407 INSPECTION STATUS INSPECTION

SUMMARY

 + INSPECTION ON JUNE 10-28, 1985 (REPORT NO.                   50-275/85-25) AREAS INSPECTED: SPECIAL UNANNOUNCED INSPECTION OF DIABLO CANYON'S ADMINISTRATIVE CONTROLS ASSOCIATED HITH THE FOUR MOST IMPORTANT SAFETY-RELATED SYSTEMS BASED ON PROBABILISTIC RISK ASSESSMENT.

MORE SPECIFICALLY SELECTED SYSTEMS AND ACTIVITIES RELATED TO THE AUXILIARY FEEDHATER SYSTEM (AFHS); DIESEL GENERATORS (DGS); 125V VITAL DC SYSTEM; HIGH PRESSURE SAFETY INJECTION (HPSI); 0FFSITE COMMITTEE ACTIVITIES; HEALTH PHYSICS PROGRAM AND ASSOCIATED LICENSEE ADMINISTRATIVE CONTROLS HERE INSPECTED. THE TEAM S APPROACH HAS TO DIRECT 60 PERCENT OF ITS EFFORT ON ADMINISTRATIVE CONTROLS ASSOCIATED WITH THE EMERGENCY DGS. 125V DC, HPSI AND AFH SYSTEMS AND THE IMPLEMENTATION AND ADHERENCE OF THOSE CONTROLS IN THE FOLLOHING AREAS: M&TE CALIBRATION PROGRAM: MAINTENANCE PROGRAM: SURVEILLANCE PROGRAM VENDOR FIELD CHANGE NOTICES; AND DESIGN CHANGES AND MODIFICATIONS. THE OTHER 40 PERCENT OF THE TEAM'S EFFORT HAS ON ADMINISTRATIVE CONTROLS IN THE FOLLOWING IMPORTANT AREAS: IMPLEMENTATION OF CORPORATE POLICIES; 0FFSITE COMMITTEE ACTIVITIES; QUALITY ASSURANCE AUDITS CONSITE); LICENSED /NON-LICENSED OPERATOR TRAINING; PLANT OPERATIONS; HEALTH PHYSICS; AND RADI0 ACTIVE HASTE SYSTEMS. THE TEAM STRATEGY FOR THIS INSPECTION REQUIRED THE SELECTION OF A SAMPLE OF DIABLO CANYON ADMINISTRATIVE CONTROLS ASSOCIATED HITH FOUR IMPORTANT SAFETY-RELATED SYSTEMS (HPSI, AFHS, 125V DC SYSTEM, AND THE EMERGENCY DGS) FOR VIGOROUS EXAMINATION. THE SAMPLE APPEARED REPRESENTATIVE OF ALL MANAGEMENT CONTROLS, TESTING, METHODOLOGY AND DOCUMENTATION FOR OTHER SAFETY-RELATED ADMINISTRATIVE CONTROLS AT THE DIABLO CANYON NUCLEAR P0HER PLANT. THE INSPECTION INVOLVED 719 INSPECTOR-HOURS ONSITE BY TEN NRC INSPECTORS, AND 14 HOURS AT THE CORPORATE OFFICES IN SAN FRANCISCO. RESULTS: OF THE AREAS INSPECTED. THREE VIOLATIONS OF NRC REQUIREMENTS HERE IDENTIFIED IN THE AREAS OF 1) CONTROL OF MEASURING AND TEST EQUIPMENT, 2) RADIATION PROTECTION PROCEDURE IMPLEMENTATION, AND 3) PERSONNEL QUALIFICATION REQUIRED BY TECHNICAL SPECIFICATIONS. PAGE 2-094

                  - ~      .     - - -              -      .-                . _ _ - . - -           . -   .-       .         . .    .          __ _ . .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M DIABLO CANYON 1 M' MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

O INSPECTION ON JUNE 3-28, 1985 (REPORT NO. 50-275/85-24) REPORT BEING PREPAREDJ TO BE REPORTED NEXT MONTH.

              -+ INSPECTION ON MAY 26 - JUNE 29, 1985 (REPORT NO.      50-275/85-25) AREAS INSPECTED: ROUTINE INSPECTION OF PLANT OPERATIONS, MAINTENANCE AND SURVEILLANCE ACTIVITIES, FOLLONUP OF ONSITE EVENTS, OPEN ITEMS, AND LERS. AS HELL AS SELECTED INDEPENDENT INSPECTION ACTIVITIES. THE INSPECTION INVOLVED 209 INSPECTOR-HOURS ONSITE BY FOUR RESIDENT NRC INSPECTORS AND ONE REGIONALLY BASED NRC INSPECTOR.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. O INSPECTION ON JUNE 30 - JULY 7, 1985 (REPORT No. 50-275/85-26) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

               + INSPECTION.ON FEBRUARY 11 - JULY 17, 1985 (REPORT NO.        50-275/85-27) AREAS INSPECTED: FOLLOHUP OF VARIOUS ALLEGATIONS PERTAINING TO PLANT CONSTRUCTION.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: 100% POWER LAST IE SITE INSPECTION DATE: 06/30-07/07/85 l INSPECTION REPORT NO: 50-275/85-26 PAGE 2-095

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 REPORTS FR0M LICENSEE M DIABLO CANYON 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-13-LO 04-30-85 06-07-85 DIESEL LOAD SEQUENCE IIMERS DUT OF SPECIFICATION 85-14-L0 05-18-85 06-18-85 REACTOR TRIP AND SI CAUSED BY FAILURE OF SLAVE 2.5 KVA REG TRANSFORMER ON INSTR INVERTER IY-t-3 85-15-L0 05-20-85 06-18-85 REACTOR TRIP AND SI CAUSED BY LOOSE CONN TO OUTPUT CIRC BKR INSTR INVERTER IY-1-2 85-16-LO 05-20-85 06-18-85 REACTOR TRIP IN MODE 3 CAUSED BY TRANSFERRING IY-1-2 FROM BACKUP TO NORMAL 85-17-L0 05-23-85 06-24-85 MAINTENANCE NORKER HAS PERMITTED TO ENTER HI RAD AREA 85-18-Lo 05-05-85 07-09-85 LCO TS3336 ACTION B EXCEEDED TEST LEADS LEFT ON RCS OUTLET TEMP MONITORS 85-19-L0 06-02-85 07-02-85 THERMOCOUPLE MONITORING SYSTEM CHANNEL CHECK EXCEEDED 85-20-Lo 06-13-85 07-12-85 SURV TESTING DGt3 AUTO START DG12 STARTED OPERATOR ERROR 85-21-L0 06-18-85 07-18-85 AXIAL FLUX DIFFERENCE TS TIME EXCEEDED

                               ==================================================================================================================================

PAGE 2-096

                                                                                                                                                 -s

---,,-----,---w---,e y THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-097

                                                                    =                  . _                             _     _
1. Dock et 50-237 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DRESDEN 2 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts D. C. MAXHEtt (815) 942-2920 AVERAGE DAILY PONER LEVEL (MHe) PLOT O. Licensed Thermal Power (MHt): 2527 DRESOEN 2
5. Nameplate Rating (Gross MWe): 920 X 0.9 = 828
6. Desion Electrical Rating (Net MHe): 794 812 I"
7. Maximum Dependable Capacity (Gross MWe) 8 OESIGN E220. RRTING = 794
8. Maximum Dependable Capacity (Not MWe): 772 MRX. OEPDC. Ofr. - 772 1100X)
9. If Changes Occur Above Since Last Report Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5.087.0 133,391.0
13. Hours Reactor Critical 727.8 2.442.4 101,179.3 m W K - m crtI n EM m 27 tome h
                                                                                 '~~~ ~~~             ~          ~~   ~        -1"
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 707.3 2,244.5 96,549.1 f -"
13. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1,709,842 4,849,205 196,250,223 500-I
18. Gross Elec Ener (MHH) 535,960 1.522,582 62,727,336
19. Net Elec Ener (MHH) 508,863 1,430,496 59,288,300
20. Unit Service Factor 95.1 44.1 72.4
31. Unit Avail Factor 95.1 44.1 72.4 4
32. Unit Cap Factor (MDC Net) 88.6 36.4 57.6
33. Unit Cap Factor (DER Net) 86.1 35.4 56.0 0
34. Unit Forced Outage Rate 4.9 14.0 11.5 0 5 io is ~io is 'So 36.7 365.9 5,075.9 OflYS
35. Forced Dutage Hours
36. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):
                                                                        ,                             .AA.T 1986 SNUBBER INSPECTION, MID-0CT. 1985 - HEEKEND
37. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-098
  - _ _ _ _ _ . - _ . - . . .               .                      .          _   -        _-.  . . . . .    .--     -_-_-.              . - - . ~         . ~ - . - .  -.    -     _ . . . _-

t MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M DRESDEN 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date 1535 hours Reason Method LER Number Syst em domoonent Cause & Corrective Action to Prevent Recurrence 5 07/27/85 F 56.7 A 3 85-051 SCRAM DISCHARGE VOLUME HIGH LEVEL HITH RX SCRAM. 1 b l 4 ENuMMMMMMMM DRESDEN 2 OPERATED HITH 1 OUTAGE FOR EQUIPMENT FAILURE IN JULY. n

SUMMARY

M MMMMMMMMMMM Tvom Reason Met ho d System & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H 9 S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for  ; C-Refueling H-Other 5-Auto Scram Preparation of , D-Regulatory Restriction 4-Continued Data Entry Sheet i E-Operator Training 5-Reduced Load Licensee Event Report 3 License Examination 9-Other (LER) . File CNUREG-0161)

PAGE 2-099 i
                   -                     _             m     m   _ _       _  _._. _ . _ _ _ .   . _ _ _ _ ._              . _ _ _                _ . _ - . .            _ _ _          _ _ _ _ . _

CCMuMMNuuMuuMNuuMMMMMMMMMMMMMMMMMMMM u DRESDEN 2 M c:MMuMuuMMMuuuuMMuuuuuuMuuuuMMuunuMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS L ICENSEE. . . . . . . . . . . . . . . . .COMMONHEALTN EDISON COUNTY...................GRUNDY CORPORAT E ADDRESS. . . . . . . .P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 9 MI E OF CONTRACTOR MORRIS, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF R EACT OR . . . . . . . . . . . . BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC BATE INITIAL CRITICALITY... JANUARY 7, 1970 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER 1ST GENER... APRIL 13, 1970 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 9, 1970 REGULATORY INFORMATION CONDENSER COOLING METHGD... COOLING L AKE IE REGION RESPONSIBLE......III CONDENSER COOLING MATER....KANKAKEE RIVER IE RESIDENT INSPECTOR......T. TONGUE ELECTRIC RELIABILITY LICENSING PROJ MANAGER. . . . .R. GILBERT COUNCIL..................MID-AMERICA DOCKET NUMBER. . . . . . . . . . . 50-237 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-19, DECEMBER 22, 1969 PUBLIC DOCUMENT ROOM....... MORRIS PUBLIC LIBRARY 604 LIBERTY STREET MORRIS, ILLINDIS 60450 INSPECTION $TATUS INSPECTION

SUMMARY

INSPECTION DURING THE PERIOD OF APRIL 19 THROUGH JUNE 7 (85017): ROUTINE, UNANNOUNCED RESIDENT INSPECTION OF HEADQUARTERS AND REGIONAL REQUESTS, OPERATIONAL SAFETY, EVENTS, I.E. BULLETINS, LICENSEE EVENT REPORTS, MAINTENANCE, SURVEILLANCES, INDEPENDENT INSPECTION AND REPORT REVIEH. THE INSPECTION INVOLVED A TOTAL OF 249 INSPECTOR-HOURS ONSITE BY TWO NRC INSPECTORS INCLUDING 56 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. OF THE TEM AREAS INSPECTED, NO ITEMS OF HONCOMPLI ANCE HERE IDENTIFIED. INSPECTION ON JUNE 3-7 (85022): ROUTINE, UNANNOUNCED INSPECTION OF THE LIQUID AND GASEOUS RADHASTE MANAGEMENT PROGRAMS. INCLUDING: ORGANIZATION AND MANAGEMENT CONTROLS, LIQUID AND GASEOUS RADHASTE MANAGEMENT, EFFLUENT REPORTS, QUALITY ASSURANCE AUDITS, STANDBY GAS TREATMENT SYSTEM TESTING, AND REACTOR COOLANT HATER QUALITY. ALSO REVIEHED HERE PREVIOUS INSPECTION FINDINGS AND STATUS OF UNIT 1 CHEMICAL CLEANING. THE INSPECTION INVOLVED 84 INSPECTOR-HOURS ON SITE BY THQ NRC INSPECTORS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MAY 14 AND JUNE 4 (85020): ANNOUNCED SPECIAL SAFETY INSPECTION BY REGIONAL INSPECTOR OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS REGARDING THE UNIT 2, 125 V DC BATTERY MODIFICATION, IDENTIFIED IN REGION III INSPECTION REPORT NO. 50-257/85014(DRS). THE INSPECTION INVOLVED A TOTAL OF 6 INSPECTOR-HOURS ONSITE AND 9 INSPECTOR-HOURS OFFSITE BY ONE HRC INSPECTOR. OF THE AREA INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION DN MAY 21-25, 29 AND JUNE 5 (85021): SPECIAL UNANNOUNCED INSPECTION OF IMPLEMENTATION OF to CFR PART 61 AND 10 CFR PART 20.311 REQUIREMENTS FOR DISPOSAL OF LOH-LEVEL RADIDACTIVE HASTES, QUALITY CONTROL, TOUR OF THE FACILITY, AND IMPLEMENTATION OF WASTE FORM AND HASTE CLASSIFICATION REQUIREMENTS. THE INSPECTION INVOLVED 45 INSPECTOR-HOURS ON SITE BY THQ NRC INSPECTORS. PAGE 2-100 [

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M DRESDEN 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SUtmARY ONE H-3, APPARENT C-14, TC-99 ITEM OFI-129 AND NONCOMPLIANCE HAS IDENTIFIED (SEVERITY LEVEL V SUPPLEMENT IV VIOLATION - FAILURE TO INCLUDE QUANTITIES OF ON MANIFESTS). INSPECTION ON JUNE 21 (85024): ANNOUNCED, SPECIAL INSPECTION TO REVIEW ACTIVITIES RELATED TO THE MAIN STEAM (MS) TRANSIENT MONITORING WERE SYSTEM. THE INSPECTION INVOLVED A TOTAL OF 3 INSPECTOR-HOURS ONSITE BY Of4E NRC INSPECTOR. NO VIOLATIONS OR DEVIATIONS IDENTIFIED. < ENFORCEMENT

SUMMARY

l l NONE OTHER ITEMS r SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS ANg rRDCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY.  ; LAST IE SITE INSPECTION DATE: AUGUST 12 - 20, 1985 INSPECTION REPORT NO: 85027 REP 0RTS FR0M LICEN$EE

                   ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT t EVENT REPORT  ! 85-27 06/09/85 07/03/85 REACTOR SCRAM 85-28 06/19/85 07/18/85 UNIT 2 REACTOR SCRAM

                   ==================================================================================================================================

PAGE 2-101 l

1. Dockets 50-249 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M DRESDEN 3 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 *MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM S. Utility

Contact:

D. C. MAXHELL (815) 942-2920 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2527 I)RE'SOE'N 3
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Net MHe): 794
7. Maximum Dependable Capacity (Gross MWe): 812 1500
8. Maximum Dependable Capacity (Net MHe)8 773
                                                                                                                           --        ImX. IMFDC. Orr. - 773 (100%)
9. If Changes Occur Above Since Last Report, Give Reasonri NONE
10. Power Level To Which Restricted, If Any (Net MHe):

I

11. Reasons for Restrictions, If Anyt i

NONE 2000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 122.976.0
13. Hours Reactor Critical 744.0 4.838.7 91.562.8 h
                                                                                                                        *-~~~                       -----             - 100
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Gene-ator On-Line 744.0 4.766.t 87.939.6 l
                                                                                                                                                                      -80 1G. Unit Reserve Shtdwn Hrs                 .0         .0                .0
17. Gross Therm Ener (MHH) 1.687.669 10.876.095 177.936.024
                                                                                                                                                                      - 80
18. Gross Elec Ener (MHH) 527.501 3.443.018 57.631.865 r
19. Net Elec Ener (MHH) 501.551 3.278.280 54,614.509 100.0 93.7 71.5 -40
20. Unit Service Factor l
21. Unit Avail Factor 100.0 93.7 71.5 87.2 83.4 57.5 -20
22. Unit Cap Factor (MDC Net) l
23. Unit Cap Factor (DER Net) 84.9 81.2 55.9 2.9 12.2 0 ,. , o
24. Unit Forced Outage Rate .0 0 5 to 35 20 25 30
25. Forced Outage Hours .0 140.2 7.102.9 DMS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING 8 MAINT.: 10/85 - 6 MONTHS.

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-102

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M DRESDEN 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvon Hours Reason Method LER Number $vstem Domponent cause & Corrective Action to Provent Recurrence NONE r a cu=MMMMMMMM DRESDEN 3 OPERATED WITH NO OUTAGES OR REDUCTIONS DURING JULY. u

SUMMARY

M UKKMMMMMMMM Tvom Reason Met ho d System 8 Comannent F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scran Prep. ration of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                          & License Examination                                         9-Other         (LER) File (NUREG-0161)

PAGE 2-103

l M2MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM n DRESDEN 3 M N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0!S LICENSEE.............. ..COMMONHEALTH EDISON COUNTY...................GRUNDY CORf oku. E ADDRESS . . . . . . . .P. O . BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 9 MI E OF CONTRACTOR MORRIS, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JANUARY 31, 1971 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER IST GENER... JULY 22, 1971 TURBINE SUPPLIER.. ...... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... NOVEMBER 16, 1971 REGULATORY INFORMATION CONDENSER COULING METHOD... COOLING LAKE IE REGION RESPONSIBLE......III CONDENSER COOLING HATER....KANKAKEE RIVER IE RESIDENT INSPECTOR......T. TONGUE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. GILBERT COUNCIL . . . . . . . . . . . . . . . . . .MI D-AMERICA DOCKET NUMBER........... 50-249 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....DPR-25, MARCH 2, 1971 PUBLIC DOCUMENT ROOM....... MORRIS PUBLIC LIBRARY 604 LIBERTY STREET MORRIS, ILLINDIS 60450 INSPECTION STATUS INSPECTION

SUMMARY

INSPECT!0N DURING THE PERIOD OF APRIL 19 THROUGH JUNE 7 (85015): ROUTINE, UNANNOUNCED RESIDENT INSPECTION OF HEADQUARTERS AND REGIONAL REQUESTS, OPERATIONAL SAFETY, EVENTS, I.E. BULLETINS, LICENSEE EVENT REPORTS, MAINTENANCE, SURVEILLANCES, INDEPENDENT INSPECTION AND REPORT REVIEH. THE INSPECTION INVOLVED A TOTAL OF 249 INSPECTOR-HOURS ONSITE BY THG NRC INSPECTORS INCLUDING 56 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. OF THE TEN AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE HERE IDENTIFIED. INSPECTION ON JUNE 3-7 (85018): ROUTINE, UNANNOUNCED INSPECTION OF THE LIQUID AND GASEOUS RADHASTE MANAGEMENT PROGRAMS, INCLUDING: ORGANIZATION AND MANAGEMENT CONTROLS, LIQUID AND GASEOUS RADHASTE MANAGEMENT, EFFLUENT REPORTS, QUALITY ASSURANCE AUDITS, STANDBY GAS TREATMENT SYSTEM TESTING, AND REACTOR COOLANT HATER QUALITY. ALSO REVIEHED HERE PREVIOUS INSPECTION FINDINGS AND STATUS OF UNIT 1 CHEMICAL CLEANING. THE INSPECTION INVCLVED 84 INSPECTOR-HOURS ON SITE BY THQ NRC INSPECTORS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MAY 21-23, 29 AND JUNE 5 (85017): SPECI AL UNANNOUNCED INSPECTION OF IMPLEMENTATION OF 10 CFR PART 61 AND 10 CFR PART 20.311 REQUIREMEf4TS FOR DISPOSAL OF LOH-LEVEL RADI0 ACTIVE HASTES, QUALITY CONTROL, TOUR OF THE FACILITY, AND IMPLEMENTATION OF HASTE FORM AND HASTE CLASSIFICATION REQUIREMENTS. THE INSPECTION INVOLVED 45 INSPECTOR-HOURS ON SITE BY TH0 HRC INSPECTORS. ONE APPARENT I)EM OF NONCCMPLIANCE WAS IDENTIFIED (SEVERITY LEVEL V SUPPLEMENT IV VIOLATION - FAILURE TO INCLUDE QUANTITIES OF H-3, C-14, TC-99 AND I-129 ON MANIFESTS). PAGE 2-104

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M DRESDEN 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT SUfetARY NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: PREPARING FOR MAJOR PIPING REPLACEMENT IN OCTOBER LAST IE SITE INSPECTION DATE: AUGUST 12 - 20, 1985 INSPECTION REPORT No: 85022 REP 0RTS FR0M LICENSEE

         ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

         ==================================================================================================================================

l PAGE 2-105

1. Docket 50-331 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummuu M DUANE ARNOLD M
2. Reporting Period: 07/01/85 Outage + On-line Hrs 744.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu
5. Utility

Contact:

BRADFORD THOMAS (319) 851-7539 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1658 DUANE: fWtNOL.D
5. Nameplate Rating (Gross MHe): 663 X 0.9 = 597
0. Design Electrical Rating (Net MHe): 538 545 1800
7. Maximum Dependable Capacity (Gross MHe):
8. Maximum Dependable Capacity (Het MWe): 515 I" *"I"~ "

PmX. (EPDC. Cfr. == 515 (100%)

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 92,015.0
15. Hours Reactor Critical 286.4 1,060.2 63.622.3 h
14. Rx Reserve Shtdwn Hrs .0 .0 130.3
15. Hrs Generator On-Line 1,038.8 61,886.5 265.7 f
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 218.976 1.224,444 77,684,377 -----~~~------- -- ----- '100 500-
18. Gross Elec Ener (MHH) 68,273 404,123 25,991,417,
19. Net Elec Ener (MHH) 62.682 376,335 24.330,268 20.4 67.3 - e0
20. Unit Service Factor 35.7
21. Unit Avail Factor 35.7 20.4 67.3 _,
22. Unit Cap Factor (MDC Net) 16.4 14.4 51.3
25. Unit Cap Factor (DER Net) 15.7 13.8 49.1 8 0
24. Unit Forced Outage Rate .0 .0 16.7 0 5

to 15 30 m 30

25. Forced Outage Hours .0 .0 12.384.8 DRYS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JA.Y 1985 NONE

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-106

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / REDUCTIONS M DUANE ARNOLD M MMMMMMMMMMMMMMMMMMMMMMMMMMMhMMMMMMMM No. Date YvEn HouFu Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 1 02/02/85 S 471.5 C 4 CONTINUED REFUEL OUTAGE. 2 07/21/85 S 0.9 8 1 OVERSPEED TURBINE TRIP TESTING. 5 07/22/85 S 5.9 5 1 TURBINE TRIPPED TO REPAIR BACKUP OVERSPEED CIRCUITRY. 6 07/30/85 F 0.0 A 5 POWER REDUCTION DUE TO LIMITING CONTROL ROD PATTERN WITH AN INOPERABLE ROD BLOCK MONITOR CHANNEL. l cc:MMMMMMMM DUANE ARNOLD OPERATED HITH 3 OUTAGES AND 1 REDUCTION DURING JULY. u

SUMMARY

M i n==MMMMMMMM , Tvom Reamen Met hod Svutem a Comoonent i F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                            & License Examination               9-Other             (LER) Flie (NUREG-0161)

PAGE 2-107 i  ! l

i CC3%MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u DUANE ARNOLD M untcMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FAC.ILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY j STATE................... 10HA LICENSEE.................IDME ELECTRIC PDHER & LIGHT COUNTY...................LINN CORPORATE ADDRESS........I E TOWERS, P.O. BOX 351 CEDAR RAPIDS, IONA 52406 DIST AND DIRECTION FROM i NEAREST POPULATION CTR.. 8 MI NN OF CONTRACTOR CEDAR RAPIDS, IA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC

,                DATE INITIAL CRITICALITY... MARCH 25, 1974                                                              CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...MAY 19, 1974                                                                 TURBINE SUPPLIER......... GENERAL ELECTRIC I

DATE COMMERCIAL OPERATE.... FEBRUARY 1, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... CEDAR RAPIDS RIVER IE RESIDENT INSPECTOR......J. HEIBE

 ,               ELECTRIC RELIABILITY                                                                                 LICENSING PROJ MANAGER.....M. THADANI COUNCIL..................MID-CONTINENT AREA                                                     DOCKET NUMBER........... 50-331 RELIABILITY COORDINATION AGREEMENT                                            LICENSE & DATE ISSUANCE....DPR-49, FEBRUARY 22, 1974                            s PUBLIC DOCUMENT ROOM....... CEDAR RAPIDS PUBLIC LIBRARY 500 FIRST STREET, S.E.

CEDAR RAPIDS, IDHA 52401 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON MAY 15-17, 28-51. AND JUNE 10-14 (85013): ROUTINE, ANNOUNCED INSPECTION BY TH0 REGIONAL INSPECTORS OF GA PROGRAM - ANNUAL REVIENs TEST AND MEASUREMENT EQUIPMENT PROGRAMS MAINTENANCE PROGRAMS PROCUREMENT CONTROLS RECEIPT, STORAGE, AND HANDLING OF EQUIPMENT AND MATERIALS PROGRAM; AND OFFSITE SUPPORT STAFF. THE INSPECTION INVOLVED A TOTAL OF 236 INSPECTOR-HOURS ONSITE BY TH0 NRC INSPECTORS AND 10 INSPECTOR-HOURS AT CORPORATE HEADQUARTERS. IN THE SIX AREAS INSPECTED, HO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON JUNE 24-27 (85018): INCLUDED A REVIEH AND FOLLOHUP OF UNRESOLVED ITEMS; MANAGEMENT EFFECTIVENESSs SECURITY ORGANIZATIONS RECORDS AND RFPORTSr LOCKS, KEYS AND COMBINATIONSs SECURITY SYSTEM POWER SUPPLYs LIGHTING; COMPENSATORY MEASURES; . ASSESSMENT AIDS; ACCESS CONTROL - PERSONNEL s ACCESS CONTROL - VEHICL Ess AND COMMUNICATION. THE INSPECTION INVOLVED 51 INSPECTOR-HOURS BY ONE NRC INSPECTOR. THE INSPECTION BEGAN DURING THE DAY SHIFT. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE HITH NRC PEQUIREMENTS WITHIN THE AREAS EXAMINED DURING THIS INSPECTION. ENFORCEMENT

SUMMARY

i NONE l PAGE 2-108 t

                          .--    -    .        . - . - . _ -                 =-          - -                -_    .         -     - _ - _                -

Report ?oclod JUL 1985 MMMMMMMhMMMMMMMMMMMMMMMMMMMMAMMMMMMM IN5PECTION STATUS - (CONTINUED) M DUANE ARNOLD M MMMMMMMEMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NOME ~ PLANT STATUS: THE PLANT RESUMED OPERATION ON JULY 19, 1985 CONCLUDING AN OUTAGE HHICH BEGAN ON FEBRUARY ?. 198; EXTENSIVE RECIRCULATION SYSTEM PIPE HELD REPAIR HAS PERFORMED DURING THE OUTAGE. LAST IE SITE INSPECTION DATE: AUGUST 18 - 25, 1985 INSPECTION REPORT NO: 85024 REP 0RTS FR0M LICENSEE

     ===============s========================================================================================u================a========

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-16 06/01/85 07/01/85 INADVERTENT MOMENTARY SECONDARY CONTAINMENT VIOLATION 85-17 04/11/85 07/12/85 LOM PRESSURE SETPOINTS FOUND IN BENCH TESTS OF MAIN STEAM SAFETY / RELIEF VALVES 85-18 06/06/85 07/05/85 RPS TRIP FROM A SPURIOUS LPRM SIGNAL 85-19 06/07/85 07/07/85 ELECTRICAL ISOLATION ERROR DURING CRD MAINTENANCE 85-20 06/10/85 07/10/85 INADVERTENT RPS ACTUATIONS 85-21 06/14/85 07/12/85 SPENT FUEL POOL LEVEL FOUND BELON TECHNICAL SPECIFICATION LIMIT 85-22 06/17/85 07/17/85 INADVERTENT GROUP III VALVE ISOLATIONS DUE TO PLANT MODIFICATIONS AND TESTING 1 85-23 07/02/85 08/01/85 UNPLANNED REACTOR HATER CLEANUP ISOLATIONS I'

       ==========================================================2========================r========a===================================

PAGE 2-109

1. Dock et 50-348 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M FARLEY 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 141.Q,, MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. D. H00DARD (205) 899-5156 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2652 ffRdY l
5. Nameplate Rating (Gross MHe): 1045 X 0.85 = 888
6. Design Electrical Rating (Net MWe): 829 1500
7. Maximum Dependable Capacity (Gross MHe) _._, 861 DCSION E1.EC. ARTING = 829
8. Maximum Dependable Capacity (Net MWe): 8 16 . . MRX. DEFEND. ORP. - 016 (100%)
9. If Chances Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:._.

NCHE gogo MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 67 ,199 , Q ,

3,831.1 45,960.1 gon h

13. Hours Reactor Critical 7373 , . . .
                                                                                                                                            \-

3,650.7

14. Rx Reserve Shtdwn Hrs .0 .0
15. Hrs Generator On-Line 721.6 3,708.2 44,732.6 h
16. Unit Reserve Shtown Hrs .0 .0 .0 g 17, Gross Therm Ener (MHH) 1,844,333 9,378,211 113.278,784 500-- m
18. Gross Elec Ener (MHH) 602,538 3,038,490 36,05t.608
19. Net Elec Ener (MHH) 570,320 2,859,066 33,988,112
                                                                                                                                                           - to
20. Unit Service Factor 97.0 72.9 66.6 4
21. Unit Avail Factor 97.0 72.9 66.6
22. Unit Cap Factor (MDC Net) 93.9 68.9 63.3M 1
23. Unit Cap Factor (DLR Net) 92.5 67.8 61.0 0
24. Unit Forced Outage Rate 3.0 3.6 12.5 0 5 1'O l's do $5 $0 136.9 6,382.9 ONYS

! 25. Forced Dutage Hours 22.4 _ _26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): .AA.Y 1985 NONE N/A M Item calculated with a Heighted Average Pf,GE 2-110

27. If Currently Shutdown Estimated Startup Date s i
            .- .        ~ - - -       _ . . - _ . . - . . . .         ..    .                    -            _.     -          - . . -- - -          . -,         . . _ -

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i Report Period JUL 1985 UNIT SHUTD0WN$ / REDUCTIONS M FARLEY 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TvEi Hours Aeason Method LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence 006 07/02/85 F 0.0 B 5 AB P POWER HAS REDUCED TO 37% TO FACILITATE A CONTAINMENT ENTRY TO ADD OIL TO THE IC REACTOR COOLANT PUMP. 007 07/17/85 F 22.4 8 3 85-013 SJ P A REACTOR TRIP OCCURRED DUE TO LOH-LOH STEAM GENERATOR LEVEL FOLLOHING A TRIP OF THE IB STEAM GENERATOR FEED PUMP (SGFP). THE SGFP TRIPPED WHEN A TECHNICIAN ACCIDENTLY BUMPED A CABLE AND BROKE A CONNECTION DN A HIRE LEADING TO THE SGFP THRUST BEAPING HEAR PROTECTION UNIT. t n l NMMMMMMMMMM FARLEY 1 OPERATED WITH 1 OUTAGE AND 1 REDUCTION, BOTH DUE TO MAINTENANCE, DURING JULY.

  .u 

SUMMARY

M UNMMMMMMMMM Tvom Reason Method Svetem & Comnanent F-Forced A-Equip Failure F- A dmi n 1-Manual Exhibit F & H

;  S-Sched       B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling         H-Other                     3-Auto Scram    Preparation of D-Regulatory Restriction                        4-Continued     Data Entry Sheet E-Operator Trainino                             5-Reduced Load Licensee Event Report
                    & License Examination                        9-Other         (LER) File (NUREG-0161)

PAGE 2-111

l MMEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u FARLEY 1 M MMUMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTIQN UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY , STATE.................... ALABAMA LICENSEE................. ALABAMA POWER CO. COUNTY................... HOUSTON CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 18 MI SE OF CONTRACTOR DOTHAN, ALA ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 9, 1977 CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER IST GENER... AUGUST 18, 1977 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 1, 1977 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOHER IE REGION RESPONSIBLE......II CONDENSER COOLING HATER....CHATAH00CHE*d RIVER IE RESIDENT INSPECTOR......H. BRADF0RD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. REEVES COUNCIL................. 50UTHEASTERN ELECTRIC DOCKET NUMBER........... 50-348 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-2, JUNE 25, 1977 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 H. BURDESHAN STREET DOTHAN, ALABAMA 36301 INSPECTION STATUS INSPECTION

SUMMARY

              + INSPECTION JUNE 3-7 (85-25): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 34 INSPECTOR-HOURS ONSITE IN THE AREAS OF SURVEILLANCE TESTING AND CALIBRATION CONTROL PROGRAM, MEASURING AND TEST EQUIPMENT PROGRAM, AND LICENSEE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION FINDINGS. FOUR VIOLATIONS HERE IDENTIFIED - FAILURE TO PERFORM EVALUATION OF OUT-OF-TOLERANCE MEASURING AND TEST EQUIPMENT, FAILURE TO ESTABLISH ENVIRONMENTAL CONTROLS FOR CALIBRATION OF MEASURING AND TEST EQUIPMENI, FAILURE TO CONFIRM ADEQUACY OF CALIBRATION FREQUENCY OF MEASURING AND TEST EQUIPMENT, FAILURE TO CONTROL ACCESS AND ASSURE ACCOUNTABILITY OF MEASURING AND TEST EQUIPMENT.

INSPECTION JUNE 18-21 (85-26): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 28 INSPECTOR-HOURS ONSITE IN THE AREAS OF REVIEH OF THE SURVEILLANCE AND INSPECTION PROGRAM FOR SNUBBERS FOLLOHUP DN LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, AND REVIEH OF THE REPAIRS TO UNITS 1 AND 2 CONTAINMENT BUILDING POST TENSIONING SYSTEM. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 17-20 (85-27): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 30 INSPECTOR-HOURS ONSITE IN THE AREAS OF QUALITY CONTROL AND CONFIRMATORY MEASUREMENTS INCLUDING REVIEH OF THE L ABORATORY QUALITY CONTROL PROGRAMS REVIEH OF PROCEDURES AND INSTRUCTIONS 3 REVIEW OF QUALITY CONTROL RECORDS AND LOGSs REVIEH OF THE COUNTING ROOM AND CHEMISTRY LABORATORY FACILITIESs AND RESULTS OF SPLIT SAMPLES ANALYZED BY THE LICENSEE AND THE NRC REGION II LABORATORY FACILITIES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 11 - JULY 10 (85-28): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 86 INSPECTOR-HOURS ONSITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, MONTHLY SURVEILLANCE OBSERVATION, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL PAGE 2-112

Rcport Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M FARLEY 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

SAFETY VERIFICATION. LICENSEE EVENT REPORTS, IE BULLETINS, AND ONSITE FOLLONUP OF EVENTS. HITNIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEM?- NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATIONS. LAST IE SITE INSPfwv'ON DATE: JUNE 11 - JULY 10, 1985 + INSPECTION REPORT = 348/85-28 + REPORTS FR0M LICENSEE

                          =E=====E=========,s
                                                                  ========E=====E======E=EE===E=====E=========E==========E========EE====E====================E====E===E===

NUMBER DATE OF DATE OF SUBJECT EVENT REr0RT

                                                           ._--- --- = _ - - - __ _ - - - - - -            - - . --

85-010 06/08/85 07/03/85 REACTOR TRIP, DUE TO PERSONNEL ERROR / PROCEDURAL INADEQUACY. E=======E======E===3===E============E=======E====E=ER==E=EEEE==EE========E==E=======E===E===E===E===EE====EE====EE===ER==EES==EE== PAGE 2-113

1. Dock et 50-364 0PERATING STATUS MunummunummunwMuuuwwwwuMuunuwMunumwM M FARLEY 2 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 unumMxxwuMuumumunuxuuunummuunnumunum
3. Utility

Contact:

J. D. H00DARD (205) 899-5156 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2652 FARLEY 2
5. Nameplate Rating (Gross MHe): 860
6. Design Electrical Rating (Net MWe): 829 850 1500
7. Maximum Dependable Capacity (Gross MHe):
                                                                                                                    ~
8. Maximun Dependable Capacity (Net MHe): 807 ,__,
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions. If Any NONE MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5.087.0 35.112.0 7 16.1 3.279.9 30,192.4
15. Hours Reactor Critical -------------------r-----===- -100
14. Rx Reserve Shtdwn Hrs .0 .0 138.4
15. Hrs Generator On-Line 692.4 3.211.4 29.789.5 l -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1.769.634 8.030.519 76.456.115 ggg, -so
18. Gross Elec Ener (MHH) 587.200 2.665.516 24.611.770
19. Het Elec Ener (MHH) 556,938 2.509.022 23,327.944
                                                                                                                                - to
20. Unit Service Factor 93.1 63.1 84.8
21. Unit Avail Factor 93.1 63.1 84.8
22. Uni t Cap Factor (MDC Net) 92.8 61.1 82.3
23. Unit Cap Factor (DER Net) 90.3 59.5 80.1 0
24. Unit Forced Outage Rate 6.9 2.4 5.1 0 5 1'o l's $0 d5 $0 51.6 80.2 1.6 16.7 UNYS
25. Forced Outage Hours
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-114

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M FARLEY 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TvEn Hours Reason Haihad LER Number $vstem Component Cause & Corrective Action to Prevent Recurrence 005 07/15/85 F 42.1 H 3 85-010 A REACTOR TRIP OCCURRED DUE TO THE LOSS OF P0HER IN THQ ROD CONTROL SYSTEM POWER CABINETS. THIS HAS CAUSED BY LIGHTHING. 006 07/17/85 F 9.5 A 3 85-011 SJ P A REACTOR TRIP OCCURRED DUE TO LOH-LOH LEVEL IN THE 2C STEAM GENERATOR FOLLOHING A STEAM GENERATOR FEED PUMP AND MAIN TURBINE TRIP CAUSED BY HIGH LEVEL IN THE 2A STEAM GENERATOR. 1 n:MMMMMMMMM FARLEY 2 OPERATED WITH 2 OUTAGES AND NO REDUCTIONS DURING JULY. H

SUMMARY

M MEMMMMMMMMM Tvoo Reason Met hod System 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparatinn of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                       & License Examination        9-Other         (LER) Flie (HUREG-0161)

PAGE 2-115

ECMMMMMMMMWMMMMMMMMMMMMMMMMMMMMMMMMM M FARLEY 2 M c:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... ALABAMA LICENSEE................. ALABAMA P0HER CD. COUNTY................... HOUSTON CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 28 MI SE OF CONTRACTOR DOTHAN, ALA ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 5, 1981 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER...MAY 25, 1981 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL DPERATE.... JULY 30, 1981 REGULATORY INFORMATION CONDENSER C00LIhG METHOD... COOLING TOWER IE REGION RESPONSIBLE.... .II CONDENSER COOLING HATER....CHATAH00CHEE RIVER IE RESIDENT INSPECTOR......H. BRADFORD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. REEVES COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET hUMBER......... . 50-364 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-8, MARCH 31, 1981 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 H. BURDESHAH STREET DOTHAN, ALABAMA 36301 INSPECTION STATUS INSPECTION

SUMMARY

 + INSPECTION JUNE 3-7 (85-25): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 34 INSPECTOR-HOURS ONSITE IN THE AREAS OF SURVEILL ANCE TESTING AND CALIBRATION CONTROL PROGRAM, MEASURING AND TEST EQUIPMENT PROGRAM, AND LICENSEE ACTION ON PREVIOUSLY IDENTIFIED INSPECTION FINDINGS. FOUR VIOLATIONS HERE IDENTIFIED - FAILURE TO PERFORM EVALUATION OF OUT-OF-TOLERANCE MEASURING AND TEST EQUIPMENT, FAILURE TO ESTABLISH ENVIRONMENTAL CONTROLS FOR CALIBRATION OF MEASURING AND TEST EQUIPMENT, FAILURE TO CONFIRM ADEQUACY OF CALIBRATION FREQUENCY OF MEASURING AND TEST EQUIPMENT, FAILURE TO CONTROL ACCESS AND ASSURE ACCOUNTABILITY OF MEASURING AND TEST EQUIPMENT.

INSPECTION JUNE 18-21 (85-26): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 28 INSPECTOR-HOURS ONSITE IN THE AREAS OF REVIEH OF THE SURVEILLANCE AND INSPECTION PROGRAM FOR SHUBBERS, FOLLOHUP DN LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, AND REVIEH OF THE REPAIRS TO UNITS 1 AND 2 CONTAINMENT BUILDING POST TENSIONING SYSTEM. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 17-70 (85-27): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 30 INSPECTOR-HOURS ONSITE IN THE AREAS OF QUALITY CONTROL AND CONFIRMATORY MEASUREMENTS INCLUDING REVIEW OF THE LABORATORY QUALITY CONTR9L PROGRAMS REVIEH OF PROCEDURES AND INSTRUCTIONS; REVIEW OF QUALITY CONTROL RECORDS AND LOGSs REVIEH OF THE COUNTING ROOM AND CHEMISTRY LABORATORY FACILITIES: AND RESULTS OF SPLIT SAMPLES ANALYZED BY THE LICENSEE AND THE NRC REGION II LABORATORY FACILITIES. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUl4E 11 - JULY 10 (85-28): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 86 INSPECTOR-HOURS ONSITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS, MONTHLY SURVEILLANCE OBSERVATION, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL PAGE 2-116

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M FARLEY 2 M MMMMAMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION StNW4ARY SAFETY VERIFICATION, LICENSEE EVENT REPORTS, IE BULLETINS, AND ONSITE FOLLONUP OF EVENTS. HITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT SUIW4ARY NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: LICENSEE CONTINUES TENDON FIELD ANCHORS INSPECTION. FACILITY ITEMS (PLANS AND PRDCEDURES): NONE. , MANAGERIAL ITEMS: NONE. PLANT STATUS: NORMAL OPERATION. LAST IE SITE INSPECTION DATE: JUNE 11 - JULY 10, 1985 + INSPECTION REPORT NO: 50-364/85-28 + REPORTS FR0M LICENSEE

    ==33E=E=EE====E==33EE====3EE=3333333==3E=3=E333333333333=E=3====33=E=33=3EEEEE=E5=3333333=EE=33E=E=3EREEE23E=EEEEEEEEEE=E=E==33333 NUMBER            DATE OF           DATE OF            SUBJECT EVENT             REPORT                                                                                                                                 ----

NONE.

    = E =E== E= = = E= = = = E=3= 3 3 =3E = E 323 F= E E3 3 3 3 3 3 3 3 = 3 3 3 3 3 3 3 3 = EE 3 3 3 3 3 3 3 3 3 3 3 3 3 3 E3 3 3 E 33 3 33 E 3 53 = = 3 33 3 3 3 3 3 E 3 E 3 3 3 3 3 3 3 3 3 33 E = = 3 3 3 3 3 3 3 3 3 33 3 3 3 E 3 = E 3 B = E PAGE 2-117
1. Docket 50-333 0PERATING STATUS wuuuuunnunuwwwuMMwwwwwwMuxum-NwMMMMM M FITZPATRICK M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMuuuuummwxunummununuwwww4mmuunuww
3. Utility Contacts J. COOK (315) 342-3840 AVERAGE DAILY P0HER LEVEL ("He) PLOT
4. Licensed Thermal Power (MHt): 2436 F'ITZPflTRICK
5. Nameplate Rating (Gross MHe): 981 X 0.9 = 883
6. Design Electrical Rating (Net MWe): 821
       '/ . Maximum Dependable Capacity (Gross MHe):                        830                   1500
8. Maximum Dependable Capacity (Net MHe): 810 *
  • EI
                                                                                                             .. ImX. DEPDC. OPP. - 810 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 87.768.0
13. Hours Reactor Critical 703.5 2.439.9 62,055.9
                                                                                                                                       =________           _

100 E 8

14. Rx Reserve Shtdwn Mrs .0 .0 .0
15. Hrs Generator On-Line 684.3 2.289.7 60.237.3 f -80
10. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 1.585,056 5,079,360 128.015,314
                                                                                                                                                                  -80
18. Gross Elec Ener (MHH) 530.300 1,709.980 43,428,390
19. Net Elec Ener (MHH) 512,795 1.653.055 42.051.060 j 92.0 45.0
                                                                                                                                                                  ~"
20. Unit Service Factor 68.6
21. Unit Avail Factor 92.0 45.0 68.6
22. Unit Cap Factor (MDC Net) 85.1 40.1 62.1M -20
23. Unit Cap Factor (DER Net) 84.0 39.6 58.4
24. Unit Forced Outage Rate 8.0 10.0 13.4 0 , ,_ ,. , , , 0 0 5 to 15 20 25 30
25. Forced Outage Hours 59.7 255.6 9,462.1 DAYS
24. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-118
  -.   .   -     _-.                               ..                         .      .  - - -      -. .    --   . . ~ . . - .--                 -        -  -     . . _ .            - . .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M FITZPATRICK M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No, Date Tyne Hours Reason Method LER Number System Component Cause & Corrective Action to Provent Recurrsnce 7 07/19/85 F 29.7 0 3 REACTOR SCRAM ON LOH VACUUM DUE TO OPERATOR ERROR HHILE TRANSFERRING ELECTRICAL LOADS. 8 07/26/85 F 30.0 G 3 REACTOR SCRAM DURING TURBINE CONTROL VALVE TESTING DUE TO IMPROPER OPERATOR ACTION. I i I muMMMMMMMMM THE FITZPATRICK PLANT DPERATED AT NEAR FULL THERMAL POWER FOR THIS REPORTING PERIOD HITH ONE u

SUMMARY

M INADVERTENT SHUTDONN HHILE TRANSFERRING ELECTRICAL LOADS AND A UNIT TRIP DURING TURBINE CONTROL MMMMMMMMMMM VALVE TESTING. } Tvom Raamon Met hod System 8 Commonant F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched . B-Maint or. Test G-Oper Error 2-Manual Scram Instructions for  ! C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 4 & License Examination 9-Other (LER) File (NUREG-0161) PAGE 2-119

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N FITZPATRICK M uMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................NEN YORK LICENSEE. . . . . . . . . . . . . . . . . POWER AUTHORITY OF STATE OF N.Y. COUNTY.................. 0SHEGO CORPORATE ADDRESS....... 10 COLUMBUS CIRCLE NEW YORK, NEH YORK 10019 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NE OF CONTRACTOR OSHEGO, NY ARCHITECT / ENGINEER....... STONE & HEBSTER TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... NOVEMBER 17, 1974 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... FEBRUARY 1, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . JULY 28, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... LAKE ONTARIO IE RESIDENT INSPECTOR......L. DOERFLEIN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. ABELSON COUNCIL.............. ... NORTHEAST POWER DOCKET NUMBER........... 50-333 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-59, OCTOBER 17, 1974 PUBLIC DOCUMENT ROOM....... STATE UNIVERSITY COLLEGE OF OSHEGO PENFIELD LIBRARY - GOVERNMENT DOCUMENTS COL OSHEGO, NY 13126 (315) 341-2323 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

TECH SPEC 6.11( A) REQUIRES, IN PART, THAT ENTRIES, INTO A HIGH RADIATION AREA BE CONTROLLED BY ISSUANCE OF A RADIATION HORK PERMIT, AND THAT ENTRIES PERMITTED UNDER 6.11( A).1.C BE CONTROLLED BY AN INDIVIDUAL QUALIFIED IN RADIATION PROTECTION PROCEDURES AND THAT THE INDIVIDUAL PERFORM PERIODIC RADIATION SURVEILLANCES AT THE FREQUENCY SPECIFIED BY THE FACILITY IN THE RADIATION HORK PERMIT. CONTRARY TO THE ABOVE, SPECIAL RADIATION HORK PERMITS ISSUED FOR DRYNELL ENTRY FOR THE PERIOD OF MARCH 1-21, 1985 FAILED TO SPECIFY THE FREQUENCY FOR PERFORMING PERIODIC RADIATION SURVEILL ANCES IN THE RHP. TECH SPEC 6.11 REQUIRES, IN PART, ADHERENCE TO RADIATION PROTECTION PROCEDURES FOR ALL PLAtlT OPERATIONS INVOLVING RADIATION EXPOSURE AND CONTAMINATION CONTROL. LICENSEE PROCEDURE RDOP-4 REQUIRES, IN PART, COMPLIANCE WITH ANY CONDITION STATED ON THE RADIATION HORK PERMIT (RNP) BY ALL PERSONNEL HHO SIGN-IN ON THE RHP. CONTRARY TO THE ABOVE, PERSONNEL DOSIMETRY HAS NOT HORN BY FOUR INDIVIDUALS WHO HAD SIGNED IN ON AN RHP FOR DRYNELL ENTRY ON THE FOLLONING DATES: FEBRUARY 25, MARCH 11, 18, AND 20, 1985: AND MARCH 20, 1985 RUBBER GLOVES, AS SPECIFIED BY THE RHP HERE NOT WORN BY TWO INDIVIDUALS WHO HERE SORTING TRASH FROM THE RESTRICTED AREA. (8500 4) PAGE 2-120

1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M FITZPATRICK M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): I NO INPUT PROVIDED. i MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: i NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

                        ====3===============================================================================3========3====================================

NUMBER DATE OF DATE OF SUBJECT a EVENT REPORT

                                           .           __=--        --

NO INPUT PROVIDED.

                        ==3=======E=33=33=33E=E:53333E===33==3E==F===33333=3===3==3==3=3=E=3==3======3==========3===3=============333==3=====3===========3 i

e PAGE 2-121

1. Docket 50-285 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

! M FORT CALHOUN 1 M

c. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMhMMMMMMMMMMMMMMM
3. Utility

Contact:

T. P. MATTHENS (402) 536-4733 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1500 FORT CALHOUN 1
5. Nameplate Rating (Gross MHe): 591 X 0.85 = 502
6. Design Electrical Rating (Net MHe): 478
7. Maximum Dependable Capacity (Gross MHe): 502 1500 DESIGN ELEO. MRTING = 478
8. Maximum Dependable Capacity (Net MHe): 478 _g , gg
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 103.872.0
13. Hours Reactor Critical 744.0 5.060.6 81.060.8 h
10. Rx Reserve Shtdwn Hrs .0 .0 1.309.5
15. Hrs Generator On-Line 744.0 5.052.7 79.670.2 h
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Thern Ener (MHH) 1.110.687 7.478.935 101.665.703 500 -
                                                                                                                                               -100
18. Gross Elec Ener (MHH) 364.894 2.523.278 33.604.758
                                                                                                                                              ~ 80
19. Net Elec Ener (MHH) 347.599 2.407.384 31.819.015
20. Unit Service Factor 100.0 99.3 76.7 - so
21. Unit Avail Factor 100.0 99.3 76.7 _g
22. Unit Cap Factor (MDC Net) 97.7 99.0 66.6M
                                                                                                                                              -20
23. Unit Cap Factor (DER Net) 97.7 99.0 64.1 0
24. Unit Forced Outage Rate .0 .0 3.6 0 5 1'o l's N i Y
                                                             .0                                                           DAYS
25. Forced Dutace Hours .0 1.750.3 2G. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

Jul.Y 1985 REFilELING 8 MAINTENANCE: 10/85 - 12/85

27. If Currently Shutdown Estimated Startup Date: N/A M Item calculated with a Helohted Average PAGE 2-122

_ _ - _ _ _ _ _ _ - _- . _- . - . -,_. . ._ .< -_ . . . . - - . .~ . MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M FORT CALHOUN 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Yvoe Hours kaanon LER Number $vstem Comoonent Cause & Corrective Action to Prevent Recurrence NOME i t E:MMMMMMMMM FORT CALHOUN OPERATED AT NEAR FULL POWER DURING THE JULY REPORT PERIOD. N

SUMMARY

M REMMMMMMMMM Tvne Reason Met ho d Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of { D-Requiatory Restriction 4-Continued Data Entry Sheet E-operator Training 5-Reduced Load Licensee Event Report

                                          & License Examination          9-Other         (LER) File (NUREG-0161)

PAGE 2-123 }

_ _ - _ - _ _ _ __ _ _ _ _ _ . . . _ _ _ . . _ _ _ _ _ _ . _ _ . _ . __ m- - - m - . . _ _ - _ . ) Muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum M FORT CALHOUN 1 m , usuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY i STATE.................... NEBRASKA LICENSEE................ 0MAHA PUBLIC POWER DISTRICT COUNTY...................HASHINGTON CORPORATE ADDRESS. . . . . . . 1623 HARNEY STREET OMAHA,, NEBRASKA 68102 i DIST AND DIRECTION FROM 4 NEAREST POPULATION CTR.. 19 MI N OF CONTRACTOR

DMAHA, NEB ARCHITECT / ENGINEER.......GIBBS, HILL, DURHAM & RICHARDSON i ,

I TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... AUGUST 6, 1973 CONSTRUCTOR..............GIBBS, HILL, DURHAM & RICHARDSON DATE ELEC ENER IST GENER... AUGUST 25, 1973 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 20, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD.. .ONCE THRU IE REGION RESPONSIBLE......IV CONDENSER COOLING HATER.... MISSOURI RIVER IE RESIDENT INSPECTOR......L. YANDELL ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....E. TOURIGNY 4 COUNCIL..................MID-CONTINENT AREA DOCKET NUMBER........... 50-285 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-40, AUGUST 9, 1973 PUBLIC DOCUMENT R00M.......H. DALE CL ARK LIBRARY 215 S. 15TH STREET OMAHA, NEBRASKA 68102 INSPECTION STATUS IM}fECTION

SUMMARY

INSPECTION CONDUCTED MAY 1-31, 1985 (85-11) ROUTINE, UNANNOUNCED INSPECTION OF LICENSEE S ACTIONS ON PREVIOUS INSPECTION FINDINGS, OPERATIONAL SAFETY VERIFICATION, SURVEILLANCE TESTING, SURVEILLANCE PROGRAM,' MAINTENANCE ACTIVITIES, FOLLONUP OF IE INFORMATION NOTICES, AND FOLLONUP OF LERS. HITHIM THE SEVEN AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED (FAILURE TO FOLLON PROCEDURES). INSPECTION CONDUCTED MAY 20-24, 1985 (85-12) ROUTINE, UNANNDUNCED INSPECTION OF THE LICENSEE'S RADIDACTIVE HASTE MANAGEMENT PROGRAM INCLUDING: LIQUID, GASEOUS, AND SOLID RADI0 ACTIVE HASTE SYSTEMS ORGANIZATION AND STAFFING; EFFLUENT CONTROL INSTRUMENTATION PROCEDURES FOR CONTROLLING THE RELEASE OF

EFFLUENTS; AIR CLEANING SYSTEMS; AND REACTOR COOLANT AND SECONDARY HATER QUALITY.

WITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ! ENFORCEMENT

SUMMARY

PAGE 2-124 t

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M FORT CALHOUN 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT SUMARY CONTRARY TO THE REGUIREMENTS OF TECHNECAL SPECIFICATION 5.8.1, AND STANDING ORDER G-23, THE LICENSEE FAILED TO ACCOUNT FOR SIX SURVEILLANCE TESTS PERFORMED DURING THE JULY 1984 REFUELING OUTAGE. (8501 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS NOME PLANT STATUS: LAST IE SITE INSPECTION DATE: MAY 1-31, 1985 BY L.A. YANDELL INSPECTION REPORT NO: 58-285/45-11 REP 0RT$ FR0M LICENSEE 33333E3======E=33=3223:3==3E==3=E==3====3EEEEEEEEE==3=EEEE33==3=3==33E=EE3===E========3=333=3=33333====33=====3=E=EE====3========= NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 33333E==3====3=EE3=333===E==E==333=E333EEEE=EEEEEEEE==333=ESE3333333E=333E=33E3E3=3333333353353=33E=3EE=3333E=333333E==E3333=3333= i PAGE 2-125

1. Dock et 50-267 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u FORT ST VRAIN N
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744,0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununx
3. Utility Contacts FRANK NOVACHEK (303) 785-2224 AVERAGE DAILY P0HER LEVEL (MHe) PLOT O. Licensed Thermal Power (MHt): 842 TORT ST VRfiIN
5. Nameplate Rating (Gross MHe): 403 X 0.85 = 343
6. Design Electrical Rating (Not MHe): 330
7. Maximum Dependable Capacity (Gross HHe): 342 1500 ON
8. Maximum Dependable Capacity (Net MHe): 330
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted. If Any (Net MHe): 280
11. Reasons for Restrictions, If Any B-0 STARTUP TESTING.

1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 53,352.0
13. Hours Reactor Critical 67.7 67.7 27,219.1 h
10. Rx Reserve Shtdan Mrs .0 .0 .0 18,463.5
15. Hrs Generator On-Line .0 .0 l
10. Unit Reserve Sht&sn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 109 109 9,709,908
18. Gross Elec Ener (P54H) 0 0 3,248,888
19. Net Elec Ener (MHH) -2,973 -15.255 2,912,997 NO NE'T pop OUTPUT THIS HONTH
20. Unit Service Factor .0 .0 34.6
21. Unit Avail Factor .0 .0 34.6 ,,
23. Unit Cap Factor (MDC Net) .0 .0 16.5 .e
33. Unit Cap Factor (CER Net) .0 .0 16.5 - 30 0
24. Unit Forced Outage Rate 100.0 100.0 53.7 0, g g g g g g
25. Forced Outace Hours 744.0 5,087.0 21,416.5 DfWS
30. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):
                                                                                              ,AA.Y 1995 NONE
37. If Currently Shutdown Estimated Startup Date: 09/01/85 PAGE 2-126

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M FORT ST VRAIN M I MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l No. Date Tvoe Hours Reason pathod LER Number System Comoonent Cause & Corrective Action to Pr ev en t Recurrence 1 84-006 06/01/84 F 552.0 A 5 85-002 AB BLO COMPLETION OF CIRCULATOR BOLTING CHANGE 0UT AND PRIMARY COOLANT CLEANUP. 85-001 07/20/85 F 192.0 G 9 85-012 AB XXXXXX PRIMARY COOLANT CLEANUP. l l n==MMMMMMMM FORT ST. VRAIN REMAINS OFFLINE FOR A CONTINUING MAINTENANCE OUTAGE. D

SUMMARY

e En%MMMMMMMM Tvee Rea son Met ho d Svsten & Conoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 1 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

               & License Examination         9-Other          (LER) File (NUREG-0161)

PAGE 2-127

                       .. - - - _ . .        . . .       -.       _ . . .   ._  - - . . _ _                         __        .            .. - -           . . . . _.    -_ .   . . .         ..~

unsunuuuuuuuuuuuuuuuuuuuuuuuuuuummum n FORT ST VRAIN u i n=:muuuuuuuuuuuuuuuuuuuuuuuuuuuununu FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE................... 00LORADO LICENSEE. . . . . . . . . . . . . . . . .PUBLIC SERVICE OF COLORADO COUNTY...................NELD CORPORATE ADDRESS........P.O. BOX 840  ! DENVER, COLORADO 802D1 DIST AND DIRECTION FROM MEAREST PDPULATION CTR.. 35 MI N OF CONTRACTOR i DENVER, COL ARCHITECT / ENGINEER.......SARGENT 4 LUNDY  ! TYPE OF REACTOR. . . . . . . . . . . .HTGR NUC STEAM SYS SUPPLIER... GENERAL ATOMIC CORP. DATE INITIAL CRITICALITY... JANUARY 31, 1974 CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... DECEMBER 11, 1976 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE C0fetERCI AL OPERAT E. . . . JULY 1, 1979 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TONER IE REGION RESPONSIBLE......IV CONDENSER COOLING MATER....S. PLATTE RIVER IE RESIDENT INSPECTOR......R. FARRELL ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....P. WAGNER COUNCIL..................NESTERN SYSTEMS DOCK ET NUMB ER . . . . . . . . . . . 5 0-26 7 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-34, DECEMBER 21, 1973 PUBLIC DOCUMENT ROOM.......GREELEY PUBLIC LIBRARY CITY COMPLEX BUILDING GREELEY, COLORADO 80631 1 IN5PECTI0N STATUS INSFECTION SUlmARY ENFORCEMENT SUIWARY NOME a OTNER ITEMS SYSTEMS AND C0fFONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: PAGE 2-128

 . _ . _ - ~ - - . - - - . - -                                                - . . . - . _ - _ . _ - . - . . - . . _ - - - - . - _ . . - _                                            -_.-     . - ..               _. . ~ - ~ . -            - - . . ..-.

l i Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) N FORT ST VRAIN M , MMMMMMMMMMMNNNNNMMMMMMMMMMMMMMMMNNMM OTHER ITEMS I NONE ' PLANT STATUS: PLANT IS CETTING READY TO RESTART l LAST IE SITE INSPECTION DATE: APRIL 15-19, 1985 INSPECTION REPORT NO: 267/85-12

                                                             .                                                           REPORTS                  FR0N                 LICENSEE                                                                                   ,

3E333=333=33333=32323333333333E=E33333333333333 5E3333333333333333333333===33E=33333333E=3 3333EE33333=333333E323:33E=E3EE==3=3=33 NUMBER BATE OF DATE OF SUBJECT i EVENT REPORT NOME zzazzzzzzsazzzazzsanza:E=sazzazzazz==mmsas=zzazz=maz=s=szzEsassanssazz==azzazz=ssz==s===ssazzaz=zzazzazz==ss===azzzassazzsEsEzzEm= i

                                                                                                                                                                                                                                                                -f A

t I i l PAGE 2-129 1

          -_-- - . . _ _ - - _ - _ . - _ _ _ _ _ _ - - - -                         . _ - - . _ . ,            nn-.   ,..                    -    . ~ . - - - - - , - -    - - - - , e-      -          w- --
                                                                                                                                                                                                             -m-   ,         -      ,.       ,        ..n   . ,

l 1

1. Dock et t 50-244 0PERATING STATUS ununuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u GINNA u
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu
3. Utility Contacts ANDREH MC NAMARA (315) 524-4446 AVERAGE DAILY POWER LEVEL (MWe) PLOT 4 Licensed Thermal Power (MHt): 1520 GIP #M
5. Nameplate Rating (Gross MWe): 608 X 0.85 = 517
0. Design Electrical Rating (Net MWe): 470
7. Maximum Dependable Capacity (Gross MHe): 490 3800
8. Maximum Dependable Capacity (Net MHe): 470 [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE _
13. Report Period Mrs MONTH 744.0 YEAR 5.087.0 CUMULATIVE 137.447.0 g
13. Hours Reactor Critical 744.0 4.196.1 104.644.2 h
10. Rx Reserve Shtdwn Hrs .0 .0 1.687.7 5
15. Hrs Generator On-Line 744.0 4.081.7 102.373.3 f
13. Unit Reserve Shtdwn Hrs .0 2 8.5
17. Gross Thern Ener (MHH) 1.126.464 6.021.761 142.307.129 800- see one et tinuteno m Orrievu. muesticus I"
18. Gross Elec Ener (MHH) 371.112 2.024.297 46.509.705
                                                                                                                                                                    - so
19. Het Elec Ener (MHH) 353.199 1.906.933 44.089.960 i
20. Unit Service Factor 100.0 80.2 74.5 -so
21. Unit Avail Factor 100.0 80.2 74.5
                                                                                                                                                                    - 40
22. Unit Cap Factor (MDC Net) 101.0 79.8 69.8u
                                                                                                                                                                    -30
23. Unit Cap Factor (DER Net) 101.0 79.8 69.8m 0
20. Unit Fo. ned Outage Rate .0 2.2 7.5 0 5 io is do is 3IO
25. Forced 0.tage Hours .0 92.3 4.191.3 DAYS
26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):
                                                                                                                                        ,AA.T 1985 NONE
27. If Currently Shutdown Estimated Startup Date: N/A u Item calculated with a Heighted Average PAGE 2-130

1 _ 3 1 - 2 MNM M M E T' M e G M M c A M M n P M M e M M r M M r M M u M M c M M e M M R M M M M t M M n M M e M M v MAM e MNM r MNM P MIM MGM o M M t M M M M n M M o M M i M M t M M c M M A M M M M e M M v M M i M M t MMM c e r r S o C N _ O e I s _ u T a ) C 1 ._ C t6 _ r1 U o0

                            . t              p-D                    D      n             eG O      a     r tRE E                    I      n     o e R R      a    ffetU R    t               E      a H ohnN n              P      =     s S e(

. e o &nn v

     /     n              T     C      o o yE e o

p R Fiir l O 8 tttei S m P tcaneF o E m i u rE s N C R e bra n) t it pa eR - W m e Y s y hsetcE L xnraiL 0 t U S EIPDL( s J _ D v - _ b E m d T H a a U r T rm cadL o e G Sre H b N cud m I llSne S u R aa icr N U d uuotue D o n nt ndh R h aauoet T E R t MMACRO _ L E e - I N M t23459 - D N d P ._ o . r U h L o t L r e U r M F E n n rn n T ireo o o A mehi i s d ptt t a D AOOc a e E i gn R T FGH r ni A tim . s R sna r E et eix u P rs R aE 5 H o O ue r yT e lT 8 A i gr s 9 1 N N arnorn F oit o e L U E I G n inuurL latc pt el ai J o uif g e s qaeep& d e a EMRRO o t e - - - i a MMM R ABCDE r D M M e MYM P MRM d MAM ed t r MMM ce MMM rh o p E MUM e oc o N MSM n FS _ e N 0 M M v - - R h MMM T FS i li !

i , +* .! -  ! ' l  ! *'  ! ' t ii  !!t ;ir1t . ti!I Iih n 2 3 1

-                          5 8                                                                                                                                                                             -

9 2 1

.                                                                                                                                                                                                      E a                           L                                                                                                              N                                                             G A

U O P J I S d I i o V I r D e E P , 4 C 4 . t 0 N 0 r 6 4 E 6 o 8 YI 4 - C 4 p I 1 9 RC 1 e R 1 AS R T K R C R , BL K E O 0 IA R L Y S 1 LI O - E E CEY W T R COU

                                          &            E        A                                                            E ISNW EN           I                                                            B      L          EE S U                   C                                                            M BDVN A         N,          O E                 E                                        E      UNA, G ER                  S S                 S                                        C      PA VE          S U                 U                                        E                 HR
  -                                       R AT                  A O                 O                              R         D RSTE E            S              H             H                              E                ESUT T    TE               T G L G                                    K       L           , TEOS S    SH               R N E N                                    O L4 8 SNSE

~. E AC E I T I O I4 1 EI H H EO B T H T C M2 - HS5C N C R L S C S - R CU1O O O 9 I E E E . 0 P OB1R

.                                I R.

8 G. W B. N. I.. H. C.5 D. R.

  .                              T                                       .

A . . . . . . . . . . .

~                                                                                                     . . . .

M . . . . . . R . . . R . . . . _ O F

                                                                  . E
                                                                  . I
                                                                                                      . . R . C
                                                                                                                         . E           .

N . . . L . . E R E . N . I . . R P . . N L O G . A M

                                             . S             E P             . .        O        B T A . U O R           . S             E U             . R        I        I      C N . S O O           . E             N S             . E T               S E A . S R                                      S T           . R             I               . I      A        N P M .                  I C           . D             G S             . L M             O S               R             T                U A           . D             N Y             . P R               P N JE E N                                                                                                      -

R . A E S R P O S I OB T E T A T . / O U F E RM A M m N . E T M T S N R T PU D U A T O E T RC A C I N N C n_ C E A OE E U E N E G & O T A S R TT T R N Y O D NT D _ YN O CI S T R IE E S ~ D 8 TE P AH S B O I I I G S SK S C Y IC R RC C N R T E E NC N I a T I LI IL O C TR NA N C T U O U A L R R EO E L CD C B Y L T O U E E I I U . I U C G I I L L P N T T E n__ I L U R O I T _ I ~. C C -

.-                                                                                                                                                   E A                                                                                               L I                         P F                                                                                               C N                         S                                                              -

U O N 9 9 C 6 6 R I 9 9 EG Y 1 1 WN N 0 O OI F , . 7 I PT  :

 -                                                          O .               8 2 9                        R               A                                                                  )                     -

R 1 U A TN S K EE R R R T SI E -

 -                     MMu                R                 NT                E E            . H N                    AD                                                                      R                     -

M u O S B B 1 T O ER U M M Y E IE MM HO D M m N MH E E Y E E TO E M u WY C R V C L C K RC C . M n E A 5O H O E U N A O . O ~ M u 1R D R . M M N. k. . P. N. D. J. O. L. N. E P _ M m u

                                             .                .                 . . . . .                                .                               D D                     .

N . M. . . . . . I N M . . OR . Y R D . . V N M M . . RT . T E E O R . O  : A M u . . FC . I N T .H E . R S

 .                     M    u                . .                          . L E A T T                                    .                               P                          T         S                     -

M M . . NN A G R E A N N - M m . . OO C E M H Y. T T E A M m N . . II . I T P I U N . L MAu O . . TT . T S IO G G L P Y O D P MNu I . . CA . I N N I . Y N R P E ( - MNM T . . EL R R L I I B . R I A M D

-                      MIm       P           . . RU                   O     C R A                   L L            A .                                 A         M                  O    I    S MGu       I           . . IP                   T              E I O O                       I .                                 M N       M                  C V M M   n R               . . DO                   C     L N C O O L .                                                              M O       U                       O E

- M u C . . P A A E R C C E . U I S . D R IT

-                      M    n  S             . . D                    E       I            E                       R .                                 S T                          N P

.- M u E . . NT R T C M R R L C T S A M u D N . Y AS I E M E E CI N E N M T Y M M OE T E F N L O S S IC O P E E S U T . - .M m Y IT N TR O I E C N N RN I S M T M P I . M u T TA U SA E E TU T N E - I E N L

.                      M   u     I AT O                  IE-          E E E E D D CO                                                                   C I       C E                T     I   I M   M     L    CS C DN                         P T T T N N EC                                                                   E         R N       -R       S         C M

M M u C L I O Y A A A O O T D D D C C E L P S O N O O F N -HE Y G A S N F M M A N M T MMM F I E O

     ,!111I,i}j1J                   l      i!iI3             .          ,                       1!             iii                li!1)4tj<]tl{i<                                :      j       !td        , ; }i}1
  . - ._ . _ . . . _ _ _ .               - . - . . _ _ _ _ . . _ _ . . . _ _           .._.._.,_-m._.-             _ _ . _ _ . . .       _.     . _   .    . . _ _ _           _   . .. _-. . . _ . .. ._ . . _ .                              -._.m. _

Report Period JUL 1985 NMENENNNNNNNNNNNNNNNNENNNNNNNNNNNNNN INSPECTION S T A T U 'a - (Coh.'INUED) N GINNA N NNNNNNNNNNENNNNNNNNNNNNNNNNNENNNNNNN OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS

  • NO INPUT PROVIDED.

LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. , REPORTS FROM LICENSEE E233333=E3333333333333333333333333333333333E=3333333 3333E=3333=2=333==3333333333333E=E333333333333333E33333333333333E===3333=233=

!                      NUMBER    DATE OF                 DATE OF                 SUBJECT EVENT                    REPORT
                                                                                                         ~--------                                                   - - - . --                      - .--.       ---

NO INPUT PROVIDED.

                  ============us=====================================33======3======                                               : ========================================================== ==

'I I i 4 PAGE 2-133 l 4 1 i w r - ,- - - - - - - ---

1. Docket 50-416 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu u GRAND GULF 1 m
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744,0 uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum
3. Utility

Contact:

J. G. CESARE (601) 969-2'

  • AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 3833 GRAND GULE 1
5. Nameplate Rating (Gross MHe): 1373
6. Design Electrical Rating (Net MHe): 1250 I"
7. Maximum Dependable Capacity (Gross MHe): 1250 DESIGN ELEC. HRTING = 1250
8. Maximum Dependable Capacity (Net MWe): 1108 - MRX. DEPDC. GF. - 1100 1100%)
9. If Changes Occur Above Since Last Report, Give Reasons
  • roc cues se r===wn tsent artiseu. omettles l
10. Power Level To Which Restricted, If Any (Net MHe) *
                                                                                                                 #                                                -100
11. Reasons for Restrictions, If Anyt NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Mrs 744.0 744.0 744.0 ,,,
13. Hours Reactor Critical 722.6 722.6 722.6 h
14. Rx Reserve Shth Hrs .0 .0 .0
15. Mrs Generator On-Line 711.7 711.7 711.7 -e0
15. Unit Reserve Shtean Mrs .0 .0 .0
17. Gross Thern Ener (NH) 2.196.729 2.196.729 2.196.729 300-
18. Gross Elec Ener (MHH) 676.930 676.950 676.930 - 40
19. Het Elec Ener ( NH) 645.149 645.149 645.149
20. Unit Service Factor 95.7 95.7 95.7 95.7 95.7 95.7 - 20
21. Unit Avail Factor
22. Unit Cap Factor (MDC Net) 78.3 78.3 78.3
23. Unit Cap Factor (DER Net) 69.4 69.4 69.4 0
24. Unit Forced Dutage Rate 4.3 4.3 4.3 0 s io t's do is 60 32.3 32.3 32.3 OflYS
25. Forced Dutage Hours
26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):

JLLY 1985 NONE

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-134 J
   .    . - - >        - _ . _ _ , _ . _ _ _ . - _ _ _ _ _ . . . _ _ . _ . __                ..m.          .m___ . . . . . .               . . _ _ _ - . _ _ _ . _       m_._...m_       _ . _   _ _ _ _ - _ . . , _ _ _ _ _ _ _ __ _ _ _ _ _ _ . _ _ _ _ .

I s Report Period JUL 1985 NNNNMMNNNNNNNNNNNNMMMMMMMNNNNNNNNNMM UNIT SHUTD0WNS / REDUCTIONS M GRAND GULF 1 M MNNNNNNNMMNNNNNMMMNNNNNNNNNNNNNNNNNW No. Date E Mours Season Flethod L ER WA-- System Comoonent Cause a Corrective Action to Prevent Recurrence 85-16 07/05/85 F 32.3 A 3 85-027 SG MON A TRIP OF CIRCULATING MATER PUMP 'B' CAUSED A LOW CONDENSER ' VACUUM HHICH RESULTED IN A TURBINE TRIP AND A REACTOR SCRAM. THE CAUSE OF THE CIRCULATING HATER PUMP TRIP HAS A FAILED ROTOR TEMPERATURE MONITOR. 85-17 07/09/35 F 0.0 A 5 SG P THE 'A' CIRCULATING MATER PUMP MOTOR BURNED UP LIMITING L REACTOR POWER TO APPROXIMATELY 60 TD 65 PERCENT. A NEN PUMP Mo*0R WAS INSTALLED AND MONITORED FOR CORRECT OPERATION, 1 I L I i I t

)I n=::N N N N N N M M                           GRAND GULF 1 DECLARED C009ERCIAL OPERATION ON JULY 1,                                          1985 AND OPERATED WITH t DUTAGE AND 1 REDUCTION 5 $UPWIARY N                                   DURING THE MONTH.

c==MNNNNNNN Tyne Reason Method System 8 Cnmoonent F-Forced A-Equip FalIure F-Admin t-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for

.                                 C-Refueling                                      H-Other        3-Auto Scram                  Preparation of
 !                                D-RequIatory Restriction                                        4-Continued                   Data Entry Sheet E-Operator Training                                             5-Reduced Load Licensee Event Report
                                             & License Examination                                9-Other                       (LER) File (NUREG-0161)

I PAGE 2-t35

i 1

J 1 i_____

mumummmmmmunummmmmmmmmmmmmmmanumanu D GRAND GULF 1 m a mmmmmmmmmmmmmmmmmmmmmmunusunummune FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY

!                                       STATE.................... MISSISSIPPI                                                            LICENSEE................. MISSISSIPPI PONER 8 LIGHT COMPANY 1

COUNTY................... N I90RNE CORPORATE ADDRESS. . . . . . . .P.O. BOX 1649 JACKSON, MISSISSIPPI 59205  ;

.;                                      BIST AND DIRECTION FROM                                                                                                                                                                                                          '
,                                       NEAREST POPULATION CTR.. 25 MI 5 0F                                                           CONTRACTOR
!                                                                                     VICKSBURG, MISS                                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BNR                                                                      NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... AUGUST 18, 1982                                                         CONSTRUCTOR..............BECHTEL DATE ELEC ENER tST GENER.. 0CTOBER 20, 1984                                                         TURBINE SUPPLIER.........ALLIS-CdALMERS DATE CopW9ERCIAL OPERATE. ... JULY 1.1985                                                      REGULATORY INFORMATION CONDENSER COOLING METHOD...CCHNDCT                                                               IE REGION RESPONSIBLE......II

! CONDENSER COOLING MATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......R. BUTCHER l ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....L. KINTNER CC'JNCI L . . . . . . . . . . . . . . . . . 50UTHMEST POWER POOL DOCKET NUMBER........... 50-416 1 3 LICENSE 4 DATE ISSUANCE....NPF-29, NOVEMBER t, 1984 l {

,                                                                                                                                     PUBLIC DOCUMENT R00M....... HINDS JUNIOR COLLEGE MC LENDON LIBRARY                                                                [

RAYMOND, MISSISSIPPI 39154 - INSPECTION STATUS } i INSPECTION SUPOtARY l + INSPECTION MAY 18 - JUNE 15 (85-201: THIS ROUTINE INSPECTION ENTAILED 150 RESIDENT INSPECTOR-HOURS AT THE $1TE IN THE AREAS OF OPERATIONAL SAFETY VERIFICATION. MAINTENANCE OBSERVATION. SURVEILLANCE OBSERVATION, ESF SYSTEM WALKDOWN, REPORTABLE OCCURRENCES, 1 OPERATING REACTOR EVENTS. DESIGN. DESIGN CHANGES AND PODIFICATIONS. STARTUP TESTING, AND INDEPENDENT INSPECTION. OF THE EIGHT i AREAS INSPECTED, NO APPARENT VIOLATIONS 08t DEVIATIONS HERE IDENTIFIE3 IN SIX AREAS; TWO APPARENT VIOLATIONS HERE FOUND IN TWO ] AREAS. INSPECTION JUNE 17 - 21 (45-21): THIS ROUTINE. UNANNOUNCED INSPECTION ENTAILED 36 INSPECTOR-HOURS AT THE SITE ON THE AREAS OF i COMPLETED STARTUP TESTS. NO VIOLATIONS OR DEVIATIDMS HERE IDENTIFIED. INSPECTION JUNE 20 - 21 (85-23): THIS SPECIAL. ANN 0UNCED INSPECTION ENTAILED to INSPECTOR-HOURS ONSITE (2 HOURS Od BACKSHIFT)

.                                    REVIEMING THE CIRCUMSTANCES OF A LICENSEE REPORTED INVESTIGATION OF ALLEGED DRUG USE BY EMPLOYEES AND CONTRACTORS OF THE GRAND                                                                                                      l 4                                     GULF NUCLEAR PLANT. AND VERIFYING THE CONTINUED MAINTENANCE OF SECURITY PROGRAM REQUIREMENTS IN ACCORDANCE WITH COMMITMENTS OF THE LICENSEE'S APPROVED PHYSICAL SECURITY PLAN. NO VIOLATIONS OR REGULATORY REQUIREMENTS HERE IDENTIFIED. THE RESULTS OF THE ONGOING
,i                                   INVESTIGATION SY THE LICENSEE HILL SE REVIEWED DURING SUBSEQUENT IN'.PECTIONS.

INSPECTION JULY 15-19 (85-25): THIS ROUTINE UNANNOUNCED INSPECTION ENTAILED 32 INSPECTOR-HOURS AT THE SITE IN THE REVIEN OF I COMPLETED STARTUP TESTS. NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED. l 4 INSPECTION JULY 15-16 (85-26): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 68 INSPECTOR-HOURS ONSITE IN THE AREAS OF THE PAGE 2-156 l I

Report Period JUL 1945 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM IN5PECTION STATUS - (CONTINUED) M GRAND GULF 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMr2rxMM INSPECTION SUPEERY l SNUBBER SURVEILLANCE PROGRAM, THERMAL EXPANSION TESTING, REPAIRS TO THE DIVISION III EMERGENCY DIESEL GENERATOR, AND PREVIOUSLY IDENTIFIE3 INSPECT 08t FOLLOMUP ITEMS. NO VIOLATIONS OR DEVIATIONS WERE YDE;4TIFIED.

       .-      ENFORCEfENT SurguRY l

i NONE OTHER ITEMS

                                                                                                                                                                                                                                                                      }

f-SYSTEMS AND COMPONENT PRO &LEMS: . _ NONE. FACILITY ITEpts (PLANS AND PROCEDURES) I NONE. PmrJRIAL ITEMS:  ! t NONE. i PLANT STATUS: PLANT DECLARED CopetERCIAL ON 7/1/85. + LAST IE SITE INSPECTION DATE: JULY 15-19, 1985 + t INSPECTION REPORT NO: 53-416/45-25 + REPORT 5 FR0M L ICENSEE i 33333333333333333333333333333333333333333=333333333=3=333333333333333=33333=3=3333333333333333333333333333333333333333333333333333 NUMBER DATE OF DATE OF SUBJECT EVENT l REPORT ' 85-021 94/04/85 07/03/45 REACTOR SCRAM DUE TO TURBINE TRIP, STEAM SUPPLY LINE MOISTURE SEPARATOR TO THE CGdDENSER HAD I SECOME FOULED. 85-022 86/85/85 07/03/85 SPURIOUS REACTOR WATER CLEANUP ISOLATION, NO CAUSE FOUND. I 1 3333333333333333E=333=3333333333333333333333=33333333333333333333333333333333343333333333333333333333333333333333333333333=3333333 PAGE 2-137 i i

t. Docket 50-213 0PERATING STATUS unnuvuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum u HADDAM NECK u
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
3. Utility Contact J. P. DRAGO (203) 267-2556 X452 AVERAGE DAILY POWER LEVEL (MHe) PLOT O. Licensed Thermal Power (MHt): 1825 MODAM PECK
5. Nameplate Rating (Gross MHe): 617_X 0.9 = 600
6. Design Electrical Rating (Net MWe): 582 1888
7. Maximum Dependable Capacity (Gross MWe): 596
8. Maximum Dependable Capacity (Net MWe): 569 _ [ g
9. If Changes occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE

12. Weport Period Mrs 744.0 5.087.0 154,127.0
13. Hours Reactor Critical 744.0 5.053.8 132.770.8 h
10. Rx Reserve Shth Mrs .0 .0 1.200.5
15. Hrs Generator On-Line 744.0 5.030.2 127.233.6 h
16. Unit Reserve Shth Mrs .0 .0 373.7 h g __
                                                                                                                                               --              --100 1.334.672 8.908.864 221.096.047                                                     v
17. Gross Thern Ener (MHH) gag,
                                                                                                                                                               -80
18. Gross Elec Ener (PG4H) 415.745 2.917.467 72.576.186
19. Net Elec Ener (MHH) _345.716 2.781.109 69.044.100 ,,,,
20. Unit Service Factor 100.0 98.9 82.6
21. Unit Avail Factor 100.0 98.9 82.8
22. Unit Cap Factor (MDC Net) 93.5 96.1 82.4u
23. Unit Cap Factor (DER Net) 91.4 93.9 77.Ou 0
20. Unit Forced Outage Rate .0 1.1 5.7 0 5 1'O l's 50 is $0 56.8 1.244.9 DAYS
25. Forced Outage Hours .0
26. Shutdoms Sched Over Next 6 Months (Type Date. Duration):
                                                                                                                                   .AA.Y 1985 REFUELING. 01/04/86. 8 TO 12 NEEKS
27. If Currently Shutdown Estimated Startup Dates N/A u Item calculated with a Weighted Average PAGE 2-138

Report Period JUL 1985 ENUENEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / REDUCTIONS M HADDAM HECK M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvoe hours Reason Method LER Number System Comoonent Cause a Corrective Action to Prevent Recurrence 85-05 07/27/85 S 0.0 3 5 HC HTEXCH ! CONDENSER FOULING - REDUCED LOAD TO CLEAN CONDENSER HATERBOXES "A" AND "C". i t n===MMMMMMM u

SUMMARY

M CONNECTICUT YANKEE HADDAM NECK OPERATED WITH 1 REDUCTION FOR MAINTENANCE IN JULY. EZ CMMMMMMM Tvna Reason Method System 8 Comnanent F-Fsrced A-Equip Failure F-Admin 1-Manual Exhibit F a H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation o f D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report A License Exaeination 9-Other (LER) File (NUREG-0161) PAGE 2-139

CO2MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM D HADDAM NECK M c rMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... CONNECTICUT LICENSEE................. CONNECTICUT YANKEE ATOMIC POWER COUNTY...................MIDDLESEX CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 15 MI E OF CONTRACTOR MERIDEN, CONN ARCHITECT / ENGINEER....... STONE & HEBSTER TYP E O F REACTOR . . . . . . . . . . . .PWR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... JULY 24, 1967 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... AUGUST 7, 1967 TURBINE SUPPLIER.........NESTINGHOUSE DATE COMMERCIAL OPERATE.... JANUARY 1, 1968 REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... CONNECTICUT RIVER IE RESIDENT INSPECTOR......P. SHETLAND ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....F. AKSTULENICZ COUNCIL.................. NORTHEAST POWER DOCKET NUMBER........... 50-213 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-61, DECEMBER 27, 1974 PUBLIC DOCUMENT ROOM....... RUSSELL LIBRARY 123 BROAD STREET MIDDLETOHN, CONNECTITCUT 06457 INSPECTION STATUS INSPECTION

SUMMARY

N0' INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

TECHNICAL SPECIFICATICN 6.13.1(C) REQUIRES, IN PART, A HEALTH PHYSICS QUALIFIED INDIVIDUAL (I.E., QUALIFIED IN RADIATION P10TECTION PROCEDURES) HITH A RADIATION DOSE MONITORING DEVICE TO PROVIDE POSITIVF CONTROL OVER HORK ACTIVITIES IN HIGH RADIATION AREAS. CONTRARY TO THE ABOVE, ON OCTOBER 13, 1984, A JUNIOR HEALTH PHYSICS TECHNICIAN HAS ASSIGNED THE RESPONSIBILITY OF 1, A HIGH PROVIDING RADIOLOGICAL CONTROL COVERAGE DURING THE RECOVERY OF A HRENCH FROM THE SECONDARY SIDE OF STEAM GENERATOR NO. RADIATION AREA, BUT THE TECHNICIAN DID NOT PROVIDE POSITIVE CONTROL OVER HORK ACTIVITIES AND HAS NOT QUALIFIED TO PROVIDE SUCH COVERAGE IN THAT SHE HAD NOT RECEIVED THE NECESSARY TRAINING AND DID NOT POSSESS THE REQUIRED TH0 YEARS OF RADIATION CONTROL EXPERIENCE AS DESCRIBED IN ITEMS A AND 5 ABOVE. TECHNICAL SPECIFICATION 6.4.1 REQUIRES, IN PART, A REPLACEMENT TRAINING PROGRAM FOR FACILITY STAFF IN ACCORDANCE HITH SECTION 5.5 CF ANSI N18.1-1971. SECTION 5.5 0F ANSI N18.1-1971 REQUIRES, IN PART, SPECIAL TRAINING SESSIONS FOR REPLACEMENT PERSONNEL. CONTRARY TO THE ABOVE, ON OCTOBER 13, 1984, A JUNIOR HEALTH PHYSICS (HP) TECHNICIAN HAS ASSIGNED AS A REPLACEMENT HEALTH PHYSICS TECHNICIAN WITH THE RESPONSIBILITY FOR PROVIDING RADIOLOGICAL CONTROL COVERAGE DURING THE RETRIEVAL OF A HRENCH FROM THE SECONDARY SIDE OF STEAM GENERATOR NO. 1 BUT THE JUNIOR HP TECHNICIAN HAD NOT RECEIVED ANY SPECIAL TRAINING IN STATION RADIATION PROTECTION PROCEDUdES. TECHNICAL SPECIFICATICH 6.3.1 REQUIRES THAT EACH MEMBER OF THE FACILITY STAFF MEET OR EXCEED THE MINIMUM QUALIFICATIONS OF ANSI N1.1-1971 FOR COMPARABL E POSITIONS. SECTION 4.5.2 0F ANSI PAGE 2-140

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M HADDAM NECK M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

N18.1-1971 REQUIRES, IN PART, THAT TECHNICIANS IN RESPONSIBLE POSITIONS HAVE A MINIMUM OF TWO YEARS OF HORKING EXPERIENCE IN THEIR SPECIALTY. CONTRARY TO THE ABOVE, ON OCTOBER 13, 1984, A JUNIOR HEALTH PHYSICS TECHNICIAN HAS ASSIGNED THE RESPONSIBILITY OF PROVIDING RADIOLOGICAL CONTROL FOR THE STEAM GENERATOR NO. 1 HRENCH RECOVERY JPERATION HITH LESS THAN ONE YEAR HORKING EXPERIENCE IN HER SPECIALTY. (8402 3) FAILURE OF LICENSEE TO ACCURATELY MAINTAIN MEPL, TO REVISE MEPL PRIOR TO EACH REFUELING OUTAGE, AND TO PROVIDE MEPL CHANGE NOTICES HHICH ISSUED AGAINST A CATEGORY I COMPONENT. ARE USED TO INDICATE MINOR CHANGES TO MEPL BETHEEN MEPL REVISIONS. THIS RESULTED IN A NON-CATEGORY I HORK ORDER BEING (8402 4) OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE E=E=E=E=======EE===E=E=23==EEEEE23E3E=E=33=23E=3E33E33333E=33333E=E=IEEEE333E=EEEEEE==E=3=EEE=EEEEEEE32=E=====EEE=F==EEEEEE=22=E=3 NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                                                                                                                           =    __     =-     -
                                                                                                                                                                                                            . = _ _ -

NO INPUT PROVIDED. E=3333333333E=33332=3333333E=333333EEEEEE23=EE=3EEEEEEEEE323EEEE=53333333333332333335533333333333SSEEEEEEEEEEEEEEEEEEE==ESE=EEEEEE PAGE 2-141

1. Dock et 50-321 0PERATING STATUS muununummuununuunnummuununummuumuvun M HATCH 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 zumuwmMMMuxumuuummununuMMMuunumNunnu
3. Utility Contact MARK S. BOONE (912) 367-7851 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2436 HATCH 1
5. Nameplate Rating (Gross NHe): 1000 X 0.85 = 850
6. Design Electrical Rating (Net NHe): 777 801 1500
7. Maximum Dependable Capacity (Gross MHe):
8. Maximum Dependable Capacity (Net MWe): 752 , [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted If Any (Net MHe):
11. Reasons for Restrictions. If Any:

NONE g MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 %087.0 83.999.0 59,346.8
13. Hours Reactor Critical 565.5 4.202.3 peo opes og ... . .. , m oPTim ame! Time
14. Rx Reserve Shtdwn Hrs .0 .0 .0 r--q -- -

q - - ~~ -100 4,062.2 55,930.0

15. Hrs Generator On-Line 565.5 f
                                                                                                                                        -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1,277,544 9,060,744 118,240,498 gag, 2.974,150 38.220,680 -so
18. Gross Elec Ener (MHH) 415.910
19. Net Elec Ener (MHH) 395.839 2,838.307 36.286.117
                                                                                                                                        - to
20. Unit Service Factor 76.0 79.9 66.6
21. Unit Avail Factor 76.0 79.9 66.6 57.4 "#
22. Unit Cap Factor (MDC Net) 70.8 74.2
25. Unit Cap Factor (DER Net) 68.5 71.8 55.6 0
24. Unit Forced Outage Rate 24.0 15.5 15.8 o s l'o l's $0 Ms ~f0
25. Forced Outage Hours 178.5 743.2 10,320.8 ORYS
26. Shutdowns Sched Over Hext 6 Months (Type,Date. Duration):

JLA.Y 1985 REFUELING OUTAGE: NOVEMBER 30, 1985 - 14 WEEKS

27. If Currently Shutdown Estimated Startup Date: 08/04/85 PAGE 2-142
             ~                   -. -                   -_.       .       .    - _          .-..     . - .       . _ - _ .  -             - - . .

R: port Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0WNS / REDUCTIONS M HATCH 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvon Hours Reason Method LER Number System Comoonent cause & Corrective Action to Prevent Recurrence 85-42 07/01/85 S. 0.0 B

                                                                     -5                    EB     TRANSF   PCHER ASCENSION FOLLONING SCRAM 06-27-85 CONTINUES.

85-63 07/05/85 S 0.0 A 5 HC HTEXCH P0HER REDUCED TO ISOLATE HATER BOXES IN ORDER TO LOCATE AND PLUG CONDENSER TUBE LEAKS. 85-64 07/14/85 5 0.0 B 5 HA TURBIN HEEKLY TURBINE TESTING. 85-65 07/16/85 S 0.0 8 5 SF PUMPXX HPCI OPERABILITY TEST PERFORMED HNP-1-3303. 85-16 07/19/85 S 0.0 B 5 HC HTEXCH LOAD REDUCTION IN ORDER T0-LOCATE AND PLUG CONDENSER TUBE LEAKS. 85-67 07/24/85 F 178.5 A 5 85-27 CD VALVEX RX SCRAM ON MSIV NOT FULLY OPEN TRIP. UNIT GOING TO COLD SHUTDOWN FOR MSIV REPAIR. 4 MMMMMMMMMMM HATCH 1 OPERATED WITH 1 OUTAGE AND 5 REDUCTIONS DURING JULY. u

SUMMARY

M MMMMMMMMMMM Tvon Reason Met hod Svstem 8 Comoonent F-Forced A-Equip Failure .F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry. Sheet E-Operator Training 5-Reduced Load Licensee Event R(port

                                          & License Examination             9-Other         (LER) File (HUREG-0161)

PAGE 2-143

                  --- - .                .       ._                     _-m             ._ ___m-_          _     _ ___ _ _ _         _______m               _ . . , . . . _ _ _    . _ . _ _ _ _            _ .     . _ . . _

I 4. 1 i MOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM D HATCH 1 M

M00MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985-FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION l, LOCATION UTILITY STATE.................... GEORGIA LICENSEE................. GEORGIA PONER COUNTY...................APPLING CORPORATE ADDRESS....... 333 PIEDMONT AVENUE
- ATLANTA, GEORGIA 30308 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI N OF CONTRACTOR BAXLEY, GA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 12, 1974 CONSTRUCTOR.............. GEORGIA POWER CO.

DATE ELEC ENER 1ST GENER... NOVEMBER 11, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC ). DATE COMMERCIAL OPERATE.... DECEMBER 31, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOMER IE REGION RESPONSIBLE......II CONDENSER COOLING MATER....ALTAMAHA RIVER IE RESIDENT INSPECTOR......P. HOLMES RAY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. RIVENBARK . COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-321 2 RELIABILITY COUNCIL i LICENSE & DATE ISSUANCE. . . .DPR-57, OCTOBER 13, 1974 PUBLIC DOCUMENT ROOM.......APPLING COUNTY PUBLIC LIBRARY 301 CITY HALL DRIVE BAXLEY, GEORGIA 31563 INSPECTION ST.ATUS l INSPECTION

SUMMARY

~

                          + INSPECTION MAY 24 - JUNE 28 (85-18):                              THIS INSPECTION INVOLVED 84 INSPECTOR-HOURS ONSITE IN THE AREAS OF TECHNICAL SPECIFICATION COMPLIANCE,-OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES, STATION AND CORPORATE MANAGEMENT PRACTICES, CORRECTIVE AND PREVENTIVE MAINTENANCE ACTIVITIES, SITE SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES, AND SURVEILLANCE ACTIVITIES. OF THE AREAS INSPECTED, ONE VIOLATION HAS IDENTIFIED (VALVES OUT GF POSITION RESULTING IN A SCRAM, PARAGRAPH 6).

INSPECTION JUNE to -14 (85-19): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 28.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF CORRECTIVE MAINTENANCE, PREVENTIVE MAINTENANCE, HOUSEKEEPING AND INFORMATION NOTICE TRACKING. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 17-19 (85-20): . THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 7 INSPECTOR-HOURS ONSITE (ONE HOUR ON BACKSHIFT) INSPECTING: CHANGES TO THE PHYSICAL SECURITY PLAN AND IMPLEMENTING PROCEDURES 3 MANAGEMENT EFFECTIVENESS - SECURITY PROGRAMS SECURITY ORGANIZATIONS PHYSICAL BARRIERS - PROTECTED AREAS PHYSICAL BARRIERS - VITAL AREASs COMPENSATORY MEASURES: ACCESS CONTROL

                          - PERSONNEL: ACCESS CONTROL PACKAGES: ACCESS CONTROL-VEHICLESs AND COMMUNICATIONS. THE LICENSEE HAS FOUND TO BE IN COMPLIANCE

, HITH REGULATORY REQUIREMENTS AND PHYSICAL SECURITY PLAN COMMITMENTS WITHIN THE 10 AREAS INSPECTED. l PAGE 2-144 _ _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _- ---- . - - _ _ -._e -. - - - -

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M HATCH 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

CONTRARY T0 to CFR 50 APPENDIX B, CRITERION XII AND V MEASURES HAVE NOT BEEN ESTABLISHED TO ASSURE THAT MEASURING AND TESTING DEVICES ARE PROPERLY CALIBRATED AND ACTIVI1IES AFFECTING QUALITY HAVE NOT BEEN PRESCRIBED BY PROCEDURES APPROPRIATE TO THE MAINTENANCE SHOP DO NOT PROVIDE PREREQUISITES, STEP-BY-STEP INSTRUCTIONS, OR ACCEPTANCE CRITERIA. (8501 4) CONTRARY TO UNIT 1 TECHNICAL SPECIFICATION 1.0 (II), SURVEILLANCES TESTS HERE PERFORMED IN EXCESS.0F THE 25% ALLOHABLE EXTENSION OF THE SPECIFIED FREQUENCY. (8501 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: SHUTDOHN FOR EQUIPMENT REPAIRS. LAST IP SITE INSPECTION DATE: MAY 24 '- JUNE 28, 1985 + INSPECTION REPORT NO: 50-321/85-18 + REP 0RTS FR0M LICENSEE 0E3333333333333333E3E33333E333E=E2333333E352333333333333333333333333333333355335333333333333333EEEEEEEEEEEEEEEEEEEEEEEEEE=EEEEEEEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __- __==.-__--- __ . _ _ _ NONE. 23:2333333333333==EE33333:E=3333323 33E2243333333333333332 E233=3E:3E333E3333353=23333253 2333333EE=EEEEE=3=EEER=3333EEE=EEE====E= PAGE 2-145

1. Dock et : 50-366 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M HATCH 2 M
2. Reporting Period: 07/01/85 Outaga + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact MARK S. BOONE (912) 367-7851 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2436 HATCH 2
5. Nameplate Ratino (Gross NHe): 1000 X 0.85 = 850
6. Deslan Electrical Rating (Net NHe): 784
7. Maximum Dependable Capacity (Gross MWe): 804 1500
                                                                                                                                                                    ~     78
8. Maximum Dependable Capacity (Net MHe): 748 ,

7

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reanans for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE e

12. Report Period Hrs 744.0 5,087.0 51,768.0 W
13. Hours Reactor Critical 744.0 5,858.5 34,206.1 ecc ofes se rwwerwn uient orTIree. OoseITIous
14. Rx Reserve Shtdwn Hrs .0 .0 .O gg .... _ 1.. .. - 100 3
15. Hrs Generator On-Line 744.0 3,780.3 32,547.4 g
16. Unit Reserve Shtdwn Hrs .0 .0 .0 -so
17. Gross Therm Ener (MHH) 1,772,424 8.852,736 70,404,359 23,236,010 - 80
18. Gross Elec Ener (MHH) 584,810 2,942.960
19. Net Elec Ener (MHH) 561,051 2,813.027 22,107,094 62.9 ~#
20. Unit Service Factor 100.0 74.3_
21. Unit Avail Factor 100.0 74.3 62.9 4
22. Unit Cap Factor (MDC Net) 100.8 73.9 57.1
23. Unit Cap Factor (DER Het) 96.2 70.5 54.5
                                                                                        .0                                   0
24. Unit Forced Outage Rate 3.I 10.4 0' 5 1'O l's $0 I5 ~IO
25. Forced Outage Hours .0 121.3 3,785.7 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-146

A

                                           *%(

f . - MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M HATCH 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Nc. Date G Hours heason Method LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence 85-36 07/07/85 S 0.0 8 5 HA TURBIN HEEKLY TURBINE TESTING. 85-37 07/12/85 S 0.0 B 5 HA TURBIN HEEKLY TURBINE TESTING. 85-38 07/20/85 S 0.0 B 5 HA TURBIN HEEKLY TURBINE TESTING. 85-39 07/22/85 S 0.0 B 5 RC CONROD R0D PATTERN ADJUSTMENT. 85-40 07/26/85 S 0.0 B 5 RC CONROD ROD SEQUENCE EXCHANGE. urMMMMMMMMM HATCH 2 OPERATED HITH 5 REDUCTIONS DURING JULY. .m

SUMMARY

M MMMMMMMMMMM Tvon Reason Method $vstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scraa Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

              & License Examination               9-Other         (LER) File (NUREG-0161)

PAGE 2-147

N 8 O L 4 5 I O 1 8 T E R - 9 A R ) TE 2 1 C E T NC I , H F;ON E L F M IMCA G U I A S HA I A J CT R FN SRSL P ENDC OO KGSP d PENS I COEM o SMA ST ARCO E AA BPCC i r LG,A EI A e Y AASN RV NY N P R CNEI AE OT;I A IAI D IS t R NMTG E RREE r B H IN HR UURB o p 8 I CEVI TO OCU 0 L 3 ETIT HESO e 3 6 TATL NS SAT R 0 C 5 RCU IN E E 3 8 IE1 FOAS O N MD E 7 LV3 OP E EI O N UA 9 BI RLR TT (SYU NI . 1 UR SOO IA SRO EG C O C PDA ACRN SL EEOF VR I C I , I E TO NO TNT AO R R 3 YLG RDNI OI IEAS R E T R T Y 1 TLR ANOT V SVSA E TG C E C A K NAO ACI S NINH . W N, E W E R R E UHE E S RO OTE D O O L O L A N O G HNNO UN CPEE P MA E P E S B U CY, TOOP O SEMET DT E N J T II H RFOSC A EN L L A L M E GIY NTTF - . UFCNE I IA E A I A L V6 , NCE IAAO RG OE EP G PL T R G R O I6 5 I L TI ON H ;CS R T H E R E H R3 - L1X ESDT TI TSIN N O 3A C N O N - F P0A T AU CK RNALI O E 3 E E E E I . 0 P P3B I ,R O EC OEE SS PA TMRES I T G. 3 B. G. G. G. I.. . P.. . .G.. 5 N. A. NE ,S SR CEAHA A . . . . . . OCSE NT EG TE M . . . . . . . . . . . . IEV I PAL R R . . . R . . . . . . . . STRL E SNA O . . . E . . . . . . E . RCUA C NAT .A F . . . I . . . . R . C . UADV 5. I IMIS0 N . . . L . . E R E . N . ORE ( 8T VN1 I . . R P . . N L O G . A M HPC 2O 7; O

                 . S             E P            . .        O B T A . U O                                -    OD           N     S     IE R       . S             E   U          . R        I     I     C N . S O                       RERE           D      DE TH O       . E             N   S          . E T S E A                        . S R         S   OCPI           EN     ERSAT T       . R             I              . I     A N P M                 . I               TN F           LO     LURC C       . D           G   S          . L     M O S                 R         T       U   CAYI           II     IDEIN A       . D             N   Y          . P R P N JE E N                                    ERTT           AT     AEINI R       . A             E   S R P O S                         I      OB T E               T   PUIN           TA     TCRUH A T         .
                                 /            O U F E                         RM A M                   SSRE           NM     NORMT N       . E           T   M T S N R T PU D U                                            A   NSUD           ER     ERAMI T O       E T           RC    A   C                   I           N         N         C           IACI               O     PBOW C     E A           OE    E   U E                       N E G                 & O         T         E        NF     N        C A         S R           TT    T   R N Y O D NT                                        D           4YSS           ON     OGL S
         &  YN O             CI    S   T             I     R     I     I      IE E                 S   8T A           II     INADT D      TE P             AH               S B O G S SK S C                                            IEH         T      TICNN Y  IC R             RC C N R T E E NC N                                           I           DLT            CD     CTIAE T  LI       O       TR U O U A R R EO E                                           L           EAIN           EN     ENS M I  IL       C       NA H C T                      L                  CD C B                   VUSO           PA     PEY:T Y   L  T                O                             U E E              I        I   U           LQ     ,I      S      SMHSI I  U                C                             G     I     I      L        L P         N   O        T     NG     NEPEM T T                                                   E                                           V,SA           IN     IL       LM U                                                 R                                       O   NSEL               I     P;CO I                                                                                                 INIO           DP     DMAIC I      OTI         EE     EIEH L                                                                                                 NIIV           CE     C REN I

T OTV NK NDAVA IAIE UE UN - L C TRTN OS OADLP C CECO NU N EO E EPA, NO NNTRY A PO AH AACTT CL P S ED N NLENI F II NTCE U, UPTOR RC S INNT E OCU 8 TN AAC ,C ,Y R C 7 9 CU N SLNE EN ETPSE 9 7 EO IPEP NA NI SS 1 9 LC I H TS IN IR E 1 R E TLNN TE TU CL R E Y LII UT UCSCA 8 2 , E V NT AA ON OERAC 7 2 5 M I RI :RMS RI RSE I FA 9 O R EL )E A A I ;S OG 1 R R T TI 8 VEE SM SLRSY E E A SB 1OVR I IAREH . MMM A G N, , B B G H AA - HE HCAGP M M I N Y 4 M M N A EI 5 ,IT A TV TIBA M M G I IE E E I M HL 8ENE I S KD M M R L ML Y T T L A TE (CEH T YLCN M u O P X R L P P O T UR NVT  : N :HAAA M u E P 1A H U E E O L 0 8AE )E )PCP M u 1B 5 2MRF 9V 0 I S M u G. A. . B. J. S. S. C. A. RPO 1E 2ESLT M x . . . . . . . . . . EO R HYON M u . . M. . . . . . . . NFD 5P 5THRE M M . . OR . Y R . D . . URN . 8 8 PTM M M . . RT . T E E O R . JEAS ( , (O NE M u . . FC . I N T H E . P E E T;OR M u . . . L E A T T . - EI 4C 9 NCI M u . . NN . A G R E A . RVT 1N 1SO U M u M2M N

                 . . OO
                                          . C            E M H              Y.

T 4OII A EISQ II . I T P I . 2TTV 0N 7GTSE M mO . . TT . T S O G G L . ACI 1E 1NAER MHu I . . CA . I I N N I . Y YRET T AZC MCu T . . EL R R L I I B . R AERC EN EHICY MTu P . . RU O C R A L L A . A MPRA NI NCNAR MAu I . . IP T E I O O I . M OO . UA U A O MHu R . . DO C L N C O O M JM . J M u C . . P A A E R C C E . L . U N,CE) O G;T . IE,C6 :RLA _ M u S . . D E I E R . S N NED NGOEL _ M u E . . NT R T C M R R L TCSAH OVE ON NU _ M u D N . Y AS I E M E E CI N CNELP III IIYNG M M OE T E F N L O S S IC O EACLA TTF TTTOE _ M M Y IT N TR O I E C N N RN I PIIIR CCI CCISR M M T TA U SA E E TU T SLTEG EET EERR M m I AT O IE E E E E D D CO C NPCVA PRN PPUEH M u L CS C DN P T T T N N EC E IMARR SRE SSCPT - M u I O Y A A A O O L P ORUA NOD NNE I _ M M C L T D D D C C E S +CPSP ICI IIS H - M m A N _ _ MMM F I

                                                                                     =        _          =  9 F                                                                =        _          =  4 O                                                                =          _        =  1
                                                                                     =          _        =   -

T = _ = 2 MMM G SS = = M M N IA = = E M M I S E = = G M M T NSH = = A M M SE ONT = = P M M EH CO = . = M M TT IFS = D = _ M M LTOE = N = M M DO LC R = U = M M NT AN%U = O = M M A HU0T = F = M M E SF0C = = M M GT 3A = S = M M NA )R F = A = M M II SERU = - H = M M RR KON = - = M2M UP 'B A A = - E = M M SO CE%M = - R = MHM AR MR5 = - U = _ MCM EP (B7L = - L = _ MTM MP 2A = - I = MAM A ST1C = - A = MHM T RN I = - F = M M AS EEDR = - = M M HE KRET . = - T = M M TR ARTCS = N = M M U EUCEN = _ E = M M ED RCELO = _ D = M M RE B JEI = _ I = M M UC . EN T = V = M M SOA THILA = E = M M SRI IT AC = = M M APR U HNI = 0 = M M E CTCOF = H = M M OYT RAIII = =

                                                                                     =               , =

MMM TBI IHHTC = L = R CTHAE = E = DDC NP

                                                                                     =

V = EE EG0 S _ HBE SN5H = - E = SIC AI8TL = - L = IRN CY3IA E = - = LCA F HC = - H =

 )       BST        DI2          I                                               E =          -    G =

D AEP ER EN = - I = E TRE DEPCH S = - H = U SPC LVNNC = - = N E C O HAE N = - R = I NA MD DT = - S = T NE NER E = - M = N EER RAROH = - = O EBO O UCT C = - D = C B FRDCI = . E = ( T , EEAH I = . T = TOS TKC = . C = ONN SAONE L = = E =

   -     N O        EERIC                                                            =             P     =

EI TRP N = S = EVT B SA . = U = S VAC L HII 5 M = S = AHU ATC L 8 = = U H R NITDP 9 0 = O = YT OUAOM 1 = T = T STS ICHHO R = = EIN TR TC , = E = A RLI CIRE 2 F = U = UA NCEMN 1 = D = T SUP U P I - = - = AQE FE G 9 = M = S E T HDNT S = A = MGS ETEIO L + = R = N- H TTN I T = C =

           ,IY      TOSS                            R                     5          =             S =

VTB TEES P 8 R = = C- T TTI A 9 = R = N DEP AT 1 0 = O = NFE HN3ST F = T = O AFT TINIU O , P = C = AS OIHB 8 = A = I I SPET S 2 E = E = IS, ETB D A = R = T XES RE N E R = = IE ISE .U E N = D = C NTT d RTO G U = E = OII QDENS A J = T N = E IVS EEHI T = C N = RII RI OY U - = E A = P ETU FSPL  : O = J L = TCQ I TL ) 4 + = B P = S IAE 2. C 'B E A S E 2 = U N = R R AECSC E C 8 = S U = N CDE PM I R N Y 1 = = _ NR 1S DN U A A - = = _ I ,AP . ,E H D N M 5 = = B E E 8 = 5 = DE 6.EEIC HVFE S C T / = FT 8 = XED M O N = OR ITI 2.TOITBC E R I E 6 6

                                                                                     =
                                                                                     = EP O
                                                                                                    / =

1 =

                                                                                                          =

DAV TAES L P A T 3 0 NRO 8. A PI B M A - = TE / = EBR 4 ES O D D 0 = AR 7 = PIP TH D R N D 5 = D 0 = PL SUTSN P A N N = = AAT NP NA A O = = CO ONOO T S I  : = = 5 0 N IITIS N N G T O = 5 = 8 5Y T TD E A N . C N = F 8 = 9 LO ATYAR N L I S E = OT / = 1 Y RRD CNRCA O P L  : N P T = N 3 = R FE IEAID P ( E S O S R S EE 0 = L A CPP FRRFN M U M I N O = TV / = U M OO IRTIA O S F E T I P = AE 6 = J M 0RH CUNCT C M E T  : A E = D 0 = U 1PS ECOES E R I S R E R = = d S P CP D T U E T = = o OEE SA SN N I S L T P I N = = i T TRC O S A H A A O S O = = r N AN LG .LI M Y T I T I = R 8 =

                                                                                                          =

e E Y A) ANDAT ) E S T N R S E E T = E 1 P M RSN4 CIECA 5 T M I O E N I C = B 0 = E AEE ITNII I E . L MG . T I E = M - = t C RCT1 NCGNC 1 T E I A E N T T P = U 5 = r R TIN 0 HEIHO 0 R S N C O N N A U S S = N 8 = o O NVI5 CJSCS 5 E Y O A W A O L O A N = = p F OEA8 ENEES 8 H S N F T M N P R L I = = e N CDM( TIDTA ( T R E O

1. Dock et 50-247 0PERATING STATUS MMuwwwwwwwxuuuuuummwwwMMwwwwwwumMwww M INDIAN POINT 2 M
2. Reporting Period 07/01/85 Outage + On-line Hrs 744.0 MMMMNwwwwwwwxuwwwwwwwuMMMMMMMuwwMuun
3. Utility

Contact:

MIKE BLATT (914) 526-5127 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2758 INDIfiN POINT 2
5. Nameplate Rating (Gross MHe): 1126 X 0.9 = 1013
6. Design Electrical Rating (Net MHe): 873
7. Maximum Dependable Capacity (Gross MHe): 1500 885 DESIGN E2.EO. MTING = 873
8. Maximum Dependable Capacity (Net MHe): 849 NRX. DEPEND. CMP. . e49 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net NHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Mrs 744.0 5,087.0 97.176.0
13. Hours Reactor Critical 744.0 5,018.4 65,684.4 v ' 7 E~~*~~2"~~ - 100 h
14. Rx Reserve Shtdwn Hrs .0 28.7 2.373.7
15. Hrs Generator On-Line 744.0 4.946.3 63.696.4 h -so
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 2.050.397 13,434,953 166.147,208 500- - 90
18. Gross Elec Ener (MHH) 642.660 4.253,560 51,571,176
19. Net Elec Ener (MHH) 618,704 4.098.712 48,612.531
20. Unit Service Factor 100.0 97.2 65.5
21. Unit Avail Factor 100.0 97.2 65.5
22. Unit Cap Factor (MDC Net) 97.9 94.2 59.0W
23. Unit Cap Factor (DER Net) 95.3 92.3 57.3 0
24. Unit Forced Outage Rate .0 2.8 9.3 0 S lO l5 ~io is 60
25. Forced Outage Hours .0 140.7 6,309.3 OfiYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 CYCLE 7/8 REFUEL /MAINT OUTAGE: 01/15/86 - 9 HKS

27. If Currently Shutdown Estimated Startup Dates N/A N Item calculated with a Helchted Average PAGE 2-150

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM < Report Period JUL 1985 UWIT SHUTD0NNS / REDUCTIONS M INDIAN POINT 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TvEe HEuFi Reason Method LER Number $vstem domponent Cause & Corrective Action to P rev en t Recurrence NONE DDMMMMMMMMM INDIAN PGINT 2 OPERATED AT NEAR FULL P0HER DURING JULY. O

SUMMARY

M ODMMMMMMMMM i Tvoo R ea son Met ho d System 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-151

i , 2 5 5 1 8 - 9 2 1 E L E G U H A J T P S d EOU o BTO i E r 1 LYS e P 0 LRA P R 6 AAG O Y 01 HR t 3 S C 3 R STD r 0 R 7 A NN o p 0 O T 9 R SOA 0 T N 1 B K EC e 1 C E I R I D _ R U M , L O C I K R P 8 Y I .U N R T O 2 CE LNQ D O S L IUW OOI S Y N E R LNE PIL I O V E BEN T D N C E B UV EAO E EE D M PA, VTT CN & E S IN D A, E E E S S T SEN TEE E L . S S S R R P NNI AMU T PK G U U U O O E IIA RED A R N O O O B B S ATL TL D GO E H H H H H LRP SPS I NY G G G G G , PA IMN L I D N N N I I7 6 ME NIO O VW E I I I E E4 2 E T I I S RE T T T T N N2 - T0I M)T N N IN I S S S - R I0H DMA O O N E E E . .0 P H1N ACL M DU I A T C. 4 U. N. N. I. D. D. 5 D. H. DDC

                                          . . . .                         . . . .                   . .                         N(L M          . .               . . . .                         . . . . . .                                           A A R          . .               . R           . .               . . . . . .                                              LC O          . .              . E            . .               . . . . E                       .                     SA F           . .              . I        . .               . .       R .         C         .                     EUE N          . .              . L            . .             E R E . N                         .                     RNS I           . .            R    P           . .       N     L     O G               A N                             UAO
                        . S          E    P           . . O B T                   A           U G                             DMD

_ R O

                       . S
                       . E E

N U S

                                                        . R       I     I
                                                        . E T S E A . S R C N . S O S

E CNE T . R I . I A N P M. I OOT C . D G S . L M O S R T U RII A . D N Y . P R P N JE E N PTS _ R . A E S R P O S I OB T E T AF A T . / O U F E RM A M NLF N . E T M T S N R T PU D U A EUO T O E T RC A C I N N C TC C E A OE E U E N E G & O T TLM A S R TT T R N Y O D NT D IAC

            &     YN O             CI S T                   I     R     I     I     IE E                          S             RCD D         TE P             AH                S B O G S SK S C                                                           N O Y     IC R             RC C N R T E E NC N                                                  I                          E T     LI        O      TR U O U A R R EO E                                                  L                       TSE I     IL        C      NA N C T                       L                 CD C B                                      AOH Y   L     T                O                              U E E             I           I       U                       HDT

_ I U C G I I L L P N T T T E EG U R O STN _ I EII L ' I TSM

.                                                                                                                               AFR
.       I T             TFO SOF C                                                                                                         C                   R SEE E             NHP A                                                                                     L                                 OT F

I P I R C TGO N S ANF _ U CI Y O N IRD N C FEE R I IVH

                                         ,                        4                      EG                                     COS

_ Y 3 7 WN ECI T 3 7 9 R OI P L R I 7 9 1 E PT SDB E FC 9 1 V A EA _ T O 1 , U I TN LNT K S K , 1 R R SI AIS MMM R E NR , 6 H AD CAE _ M M O H O 2 2 T T N ER IT M M Y C IY 2 S O HO NNE _ M M T M E U E S TO HIR M M WS W R Y N G C D RC CAE M M E E 5E H A U U N U 0 . EMN M M 0 D T M M N. N. 2. N P. M. J. A. H. N. E DS M M . . . . . . . . . . D 2NE M M . . M. . . . . . . . I AR M M . . OR . Y R . D . . V T U M M . . RT . T E E O R . O IDD  : M2M . . FC . I N T H E . R NEE S M M . . . L E A T T . P UTC T MTM . . NN . A G R E A NO N MNM MIM N OO- . C E M M Y. T T EER E II . I T P I . U HMP N . _ MOM O . . TT . T S O G G L . P Y TE O D MPM I . . CA . I 1 N N I . Y N R LN P E M M T . . EL R R L I I B . R I A FPE MD MNM P . . RU O C R A L L A . A M 0MT O I MAM T E MIM I R

                       . . IP
                       . .      DO            C    L N     C O I

O L . O O I . WN l P O M U 1 IT C V O MDM C MNM S

                      . . D P          A E

A E R C C E . U I S ..I R D R I E R . S T N P MIM E . . NT R T C M R R L C T 8. EDH. S A M M D N . Y AS I E M E E CI N E N 6HOS M T M M OE T E F N L O S S IC O P E SNT) E S U M M Y IT N TR O I E C N N RN I S M NI N4 T M P M M T TA U SA E E TU T N E OL ,E I E N M M I AT O IE E E E E D D CO C I C IBEU0 T I M M L CS C DN P T T T N N EC E R TAVL0 R S M M I O Y A A A O O L P O O CTOF5 E Y O M M C L T D D D C C E S N F ESBF8 H S N M M A N N SEAE( T MMM F I E O

                !                     i!                      ;                       1   ,                  l!                            i        )        ;. ! !

E = 3

                                                        =                   r   5 E                   =   1
                                                        =                   E     -
                                                        =          =        =   2 MMM                                             =          =        =

M M E = E M M E = G M M E E A M M 3 = P M M = E M M 3 3 M M 3 3 M M = 3 M M E 3 M M E 3 M M E 3 M2M E 3 M M = 3 MTM E E MNM E = MIM E = MOM = E MPM E = M M = 3 MNM 3 = MAM 3 E MIM = 3 MDM 3 3 MNM 3 3 MIM 3 _ 3 M M 3 3 M M 2 3 M M = 3 M M 3 3 M M 3 3 M M 3 E M M 3 E M N 3 E M M 3 E MMM 3 = 3 S 3 E E E 3 E E E E 3 E 3 E

          )                                         E   3                   E D                                             3                   E E                                         S =                     E U                                             =           .
                                                                    .       E N                                         N =                     E I                                             E                   3 T                                         E   3                   3 N                                             E                   3 O                                         C   3           _       3 C                                             3                   =

( I 3 = E E L = E

            -                                           E                   E 3                   3 3            _      =

S M 3 3 3 3 U 0 3 = 3 3 T R 3 3 3 3 _ A F 3 = 3 E T 3 3 3 3 S S 3 3 3 3 T = = E 3 R 3 E 3 3 N 0 3 3

                                              .         3                   3 O                                D        P   3                   3 E            3                   3
-         I                                D        E   3                   3 I             3                  3 T                                V        R    3                  3 O             3                  3 C                                R             3                  3 P      .      3   T               3 E                                     D        = C                 E T E           E   E               =

P  : U D 3 J E _ ) P I 3 B 3 S S N V 3 U 3 E I O 3 S = N R R 3 3 U O P E =

.                                                                            =

I D N E E T R S . C U E FT E O  : P = OR = R E N = O E _ P T I 3 EP E A 3 TE E D D O E AR E

.                  N                            N        = D                 E N            E                   E A

O 3 = S I  : 3 = 5 N T O E . E 8 A C N E F D E 9 L . . . E E OT E = 1 P D  : D D P T E N D E ( E S E E S R E EE I E _ L D M D D N O = TV V E U S I E I I I P 3 AE O E J M V T V  : V E 3 D R E E O I O S O E R E P = d T R R U R T = = o I P L P T P I N = T E i S A A S O = U = _ r M Y T I T T T I = R _ P 3 _ e E T U R U S U E T = E _ N 3 _ P T I P E P P I C 3 B I E I L N G N T N E = M E _ t I I A I N I T P = U O E r R C N A S S 3 N N E L O A N E E o p E A O A O

                                                          =                  S H F N M N P N L                I

_ e T R O

i. i1
1. Docket _30-286 0PERATING STATUS unuwwwMuwwwwwunnuuuuuuuuuMuununnunuM
2. Reporting Period M INDIAN POINT 3 M 07/01/85 Outage + On-line Hrs 744.0 uMMMMMuMMMMuMMMMMMMMMMMMMMMMMMuMMMuN
3. Utility

Contact:

L. KELLY (914) 739-8200 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3025 INOIAN POINT 3
3. Nameplate Rating (Gross MHe): 1126 X 0.9 = 1013
6. Design Electrical Rating (Not MHe): 965
7. Maximum Dependable Capacity (Gross MHe): 1000 1500
8. Maximum Dependable Capacity (Net MWe): 965 MION M. WIM - M
                                                                                     .. .. fmX. IEPEM). OFF. ~ 985 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE NO NET POWER OUTPUT THIS NONTH 3 MONTH YEAR CUMULATIVE -100

12. Report Period Hrs 744.0 5.087.0 78.192.0
13. Hours Reactor Critical .0 3,728.1 45.094.2 h
14. Rx Reserve Shtdwn Hrs .0 .0 .0 - so
15. Hrs Generator On-Line .0 3.704.9 43.553.2 g
16. Unit Reserve Shtdwn Hrs .0 .0 .0
                                                                                                                             - 80
17. Gross Therm Ener (MHH) 0 10,235,663 113,884,799 500-
18. Gross Elec Ener (MHH) 0 3,358,410 36,000,576
19. Net Elec Ener (MHH) 0 3.229,876 34.515,744 ~ *O
20. Unit Service Factor .0 72.8 55.7
21. Unit Avail Factor .0 72.8 55.7
                                                                                                                             -30
22. Unit Cap Factor (MDC Net) .0 65.8 45.7
23. Unit Cap Factor (DER Net) .0 65.8 45.7
24. Unit Forced Outage Rate .0 2.3 20.4 0 .
                                                                                          ...       ,      ,   ... ...         0 0        5      to     15    30  35  .,30
25. Forced Outage Hours .0 86.1 11.153.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Date: 09/15/85 PAGE 2-154 i

l l _ _ _ _ _ _ _ _ _ .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0HNS / REDUCTIONS M INDIAN POINT 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date lidi Hours Reason hathod LER Number $vstem _Comoonent Cause & Corrective Action to Prevent Recurrence 03

  • 06/08/85 S 744.0 C 4 RC FUELXX UNIT IN A SCHEDULED CYCLE IV - V REFUELING OUTAGE.

4

}

l I NMuMMMMMMMM INDIAN POINT 3 REMAINS SHUTDOHN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE. M

SUMMARY

M MEKMMMMMMMM Tvom R ea son Met ho d Svstem & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                   & License Examination            9-Other                              (LER) File (NUREG-0161)

PAGE 2-155

EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N INDIAN POINT 3 M uuMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 ] FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................NEH YORK LICENSEE. . . . . . . . . . . . . . . . . POWER AUTHORITY OF STATE OF N.Y. COUNTY...................HESTCHESTER CORPORATE ADDRESS....... 10 COLUMBUS CIRCLE NEW YORK, NEH YORK 10019 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI N OF CONTRACTOR NEH YORK CITY, NY ARCHITECT / ENGINEER....... UNITED ENG. 8 CONSTRUCTORS TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...NESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 6, 1976 CONSTRUCTOR..............HESTINGHOUSE DEVELOPMENT CORP DATE ELEC ENER 1ST GENER... APRIL 27, 1976 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... AUGUST 30, 1976 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... HUDSON RIVER IE RESIDENT INSPECTOR......P. KOLTAY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. NEIGHBORS COUNCIL.................. NORTHEAST POWER DOCKET NUMBER........... 50-286 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-64, APRIL 5, 1976 PUBLIC DOCUMENT R00M.......HHITE PLAINS PUBLIC LIBRARY 100 MARTINE AVENUE HHITE PLAINS, NEW YORK 10601 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-156

I>

                                          =                  =    7
                                          =                  =    5
                                          =                  =    1
                                          =                  =     -
                                          =                  =    2 MMM                                     =           _      =

M M = = E M M = = G M M = = A M M = = P M M = = M M = = M M = = M M = = M M = = M M = = M M = = M3M = = M M = = MTM = = MNM = _

                                                             =

MIM = = MOM = = MPM = - = M M = = MNM = = MAM = = MIM = - = MDM = - = MNM = - = MIM = = M M = = M M = = M M = = M M = _ = M M = _ = M M = = = M M = = M M = = M M = = MMM = =

                                          =                  =
                                          =                  =
                                          =                  =
                                          =          _       =
                                          =          _       =

E = . =

                                          =        .         =
    )                                 E =          -         =

D = . = E S = = U = = N N = = I = = T E = = N = = O C = = C = = ( I = =

                                          =                  =

L = =

      -                                   =                  =
                                          =          _       =
                                          =          _       =

S M = =

                                          =                  =

U 0 = _ =

                                          =                  =

T R = _ =

                                          =                  =

A F = =

                                          =                  =

T = =

                                          =                  =

_ S S = =

                                          =                  =

T = =

                                          =                  =

R = =

                                          =                  =

N O = _ =

                                .         =                  =

O D P = = E = _ = I D E = = I = = T V R = = O = = C R = = P . = T = E D = C = T E = E = P U D = J = P I = B = S N V = U = I O = S = N R = = O P = = I N = = T = = U = FT =

P = OR =

. E N = O = T I = EP = A = TE = D O = AR = N = D = N = = O = = I = = 5 T O = . = 8 C N = F D = 9 . . E = OT E = 1  : D D P T = N D = S E E S R = EE I = L MD D N O = TV V = U E I I I P = AE O = J T V : V E = D R = I O S O E R = P = d R U R T = = o L P T P I N =

                                          =

T = _ i S A A S O U = r N I T T T I = R P = e E R U S U E T = E N = _ P t T I E P G N T N A I N I P I T P C E

                                          =
                                          = M
                                          = U B         I O =
                                                             =
                                                             =

r R N A S S = N N = o p E A O L O A N = = H M N P N L I = = e T R O 1

1. Docket: 50-305 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMuna M KEHAUNEE M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

G.RUITER (414) 388-2560 X207 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1650 KEWAUNEE
5. Nameplate Rating (Gross NHe): 622 X 0.9 = 560
6. Design Electrical Rating (Net MHe): 535
7. Maximum Dependable Capacity (Gross MHe): 529 1500
8. Maximum Dependable Capacity (Net MHe): 503
                                                                                                                    ,_                            [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE
12. Report Period Hrs MONTH 744.0 YEAR 5.081.0 CUMULATIVE 97,536.0 g
13. Hours Reactor Critical 744.0 3,624.3 82.374.9 h
14. Rx Reserve Shtdwn Hrs .0 .Q 2.330.5
15. Hrs Generator On-Line 744.0 _3 567,7 80,928.6 h
16. Unit Reserve Shtdwn Hrs .0 .0 10.0 b Z 190(He K - taantyTIPH. Cope!TIEbs
17. Gross Therm Ener (MHH) 1,218,713 5,788,667 126,855,791 500- ET-"---hW--------------
                                                                                                                                                              -m
18. Gross Elec Ener (MHH) 406,800 1,934.500 41,791,800
                                                                                                                                                              ~
19. Het Elec Ener (MHH) 387,658 1,843,973 39,786,009
20. Unit Service Factor 100.0 70.5 83.0 -so
21. Unit Avail Factor 100.0 70.5 83.0 _,
23. Unit Cap Factor (MDC Net) 103.6 72.1 78.7M
23. Unit Cap Factor (DER Net) 97.4 67.8 76.2 3.4 0
24. Unit Forced Outage Rate .0 .0 0 5 l'O l's 'do is 60
35. Forced Outage Hours .0 .0 2,745.4 OfWS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JA.Y 1986 NONE

27. If Currently Shutdown Estimated Startup Date: N/A M Item calculated with a Heighted Average PAGE 2-158

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Caport Period JUL 1985 UNIT SHUTD0NNS./ REDUCTIONS M KEHAUNEE M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TvEm Hours Reason LER Number System Domponent Cause & Corrective Action to Prevent Recurrence NONE 4 t l i mMMMMMMMMMM KENAUNEE OPERATED AT FULL POWER DURING THE JULY REPORT PERIOD. u

SUMMARY

M MEMMMMMMMMM Tvoo Reason Met ho d Svstem & Comoonent F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Lvent Report

                                  & License Examination         9-Other           (LER) File (NUREG-0161)

PAGE 2-159

EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M KEHAUNEE M uMEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM rACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LLCATION UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . HI SC0NSI N LICENSEE.................HISCONSIN PUBLIC SERVICE COUNTY...................KEHAUNEE CORPORATE ADDRESS........P.O. BOX 19002 GREEN BAY, HISCONSIN 54307 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 27 MI E OF CONTRACTOR GREEN BAY, HI. ARCHITECT / ENGINEER....... PIONEER SERVICES & ENGINEERING TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER. . .HESTINGHOUSE DATE INITIAL CRITICALITY... MARCH 7, 1974 CONSTRUCTOR.............. PIONEER SERVICES & ENGINEERING DATE ELEC ENER 1ST GENER... APRIL 8, 1974 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL DPERATE.... JUNE 16, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......R. NELSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....M. FAIRTILE COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-305 INTERPOOL NETHORK LICENSE & DATE ISSUANCE....DPR-43, DECEMBER 21, 1973 PUBLIC DOCUMENT ROOM....... UNIVERSITY OF HISCONSIN LIBRARY LEARNING CENTER 2420 NICOLET DRIVE GREEN BAY, HISCONSIN 54301 INSPECTION STATUS INSPECTION

SUMMARY

NONE ENFORCEMENT

SUMMARY

BACKGROUND SCREENING NAS NOT ADEQUATELY COMPLETED FOR SOME UNESCORTED PERSONNEL. (8500 5) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-160

 . .              -   _-. .       .-       .- - . - _ _ - .             .   . -   . ..     . -         . . _ _ .             - - . . - .          .      . .-           . ~ .                   . .

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M KEHAUNEE M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NONE MANAGERIAL ITEMS: NONE PLANT STATUS

  • l THE PLANT IS OPERATING NORMALLY.

LAST IE SITE INSPECTION DATE: AUGUST 16 - OCTOBER 15, 1985 INSPECTION REPORT NO: 85013 REP 0RTS FR0M LICENSEE

       ===E==3=========3==33333=E=333===================33333333                               3=3=3==========3==33========333333==3=3:33====g====33=333333=g33========

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ -__= _ .__ _ - -- 85-14 06/15/85 07/15/85 INADEQUATE IMPLEMENTATION OF ADMINISTRATIVE CONTROLS 85-15 06/17/85 07/17/85 INADEQUATE DOCUMENTATION TO SUPPORT SEISMIC QUALIFICATION OF DIESEL GENERATOR DIFFERENTIAL RELAYS

         ==3==========================================3============3====3==========3=======================================================

l a I 4 PAGE 2-161 1

1 l l t

1. Dock et 50-409 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M LA CROSSE N
2. Reporting Period: 07/01/85 Outage + On-line Hrs 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact L. S. GOODMAN (608) 689-2331 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 165 LR CROSSE
5. Nameplate Rating (Gross MWe): 76.8 X 0.85 = 65
0. Desion Electrical Rating (Net MWe): 50
7. Maximum Dependable Capacity (Gross MHe): 50 I"
8. Maximum Dependable Capacity (Net MWe): 48 [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5,087.0 138,050.0
13. Hours Reactor Critical 719.6 4,154.4 92,335.8 h
14. Rx Reserve Shtdwn Hrs .0 .0 478.0
15. Hrs Generator On-Line 702.8 4,038.6 85.942.2 h
16. Unit Reserve Shtdwn Hrs .0 .0 79.0
17. Gross Thern Ener (MHH) 100,732 566,249 11,913,641 g.
18. Gross Elec Ener (MHH) 30,299 174,213 3,569,824 19 Het Elec Ener (MHH) 28,586 163,089 3,308,928
20. Unit Service Factor 94.5 79.4 62.3
21. Unit Avail Factor 94.5 79.4 62.3
22. Unit Cap Factor (MDC Net) 79.5 66.8 49.9
23. Unit Cap Factor (DER Net) 76.T 64.1 47.9 o \#
24. Unit Forced Dutage Rate 5.5 3.1 9.9 o s l'o l's do is so
25. Forced Outage Hours 41.2 127.9 8,481.7 UNTS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-162

i Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0HNS / REDUCTICNS M LA CROSSE M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Yvon Hours Aeason Method LER Number System Comnonent Cause & Corrective Action to Prevent Recurrence 85-05 07/10/85 F 0.0 A 5 CB INSTRU POWER DECREASED FROM 97% TO 65% WHEN THE 1A FORCED CIRCULATION PUMP DISCHARGE VALVE CLOSED HHEN A SPURIOUS HIGH DIFFERENTIAL LOOP TEMPERATURE SIGNAL OCCURRED. P0HER HAS MANUALLY REDUCED BELOH 50%. 85-06 07/14/85 F 0.0 A 5 HH PIPEXX MANUAL SHUTDOWN HAS COMMENCED DUE TO A SMALL STEAM LEAK AT NO. 3 FEEDHATER HEATER. THE LEAK HAS TEMPORARILY PATCHED AND P0HER HAS RE-ESCALATED, 85-07 07/25/85 F 41.2 A 3 85-14 RB ELECON REACTOR SHUTDOHN AUTOMATICALLY DUE TO A GROUND IN THE GAS PRES $URE SCRAM CIRCUIT ON CONTROL ROD DRIVE MECHANISM HO. 8. i t c:M:MMMMMMM LACROSSE OPERATED HITH 2 REDUCTIONS AND 1 OUTAGE DURING THE JULY REPORT PERIOD. u

SUMMARY

M EGERMMMMMMM Tvne Rea son Met ho d System 8 Coenonent F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination         9-Other           (LER) FIIe (NUREG-0161)

PAGE 2-163

_. -.. _. . . . _ . _ __ __ . . - . _ . - _ . ~ . - . - _ - . . - _ .+. i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ' M M LA CROSSE unmMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................HISC0NSIN LICENSEE.................DAIRYLAND POWER COUNTY...................VERNON CORPORATE ADDRESS....... 2615 EAST AVENUE SOUTH LACROSSE, HISCONSIN 54601 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 19 MI S OF CONTRACTOR LACROSSE, HISC ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER...ALLIS-CHALMERS DATE INITI AL CRITICALITY. . . JULY 11, 1967 CONSTRUCTOR.............. MAXON CONSTRUCTION COMPANY j DATE ELEC ENER 1ST GENER... APRIL 26, 1968 TURBINE SUPPLIER.........ALLIS-CHALMERS , DATE COMMERCIAL OPERATE.... NOVEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD...ON'CE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......I. VILLALVA ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. STANG COUNCIL..................MID-CONTINENT AREA DOCKET NUMBER........... 50-409 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-45, AUGUST 28, 1973 PUBLIC DOCUMENT R00M.......LA CROSSE PUBLIC LIBRARY 800 MAIN STREET LA CROSSE, HISCONSIN 54601 INSPECTION STATUS i INSPECTION

SUMMARY

INSPECTION ON JUNE 10-14 (85011): ROUTINE, UNANNOUNCED SAFr'Y INSPECTION OF SURVEILLANCE OF CORE THERMAL POWER DISTRIBUTION LIMITS; CORE THERMAL P0HER EVALUATION; DETERMINATION OF REAC10R SHUTDOWN MARGIN; NUCLEAR INSTRUMENTATION TESTING AND CALIBRATION; CONTROL ROD SEQUENCES AND REACTIVITY CHECKS; AND CONTROL ROD SCRAM TIME TESTING. THE INSPECTION INVOLVED A TOTAL OF 40 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR INCLUDING FOUR INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. OF THE SIX AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. , ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-164

                                                                                                                                             ~-

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M LA CROSSE N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: OPERATING ROUTINELY. LAST IE SITE INSPECTION DATE: JULY 8 - 11, 1985 INSPECTION REPORT NO: 85013 I REP 0RTS FR0M LICENSEE

                  ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT i 85-13 07/01/85 07/23/85 1A HIGH PRESSURE SERVICE HATER DIESEL SURVEILLANCE TEST FAILURE

                  ==================================================================================================================================

PAGE 2-165

1. Docket 50-373 0PERATING STATUS unwwwumummmmwummuvuunnununuwwwwwunnu M LASALLE 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMuuMMMMMuwmummunumnuwwumuwwwumunu
3. Utility

Contact:

RANDY S. DUS (815) 357-6761 X324 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 3323 LRSALLE 1
5. Nameplate Rating (Gross NHe): 1078 ___
6. Design Electrical Rating (Not MWe): 1078
7. Maximum Dependable Capacity (Gross MHe): 1078 1500 1036 MIGN M. WING - 1m
8. Maximum Dependable Capacity (Net MWe): MRX. DEPDC. Orr. - 1036 (200%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:
                                                                                                                 . ~ . . . . - . . . - . - . . - . - . .    -100 NONE                                                               1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 13.871.0
13. Hours Reactor Critical 370.8 3.879.5 10.159.5 -so
14. Rx Reserve Shtdwn Hrs 373.2 476.0 1.640.9
15. Hrs Generator On-Line 351.5 3.726.0 9,781.0
                                                                                                                                                            -so
10. Unit Reserve Shtdwn Hrs .0 .0 1.0
17. Gross Therm Ener (MWH) 847.778 10.290.841 33.250.148 500-
18. Gross Elec Eoor (MHH) 266.164 3.375.933 8.846.576
                                                                                                                                                            - to
19. Net Elec Ener (MHH) 249.325 3,244.270 8.450.479
20. Unit Service Factor 47.2 73.2 70.5
21. Unit Avail Factor 47.2 73.2 70.5 _m
22. Unit Cap Factor (MDC Net) 32.3 61.6 58.8
23. Unit Cap Factor (DER Net) 31.1 59.2 56.5 0 0
24. Unit Forced Outage Rate 52.8 26.8 19.9 g , g, g, g, j, gg
25. Forced Outage Hours 392.5 1.361.0 2.434.t DMS
                       .26. Shutdowns Sched Over Next 6 Months (Type.Date. Duration):

REFUELING. MAINTENANCE. MODS.' 09/03/85 - 6 MOS

27. If Currently Shutdown Estimated Startup Date: N/A PAGE 2-166

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMkMMMMMMMMMMMMMMM UNIT S H'U T D 0 H N S / REDUCTION $ M LASALLE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date T5Ee Hours Reason Method LER Number bvstem Domponent Cause 8 Corrective Action to Prevent Recurrence 14 06/29/85 F 2.5 A 4 CONTINUATION OF OUTAGE FROM PREVIOUS MONTH. 15 07/12/85 F 390.0 A 2 UNIT SHUTDOWN DUE TO INOPERABLE SUPPRESSION POOL SPRAY VALVE 1E12-F0278. uurMMMMMMMM LASALL E 1 OPERATED HITH 2 OUTAGES FOR EQUIPMENT FAILURE IN JULY. u

SUMMARY

M KNMMMMMMMMM Tvoe- Rea son Met ho d Svstem 8 Comoonent F- Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination              9-Other         (LER) File (NUREG-0161)

PAGE 2-167

CMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u LASALLE 1 M u:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONNEALTH EDISDN COUNTY...................LA SALLE CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI SE OF CONTRACTOR OTTANA, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BWR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JUNE 21, 1982 CONSTRUCTOR..............COMMONNEALTH EDISDN DATE ELEC ENER IST GENER... SEPTEMBER 4, 1982 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JANUARY 1, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... POND IE REGION RESPONSIBLE......III CONDENSER COOLING MATER.... RESERVOIR IE RESIDENT INSPECTOR......M. JORDAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....A. BOURNIA COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-375 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....NPF-11, AUGUST 13, 1982 PUBLIC DOCUMENT ROOM....... ILLINOIS VALLEY COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON JUNE 18-21 (85018; 85019): ROUTINE UNANNOUNCED INSPECTION OF GASEOUS AND LIQUID RADI0 ACTIVE PROGRAMS INCLUDING: EFFLUENT RELEASES; RECORDS AND REPORTS OF EFFLUENTS; EFFLUENT CONTROL INSTRUMENTATION; PROCEDURES FOR CONTROLLING RELEASES; REACTOR COOLANT CHEMISTRY AND ACTIVITY; AND GASEOUS EFFLUENT FILTRATION. THE INSPECTION INVOLVED 41 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR. NO VIOLATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE PAGE 2-168

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M LASALLE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: THE LICENSEE IS REORGANIZING THE STATION MANNING CHART. NEW TITLES AND RESPONSIBILITIES ARE BEING ESTABLISHED. A TECH. SPEC. CHANGES IS BEING PREPARED TO IDENTIFY THIS NEH STATION MANNING AND RESPONSIBILITIES. PLANT STATUS:

                                     .0PERATING NORMALLY.

L AST IE SITE INSPECTION DATE: ' AUGUST 12 - 13, 1985 INSPECTION REPORT NO: 85026 REP 0RTS FR0M LICENSEE

                                           ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ - . = _ __

                                                                                           =---- ..---___- .__                                        .__-- _ =.___       __

__ _= ___ . _____________ 85-45 05/31/85 06/26/85 MANUAL SCRAM DUE TO LOSS OF CIRCULATING HATER LOSS OF BOTH DIESEL FIRE PUMPS 85-46 06/19/85 07/01/85 85-47 06/10/85 07/03/85 MISSED OFF GAS HYDROGEN SAMPLE 85-48 06/14/85 07/10/85 "A" RHR SERVICE HATER PRM INOP. SAMPLE MISSED 85-49 06/25/85 07/23/85 CHLORINE DETECTOR ACTUATION 85-50 06/26/85 07/24/85 AMMONIA AND CHLORINE / DETECTOR ESF ACTUATIONS 85-51 06/27/85 07/25/85 CHLORINE DETECTOR ACTUATION 85-52 06/29/85 07/26/85 MANUAL SCRAM FOLLONING LOSS OF BOTH CRD PUMPS

                                           ==================================================================================================================================

PAGE 2-169

1. Dock et 50-374 0PERATING STATUS MuhMMMMMMMMMMMMMMMMMyMMMMMMMMMMMMMMM M LASALLE 2 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMdMMMMMMMMMMMMMMMM
3. Utility

Contact:

RANDY S. DOS (815) 357-6761 X324 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 3323 LRSALLE 2
5. Nameplate Rating (Gross MHe): 1078
6. Design Electrical Rating (Net MHe): 1078 1078 1"
7. Maximum Dependable Capacity (Gross MHe):
                                                                                                                                          *   "I"
  • I@8
8. Maximum Dependable Capacity (Net MWe): 1036
                                                                                                                 .---. PmX. DEPDC. Orr. - 1036 1100%)
9. If Changes occur Above Since Last Report, Give Reasons:
10. Power Level To Which Restricted. If Any (Het MHe)'
11. Reasons for Restrictions, If Any
                                                                                                                ' " * " " "        -"~-~~~~~~~~                 ~l0D NONE                                                                  1000-MONTH        YEAR       CUMULATIVE
12. Report Period Hrs 744.0 5.087.0 e.863.0
13. Hours Reactor Critical 266.6 1.666.4 3.278.2 30 h
14. Rx Reserve Shtdwn Hrs .0 .0 125.2
15. Hrs Generator On-Line 231.7 1.629 3 3, 166 .4 f
                                                                                                                                                               '- e0
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 493.368 4.875.753 9.388.345 ,,
18. Gross Elec Ener (MHH) 156.348 1.616.726 3.101.721
                                                                                                                                                                - 40
19. Het Elec Ener (MHH) 141,584 1.515.220 2.907.337
20. Unit Service Factor 31.1 32.0 46.1
21. Unit Avail Factor 31.1 32.0 46.1 _m
                             ,22. Unit Cap Factor (MDC Net)          18.4         28.8           40.9
23. Unit Cap Factor (DER Het) 17.7 27.6 39.3 0
                                                                                     .0
                                                                                                                 ~
24. Unit Forced Outage Rate .0 7.0 0 5 t'0 l's IO~ is' $0
25. Forced Outage Hours .0 .0 238.6 06YS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Sbutdown Estimated Startup Date s N/A PAGE 2-170

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M LASALLE 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date T5pe Hours Reason Met ho d L ER Numbet_ Svstem Component Cause & Corrective Action to Prevent Recurrence 3 02/28/85 S 512.3 5 4 MAINTENANCE AND SURVEILLANCE OUTAGE CONTINUED FROM FEBRUARY. 4 07/22/85 F 0.0 A 5 TURBINE TRIP DUE TO HIGH LEVEL IN MSR DRAIN TANK. 5 07/23/85 S 0.0 B 5 TOOK TURBINE OFF FOR RCIC SURVEILLANCE. MnMMMMMMMMM LASALLE 2 RETURNED ONLINE FROM MAINTENANCE / SURVEILLANCE ON JULY 22ND AND OPERATED WITH 2 REDUCTIONS

                         ,t1 

SUMMARY

M DURING JULY. E%MMMMMMMMM Tvon Rea son Met hod Svstem & Comoonent F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                        & License Examination           9-Other         (LER) File (NUREG-0161)

PAGE 2-171

l DEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u LASALLE 2 M EnMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE............. ...COMMONHEALTH EDISON COUNTY. . . . . . . . . . . . . . . . . . . L A S AL L E CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI SE OF CONTRACTOR OTTAHA, ILL ARCHITECT / ENGINEER.. ....SARGENT & LUNDY TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 10, 1984 CONSTRUCTOR..............COMMONHEALTH EDISON DATE ELEC ENER 1ST GENER... APRIL 20, 1984 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE... 0CTOBER 19, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD... POND IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... RESERVOIR IE RESIDENT INSPECTOR......M. JORDAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....A. BOURNIA i COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-374 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....NPF-18, MARCH 23, 1984 PUBLIC DOCUMENT R00M.......ILLINDIS VALLEY. COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON JUNE 18-21 (85018s 85019): ROUTINE UNANNOUNCED INSPECTION OF GASEOUS AND LIQUID RADI0AFTIVE PROGRAMS INCLUDING: EFFLUENT RELEASES; RECORDS AND REPORTS OF EFFLUENTS; EFFLUENT CONTROL INSTRUMENTATION PROCEDURES FOR LONTROLLING RELEASES; REACTOR COOLANT CHEMISTRY AND ACTIVITY; AND GASEOUS EFFLUENT FILTRATION. THE INSPECTION INVOLVED 41 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR. NO VIOLATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND CDMPONENT PROBLEMS: NONE PAGE 2-172 a

                                                  =              -                                      = 3
                                                  =              -                                      = 7
                                                  =              -                                      = 1
                                                  =              -                                      =  -
                                                  =              -                                      = 2 NMM                                                =              -                                      =    _

k M C = - = E M M E = - = G _ M M P = - = A M M S = - = P M M = - = M M H = - = M M C = - = M M E = - = M M T = - = M M = - = M M A = - = M M = - = M M = = M M = -

                                                                                                        =

M2M D. = - = M M E = = MEM H = = MLM S = _ = MLM I = - = MAM L = - = MSM B = - = MAM A = - = MLM T = - = M M S = - = M M E = - = M M = - = M M G = - = M M N = - = M M I = - = M M E = - E E = M M B = - L R = M M = - B U = M M E = - A L = M M R = - R I = MMM A = - E A =

                                                 =           -                           P        F    =

S = - O = E = - T N R = I = S I E = T = E M = I E = T H T R = L = _ C O =

   )                   I                     E =                                     E   T    A F      =

D B = _ G I T S = E I S = A H L N = U S = - K S E A = N N N = A D R = I O = M S E N T = T P E = U D L O R = N S = U R I H X = O E . C = C A S T R 7 = C RS = - A H S A 3 = ( E I = V K A L 2 2 = DI = C P O = NT L = R A Y S D G =

    -                  AI                        =            _          E       B B     I    N N      =

L = S A I = SI = N D G W R = S EB M = E E N O 1 U = LI = D P I L D = U TS 0 = N I R F N = I = O M P U O N = T TG R = C A D N I O = N = R H O S I = A NI F = H C C N I I T = EN = O S T O T V A = T NN = - L I I C I D = A = _ E H T U D A = S S = _ M R S A S R =

                          .M                     =                       O U         L        N G =

TN T = M R S L O H O E = RO = A F S E S G I D = AI R = R E V I I T = HT 5 = _ C N R E H C E = N CA 8 Q = S O P L I E G = T 9 = . I I G T A = O GS 1 P = - R T R L N E T = N = - O A E E P I D L = I IH , E = - T L D S U L O = NE 3 = - C O A S O O K V = T NN 1 R = A S E E R O A = A = E I H V G C E Y = C MS - = R L R = I = T I H R L D A = E NH 2 = C 2 D O A / 2 R = OT 1 = E P L T I S O = P  : I = J T U C T T P =

          )            TY              T         =   B    -         I    O D A R R            I   M =

S S AF S = U - N R R E A H N E = E TI U = S - U G C R P R U T = N R ST G = -

                                                                                                       =

U N U = - = I D EE A = - = E HD = - 5 5 5 5 5 5 5 5 = C TI = FT- 8 8 8 8 8 8 8 8 = O t = OR- / / / / / / / / = R GO E 7 = O- 0 9 6 8 9 7 2 5 = P NT T 2 = EP 1 1 2 0 0 1 2 2 = I A 0 = TE / / / / / / / / = D ZD B 5 = AR 7 6 6 7 7 7 7 7 = N IE 8 = D 0 0 0 0 0 0 0 0 = A NR N = = AA O = = S GP I  : = = 5 N RE T O = - 5 5 5 5 5 5 5 5 = 8 A OR . C N = F - 8 8 8 8 8 8 8 8 = 9 L EP Y E = OT- / / 1/ / / / / / = 1 P  : R L P T = N- 0 4 0 6 2 1 5 = ( S G L S R = EE- 1 3 0 1 2 2 0 2 = L M SN A N O = TV- / / / / / / / / = U S E II M I P = AE- 5 5 6 6 6 6 7 6 = J M T E  : R E = D - 0 0 0 0 0 0 0 0 = E I EB S O E R = - = d T E U N T = - = o I L SS T I N = - = i S A NI A G S O = - = r M Y I E T N I = R - = e E T R CS S I E T = E - 2 4 8 9 0 1 2 4 = P T I E IE T I C = B - 2 2 2 2 3 3 3 3 = I L G LG T A E = M - - - - - - - - - = t I E A N N R T P = U - 5 5 5 5 5 5 5 5 = r R C N N EA A E S S = N - 8 8 8 8 8 8 8 8 = o p E A O A HH L P A N = - = H F N M TC P O L I = - = e T R O

4 7 1 2 E G A P h 0 0 1 0 8 n e g s a

                                                                -              ~              -               _            -

MMM M M M M T O L

                                           )

0 H s M M P 0 T M M 1 N M M ) ( 0 ' M M e 1 M M M M W M 56 55 A M M ( 00 S 1 1 I M M M M L H M M E =- T ' M M1M M V 1 E S . T A' M M L NP U 5 MKM K I R P 8 MCM R C TO S 9 MIM E I R T ~ Y 1 MRM WR t f

                                             .           U                                                                                 ,5gA             Y MEM          O                              3            O                                                                                       D MMM P            E F

OM L U MIM I EE LP R J MLM Y L EE E M M L D W .

                                                                                                                                           ,g M

M M M I A N O g M M D G I . P M M SX M M E ER T M M G DM E M M A . N g M M R . M M E . O M M V . N MMM A .

                                                                   -                                     .                                    o 0

0 0 0 g a o 8 0 g I 1 hg 0 E0 7 0 2 0 4 0 4 3 5

                                                                                                                                                 ~

V 5 1 2 8 S 4 I4 1 5 2, 3 2, 8 - / 4  : T2 7 2 4 ) 5 U 7 s A6 3 6 4 n 1 n L 3 2 o / T o U2 i 9 3 5 5 5 s M t 0 A s 9 5 5 5 a  : U a r 2 0 0 0 e ) C r T H 3 1 1 1 R e L u W A N D, S e e M 0 7 0 2 0 4 0 4 N I O 3 n v . 5 1 2 I C I e  : i 2 i t R4 1 5 2 3 2, R T 8 t e l 2 9 G o A2 7 2 T E A 4 a t G - 2 0 N E 3 6 4 O M R a n 0 1 , ( Y 6, 3 2 N M E D, D N O 5  : t 2 - O P e

              -                   )              r    y                                                                         C O                      p      p I      +     1 e : o              n                                                                                                  y      u 4                     W ) p             A                                                                                                  T      t T e 8                                                                                                                                                   (        r g                   : M e         W Re       f                   0        0    0   0      0    0    0    9                                 0             a A a          )              )       s M              I                      .                                    1                                        s    t t 5                   e s                t           ,

H4 7, h S R u 1 H o t s , y T4 t O 2 M r o a d n N7 8 n d E ( G N L e A O - o e

: t ( ( t M M t P N ) ) e e c f a 5 E t e N y y c i I 6 m 0 8 D HW ( t t n r i
      /     L    MM               i i i             t        ,                                                                  )    )                 t      t 1     A    (          g c c S                   s s                                                                        t    t                  x      s 0                s n a p ap          e e n                                         s                              e e e                   e    E
      /     L     r s i                             R        o                   l                r    )                        N N          t         N 7     L     e o t            a a v                   i                       a s e M H               )                                  a                 n 0     I      w r a C C o                      h t                            c r n               H H                      C R R                    r      w B     o G R                        b      c c                        i H i            n M H         )     r         D E                s e          o P    (

l l e e A l i i h r s i n - t L d w ( M H o ( H t r ( M D ( e r v g u O t d d  : l g a b b r W ts r r w n t r M c o a o u 2 o t a n c a a u H C d O h e r ( a t r r t H d h 5 i c m i i d d c o e t S n e F c o o u e S 3 r a r t r n n c T R d r h r E n r a t t O e h

-      e    t     e a      t        e e O                                 o o S            o    e          E      e e F          c c               g c          y 0

5 P n h R o T c p p e e e s l e o r i t t r c e a r r c E i v m n c l a a d a S F F e t l t g C e l D D e v f e a v r e e e v i c u s n n d t E g e P e r e s h l c r a p p r O n e

i y e a m m n L s R e n e T E e e v a a o w r t t t s l n u u a n t s e R l S A C C F d o r e r i n p g m m h r o r s e G s s E s s e d u k o l e : i i i C e s E o r R p u t t t t t t c t E C c p i c m s x x w a N s i o o t i i i i i r u N o e t i a e a a f o e O e o x r n r r e n n n n n o h O f D R U L N D M M I P R N R H R H U G G H U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2
                            . - - _ . .. .      . - - .          . - _ _ . . . - _~ --              _.          ,       --.   ..     .          . .-          . - - . -

l l runuzzunnunuxuuuuuuMuununzuuunnunuun ! Report Period JUL 1985. UNIT SHUTD0WNS / REDUCTIONS M LIMERICK 1 M i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ! No. Date 1555 Nours Reason Method LER Number $vstem domponent Cause & Corrective Action to Prevent Recurrence t 3 06/01/85 S 744.0 H 4 ZZ ZZZZZZ UNIT IN SHUTDOWN MODE, PENDING FULL P0HER LICENSE. r l l l n=nnMMMMMMM LIMERICK 1 REMAINS SHUTDOWN IN A CONTINUING ADMINISTRATIVE OUTAGE. M

SUMMARY

M MMMMMMMMMMM Tvoo Rea son Met ho d Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scran Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

               & License Examination                    9-Other             (LER) File (NUREG-0161)

PAGE 2-175 w

C3 muuuuuuuuuuuuuuuuuuuuuuuuuuuunnun n LIMERICK 1 m cc:unuuuuuuuuuuuuuuuuuuuuuuuuuuunnum FACILITY D A T.A Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE. . . . . . . . . . . . . . . . .PHIL ADELPHI A ELECTRIC COUNTY...................MONTG0MERY CORPORATE ADDRESS....... 2301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 21 MI NH OF CONTRACTOR PHILADELPHIA.PA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BHR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY. . . DECE MB ER 22.1984 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER. .. APRIL 13,1985 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....uuuuuuuutenmuuuuun REGULATORY INFORMATION CONDENSER COOLING METHOD...CC HNDCT IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SCHUYLKILL RIVER IE RESIDENT INSPECTOR......J. HIGGINS l ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. MARTIN COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-352

AREA COUNCIL LICENSE & DATE ISSUANCE. . . .NPF-27, OCTOBE R 26,1984 PUBLIC DOCUMENT R00M.......POTTST0HN PUBLIC LIBRARY 500 HIGH STREET POTTSTOHN, PENNSYLVANIA 19464 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-176

                                                         =         7 3           3         7
                                             =           =         1
                                             =           =          -
                                             =           =         2 MMM                                       =           =

M M = = E M M = = G M M = = A M M = = P M M = = M M = = M M = = M M = = M M = 3 M M = 3 M M = 3 M M = = M M = = M1M = = M M = = MKM = 3 MCM = 3

.-                                           =
-  MIM                                                   3 MRM                                       =           =

MEM = = MMM = 3 MIM = = MLM = 3 M M = 3 M M = 3 M M = 3 -- M M = 3 M M = = - M M = =

-  M       M                                 =           3 M       M                                 =           =

M M = = M M = 3 M M = = MMM = 3

                                             =           3
                                             =           =
                                             =           3 3           3 3           3 E =             3
                                             =           3
       )                                 E =             =

D = = E $ = = U = = . N N = = I = = T E = = N = =

.      O                                 C =             E C                                     =           =

( I = =

                                             =           =

L = =

         -                                   =           =
                                             =           =
                                             =           =
.      S                                 M =             =
                                             =           =
-      U                                 0 =             3
                                             =           =

T R = =

                                                         =

A F 3 =

                                             =           3 T                                     =           3
                                             =           =

S S = =

-                                            =           3 T =             =
                                             =           =

R = =

                                             =           =

N O = =

                                  ,          =           =

O D P = 3 E 3 = I D E = = I = 3 T V R = 3 O = 3 C R = = P . = T 3 E D = C 3 T E = E 3 P U D = J 3 P I = B 3 S N V = U 3 I O = S 3 N R = 3 O P = 3 I N = 3 . T = 3 U = FT 3 _ -  : P = OR 3 E N = O 3 T I = EP 3 A 3 TE = D O = AR = N = D = N = = O = = I  : = 3 5 T O = . 3 8 C N = F D = 9 . . E = OT E 3 1  : D D P T = N D 3 S E E S R = EE I = L M D D N O = TV V 3 U E I I I P = AE O = J T V  : V E = D R 3 . I O S O E R = P 3 _ d R U R T = 3 o L P T P I N =

                                             =

T U 3 i S A A S O 3 _ r M I T T T = R P = . I _ e E R U S U E T = E N = . P T E P P I C = B I = _ I G N T N E = M = . t A I N I T P = U O = r R N A S S = N N = o p E A O L O A N = 3 - H M N P N L I = 3 e T R O i 5 1 i i

1. Dock et 50-309 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M MAINE YANKEE M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts K. L. EMBRY (207) 623-3521 AVERAGE DAILY P0HER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2630 mIpq' y g gg
5. Nameplate Rating (Gross MHe): 864
6. Design Electrical Rating (Not MWe): 825
7. Maximum Dependable Capacity (Gross MHe): 850 1#0
8. Maximum Dependable Capacity (Net MHe): 810 "I" M* EIN
  • M
                                                                                                                                                    -W.
                                                                                                                                                    -       DEPD S. Ofr. - 810 (100K)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted. If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE
12. Report Period Mrs 744.0 5.087.0 111.563.6
15. Hours Reactor Critical 726.7 5.025.2 90.325.5 N
                                                                                                                                          -.-------.                .    ...      .. .     - 100 E
10. Rx Reserve Shtdwn Hrs .0 .0 ___
                                                                                                                       .0
15. Hrs Generator On-Line 723.9 4.997.7 8.'.611.6 l -N
10. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 1.652.480 12.276.715 197.585.632
                                                                                                                                                                                           ~
18. Gross Elec Ener (MHH) 534.280 4.085.720 64.759.000
19. Het Elec Ener (MHH) 514.840 3.940.332 61.776.201 97.3 98.2 78.5 l 20. Unit Service Factor
21. Unit Avail Factor 97.3 98.2 78.5 85.4 95.6 70.3M -20
22. Unit Cap Factor (MDC Net)
23. Unit Cap Factor (DER Net) 83.9 93.9 68.4M 2.7 7.0 0 .
                                                                                                                                                ...                                          0
20. Unit Forced Outage Rate .9 0 5 10 15 20 as a
25. Forced Outage Hours 20.1 43.6 5.667.6 OflYS
30. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING & MAINTENANCE: 08/17/85 - 2 MONTHS

27. If Currently Shutdown Estimated Startup Date: N/A M Item calculated with a Heighted Average PAGE 2-178

MUCZME%MEM EMZHZMH%ZMZM22%MM%MMMMMM3 Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M MAINE YANKEE N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Data Ishi Nours Reason Method LER Number System Comoonent Cause a Corrective Action to P r ev en t Recurrence 3-85-8 07/01/85 F 20.1 H 3 85-007 HH INSTRU WHILE CALIBRATING S/G NO. 3 FEED FLOW RECORDER, A TECHNICIAN INADVERTENTLY GENERATED A LOSS OF FLDH SIGNAL, NHICH RESULTED IN A TURBINE TRIP. REACTOR TRIPPED ON LOSS OF LOAD. i a c==MMMMMMMM MAINE YANKEE OPERATED ROUTINELY HITH 1 OUTAGE DURING THE JULY REPORT PERIOD. n

SUMMARY

M CCCMMMMMMMM Tvon Reason Method System & Co=nanent F-Fo rced A-Equip Failure F-Admir 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper 2rror 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                & License Examination        9-Other          (LER) File (NUREG-0161)

PAGE 2-179

CCMIMMMMMMMMMMMax' ***MMMMMMMMMMMMMM u MAINE s.*?n tt M tuntMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY A CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... MAINE LICENSEE................. MAINE YANKEE ATOMIC POWER , COUNTY................... LINCOLN CORPORATE ADDRESS....... 83 EDISON DRIVE AUGUSTA, MAINE 04366 . DIST AND DIRECTION FROM NEAREST POPUL ATION CTR. . 10 MI N OF CONTRACTOR BATH, ME ARCHITECT / ENGINEER....... STONE & HEBSTER

TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 23, 1972 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... NOVEMBER 8, 1972 TURBINE SUPPLIER.........HESTINGHOUSE i DATE COMMERCIAL OPERATE.... DECEMBER 28, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....BACK RIVER IE RESIDENT INSPECTOR......C. HOLDEN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....P. SEARS COUNCIL..................N0RTHEAST POWER DOCKET NUMBER........... 50-309 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-36, JUNE 29, 1973 PUBLIC DOCUMENT R00M.......HISCASSET PUBLIC LIBRARY HIGH STREET HISCASSET, MAINE 04578 INSPECTION S T A~T U S INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS l SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. l FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-180

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1945 INSPECTION STATUS - (CONTINUED) M MAINE YANKEE N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTNER ITEMS MANAGERIAL ITEMS: NO IMPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE E==E=233=3E=E3=====3=33=EEEEEEEEEEEE=3 33E=2E3333333332323=3323335ES=3EEEE3333===3E=3E=2EEE3==EEEEE=EEEE==E==E==3EEEEE==EEEEEEEEEE NUMBER DATE OF DATE OF SUBJECT EVENT REPORT - NO INPUT PROVIDED. 3333E=33:333333=3333333333333===3=33==333==23333322==3E=33==33=====333333333E:333333:333E=3E23323E===333===333333333=3=====3333333 h L J I PAGE 2-18t

1. Docket 50-369 0PERATING STATUS unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu u MCGUIRE 1 x
3. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 unuuuuuuuuuuuuuuuuuuuuuuuuwwwuunuunu
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY PONER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 MCGUIRE 1
5. Nameplate Rating (Gross MWe): 1305
6. Design Electrical Rating (Net MWe): 1180
7. Maximum Dependable Capacity (Gross MWe): 1225 1800
8. Maximum Dependable Capacity (Net MHe): 1180 E ' II O. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted. If Any (Not MWe): - 100
11. Reasons for Restrictions. If Any*

NONE 1000-MONTH YEAR CUMULATIVE - so

12. Report Period Hrs 744.0 5.087.0 32.135.0
13. Hours Reactor Critical 744.0 3.414.6 22.033.7 h
10. Rx Reserve Shtdwn Hrs .0 .0 .0
                                                                                                                                              ~
15. Hrs Generator On-Line 744.0 3.329.3 21.292.0
16. Unit Reserve Shtdwn Mrs .0 .0 .0
17. Gross Thern Ener (P54H) 2.344.677 9.199.104 56.002.242
18. Gross Elec Ener (MHH) 803.912 3.131.959 19.360,825
19. Het Elec Ener (MHH) 772.998 2.980.560 18.355.815
20. Unit Service Factor 100.0 65.4 66.3' 100.0 65.4 66.3- ' -20 at. Unit Avail Factor .
22. Unit Cap Factor (MDC Net) 88.0 49.7 48[4
23. Unit Cap Factor (DER Net) 88.0 49.7 48.4 0
20. Unit Forced Outage Rate .0 10.7 15.5 0,- g- .g .g g g j
25. Forced Outage Hours .0 397.9 3.858.3 DAYS
26. Shutdowns Schgp Over Next 6 Months (Type,Date. Duration):

NONE

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-182

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M MCGUIRE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No . Date 155j Hours Reason Method LER Number hystem Co-aanent Cause a Corrective Action to Prevent Recurrence 24-P 07/01/85 F 0.0 A 5 CH PUMPXX FEEDHATER PUMP TURBINE ALIGNMENT PROBLEM. 25-P 07/05/85 S 0.0 F 5 RC XXXXXX PDHER ESCALATION TESTING. 26-P 07/09/85 F 0.0 3 5 IA INSTRU ADJUST OVERPOWER DELTA T CIRCUITRY. 27-P 07/27/85 S 0.0 F 5 CC VALVEX TURBINE GOVERNOR VALVE TESTING. 1 i b c:MMMMMMMMM MCGUIRE 1 OPERATED HITH 4 REDUCTIONS DURING THE JULY REPORT PERIOD. n

SUMMARY

M CUMMMMMMMMM Tvo. Reason Me t ho d Svetem a Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                   & License Examination                9-Other           (LER) File (NUREG-0161) j                                                                                                                                             PAGE 2-183

C]ZMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM n MCGUIRE 1 M nntMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... NORTH CAROLINA LICENSEE................. DUKE POWER COUNTY...................MECKLENBURG CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 17 MI N OF CONTRACTOR CHARLOTTE, NC ARCHITECT / ENGINEER....... DUKE P0HER TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 8, 1981 CONSTRUCTOR.............. DUKE P0HER DATE ELEC ENER IST GENER... SEPTEMBER 12, 1981

  • TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 1, 1981 REGULATORY INFORMATION CONDENSER COOLING NETHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE NORMAN IE RESIDENT INSPECTOR......H. ORDERS ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. HOOD COUNCIL..................$0UTHEASTERN ELECTRIC DOCKET NUMBER........... 50-369 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-9, JULY 8, 1981 PUBLIC DOCUMENT R00M.......MS. DANN HUBBS ATKINS LIBRARY UNIVERSITY OF NORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, NC 28223 INSPECTION STATUS INSPECTION

SUMMARY

  + INSPECTION APRIL 21 - MAY 20 (85-16): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 142 INSPECTOR-HOURS ONSITE IN THE AREAS OF OPERATIONS SAFETY VERIFICATION, SURSEILLANCE TESTING, MAINTENANCE ACTIVITIES AND REFUELING ACTIVITIES. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN THE AREAS OF SURVEILLANCE TESTING, MAINTENANCE ACTIVITIES OR REFUELING ACTIVITIES; TH0 APPARENT VIOLATIONS HERE FOUND IN THE AREA 0F OPERATIONS SAFETY VERIFICATION.

INSPECTION MAY 21 JUNE 3-7 (85-20): THIS SPECIAL INSPECTION INVOLVED (45) INSPECTION HOURS ONSITE AFTER THE REACTOR STARTUP ON MAY 17, 1985, HHEN THE REACTOR HAS TAKEN CRITICAL BELOW THE CONTROL ROD INSERTION LIMITS REQUIRED BY TECHNICAL SPECIFICATION 3.1.3.6. THE PREDICTED CRITICAL ROD POSITION HAS CALCULATED TO BE 38 STEPS ON BANK D, BUT ACTUAL CRITICAL POSITION HAS 26 STEPS ON BANK C, NHICH HAS BELOW THE INSERTION LIMIT OF 47 STEPS ON BANK C. THE PRIMARY SOURCE OF ERROR HAS ATTRIBUTED BY THE LICENSEE TO BE ERRORS IN THE XENON CALCULATION. THREE VIOLATIONS HERE IDENTIFIED: (1) TECHNICAL SPECIFICATION 6.8.1.A - FAILURE TO FOLLOW PROCEDURE FOR REACTIVITY BALANCE CALCULATIONS (ESTIMATED CRITICAL ROD POSITION OP/0/A/6190/06) AND FAILURE TO FOLLOH PROCEDURE FOR REACTOR STARTUP (OP/2/A/6100/01 AND OP/2/A/6100/05) (PARAGRAPHS 5.C AND 5.D), (2) 10 CFR 50 APPENDIX 5. CRITERION V - FAILURE TO REVIEW CHANGES TO THE XENON PREDICT PROGRAM VALUES USED IN ESTIMATED CRITICAL CONTROL ROD POSITION CALCULATIONS AND SHUTDOWN MARGIN CALCULATIONS, (PARAGRAPH 5.E), (3) TECHNICAL SPECIFICATION 6.10.1.D - FAILURE TO RETAIN RECORDS OF SURVEILLANCE REQUIREMENT 4.1.1.1.1.E FOR CALCULATION OF SHUTDOWN MARGIN (PARAGRAPH 5.F). INSPECTION JULY 8-12 (85-24): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 17.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF DESIGN PAGE 2-184

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M MCGUIRE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SUNGARY CNANGES AND MODIFICATIONS, SURVEILL ANCE TESTING, AND REVIEN OF PREVIOUS ENFORCEMENT MATTERS AND INSPECTOR FOLLONUP ITEMS. NO VIOLATIONS OR DEVIATIONS NERE IDENTIFIED. ENFORCEMENT SUM 4ARY NOME OTHER ITEMS

                       ' SYSTEMS AND COMPONENT PROBLEMS:

NONE. FACILITY ITEMS (PLANS AND PRDCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: POWER OPERATION. LAST IE SITE INSPECTION DATE: JULY 8-12, 1985 + INSPECTION REPORT NO: 50-369/85-24 + 3EP0RTS FR0M LICEN$EE 33=333=33333333E=E=E333=3====E=3E=3=333333E==E3E=3333333E======3=E=EEEEEEEEEE==EE=EE==E=EE3=E=EE==3E==E==33EE3===EEEES=33==EEE===E NUMBER DATE OF DATE OF SUBJECT 1 EVENT REPORT 85-018 05/25/85 07/08/85 CONTAINMENT INTEGRITY VIOLATED DURING CORE ALTERATIONS, DUE TO PERSONNEL ERROR. 85-019 05/30/85 06/28/85 MISSED 18 MONTH SURVEILLANCE ON CABLE TRANSITS, DUE TO ADMINISTRATIVELY / PROCEDURAL DEFICIENCY. 85-020 06/07/85 07/08/85 D/G tt STARTS DUE TO TRANSMISSION SYSTEM DISTURBANCE, DUE TO A SEVERE STORM. 85-021 06/05/85 07/05/85 PERSONNEL OVEREXPOSURE, A RADI0 ACTIVE PARTICLE NAS DISCOVERED UNDER THE UPPER LEFT ARM OF A TECHNICIAN. 20333=3=33323==&=333=3==E33==E33E33==323333333333333333333E=333EE=E=E=EEE3=3EE=3EE33=E===3=E==ES=3333EEE=333=333==E3====E==E=3=3EE PAGE 2-185

6 - 8 1 2 E G A - P h 0 uxm T 0 1 e s

                                                                                        ~

8

                                                                                                           ~
                                                                                                                             #"                 a n u O u   n       L                                                                                                                                  ,3 n   n P                                                                                                                                         .

u u . u u ) g . u u e u u W u u M _3 u u ( u u u u L u u E [ _ u u V ,m u u2u u E L 2 . u u  : 5 uEu R E R 5 uRu E S 9 1 uIu N I .

                                                                                                                                                  ,8 l Y

uUu O U 1F Y,. uGu P O D A uCu C \ . A. uMu u u Y LN u u I

                                                                                                                                                 .0 u u A                                                                                                                                             1                          .

u u D u u u u E u u G u u A ,S u u R u u E n n V uuu A

                                                                                                         ,                                            O 8                                                                   ,

3 0 y l S J 5 E0 V I1 2 3 0 4 0 0 9 3 8 6 9 8 9 6 1 4 5 4 5 6 9 6 9 2 9 9 9  : 5 8

                                                                                                                                                                           /

0  : T3 2 3 5 5 ) U D 3 s n A4 3 1 3 0 9

                                                                                                                    . 6       6                1          2 9       n 2

0 T 1 o L U2 8

                                                                                            .        6       5    4                                               o        /
 .                                                                            8                      9       1 7                                        1     i         8
1 = 0 5 0 s M1 . t 0 A s 1 8 2 8 a 8 U 5 9 8 a r 7 4 9 1 2 1 e ) C 2 r T H 6 3 1 1 1 R e u S e 7 5

X e W M 0 9 0 2 0 5 3 9 1 1 5 5 7 D. n - i 3 0 v 1 7 6 . . 2_ e  : i t e R7 4 9 5 1 3 0 0 6 6 7 3 t e l 7 5 G A8 8 3 . . 4 4 3 3 2 6 a t G - 3 4 N E0 1 0 2 3 1 7 D, a n 1 , ( Y. . 9 1 9 D N O )  : t 5 2 2 5 3 1 e 4 ) r y . . p p I +0 e : o n 6 2 2 y u T e 7 ( W ) p A T t g M e e ( r

WR f 0 5 0 8 0 8 2 5 9 9 2 a A a T )

e s s M I . . 3 2 4 f. 6 1 s t t X t  : H4 0 1 8 0 6 7 7 4 4 2 2 h S R u E W o t s , y T4 5 8 3 3 5 3 6 6 t O M r e a d n N7 3 2 9 6 3 4 n d E S G N L e A O 4 2 0 o e I  : : t ( ( t M 9 3 3 M t P V ) ) e e c f a 5 A t e N y y c i I 6 m 0 8 E H H ( t t n r i

          /     R     MM             i i i            t        ,                                                                      )   )                      t         t 1           (          g c c S               s s                                                                            t t                          x        s 0       .

s n a a e n s e e e e E

          /     A      r s i p p e                    R        o              l                  r   )                                N N t                      N 7            e o t           a   a v               i                 a s e M H                     )                                     a                        n 0       .

w r a C C o h t c r n H H C R R r w J o G R b c c i H i n M N ) r D E s e o

.                     P    (           e e A          i i                     t           L      w   (       M M o                    M D           e      r v             d
l l l h r s i n - d ( M t r ( ( g u O t d l g a b b r W r a o MrC r h n O h te t M c o u 0 o t a n c a a u s c r ( a t r r t H d h 7 i c m r a r i i d d c o e t S n e F c o o u e S 3

e t t r n n c e a tc p ep e O T R d r h r E n re a t t O e h

    -                                                                   o o S               o e              E        e F              c c                  g c             y 0

5 P n h R o T e e e s l e o r i t r c e a r r c E i t v n n c a a d a S l e ae rve rs he e e l c r va p i p rF OF ne c l t t g C e l D D e v f u s n n y e dat E g e P e i m m n L s R e n e T E e e vl a a o w r - t t t s l n u u a n t s e R S A C C F d o r k e r i n p g m m h o l e e i i i C r o e s E r s e G o r R s s E s s e d u c p i c m s x x p u s i t t t t t t c t E C w a N o o t i i i i i r u N o e t i a e a a f o e O. e o x r n r r e n n n n n o h O f D R U L N D M M I P R N R H R H U G G N U U U U U F S N I - 1 2 3 4 5 6 7 8 9 0 1 1 1 2 1 3 1 4 51 6 17 8 1 9 0 1 2 3 4 5 6 7 1 1 1 2 7 2 2 2 2 2 2

                                                                                          !                   ;                '    I                               ,'

G MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTDDHNS / REDUCTIONS M MCGUIRE 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date__ liii Hours Reason Method LER Number $vstem Component Couee a Corrective Action to P r ev en t Recurrence 5 07/12/85 F 381.6 A 3 HA INSTRU GENERATOR PHASE DIFFERENTIAL X-PHASE, CHANNEL t RELAY ACTUATION. 6 07/28/85 F 11.4 A 1 HA TURBIN FAN SHAFT VIBRATION. 7 07/29/85 F 69.2 A 3 HA INSTRU GENERATOR PHASE DIFFERENTIAL, X-PHASE, CHANNEL 1 RELAY ACTUATION. i 1 c:=rMMMMMMM MCGUIRE 2 OPERATED HITH 3 OUTAGES DUE TO EQUIPMENT FAILUR'E, SHUTTING DOHN ON JULY 29TH FOR EQUIPMENT u

SUMMARY

M REPAIRS. EADCMMMMMdM Tvom Rea eon Met hod System & Comaanant F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-RequIatory Restriction 4-Continued Data Entry Sneet E-Operator Training 5-Reduced Load Licensee Event Report

                                           & License Examination                   9-Other         (LER) File (HUREG-0161)

PAGE 2-187 e

COCCuuuuuuuuuuMuunununupuuuuuuuununu u MCGUIRE 2 m cnnrummunununummumuquuuuuummwmununuu FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION _ UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... NORTH CARD;INA LICENSEE................. DUKE POWER COUNTY...................MECKLENBURG CORPORATE ADDRESS........ POWER BLDG., BOX 2178 CHARLOTTE, NORTH CAROLINA 28201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 17 MI N OF CONTRACTOR CHARLOTTE, NC ARCHITECT / ENGINEER....... DUKE POWER TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 8, 1983 CONSTRUCTOR.............. DUKE P0HER DATE ELEC ENER 1ST GENER...MAY 23, 1983 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... MARCH 1, 1984 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE NORMAN IE RESIDENT INSPECTOR......H. ORDERS ELECTRIC RELIABILITY LICENSING PROJ MANAGER. ...D. HOOD COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-370 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE. . . .HPF-17, MAY 27, 1983 PUBLIC DOCUMENT R00M.......MS. DANN HUBBS ATKINS LIBRARY UNIVERSITY OF NORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, NC 28223 IN$PECTION STATUS INSPECTION

SUMMARY

                + INSPECTION APRIL 21 - MAY 20 (85-16):               THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 142 INSPECTOR-HOURS ONSITE IN THE AREAS OF OPERATIONS SAFETY VERIFICATION, SURVEILLANCE TESTING, MAINTENANCE ACTIVITIES AND REFUELING ACTIVITIES. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN THE AREAS OF SURVEILLANCE TESTING, MAINTENANCE ACTIVITIES OR REFUELING ACTIVITIES; THQ APPARENT VIOLATIONS HERE FOUND IN THE AREA 0F OPERATIONS SAFETY VERIFICATION.

INSPECTION MAY 21 JUNE 3-7 (85-20): THIS SPECIAL INSPECTIDH INVOLVED (45) INSPECTION HOURS ONSITE AFTER THE REACTOR STARTUP DN MAY 17, 1985. WHEN THE REACTOR HAS TAKEN CRITICAL BELON THE CONTROL ROD INSERTION LIMITS REQUIRED BY TECHNICAL SPECIFICATION 3.1.3.6. THE PREDICTED CRITICAL ROD POSITION HAS CALCULATED TO BE 38 STEPS ON BANK D. BUT ACTUAL CRITICAL POSITION HAS 26 STEPS ON BANK C, WHICH HAS BELOH THE INSERTION LIMIT OF 47 STEPS ON BANK C. THE PRIMARY SOURCE OF ERROR HAS ATTRIBUTED BY THE LICENSEE TO BE ERRORS IN THE XENON CALCULATION. THREE VIOLATIONS HERE IDENTIFIED: (1) TECHNICAL SPECIFICATION 6.8.1.A - FAILURE TO FOLLOW PROCEDURE FOR REACTIVITY BALANCE CALCULATIONS (ESTIMATED CRITICAL ROD POSITION OP/0/A/6190/06) AND FAILURE TO FOLLCH PROCEDURE FOR REACTOR STARTUP (OP/2/A/6100/01 AND OP/2/A/6100/05) (PARAGRAPHS 5.C AND 5.D), (2) to CFR 50 APPENDIX B, CRITERION V - FAILURE TO REVIEH CHANGES TO THE XENON PREDICT PROGRAM VALUES USED IN ESTIMATED CRITICAL CONTROL ROD POSITION CALCULATIONS AND SHUTDOHN MARGIN CALCULATIONS, (PARAGRAPH 5.E), (3) TECHNICAL SPECIFICATION 6.10.1.D - FAILURE TO RETAIN RECORDS OF SURVEILLANCE REQUIREMENT 4.1.1.1.1.E FOR CALCULATION OF SHUTDOWN MARGIN (PARAGRAPH 5.F). INSPECTION JULY 8-12 (85-24): THIS ROUTINE, UNANNOUhCED INSPECTION INVOLVED 17.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF DESIGN FAGE 2-188

                                          .  . _ _ _ _ .  . . -      - . - . . - ~ _ _ -  -               - - . .   . _ - . _   . . . ~ . _ . - - . . - - . ~ - -         . . ~ . . ~ -           ~ . _

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATU$ - (CONTINUED) M MCGUIRE 2 M MMMMMMMMMMMMMMMMMMMFMMMMMMMMMMMMMMMM INSPECTION SUfetARY CNANGES AND MODIFICATIONS, SURVEILL ANCE TESTING, AND REVIEW OF PREVIOUS ENFORCEMENT MATTERS AND INSPECTOR FOLLONUP ITEMS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. i NONE OTMFR ITEMS SYSTEMS AND COMPONENT PROBLEMS: NOME. ] FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: REPAIR OUTAGE. L AST IE SITE INSPECTION DATE: JULY 8-12, 1985 + INSPECTION REPORT NO: 50-370/85-24 + l REPORTS FROM LICENSEE 333333322EEE333333333333=33=33333333=E=3=33===3==333333=E=====33E====33=====EE=33=33==EE33=32==3E33333333=E3333=333333333=3E33==E= NUMBER DATE OF DATE OF SUBJECT  ? EVENT REPORT  !

                                                                                                                                                 ==-                                    ___

85-008 04/25/85 07/12/85 DISCOVERY OF HRONG VALVE STEM IN VALVE 2NI-108, DUE TO A MANUFACTURE DEFICIENCY. 85-013 05/16/85 06/27/85 UNPLANNED MANUAL REACTOR TRIP DN LOSS OF GENERATOR HYDROGEN, DUE TO A PROCEDURAL DEFICIENCY. 85-014 05/17/85 06/28/85 REACTOR CRITICALITY HITH CONTROL RODS BELOW MINIMUM INSERTION LIMITS, THE COEFFICIENTS IN THE XENON PREDICT COMPUTER PROGRAMS HERE INCORRECT. 3333==3=E==E33E3333333333333333233==33=3333=3=333E=E=33333==33323=33332333======EF===3EE=233E33=33=3=3EEEE==E=E==EEE=33=3=3=E====g PAGE 2-189 l

1. Docket: 50-245 0PERATING STATU$ muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum u MILLSTONE 1 u
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
3. Utility

Contact:

GEORGE HARRAN (203) 447-1791 X4194 AVERAGE DAILY POWER LEVEL (MWe) PLOT G. Licensed Thermal Power (MWt): 20 MILI STOPE 1

5. Nameplate Rating (Gross MWe): 735 " 0.9 = 662
6. Desion Electrical Rating (Net MWe): 660
7. tiaximum Dependable Capacity (Gross MWe): 684 teco
8. Maximum Dependable Capacity (Net MWe): 654 MIM M. WIM = 000 fmX. OEPDC. Dr. - 054 (100%)
9. If Chanc.es Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 128.615.0
13. Hours Reactor Critical 744.0 5.087.0 98.841.7 h
15. Rx Reserve Shtchn Mrs .0 .0 2.775.8
15. Hrs Generator On-Line 744.0 5.087.0 96.023.5 l 100
15. Unit Reserve Shtdwn Hrs .0 .0 26.5
17. Gross Thern Ener (MWH) 1.466.508 10.066.626 176.474.89.1 - 80
18. Gross Elec Ener (MWH) 492.300 3,421.000 59.317.696
                                                                                                                    ~80
17. Net Elec Ener (MHM) 470.467 3.272.151 56.576.311
20. Unit Service Factor 100.0 130.0 74.7
                                                                                                                    - to
21. Unit Avail Factor 100.0 100.0 74.7
22. Unit Cap Factor (MDC Net) 96.7 98.4 67.3 ,,
25. Unit Cap Factor (DER Net) 95.8 97.5 66.6 O
25. Unit Forced Outace Rate .0 .0 1U O
                                                                            ~
                                                                                'S     io     is    3ID' 3Is   '3Io
25. Forced Outage Hours .0 .0 5.715.2 DRYS
25. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

REFUELING. OCTOBER 1985. 5 NEEK DURATION.

27. If Currently S$tdom Estimated Startup Date s N/A PAGE 2-190
                '              !1 '                 ! i              !{I   .

I'

                                                                                                          .!'             'l 1
.                                                                                                                   9 1
-           MMM              .

2

  -         M     M        S                                                                                        E M     M    e   K                                                                                        G M     M    c   A                                                                                        A M     M    n   E                                                                                        P M     M    e   L M     M    r M     M    r   E M     M    u   B

_ M M c U

.           M     M    e   T M     M  R M     M        R
~. .

M M t E M1M n S M M e N MEM v E , MNM e D - MOM r N MTM P O MSM C _ MLM o _

-           MLM      t     N MIM            I MMM            A

- M M M M M M i t n o M R c M M M M M M A I A P M M e E _ M M v R . M M i

-           M     M  t     D                                                                                                   _

MMM c N _ e A r r o D N N C I F O O e T I s u R T a E ) C W 1 C O t6 P r1 U u o0

  -                       N                                                            t                       p-D          W                                                             n                      eG O                                                             e          r tRE E          D                                                             n o

o e R ffetU R t o H ohnN n m s Se( e o &nn v

               /      n                                                                C           o o yE e o                                                          .         Fiir                  I S

o o m Y L U 8 n tcaneF ttteI i u rE s

  .            N    C                                                          J        e  bra                 n)              _

t it p a eR W m e G s y h s et cE N xnraiL 0 t I S EIPDL( D T S s y R D U m d a a - U r e O N rn o cadL I Sre H b T cud S m u C llSne _ U aa icr - N D d uuotue _ E o nntndh .- - T R E R h t aauoet MMACRO

-             I L                                                          t M

e - 125459 H N d o T I r _ U h 5 W o t r , _ e D r M E E - q T A n rn n a ireo o R mehi i

.                    n B                                                     E             d ptt t a                                                       P            AOOc a e                                                       O                          ign R                                                                     FGHrni tim 1                                                -

0 E sna _ et ei x N rs RaE 5 8 G0 O T S lT ue i gr s yT e r

.            9 1

L arnorn _ L Foitoe

-                   GS I                        latc                       -

L M pt el ai - _. U n inuurL J 5 o uif g e 8 s qaeep& . d a / a EMRRO _ o t 1 e - _ i a 1 MMM R ABCDE r D / M M e 7 MYM -

-            P           0                                                    MRu         d                                      _

MAM ed _

.            t r

M t W M ce

-                                                                             M    P M      rh o

p MUM e oc . . o MSM n FS e N M M v - - R 5 MMM T FS

       !;I.                         , !ii!i!11i!j i     t !   1i!iiI     '                ii : j ji i                  !>    !

2 _ 9 1 5

.-      4                                                                                                                                                    -

9 2 1 E L G U A J P d i o r 5 e 1 8 3 P 0 1 6 t 6 0 r 0 op Y 0 Y 7 R T

-                  G           T e        R           U                                                                    9 A            U R          E           C                                                                    1      R       C N           I                                                                           B       I E           T                                                                      , ID T                                                    _

C 6 LA C R E 2 O E _ A N C C CR N E N I I R I N - L O R R E LY O C C T T B BR C U 0 C C Y O UR _ N 7 , E E K T PE , 2D L L S C F6D T R E E O D D 5R S XO L RE1O A OF L L D A , OP F E BT O A O A E E5 1 F0ER H C R C R H H4 2 RRTE _ T .R A S E S E S S2 - E UT N R A N A N - R T5OA O O O. H B E B E . 0 P A4RH I T N. P. E. G. E. G. I.. J. J. 5 D. H. A . . M . . . . . . . . . R . . . R . . . . . . O . . . E . . . . E . F . . . I . . . . R . C . N . . . L . . E R E . N . _ I . . R P . . N L O G . A M

                     . S                   E P           . . O            B T A . U 0 R        . S                   E U           . R        I     I       C N . S 0 O        . E                   N S           . E T            S E A . S R                                  S T        . R                   I             . I     A     N P            M.         I C              D               G S           . L M            O S                R             T           U A              D               N Y           . P R            P     N JE E N                                                   .

_ R . A E S R P O S I OB T E T A T . / O U F E RM A M N . E T M T S N R T PU D U A _ T O E T RC A C I N N C C E A OE E U E N E G & O T A S R TT T R N Y O D NT D _ 8 YN O CI S T I R I I IE E S D TE P AH S B O G S SK S C Y IC R RC C N R T E E NC N I T LI O TR U O U A R R EO E L I IL C NA N C T L CD C B _ Y L T O U E E I I U I U C G I I L L P N T T E U R O I I - L T I C C E . A L I P F C N $ _ U _ 0 D O N N 0 7 N C N 7 9 U R I O 9 1 O EG . C 1 1 S NN

                                                                , 7                          OI T                         ,           , 9 9                    D          PT                                                           :

U N FN 6 2 1 N A ) C O OO 2 U A TN S I D D R , R L SI E mum T N WN R E 1 H S AD R u u C O SO E B T I ER U m u E L L B M H HO D mm N I O E C E G TO E _ u m NW MN 't T V R C N RC C u u O E E W C O A N O 0 . O D _ u n u u u n C. N. 5. N 5 0 N. M. O. L. N. E D R P u u . . M. . . . . . . I D u n . . OR Y R . D . . V N u u . RT . T E E O R . O  : A u m . FC . I N T H E . R S u m . . . L E A T T . P T S ntu . . NM . A G R E A N N n s . . OD . C E M M Y. T T E A - uEu 3 . II . I T P I . U M . L mNn C TT . T S iO G G L P Y 0 D P uOu uTn T mSu P I .

                     . . EL
                     . . RU CA R

O

                                                   . I R

C R A L N N I L I L I B . A . Y N R A I R A t wD 0 E I ( S uLn sLu R I . . IP

                     . . DO T

C L N C O E I O O O L I WN l P O W U C V M O E - uIn C . . P A A E R C C E . U I S D R T mMu S . . D E I E. R . S T N P I _ m n E . . NT R T C R R C T S A u u D n n N . Y AS OE T E F I N L E WE O S S IC E CI L N E O P N E M E S T Y U T _ u u Y IT N TT O I E C N N RN I S M T M P I u n T TA U SA E E TU T N E I E N L m u I AT O I D *'; E E E E D D CO C I C E T I I m n L CS C P T T T N N EC E R N R S C u n I D Y A A A O O L P O O O E Y O A n u C L T D D D C C E S M F N N S N F u u A N N T _ uum F I E O I ;f j! l I ' * ,!'  ; ;i

       . . - - -           - -                        -        .                 -.-,-          - - -- = _ . _ ~ - - = . .__-.- ~ _,_ _ .~.. . - - -    --

A i 4 ( N H 04 N It IP H tt ** i N H l H H N MMM H H E E 80 N W ., R 3 H tl Q l M R M R N N (

j. H H A m a N H J X X N 60 i X X H N j M M H H i M X 88 60 X X N li H i 2 X N l 10 M M N t' N m a N H E *3 H H  ?

E E N tt EWW H H  !

>                ME5                                              H                          l0 EO*                                              N-                         18 E >= E                                           N                         N l            RMX                                              N                         H                                                              1 i

M mJ M N H I X .J R H te 3 E e=e E N H EEM N 88

;r               a a                                             a                          as M      M                                        N                          H                                                               '

4 j E K R M H N

                                                                           't  1 M

H i M M N 10 3 X H H E E N H R E N N X W W H

,                M      M                                        N                          H 1           MMM                                             H                          10 I

to H j N l OS 3 H y It H i H

    ,                                                            H          '1              it l                                                        W    N            I             SI r                                                               N                          ti a                                       W    N                          N O                                            N                          18                                                             P s                W                                       M    N          t              H i                S                                            #                         M I

E E N N M N N .

                    >=                                      W    H                         H E                                            N                         H                                                               'I Q

G H te I u w u a M N N 1 N 19 d H t H l H 90 N 05 < H H M E N N H 08 4 3 O N is N N

                    >=                                      M    N                         el

.'s N N j j ( b N H 00 60 l )* H $$ 4 N N {

                    @                                       M    H                         10 H                         t8
!                                                           >*   H                         H
 ,                                                               N                         If M    H                         te

.,i H N 1 E O N N 1

  • H H O O & N te W H H M A W H H M N 88
                   >*                             JD        W    H                         H
,                                                 O              H                         H I                  U                              M              H                         H b
  • N >= H 4 W S H U H 1
 ,                 L
                                                  >=

3 m W H M W

                                                                      =)

09 II l

                                                  &    M         et a                      to j                   M                              E >            n 3                       H M    O         N   W                     se

{ E N N 06 1 O & N H 4 M E H H . 1

                                                       >         H                         H                                                                [
 !                                                               N   kk                    tt                                                               4 4                                                  a              a Og                      as i                                              W              N       O                 H                                                               +-

I

 !                                                >* M           N   WL                    09 N   >= W                  ti                                                               f 1"                    "                                                                 '

E E H H , O H et 4 M = N N l M MO N

  • N GO U E H 4 O H

, @

  • e
  • W H O k= W H
** S A A >= H E A H j

g W W W H WW M It mJ su sin S G N >=> $ H 3 M M M M L N eg W G ff 4 =) >* ** *D W N R S H i M MOWW H & H j W 3 5 >= N N

                    @               .J b >= b     69   3         H                     >=  90 l
                   ***              (      (      MO             N                     3   N
g >= M >* >= >* M N  % L M i

w 3 3 M ".3 W >= H ud R H 1 b > & b L M U H M N ta E E >= E W H H I de M M E M >= b H O H L & st M g N E N d M N N l - a

4 9 1 2 E G A P 0 0 0 0 1 3 3 o wwm T

                                             )                                                                                                        ,0 w u O                                                                                                                                                    3 w u          L                              %

w u P 0 w u 0 1 s - w n ) ( a w u e l T

                                                                                                                                                       ,5 wmW                                         3                               :                                                                            3 w m M                                   m3                                  e                                                                                                   e w u w

u u u ( L 8 m a e g a s r

                                          =-

n u E e u u V 2 e i

                                                                                                                                                      ,0 3                      v m2u E                                   S .                                 r                                                                                              5  A m u          L                          Nr                                  r                                                                                              8 uEu                                     I f                                 a                                                                                                 d S             8 nNu R uOn          E      K                   WO t

n Y 1 e wTn W T . e s 5R 1 Y. t h wSu O .O D A g y i wLw P wLw wIw wMu w u Y L W M MFM D n a m u m

                                                                                                                                                        .o A.

i W e I N I u t a u u A n u D O I . c h u u X e t m u E s m u u A u G Wm f s n 5 i w n u R . a d u u E e e u u nwm A V e s t a l

                                                                         -                                         -                                       0                     u 0                                   0                                        0                                   0                           c 0                                   0                                        0                                                              l 9                                   0                                        8                                                               a 1                                   1                                                                                                        c g                                                                           t m

e I w mm 0 _ E0 0 9 4 2 0 3 4 6 2 8 9 8 8 _ V . 7 7 1 S 4 Q I5 7 6 9 8 1 4 1 6 7 2 1 6 7  :

T4 3 6 4 6 . . 6 6 6 6 1 5 )

4 1 U 7 9 s A1 7 1 0 4 2 0 1 0 n n L . . 3 2 0 o A T = o U4 8 2 6 8 0 1 0 i / 0 0 6 3 s M8 5 5 . 1 t N A s 8 0 9 7 6 3 a  : U 1 6 4 a r 1 7 8 8 8 e ) C 4 4 4 r T H 4 2 0 R e 1 u 4 W 5 D, S e 7 X e M 0 3 0 7 0 6 0 9 6 6 1 8 5 e n v . 0 0 2 2 2 4 t s e i 1 1 i t R7 5 6 0 8 0 0 8 6 l 9 1 G e A8 7 5 3 3 3 2 1 a t G - 7 0 N E0 7 6 5 7 6 1 D, a n 1 1 , ( Y 4 4 7 D N O -  : t 5 1 1 1 3 2 e p

                                     )               r       y                                                  .      .                                                 p 7                                                                                                                                                         y I      + 4                           e              o       n                                               4       1   1                                                        u 4                     H )             p      A                                                                                                          T         t T eg                                M   e   e                                                                                                                         (          r
               )                :          WR               f                  0       4      0      9    0  3 32       5    5       3      7   3        5                  a A a           3                )     s M                   I                     .         .

0 0 0 . . . s t t 0 e s t t H4 0 6 9 0 2 3 3 1 8 7 4 h S R u 2 W o t s , y T4 6 4 7 7 6 5 1 1 t O f M r e a d n N7 6 5 7 2 0 1 n d E G N L e A O 4 0 8 o e T  :  : t ( ( t M 2 4 3 M t P R ) ) e e c f a 5 E t e N y y c i I 1 6 m 0 8 H H H ( t t n r

                                                                                                                                           )       )                    t i

t

        /      C     MM              i i i                  t        ,

x 1 0

        /

R O B ( r s i g c c S s n ap ap e R s s a n o l s r ) t e N N ae t N e E s 7 e o t a a v i a s e H H ) a n 0 w r a C C o h t c r n WH C R R r w R o G R b c c i H i n M H ) r D E s e o P ( e e A i i t L w ( M H o M C e r v d

l l l h r s i n - d ( H t r ( ( g u O a o t

u d  : l g a b b r W t r r w n t r M c o a t r r t H d h _ 6 o t a n c a a u o e s H C d O h e r S n en ( F c o o u e S 3 i c m i i d d c t _ 3 r a r t r ne en Oc T R d r h r o e E E re e F c ac t t O eg ch y

   -      e     t      e a       t c p p                              r o o S t            t    v n             n c l Fa Fa d ae S t                                   l 0      P        n h R                                      l                  i 5               o T              e e e se                    e   o              r c e a r           r c E i c u s t

g C e l D D g v e f e a v r e e el P e r e s h v i c r a p p r O n e n y eda t E s e e v a a o e. t t t i t s l n u m u m a n L n t R e n e T E s e R l S A C C F d o r r e r i n p o i s m h r o r s e G s s E e d u k o l e e i i i C E e s E o r R t s s t t t t t c t E C c p i c m s x x N w a N p u s i o o t i i i i i r u N f o e t i La eN aDaMf MO o e O e o x r n r r e n n n n n o h c D R U I N P R N R H R H U G G N U U U U U F S N I 1 2 5 4 5 6 7 8 9 0 1 2 3 4 51 6 71 8 19 0 1 1 2 3 4 5 6 7 1 1 1 1 1 1 2 2 2 2 2 2 2 2

                     ~

5 9 1 MMM RR 2 M M OE H E M M e TZ G G M M c CI I A M M n AR EH P M M e EU H M M r RS TO . M M r S T E M M u FE E R M M c OR SE U M M e P UU L M M R N AD . I M M ON C R A M M e IE EDE F M2M n TP BEL M M e CO G T MEM v . U RGE N MNM e E DK EUE E MOM r G EC WLS M MTM P A RU OP P MSM T T P I MLM o U OS S . U

 -    MLM       t      O  T               %AD                           Q
-     MIM                        Y        0WE                           E

. MMM n E EB 0 N M M o C U 1RA O M M i N DD EE T M M t A E MNL

-     M     M     c    N RS               OIC                           E M     M   A      E EU               RA                            U
 -    M     M          T WA               FRS                           D M     M     e    N OC                  TA M     M     v    I     P            %SW                           S M     M   i      A        E         6                             E
. M     M   t      M %R         . 4PR                           G MMM         c          0UR             ME                         A e    L 0SE OUN                                       T r    E      1SL         TPI                          U r    U        E              A                       O S       o    F MRE DRR C       E OPE EET                                       2 N            R R S CTS
               &             FM           UA                           H O           F         E         DW .                         T e    O DT . E                                         I I       s           ESE RES                                   W u    N PYV                  CD

_ T a O PSL SIN D ) C I I A AVI E 1 C T RTV WRW T t6

 -                    E TN                   E                         A                        r1 U            L         AY RSM                                 R                       o0 P TLA E R                                        E       t               p-
-        D            M IOR               WO                           P        n              eG O NOP              O A' T                        O        e       r tRE E            C UCS              P" S                                   n       o e R D        o      ffetU R     t                                                       N        o   H oh nN n                                                     A        m       s S e(

e o 8nn v

          /      n                                                     G       C        o o yE e p

o N Fiir l V R I & tttei S m C T L t c a n eF o F S E e i u rE s N C U e bra n) F t it p a eR W m E s h s e t cE 0 D t e s y B A I B R M v xnraiL i EIPDL( O S R n d

-        T                                                            F                 a      a U      r                                                      H rm cadL o

- 4 e T Sre H b 4 cud m llSne

._      S       u                                                     Y              aa icr N                                                      L        d     uuotue 1            2                            U         o    nntndh R            1            1 J        h     aauoet T      E              -           -                                    t    MMACRO L            5            5                            E         e    -             -

I 8 8 N M 123459 I N d L o N r U h 1 5 5 O o t r e D r M E E n N n rn n R ireo o - o U mehi i n C A A T d pt t t a E AOOc a

.              o                                                      R                     ign R                                                                     FGHrni s                                                      2                     tim 8 3                 0                                                   sna r                                                      E              et      ei x u 2 4                     0                            N              rs R aE 5      h o 8          1 1

O ue r T lT yT e 8 S i gr s 9 1 i 3 5 F F L arnorn E L F oit o e

 -                                                                    I                   latc L

U I M ptelai

-                                                                               n   inuurL J             5 5                 5                                      o    uif g e 8 8                 8                                      s    qaeep8 d       e     / /                 /                                      a   EMRRO o    t      6 5                 6                                      e    - -       -

i a 1 1 2 MMM R ABCDE r g / / / M M e _ 2 7 7 MYM P _ 0 0 8 MRM d MAM ed t r MMM ce MMM rh o p MUM a oc o MSM o FS e N M M v - - R t 2 3 MMM T FS il4I 4 k i l2 l l l 1 i ;1' j iI

- _. _           -     . _ - - - _ . _ . -      -           .   ..       ___               -= -         .                                  ..            -   --             -.

C7MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u MILLSTONE 2 M c:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LDCATION UTILITY STATE.................... CONNECTICUT L ICENSEE. . . . . . . . . . . . . . . . . NORTHEAST NUCL EAR ENERGY COUNTY...................NEW LONDON CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM NEAKLST POPULATION CTR.. 5 MI SH OF CONTRACTOR NEN LONDON, CONN ARCHITECT / ENGINEER.......BECHTEL TYPE O F REACTOR . . . . . . . . . . . . PHR HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 17, 1975 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... NOVEMBER 9, 1975 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 26, 1975 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....LONG ISLAND SOUND IE RESIDENT INSPECTOR......J. SHEDLOSKY ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. OSBORNE COUNCIL.................. NORTHEAST POWER DOCKET NUMBER........... 50-336 COORDINATING COUNCIL LICENSE & DATE ISSUANCE. . . .DPR-65, SEPTEM5ER 30, 1975 PUBLIC DOCUMENT R00M.......HATERFORD PUBLIC LIBRARY 45 ROPE FERRY ROAD ROUTE 156 HATERFORD, CONNECTICUT 06385 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

MILLSTONE UNIT 2 TECH SPEC 6.8, " PROCEDURES,* REQUIRES THAT HRITTEN PROCEDURES SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED COVERING ACTIVITIES INCLUDING SURVEILLANCE ACTIVITIES OF SAFETY RELATED EQUIPMENT. THE CONTAINMENT LEAK RATE TEST-TYPE C (SP-2605D, REV 6) FOR THE CONTAINMENT PURGE EXHAUST VALVES REQUIRES THE FOLLOHING: - " SET UP THE FLON TEST BOX USING SKETCH 1 AS IN FIGURE 2605D-1* (STEP 7.2.1.1), -- OPERATION OF TEST EQUIPMENT VALVES V12 AND V13 TO PRESSURIZE THE TEST VCLUME (STEP 7.2.8.1), AND - " REMOVE AIR SUPPLY" (STEP 7.4.3) PRIOR TO RECORDING DATA. CONTRARY TO THE ABOVE, ON APRIL 10, 1985 THE CONTAINMENT PURGE EXHAUST VALVES HERE LEAK TESTED HITHOUT THE FLOW TEST BOX BEING SET UP AS SH0HN ON SKETCH 1 0F FIGURE 26050-1, HITHOUT TEST EQUIPMENT VALVES V12 AND V13 INSTALLED, AND HITHOUT REMOVING THE AIR SUPPLY PRIOR TO RECORDING DATA. THIS IS A SEVERITY LEVEL IV VIOL ATION (SUPPL EMENT I)., (8501 4) _0THER ITEMS

       ~

PAGE 2-196

E E 7 E E 9 E E 1 3 E - 3 E 2 MMM 3 E M M = E M M E

                                                          =                   E G M     M                                                  3                   =

M M 3 A 3 P M M 3 3 M M 3 3 M M 3 = M M 3 3 M M 3 = M M E E M M 2 = M M  : 3 M M 3 3 M2M 2 = M M 3 = MEM E = MNM 3 = MOM 3 = MTM 3 = MSM 3 3 MLM 3 E MLM 3 E MIM 3 = MMM 3 E M M E 3 M M 3 = M M 3 E M M 3 _ 3 M M 3 3 M M 3 _ 3 M M 3 3 M M 3 3 M M 3 3 M M 3 3 MMM 3 3 3 3 3 3 3 3 3 3 2 E E E 3 3 E

    )                                              E    3                   3 D                                                   3                   3 E                                              S    E                   3 U                                                   =                   3 N                                              N    E                   3 I                                                   E                   3 T                                              E    =                   3 N                                                   3                   3 O                                              C    3                   3 C                                                   E                   3

( I 3 3 3 3 L E 3

     -                                                  E           _       3 3           _       3
                                                        =                   3 S                                              M =                      3 3                   E U                                              0    3                   E 3                   E T                                              R    3           _

E 3 E A F 3 = 3 = T 3 =

                                                        =                   3 S                                              S    E                   3 3                   3 T =                      3
                                                        =                   3 R   3                    E E                   =

N O 3 E

                                            .          3                    E O                                     D        P   3                    =

E 3 3 I D E 3 3 I 3 3 T V R 3 3 O 3 3 C R = E P .

                                                       = T                 E E                                          D        3    C              =

T E 3 E = P  : U D 3 J =

                   )                      P   I        3    B              =

S S N V E U 3 E I O = S = _ N R R = 3 _ U O P E 3 _ D I N 3 3 E T 3 3 C U 3 FT 3 O  : P 3 OR = R E N 3 O 3 P T I 3 EP E A 3 TE = D D O 3 AR = N N 3 D - E

A N 3 3 S O 3 =

T S I  : 3 E 5 N N T O 3 . = 8 E A C N E F D 3 9 N . L . . . E 3 OT E 3 1 O D P D  : D D P T 3 D = P E ( E S E E S R 3 EEN_ I E L M D D M D D N O 3 TV_ V = U O I S I E I I I P 3 O = J C V M V T V V E 3 AE_ D R = O E O I O S O E R 3 P 3 d D R T R R U R T 3 E - o N P I P L P T P I N 3 T E _ i S A A A S O 3 - U = P _ r T Y T I T T T I 3 R - P E e E S U T U R U S U E T 3 E - N 3 P T M P I P E P P I C 3 B - I E I E N L N G N T N E 3 M - = t T I I I A I N I T P 3 U O 3 r R S C N A S S 3 N N 3 o p E Y O A O A O L O A N 3 3 H S N F N M N P N L I E 3 e T R O

1. Dock et : 50-263 0PERATING STATUS MMMMMMMMMMMMMwwMwMuwwMumummWMuuuuunn u MONTICELLO M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 wwumMMuwwwMummuwwwumumwwmuumunwwwwux
3. Utility

Contact:

A. L. Mvrabo (612) 295-5151 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 1670 t10NTICCLLO
5. Nameplate Rating (Gross MHe): 632 X 0.9 = 569
6. Design Electrical Rating (Net MHe): 545
7. Maximum Dependable Capacity (Gross MHe): 564 1800 536 MIMM.MM- 55
8. Maximum Dependable Capacity (Net MHe): FWDC. DEPEM). Orr. - 536 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted. If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 123,480.0
13. Hours Reactor Critical 731.2 4,509.1 94,424.6 h
14. Rx Reserve Shtdwn Hrs .0 .0 940.7 92,390.3
15. Hrs Generator On-Line 709.5 _%])M l
16. Unit Reserve Shtdwn Hes .0 .0 .O reo opus se tuneznen tammt artises. costuous 1,165,838 7,085,411 148,319,225 100
17. Gross Therm Ener (MHH) q 2.422,956 47,608,009
18. Gross Elec Ener (MHH) 396,399
19. Het Elec Ener (MHH) 377.397 2,325,172 45,500,597
20. Unit Service Factor 95.4 86.2 74.8 95.4 86.2 74.8 . go
21. Unit Avail Factor
22. Unit Cap Factor (MDC Net) 94.6 85,3 68.7
                                                                                                                                                  -30
23. Unit Cap Factor (DER Net) 93.1 83.9 67.6 0 . 0 1.7 -

5.1

24. Unit Forced Outage Rate 1.0 .

30 as 30 0 5 10 15

25. Forced Outage Hours 12.0 46.2 1,335.0 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                                  .AA.Y 1986 MAY 10, 1986 , REFUELING - 41 DAYS
27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-198

Report Period JUL 1985 .MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0NNS / REDUCTIONS M MONTICELLO M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvon Hours Reason Met ho d LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence 10 07/29/85 F 12.0 A 5 AD MG REACTOR SCRAM FOLLONING BRUSH MAINTENANCE ON RECIRCULATION MG SET. 11 07/30/85 S 22.5 B 9 CC V REPAIRED LEAK ON REACTOR BUILDING CLOSED COOLING HATER VALVE IN DRYNELL. NOTE: THE UNIT HAS IN A SHUTDOWN CONDITION PRIOR TO THIS OUTAGE. UDDMMMMMMMM MONTICELLO OPERATED IN JULY HITH 2 SHUTDOWNS AS NOTED ABOVE. O

SUMMARY

M UDDMMMMMMMM Tvon Rea son Method Svstem a comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint o- Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation of D-RequIatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                              & License Examination         9-Other              (LER) File (HUREG-0161)

PAGE 2-199

0 0 5 2 8 2 9 1 E E L YH G U LT A J S P Y U d R O . o A IE i R VG r 1 B 1 EA e 0 I 0 RT P 4 L 4 PU 5 Y 5 G . t 5 NR 5 S D r OA NTE o A IR INI p T 1 TB A TAF e O 8 AI T ELI R R S 9 VL O LPT E E 1 R S L N H N EC E UDE 0 N , SILN BED P LI 9 NLLN DI LM C C OBAI EN S A I I Y CUMM IEE E M, R R R P TR T S T T A L T , OXE A TI C C U ASES TEH T EL E E N TILI S LO L L N A NLLL EES . LP E E A K J EOOO VHN S N OA M C MPCP ITO E R CE L L L L T U , NAIA T I B E IN E A E A R L3 2 OENE AGT U H NN T R T R A U6 2 RN N LNA T T I H E H E H A2 - IN0N EII N R 4M1 C N C N I - R VI0I RRV E O O E E E E I . 0 P NM3M UE D SDD I I T H. 4 B. G. B. G. I.. P. R. 5 D. E. N ODR U G A . . . . . . M . . . . . . . . . . . . IEO R . . R . . . . . . . . TT F O . . . E . . . . . . E . CCS O F . . . I . . R . C . AUN N . . . L . . . . E . N E R . DO G N I . . R P . . N L O G . A M NNI

                . S               E   P           . . O            B T A . U O                                  DOT                  I R      . S               E   U           . R         I    I     C N . S O                                  CA               N O      . E               N   S           . E T         S E A . S R                              S   P      L             A T      . R               I               . I      A    N P M              . I                    USO                  E C      . D               G S             . L      M    O S             R             T          U   HNI                  L A      . D               N Y             . P R            P N JE E N                                   OOV                  C R      . A            E S R P O                        S     I      OB T E                      T   LI A T        .                 /             O U F              E            RM A M                          LTO                  L N      . E               T M T S N                        R T PU D U                               A   OCN                  A T O      E T             RC A C                          I          N         N             C              FE                   I C    E A             OE E U E                             N E G                   & O              T       P                C A        S R             TT T R N Y                           O D NT                        D              OS .                 E A YN O               CI S T                   I      R    I     I      IE E                        S   TNR                  P D     TE P               AH                S B O              G S SK S C                                       IO               S Y IC R               RC C N R T                           E E NC N                      I              N T T LI        O        TR        U O U A                    R R EO E                      L              ORC                  H I IL        C        NA N C T                        L                 CD C             B              IEE                  T Y   L T                  O                               U    E E          I          I     U              TBP                  I I U                  C                               G    I     I      L          L     P          N   CBS                  H T T                                                      E                                                 EUN U                                                    R                                             O   PNI                  S I                                                                                                          SS                   E I   N C                  V L                                                                                                          IER                  I T       EN               R I                                                                                   N                      DS                   D O                  C   ENE C                                                                                   I                      CEN                  L T                  E   NCO                  L A                                                                                   A                      UI                    A N                  P   OLY F                                                                                   I                      N B                   F D                  S   NF                    O AR                           AOE N             0                        R          EO                      N          T              T N             7                        E          RO                             ,W I               U I             9                        V          AC                      I   EES                   O M             1                        I                                      NIN 1     1    R R              TY                          IVO                   E
                                    ,             , 7 7            E                NT                          TE                    G FS                0      9 9 H I                      EIT                         URS                   N OI                1       1      1   0 P              NLN                         O R                   A A                   L                                T P              IIE                         RDU                   H T               HO                R         , ,            I          TBM                             NO                C MMM          O               NP                E 5 0 G S                           NAE                             AH M    M       S T                 A             B             3 N S                 OIE                          : -                  E M    M       E H             IE                M H                I     I          CLR                          ) :R                 H M    M       N G             MN                E C 2              L     S               EG                      9SO                  T M    M       N      I            N R C R H O S                                     DRA                          1GT             S M    M       I      R        0I        N E A U O                        I          I                            0NC             M D M    M              H                                  M                                                        5IE             E N M    M       M.              3. M B. D.                      J. C. M.        M.                           8DP             L    A M    M         . .             .          . . , . . .                                 .                         (NS             B M    M         . .        M.              . . . . . .                                 .                            IN           O D M    M         . . OR                     . Y R              . D       .          .                         3FI             R N

- M M . . RT . T E E O R . 1 P U M M . . FC . I N T H E . N0 O M M . . L E A T T . 1O2 T F MOM . . NN . A G R E A 1I N MLM . . OO . C E M H T Y. . TD E G MLM N . . II . I T P I . ECE N N MEM O . . TT . T S O G G L . NEV Y O I MCM I . . CA . I I N N I . Y UPL R P G MIM T . . EL R R L I I B . R JSO A MG MTM P . . RU O C R A L L A . A NV M O U MNM I . . IP T E I O O I . M NIN M C L MOM R . . DO C L N C O O L . M O I U P MMM C . . P A A E R C C E . U  ; S D M M S . . D E I E R . S NDN N R M M E . . NT R T C M R R L OEO T S A E M M D N . Y AS I E M E E CI N III N M T M M OE T E F N L O S S IC O TFT E E S L M M Y IT N TR O I E C N N RN I CIC M T M I M M T TA U SA E E TU T ETE E I E F M M I AT O IE E E E E D D CO C PNP C E T M M L CS C DH P T T T N N EC E SES R N R S D M M I O Y A A A O O L P NDN O O E Y R M M C L T D D D C C E S III F N H S C M M A N N T MMM F I E O

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M MONTICELLO M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: OPERATING ROUTINELY LAST IE SITE INSPECTION DATE: JULY 29 - AUGUST 1, 1985 INSPECTION REPORT NO: 85021 REP 0RTS FR0M LICENSEE

                               ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT _ _ - - - . _ _ _ - = - - - - - - - . . . . - - - - - - _ _ _ - _ - - -. _ _ _ _ - . .__- _=- - = - - - - _ _ _- _____ 85-10 06/12/85 07/12/85 REACTOR SCRAM DURING MSL LON PRESSURE SURVEILLANCE TEST 85-11 06/24/85 07/24/85 ACTUATION OF EFT IN E-MODE 85-12 06/03/85 07/03/85 HRGM TRIP DUE TO POWER LOSS

                               ==================================================================================================================================

PAGE 2-201

0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

1. Docket 50-220 M NINE MILE POINT 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 7%.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

THOMAS H. ROMAN (315) 349-2422 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1850 NIPE MILE POINT 1
5. Nameplate Rating (Gross MHe): 755 X 0.85 = 642
6. Design Electrical Rating (Net MHe): 620 630 AM
7. Maximum Dependable Capacity (Gross MHe):

MI" M* MIE " M

8. Maximum Dependable Capacity (Net MHe): 610
                                                                                                                - MX. IEPDS. Cfr. ~ 810 (1001)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 138.047.0
13. Hours Reactor Critical 744.0 5.057.1 97.773.6 h
14. Rx Reserve Shtdwn Hrs .0 .0 1.204.2
15. Hrs Generator On-Line 744.0 5.027.9 94.833.0 l 100
                                                                              .0          20.2           %___
16. Unit Reserve Shtdwn Hrs .0 C
17. Gross Therm Ener (MHH) 1.368.331 9.123.707 158.413.074 -so
18. Gross Elec Ener (MHH) 446.632 3.076.754 52.457.543 433.053 2.985.719 50.815.713 -se
19. Het Elec Ener (MHH) 98.8 68.7
20. Unit Service Factor 100.0
21. Unit Avail Factor 100.0 98.8 68.7
22. Unit Cap Factor (MDC Net) 95.4 96.2 60.3
23. Unit Cap Factor (DER Net) 93.9 94.7 59.4 0 0
24. Unit Forced Outage Rate .0 1.2 15.8 o' 's 'io 'is' io 'is do 59.1 13.118.5 DAYS
25. Forced Outage Hours .0
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): .ALY 1985 NONE N/A PAGE 2-202
27. If Currently Shutdown Estimated Startup Date s

_ _ _. ~ Report Period JUL 1985 ununuuznu=nuu MnM:nuzzuMuuurnM=nunnn UNIT SHUTD0NNS / REDUCTIONS M NINE MILE POINT 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date 1535 hours Reason Method LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence 85-11 07/27/85 S 0.0 H 5 LOAD REDUCTION TO 75% FOR CONTROL ROD PATTERN ADJUSTMENT, M2:MMMMMMMM NINE MILE POINT 1 OPERATED ROUTINELY IN JULY HITH NO SHUTDONNS AND 1 PONER REDUCTION REPORTED. u

SUMMARY

M EMMMMMMMMMM Tvon Reason Met ho d Svntem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                & License Examination        9-Other          (LER) File (NUREG-0161)

PAGE 2-203

k , OMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NINE MILE POINT 1 M M MOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION UTILITY STATE....................NEW YORK LICENSEE................. NIAGARA M0 HANK POWER CORP. COUNTY.................. 0SHEGO CORPORATE ADDRESS....... 300 ERIE BOULEVARD HEST SYRACUSE, NEW YORK 13202 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NE OF CONTRACTOR OSHEGO, NY ARCHITECT / ENGINEER. . . . . . .NI AGARA M0 HANK P0HER CORP. TYPE OF REACTOR............BHR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 5, 1969 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER IST GENER... NOVEMBER 9, 1969 TURBINE SUPPLIER. ....... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER.... LAKE ONTARIO IE RESIDENT INSPECTOR......S. HUDSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....R. HERMANN COUNCIL............ .....HORTHEAST POWER DOCKET NUMBER........... 50-220 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-63, DECEMBER 26, 1974 PUBLIC DOCUMENT ROON....... STATE UNIVERSITY COLLEGE OF OSHEGO PENFIELD LIBRARY - DOCUMENTS OSHEGO, NY 13126 (315) 341-2323 INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE i OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. i FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-204 i

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M NINE MILE POINT 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REPORTS FR0M LICENSEE

                           ====================E======E=E============================E=============E=E========================E==========E===s=======ss=szaz=

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                                                          = - - - - - - - - - - ,__          _----------- -     _-- - - - - _ __     _ - - - - -       . _ __               ___      _____----

NO INPUT PROVIDED.

                           ==================================================================================================================================

0 PAGE 2-205

1. Docket 50-338 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M NORTH ANNA 1 M
2. Reporting Period 07/01/85 Outaga + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contact B. GARNER (703) 894-5151 X2527 AVERAGE DAILY P0HER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 2775 NGRTH fW4NR 1 S. Nameplate Rating (Gross MHe): 947
6. Deslan Electrical Rating (Not MWe): 907 941 I"
7. Maximum Dependable Capacity (Gross MHe):
8. Maximum Dependable Capacity (Net MHe): 893 _ [ g
9. If Changes occur Above Since Last Report, Give Reasons:

MDC GROSS CHANGED

10. Power Level To Which Restricted. If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5.087.0 62.712.0 -

p - 100

13. Hours Reactor Critical 744.0 5.087.0 43.434.0 h 2,185.4
14. Rx Reserve Shtdwn Hrs .0 .0
                                                                                                                                       -80 u
15. Hrs Generator on-Line 744.0 5.059.8 42.148.6 g
10. Unit Reserve Shtdwn Mrs .0 .0 .0 g
                                                                                                                                       -so
17. Gross Therm Ener (MHH) 2.064.532 13.728.039 110.591.705 000-
18. Gross Elec Ener (MHH) 692.371 4.625.591 35.997.772
19. Net Elec Ener (MHH) 657.721 4.396.257 34.012.275 .g
20. Uni t Service Fac*.or 100.0 99.5 67.2
21. Unit Avail Factor 100.0 99.5 67.2
                                                                                                                                       -30
22. Unit Cap Factor (F.DC Net) 99.0 97.0 60.7
23. Unit Cap Factor (DER Net) 97.5 95.5 59.8 0
34. Unit Forced Outage Rate .0 .5 12.0 O' 's' io ' is' 'ig' 'fg' 'Io
                                            .0      27.2       5.642.1                             DAYS
25. Forced Outage Hours
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                 .AA.Y 1885 REFUELING. NOVEMBER 1.      1985. 48 DAYS
27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-204
                                                                                                              !!MMM%i:HHZM%KMME!Z:in %MMM% MUZMH%MIIEH Report Period JUL 1985                UNIT       SHUTD0WNS / REDUCTIONS                        M           NORTH ANNA 1                                                         M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date    E Hours Reason Method LER Number System donnonent               Cause a Corrective Action to Prevent Recurrence NONE
               %MMMMMMMMMM       NORTH ANNA 1 OPERATED ROUTINELY IN JULY HITH NO SHUTDOHNS OR P0HER REDUCTIONS REPORTED.

II

SUMMARY

M E%MMMMMMMMM Tvon Reamen Method Svntom & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F~& H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Screm Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                              & License Examination      9-Other            (LER) File (NUREG-0161)

PAGE 2-207

MOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M NORTH ANNA 1 M CMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... VIRGINIA LICENSEE................. VIRGINIA POWER COUNTY...................LOUISA CORPORATE ADDRESS........P.O. BOX 26666 RICHMOND, VIRGINIA 23261 DIST AND DIRECTION FROM . HEAREST POPULATION CTR.. 40 MI NH OF CONTRACTOR RICHMOND, VA ARCHITECT / ENGINEER. . . . . . . STONE 8 HEBSTER TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 5, 1978 CONSTRUCTOR.............. STONE & HEBSTER DATE ELEC ENER 1ST GENER... APRIL 17, 1978 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... JUNE 6, 1978 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE ANNA IE RESIDENT INSPECTOR......M. BRANCH ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....L. ENGLE COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-338 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....NPF-4, APRIL 1, 1978 PUBLIC DOCUMENT ROOM....... ALDERMAN LIBRARY / MANUSCRIPTS DEPT. UNIV. OF VIRGINIA / CHARLOTTESVILLE VA 22901 8 LOUISA COUNTY COURTHOUSE, LOUISA, VA 23093 INSPECTION STATUS INSPECTION

SUMMARY

                           + INSPECTION JUNE 3 - JULY 7 (85-16):         THIS ROUTINE INSPECTION INVOLVED 113 INSPECTOR-HOURS ONSITE IN THE AREAS OF LICENSEE EVENT REPORTS (LER), PREVIOUSLY IDENTIFIED ITEMS, LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, ENGINEERED SAFETY FEATURES HALKDOWN, OPERATIONAL SAFETY VERIFICATION, MONTHLY MAINTENANCE, MONTHLY SURVEILLANCE AND INSPECTION OF MANUAL REACTOR TRIP CIRCUIT LOCATION.

ONE VIOLATION HAS IDENTIFIED: MULTIPLE EXAMPLES OF FAILURE TO FOLLOH PROCEDURE, PARAGRAPHS 10, 11 AND 12. INSPECTION JUNE 11-13 (85-17): THIS ROUTINE, UNANNOUNCED INSEPCTION ENTAILED 12.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF SERVICE HATER PIPE MECHANICAL CLEANING AND HELDING, LICENSEE ACTION ON PREVIOUS OPEN ITEMS, SPENT FUEL STORAGE RACK HORK OBSERVATION, AND SERVICE HATER RESERVOIR IMPROVEMENTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS PAGE 2-208

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M NORTH ANNA 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNkMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLANS AND PROCEDURES): NONE. MANAGERIAL ITEMS: HONE. PLANT STATUS: NORMAL OPERATION. LAST IE SITE INSPECTION DATE: JUNE 3 - JULY 7, 1985 + INSPECTION REPORT NO: 50-338/85-16 + REPORTS FR0M LICENSEE

               =====33=========3=333=3===============r,=3=======================================================333===========3==================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT ___ ____ __ . =. -- - 85-008 06/28/85 07/03/85 POTENTIAL FOR UNAUTHORIZED ENTRY INTO THE PROTECTED AREA. PERSONNEL PERFORMING HORK HITHOUT PROPER AUTHORIZATION. 3=3==E=3=333333===3:33====3B==E=3=33===3=================33==3=33======33==33========3333=3==33=========E3=E==3====E=======E====== PAGE 2-209

1. Docket 50-339 0PERATING STATUS nuunnunMMMMMwNuuuuuMMMxwMuwwwmuuuwww M NORTH ANNA 2 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 mununuxxxwwwwuwmununununummunuwkumum
3. Utility Contacts B. GARNER (703) 894-5151 X2527 AVERAGE DAILY POWER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2775 ME M 2
5. Nameplate Rating (Gross MHe): 947
6. Design Electrical Rating (Not MHe): 907
7. Maximum Dependable Capacity (Gross MHe): 941 1500
8. Maximum Dependable Capacity (Net MHe): 893 M I M M . ItRTINS - 907
                                                                                                   -.. FWIX. OEPDC. Ofr. - OSS (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000-MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5,087.0 40,583.0
                                                                                                               - ........ _ ..      ..       -100
13. Hours Reactor Critical 679.2 4.963.4 30,746.3 V l
14. Rx Reserve Shtdwn Hrs 64 2 93.3 2.470.1
                                                                                                                                             ~"
15. Hrs Generator On-line 657.3 4.736.0 29.913.2
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1.709.080 12.104,277 77.608.507 - so e00 -
18. Gross Elec Ener (NHH) 563.514 4,022,336 25,741.601
19. Net Elec Ener (MHH) 533.551 3,812.067 24,381.340 '
20. Unit Service Factor 88.3 93.1 75.7
21. Unit Avail Factor 88.3 93.1 73.7 84.0
                                                                                                                                             ~"
22. Unit Cap Factor (MDC Net) 80.3 67.3
23. Unit Cap Factor (DER Net) 79.1 82.6 66.2
24. Unit Forced Outage Rate 11.7 6.9 12.1 0 .
                                                                                                         ,.     ...         ,  ... .,! .,      o o            s       10        15   20 25     30
25. Forced Outage Hours 86.7 351.0 4.125.7 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                                      # I" NONE
27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-210

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WHS / REDUCTIONS M NORTH ANNA 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. _ Date 15jj Hours Reason LER Number System Component Cause & Corrective Action to Prevent Recurrence 85-37 07/01/85 S 0.0 H 5 RAMPED DOHN TO 88% POWER FOR LOAD FOLLOH. UNIT RETURNED TO 100% P0HER. 85-38 07/02/85 S 0.0 H 5 RAHPED DOHN TO 68% POWER FOR LOAD FOLLOH. UNIT RETURNED TO 100% POWER. 85-39 07/25/85 F 86.7 A 1 RAMPED UNIT 2 0FF LINE FOR HIGH REACTOR COOLANT SYSTEM UNIDENTIFIED LEAKAGE. UNIT RETURNED TO 100% PONER. DDOMMMMMMMM NORTH ANNA 2 EXPERIENCED 1 SHUTDOHN IN JULY PLUS 2 POWER REDUCTIONS. O

SUMMARY

M ODMMMMMMMMM Tvon Reason Met hod Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for

 .                                C-Refueling      H-Other        3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued     Data Entry Sheet E-Operator Training             5-Reduced Load Licensee Event Report
                                     & License Examination        9-Other          (LER) File (NUREG-0161)

PAGE 2-211

1 . 3 0 T ,N ED 1 5 9 NNO CN 2 8 2 ENI IA - 9 2 VOT V 2 1 EDA R , KC EN E L A ELO SO G U V EAL I A J SH FT P

                                                                                                  .E           N T           OA d                                                                                       TL            ESI               V o                                                                                      PL            CEU            SR i                                                                                        EI            IRC            AE r                                                                                      DV            LUR            ES e                                                                                         S             TI          RB P                                                                                        SE ,          FAC            AO TTE           OE t                   1                                                                    PTS              FP         EK r                6                                                                    IOU            S     I        HR o

p 2 RLO AYR TO 3 CRH ETT H e 2 0 SAT RE N R 8 UHR AFR IK A 9 NCU AO . C I 1 A/O EST2 EA N MAC3 H C1 TR I , /I 9 TDA I G 1 YNY0 EED SE R R R 2 RIT3 NRRN NG R 6I E E AGN2 IE A OA E 6V T T T RRU EL R H 6 S E S E S BIO ENA1 SO D 6 , B S B S U IVCA TIU1 RT P 2D E U E U G L V IGN US N H O H O H U FA , SNA , O A XO H H C E A NOS NEM0 HL I OM & G & G N L A IA O 1 E N BH N N A G9 , M .US ,F RU I C E I E I R N3 7 RVOI SSOS OF G .I N T N T B E3 - EILU RG H T N R O S O S - F DN O UNNP CT O I O. R T E T E I . 0 P LU&L OIOA EN I T V. P. S. H. S. H. I. M. L. 5 N. A. HDIR PE NTG SP A . . . . . . . . . . . . RICA NS M . . . . . . . . . . . . OFER I R . . . R . . . . . . . . T PA , . O . . . E . . . . . . E . CNSP F . . . I . . . . R . C . EON 5.SMED N . . . L . . E R E . N . PII , 2EI I . . R P . . N L O G . A M ST E 1TF

                   . S             E P           . . O          B T A . U                      O              NCDR             II R      . S             E U           . R       I    I     C N         . S O                    IENU D T O       . E           N S           . E T          S   E A .              S R                S      PAD        ENi 1 T       . R             I             . I     A    N   P M           . I                      3S E LEE C       . D             G S           . L     M    O   S          R               T          U   1NEC          IPD A       . D             N Y           . P R          P   N JE E N                                  1ICO          AOI R       . A           E S R P O                    S     I     OB T      E                   T         NR T A T         .
                                   /           O U F            E           RM A      M                       DSAP NSE N       . E           T M T S N                    R T PU D U                                A   EUL           EUR T O       E T            RC A C                     I          N        N               C              VOLH             OE C     E A            OE E U E                        N E C                  & O                T   LIIO          NIH A         S R            TT T R N Y                      O D NT                         D              OVEL OV 8  YN O              CI S T               I     R    I     I     IE         E                  S   VEVL IES D      TE P              AH             S B O            G S SK S C                                    NRRO TRN Y  IC R              RC C N R T                      E E NC N                       I              IPUF CPO T  LI       O        TR U O U A                      R R EO E                       L                   S        P      I I  IL       C        NA H C T                   L                CD C               B              NN O ENT Y   L  T                 O                          U    E E         I          I       U              OOYT SOA I  U                 C                          G    I     I     L          L       P          N   I    L        N      I T T                                                 E                                                  TNHE INV U                                               P                                              O   COTR             OE I                                                                                                      EINU DID I   PTOL ET L                                                                                                      SCMI CCR I

T NA A NAO I .F U C C EE DES EECF NEN E NSNO NSO A INA ANI CL P TENS NET F II UCEE UCA RC $ OITL

-                                                                              TN                             RLNP            ,I LO L 0                   CU                         N                 E 8                   EO                             S,IM AA N    V     ,I
 -                                                   0     9                   LC                         I   ISMX IG 8     1                   E                              HM E TNO 0 9                                  Y                         TEY           UIN A           8     1       ,                 NT                                TLE OD FV             9           4                   RI                                IHL RL O,             1 5
                                                       ,   1 U A EL TI
                                                                                                              )DNI TP SHS E .

A HD , 2 R R N SB 6EOT I T MMM I NN 2 E H N AA 1IML HDN M M N A O 1 T B T A EI M M I S IM S M HL 5I F ,M U TNE AM M M G I MH E U E E E TE 8TN E M M R U C R N G C C K UR (NO *GV M M I O 0I H U U E N A O EI: )NO M M 7DTD 7IR M M V. L. 4. R P. J. A. D. O. L. S. IAE 1NP M M . . . . . . . . . . Y CI AM M M . . M. . . . . . . . LYIF 5EI M M . . OR . Y R . D . . ULFI 8L M M . . RT . T E E O R . JSIT (CR M M . . FC . I N T H E . URN I M2M . . . L E A T T . OEE 3LO M M . . NN . A G R E A IVD 1AV MAM MNM N

                   . . OO
                                           . C             E M H            Y.

T 3V I CR II . I T P I . EY 1IE MNM O . . TT . T S 1O G G L . ERTS 1NS Y MAM I . . CA . I N N I . Y NPEA AE R

-  M   M T         . . EL                R R               L    I     I     B .                             R MHM P           . . RU                O C R A L                    L     A .                             A U J   ,F A      H NCEHR    A M

MTM I . . IP T E I O O I . M )SN UER M MRM R . . DO C L N C O O L . M NR O JME U MOM C . . P A A E R C C E . U OELI T S MNM S . . D E I E R . S ILAT NEA M M E . . NT R T C M R R L T(NA OPH T S M M D N . Y AS I E M E E CI N C OL II N M M M OE T E F N L O S S IC O ESIO TPE E E M M Y IT N TR O I E C N N RN I PTTI C C M T M M T TA U SA E E TU T SRAV ERI E I M M I AT O IE E E E E D D CO C NOR PEV C E M M L CS C DN P T T T N N EC E IPEE STR R N R M M I O Y A A A O O L P EPN NAE O O E M M C L T D D D C C E S +ROO IHS F N H - M M A N N T . MMM F I E O

                                                        =             _       =  3
                                                        =           >         =  1
                                                        =               _     =  2
                                                        =                     =   -
                                                        =                     =  2     _

MNM = = E M M M M M

                                                        =
                                                        =
                                                        =

_ =

                                                                              =
                                                                              =

G A M M M = = P M M = = M M = = M M = = M M = = M M = =

 .                                                      =                     =

M M M M = = M M = = M2M = = M M = =

                                                        =                     =

MAM MNM = = _ MNM = = MAM = = M M = = MHM = = MTM = _ = MRM = - = MOM = = MNM = = M M = = M M = = M M = = M M = = M M = - = M M = = M M = - = M M = = = M M = -_ = M .M = = MMM = _

                                                                              =
                                                        =                     =
                                                        =                     =
                                                        =                     =
                                                        =                     =
                                                        =              _      =

E = =

                                                        =                     =
     )                                              E =                _      =

D = = E S = = U = = N N = - = I = = T E = = N = = O C = - = C = = ( I = - =

                                                        =           -         =

L = - =

       -                                                =           -
                                                                              =
                                                        =           -_        =
                                                        =           =         =

S M = s

                                                        =                     r U                                              0 =             -         =
                                                        =                     =

T R = =

                                                        =                     =

A F = =

                                                        =                     =

T = _ =

                                                        =           -_        =

S S = - =

                                             +          =                     =

T = = 5 = = 8 R = = 9 = _ = N 1 0 = _ =

                                                        =            -        =

O , P = - = 7 = = I 1 E = =

                                                        =                     =

T Y R = = L = = C U = = J = T = E = C =

                                              -         =   E                 =

P  : = J =

                       )                     5 +        =   B                 =

S S = U = E E 6 = S _ = N R N 1 = = U U - = -_ = I D J 5 = _ =

E 8 = =

S C / = FT = M O 9 = OR = E R E 3 = O = L P T 3 = EP = B A - = TE = O D D 0 = AR = R N 5 = D = P A N = = O = = T S I  : = = 5 N N T O = = 8 E A C N = F = 9 N L E = OT = 1 O P  : . P T = N. = P ( S N S R = EE. _ = L M M O N O = TV _ = U O S E I I P = _ = . J C M T  : T E = AE_ D = E I S A E R = _ = d D T U R T = = o N I L T E I N =

                                                        =
                                                                              =
                                                                              =

i S A A A P S O r M Y I T O I = R = - e E S T R S E T = E . = E = - P T M I E L I C = B - I E . L . G . T A E = M N = t T E I E A E N M T P = U O = r R S N C N N N A R S S = N _ N = o E Y O A O A O L O A N = _ = p H S N F N M N P N L I = _ = e T R O i-

1. Docket 50-269 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M OCONEE 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2568 m3
5. Nameplate Rating (Gross MHe): 1038 X 0.9 = 934
6. Design Electrical Rating (Not MHe): 887
7. Maximum Dependable Capacity (Gross MHe): 899 1800
8. Maximum Dependable Capacity (Net MWe): 860 MIE E' EIE *
  • MRX. IMFDe. 02. - 800 (100K)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 105.576.0
                                                                                                                                   ~~~
                                                                                                                                                                 ~" h
                                                                                                                                                    ~~"
13. Hours Reactor Critical 744.0 5.050.6 77.044.0 ---
14. Rx Reserve Shtdwn Hrs .0 .0 .0
15. Hrs Generator On-Line 744.0 5.033.5 73.737.9 g -80
16. Unit Reserve Shth Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 1,842.180 12.804.735 177.678.499
                                                                                                                                                                 -en 500-
18. Gross Elec Ener (MHH) 638.630 4.445.970 61.782.650
19. He'; Elec Ener (MHH) 608,071 4.244.713 58.576.999
                                                                                                                                                                 - eD
20. Unit Service Factor 100.0 98.9 69.8
21. Unit Avail Factor 100.0 98.9 69.d
22. Unit Cap Factor (MDC Net) 95.0 97.0 64 4M
23. Unit Cap Factor (DER Net) 92.1 94.1 6 2. 6 M
24. Unit Forced Outage Rate .0 1.1 15.2 0,- ,-

lo i, j,- j,- jc 0

25. Forced Outage Hours .0 53.5 12.258.7 DRYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

NONE

27. If Currently Shutdown Estimated Startup Dates N/A M ltem calculated with a Heighted Average PAGE 2-214

5 1 s 2 2 DMM E M M M M e G M M c A M M n P _ M M e P - M M r I M M r R _ GM u T . M M c S . M M e P M _ M M R M E _ M M U L M M t P B - M M n O - M1M e R R - M M v E P MEM e T - MEM r A L MNM P H I . MOM D O S - MCM o E MOM t E L T' M M F O P M M n R M M o D T T M M i E N N M M t S O E M M c U C M M M A A c M M C P V M M e MO M M v E U M M M i R P M M t U E MMM c S R V e S E L r E T A r R A V S o P H C D P N L E O

      &     I     E T O          O     F S e       .

I s LK E D . u OC T N T a RA A A Y ) 1 C TB G L C N!t I L U t6 OU T O J r1 U CR S R o0 E T N t p-D ND V N I n eG ON N O e r tRE E LA I C S n o e R N o ffetU R t O o H ohnN n I m s S e( e X X X T o &nno vo yE e

 /      n   X     X E        C a   P     P V        U       L_ Fiir             l a   M      M L       D       &        tttei S      =   U     U A        E            t c a n eF o P       P V        R        m   i u rE s N    C                               e   bra it p a eR n)

R t W m E s h s et cE e H v xnraiL 0 t H H C D S EIPDL( - s C C C P D v 3 m d 8 T a a D N rm cadL o U r e A Sre H b cud m S llSne S u N aa icr N h d uuocue 0 o nntndh R D h aauoet T E T t MMACRO L U e - - - I H M 123459 S N d O r o N o U h 5 5 5 r t a D r M E E C N n rn n ireo o n E mehi i o I o ptt t s A A F R AOOc a a E - ign e P F0H r ni R tim X s 0 0 0 E sna r et eix u 0 0 0 1 rs RaE o ue r yT e 5 N E lT E i gr s 8 N arnorn 9 g 1 g F F S O F oit o e y C latc O pt el ai L I n inuurL U g uif g e J 5 5 5 3 qaeep& 8 8 8 g EMRRO d a / / / g - o t 5 5 7 MMM E ABCDE i r D a 1 1 1 M M .

            /      / /        MYM                                  _

e 7 7 7 MRM d P 0 0 0 MAM ed t MMM ce r MMM rh o . P MUM o oc FS p o P P - MSM o e N - - 0 M M v - R 8 9 1 M*M T FS l

EiHH:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u OCONEE 1 M can:MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICENSEE.......... ...... DUKE POWER COUNTY.................. 0CONEE CORPORATE ADDRESS... ... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 30 MI H OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE & BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX DATE INITIAL CRITICALITY... APRIL 19, 1973 CONSTRUCTOR.............. DUKE PONER DATE ELEC ENER IST GENER...MAY 6, 1973 TURBINE SUPPLIER..... ... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 15, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE KE0 HEE IE RESIDENT INSPECTOR......J, BRYANT ELECTRIC RELIABILITY LICENSING ?ROJ MANAGER.....H. NICOLARAS COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........ .. 50-269 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-38, FEBRUARY 6, 1973 PUBLIC DOCUMENT R00M...... 0CONEE COUNTY LIBRARY 501 H. SOUTH BROAD ST. HALHALLA, SOUTH CAROLINA 29691 INSPECTION STATUS INSPECTION

SUMMARY

 + INSPECTION MAY 13 - JUNE 10 (85-12): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 78 RESIDENT INSPECTOR HOURS ONSITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE. INSPECTOR FOLLOHUP ITEMS, AND FOLLOHUp 0F EVENTS. OF THE FIVE AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

INSPECTION JUNE 17-20 (85-15): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 56 INSPECTOR-HOURS ONSITE IN THE AREA 0F EMERGENCY PREPAREDNESS EXERCISE. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 18-23 (85-16): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 19.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF STEAM GENERATOR CLEANING. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 11 - JULY 8 (85-17): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 73 RESIDENT INSPECTOR HOURS ONSITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE, AND STATION DRILLS. OF THE FOUR AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

CONTRARY TO 10 CFR 71.5(A) AND 49 CFR 173.425(B), THE LICENSEE FAILED TO PACKAGE A SHIPMENT OF LOH SPECIFIC ACTIVITY (LSA) PAGE 2-216

f ! l: >s ' ,!' il i1 7 .
  -                                                         F                     D F E

H G 1 2 O E O GZ NH P EU - 0 S OI EE AT H VO L 2 , MMM S 1 T YE LR MH E IR O M M DD N LC OFITNNR EH THYR E _ G M M OO%O F E NITOHOT EOA E RT CTTT _ M M E NRR0T O M OFUTT HT E HNU A IN A M M H E 7 D EE FO USEGTDN TODD 0ARO P M M T ELL YNT RHSOHSAPHUIE IENYIEUC M M HOOTRARLITW TR UTORTAG HTCALDRC M M F TRRAA OAU OYIEFO HHSEN TAO PAAEO _ -. IIRRAR S BNNST R1PCQ .LTHKIRTT M M O ETT IRI M M EIE LE R GALOLAD HDPOC D T - M M P OODNYRNREAFSOY AN A A TIREE M M O DCCOOR H R ASHLRTNOC,,ENE TR .CGOLH3 M T E RCALCEU4SE BOR N AEOFLT8 I A M TEE RSO EDA I - EL PL O 1 M M E EHHL UAEHS0.NGW NUTTO SFSESTF TA SODRN SN:NIETIR . M1M H LTTO .AN P7OEOTNFLRAAL M M T P REJN HX I LFOEAAEIE IODIDYN O . RDS SSE AEOEOS MEM MEM , M,

                                            .T NBN L A EI   .TEETDLIS RANAHRN DAA                                NRIERVCGDM MNM           5         OC.EOAENMHNUIA SEI .E C

GCLEAA ODD 4 P NLDE ESOLEDR RD OEFH R N R CPITEUEATA

.         MOM           8 MCM                     S 5. A IH                                                                            T HSHHAL

- MOM M 9 1 N2.T5ATTFNTCRS O U VEIEEAO E7TIHMRSTU RTIEAS0.HCPMOTEI DGN ENES E

                                                                                                                             ,T      TC A N

M - - FROTOSQ RIDIEBGAAD M M M M 1 I5.OPABMMTIRER T U BISDPHGEFI CNPOE AVIHD N ME PL TIAIFHT - M M A3GOSDUTIA .TNROCE O PR EOE SETOCA M M H C NRAES SR IU EHSCG INIGhT DN TGERS AH DYPTA NAE RVROTRI TP - M M M M C R FOL ETEOL HEI H PNETUAXCAI M M A IIEHNLORCA INCT F HRDT IH O ERHC M M M DTUTIPNI N:WION ,OETEE E Y D N I M M OAFIGM UDOD DREG C TRG BSSRLEE RT - M M M M N O MCEHRODQESESLP NEIFNEN IR ACIERRITI TINTOETI NEAALEYON LORRILYF A MMM NF %M DRAEFNU . STOC NR LIUTROOIDN T OIA5 S PPIEBBAINATSEA ATDNERLTRU A IC 1NNEEE TM LR RUN E HAEOTTPOA H SRCCANMNUO T TEG HOEHRGNEY.EHHPOOSH APNFOISTPNEGR G SR EO MOE GT TSIODTN IDNAEHNUHDRET C O

-                       N         S N TAEHEVIAIMTIOCNEKU                                                         N OOP P R ".D RTAD I              LORUCCTBL                         RLI            HUAPRO                   I       LNEO                  N
            )                     RALEHIII                         OERITRETS                      OH             TLLAAHTETO D             ,       ACLWSFLWLVRAX EZL UFTIA,IA               NTHT                                  CLOI TCRSP E           E         EIOO             I                                                     I       EARRS AUOS U           G         LNFPKDE,LNEAIHRAOFR,OSTW                                 N HOH                 T TELGRLPE N           A         CH               OH3H                  O        AO                             ORNTONTI R
-           I           K         UCNRRMT8SSSILD HSIE TD                                                         ROOAOINAO T           C         NEOOE                 9 NERAOTTITVS N                                          PFCMTVOFTO N           A              TITVN)1NORPMIUUHPLE.A                                                                     AC            T RROATOER5                             NOLEDE OTAVELA RE .E O           P         F       TCOOB
-           C                     OOAA             I( ,OIU  ITDSOE                           SI8P

( T TLEKT91TAESNPGTOTMU9H I IIT DUR H T AR A53CRCE OSTUEQ1R TDRTATDELU -

-                       G         RYC AT                    EEOLRDLU 0HE                                         AEECNNEYIL
-               -       I         ORSNTS0RTPRNOE MY/TR                                               ,N          IRTAIEVEAI                                             -

T PAEOL 5EOOPUFDD RN 9A DEA 0MMRVFA ER ER BR NNTAIG42 AHMIAPER F - - S , RTRDDARMPLLSYEASR N RD DTISU G NEE EFE LOSLT ITGL O0.LO AEANUBS U N LOWS %LCCNAREEXTCNO 7I L VROQO M. . O ACOA1C EO TRNEFIOLD RD EDI CE NAA RERE - T R T U PB UoDIRNGI ISC NEPE N PNt TOOETNHY TARAT DAFC UASH NNT-NAC DDOEGR O ANENTBOA - A S N 2NE AE ORFONI DO .F U S P IADNI S ,0OLAC R T A MTIIOTADOSNRRK AHEEOL RDIIE ETPD - EEDTBSPO E S R NAITU ARNAQTY1R E ATSA ORhESRC,G DFOTR AO PNAUALSNYT O FURERR DCSE HLAF RSN IRALON TC TE EROAYLECSSD A OKPII RA CNOIDIE E IMGP PRRERAEUEAED R HE OTH ART G MINOEETANE R U HEDO .TB FNO" UT EHUO A BTI HRNUNHLGNNF LNHC ILDFTH CR - OT SALEOATTEP - N K U RET ONODANEIOFLE EMOL O C A SDUL EDB ,LCASACIET A JR I BNYARTI FO/R .TUO R ,FEST H,AS H E P TR ADU EDGG ORTTFEDYH U BE 5TEH - I A OI5 TEN .NPNONSCTSNIHERT NU8PDNEE ALIA N OHTTAI DDOACS8 HT EETLEE9ST . T 7 Q9EEAMER ODHSEECS ARH CV IR1L N DE1CE AHO ,I L A H RCT OOEEPI U,OFI C N O IR,CCNRTFDDI8HTTEFAONE D AXAFE EAU 6 S HOELOC RRRB PPU LQ1T OO S - E I E1NE EBSNRB1ER ,T N CN PLSAE SE - T EH2U TM EI CIO G E A TAILRRYDSG P A ET EIIDRANYRIFSFNSB L A AAE ANED  :

                                                                                                                                                              )
-                       C         S LFRMTEUTOROT LOID                                                .L          HEFIV4MANA S           I         NHIOEB TDNLAOCEA NRDRI                                                         TB      RE1            HEB                   S F         ETR HUDEEILIDAH TNALEE                                                               FES          .N     V                  E N                                                                            UICUTV-                 SLOT 2OFIR                                   R

- I I C . ET CIPN SELCAOL RT IWAOS RPOMFI L ITTIMR

                                                                             ,P XS OR ELCMU
                                                                                      .OG       OER              EL AD TASMNP               ,O CETA                 U D

E PR ,NGIOUOP,OUISTEDBO IS AHE UHSGEH  : SO E3OEMNQC DTAHI DN RES TSLDO IAF S C P H8 RI E TE THRNAETCOT S PEFEHBFO M O TS T9D LDRSAVER TOU HNIDN DMT RT ET E R ON 1EE I NHOROO I NTOT E 1NAASU S L P - RGI CCGM 1AXNNDOAEE B B ,DHNDEOTRUFT DA ) - AT NG R (1E ETO HI PL IETTSPI8YL ISEERIR 93CNTE AEAA6RAAKEZSPDT XIISHCT F1AVERVIO AS

                                                                                . PN D ANU                         . EIAETVHR 60 MIC NTU 2GACOYA N NTIRRCDI L

O R P D N A 5.R E SNTIAE IN ROROLRDSEN ORINNPA EA T S 0E EOEIFTBFRTRAHEO N N 5 I .IRI IFHOH .RASF TCOCC E A - 8 9 1 Y ID LR AU 5BEBPCWIS OONP MR I REEOHL ,O1LSDCAEREUE LR D L OOPDEMTITFM SHRH-A L CoLTT OTR . EBNHE T A N O L P R R FCHTG 3M1AE LAHAHREO ItOA P ( - L U A M EF TF CE DSDOH9N6SPO HLF .YL UE8 . TOY N F R T TOSF F IF FHY.CICLHEL TTA DE M O S -. J M AO o TEHT1O M EEREGOP AE COE EE .L M C M UM P E HSFRNOHY E d S E tDINT NMI ) ,INDAEDFTHOIEN TONXSAANTLTEOR PSTEAAORCR D T o EM OAIM B1AIAEUMSO CKIAO . ST RS ITID N I i T VA T LR .(3TT CPOE TETS N I DTNH S A r N IC 1 EN9 SA0GYNN HTPSAH R LE .UNEAOHO M Y e E T ) Y R C2NCEOER SRZ KE AMEQOLNC T) E S T P M CE3 RYOEA NTN5.ERI INEIH SNOIDNT CEREILI ARIDR0BAFRWEBTTENITRNAE IRURTOMSAS M 4 T I M E . I L E AG T E _ t C 0A0 RAT D5MEIFOG A HO AOATM NIS ARASRS1 HUO3ITTEGE0 R S N C I r R IK0 TUIEH ELCCLREIOTSSRH I E Y O A o p OAA8 F DC5 NNSRTRCCE LEVDT RIETPHS CQP3.DNNCOC5 OAOEIFEUP0OMAANNEHPUHRO EEX AOOCRC8 H S N F e N RP( CJPHHCDNS1FEHRIOPTOARSD TRE6RCCAPA( T O R E .  ; ' ;' l ;ii}3 ' l) 1' .)' . ' i i  ;

                                                =                      =   8 E                      =   1
                                                =                      =   2
                                                =                      =    -

E = 2 MMM = = M M = = E M M = = G M M = = A M M = = P M M = = M M E = M M = = M M = = M M E = M M = _ = M M 3 _ = M M = _ = M M = = M M = = M1M = = M M = = MEM E = MEM = . = MNM = - = MOM E = MCM = = MOM = = M M = = M M = = M M = = M M = = M M R = M M E = M M = = M M E = M M = = M M = = M M E = M M = = e MMM E =

                                                =                     =

E = E =

                                                =                     =
                                                =            _        =

E = =

 -                                              =            _        =
      )                                     E =              _        =

D E _ = E S E = _ U = = N N = = I = = T E = =

.      N                                        E                     =

O C = = C E = ( - I E =

                                                =                     =

L E - =

        -                                       =                     =

E =

 -                                              =                     =

- S M = =

                                                =                     =

U 0 E =

                                                =                     =

T R = =

                                                =                     =

A F B =

 ._                                             E                     =

T = = E = S S = = =

                                     +          =          =          =

T = = 5 = = 8 R E = 9 = _ = N 1 O = =

                                                                      =

- O , P = E

                                                                      =
-                                    8          =                     =

I E E = Y = = T L R = = U = = C J = =

                                                = T                   =

E - = C = E E _ = P 1 E J _ = 1

                                         +      =      B   .          =

S = U = N E 7 N 1

                                                = S
                                                =
                                                                      =
                                                                      =

U - E = I J 5 = = 8 = = . / = FT = -  : 9 = OR = E 6 = O = T 2 E EP = A - = TE = D 0 E AR = 5 E D _ = N = = O = = I  : E = 5 T O = . = 8 C N = F = 9- E = OT = 1  : P T = N = S . S R = EE = L M N N O = TV = U E O I P = AE = J T  : I E = D - = I S T E R E _ = _ d U A T E = _ o L T R I N E = _ i S A A E S O E = _ _ r M I T P I E = e E R S O E T = R ._ E . = P T E I C E B _ E = _ I . G . T R E = M N = t E A E N E T P = U O = r R N N N A W S S = N N = o p E O A O L O A N = = H N M N P P L I = = e T _ R O _

                                ;i Ii,                        t

9 THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-217

1. Docket 50-270 0PERATING STATUS wwwwwuvuununuwwwwwwwwwwwuuuuuuuuuuum M OCONEE 2 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs: 744.0 muwwwwwununummuwxxummuMuumMMMuwuMunx
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY PONER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2568 OCONEZ 2
5. Nameplate Rating (Gross MHe): 1038 X 0.9 = 934
6. Design Electrical Rating (Net MHe): 887
7. Maximum Dependable Capacity (Gross MHe): 899 1800
8. Maximum Dependable Capacity (Net MWe): 860 [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 95,496.0
                                                                                     ~      ~         ~        ~
                                                                                                                                                        ~
13. Hours Reactor Critical 553.6 3,107.0 69,204.8 h
14. Rx Reserve Shtdwn Hrs .0 .0 .0 519.2 3.032.2 67,976.7 -80
15. Hrs Generator On-Line f
10. Unit Reserve Shtdwn Hrs .0 _
                                                     .0             .0
17. Gross Therm Ener (MHH) 1,249,897 f ,531,319 161,299,623 -so
18. Gross Elec Ener (MHH) 427,660 2,226,716 54,954,632
19. Het Elec Ener (MHH) 404,871 2,101,943 52,211.476 ,
20. Unit Service Factor 69.8 59.6 71.2
21. Unit Avail Factor 69.8 59.6 71.2
                                                                                                                                                        -20
22. Unit Cap Factor (MDC Net) 63.3 48.3 63.4w
33. Unit Cap Factor (DER Net) 61.4 46.6 61.7M J
24. Unit Forced Outage Rate 30.2 10.9 14.4 0 . . ..

O c S c s D s o

25. Forced Dutage Hours 224.8 369.8 10,625.9 ONYS
20. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                    .AA.Y 1985 NONE
37. If Currently Shutdown Estimated Startup Dates N/A M Item calculated with a Heighted Average PAGE 2-220

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0HNS / REDUCTION $ M OCONEE 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Data TvoE HouFs Reason LER Number $vstem Component Cause & Corrective ActiQn_in Prevent Recurrence 5B 07/01/85 F 220.6 A 1 CB PUMPXX REACTOR COOLANT PUMP SEAL FAILURE. 20-P 07/10/85 F 0.0 A 5 CH PUMPXX LOSS OF COOLANT FLOW TO THE (25) FEEDHATER PUMP BEARINGS. 6 07/11/85 F 4.2 A 5 IA INSTRU SPURIOUS SIGNAL DURING CONTROL SYSTEM TEST CAUSED POWER LOAD IMBALANCE. 21-P 07/12/85 F 0.0 A 5 CB HEATEX LIMITED DUE TO STEAM GENERATOR HIGH LEVEL. uM:MMMMMMMM OCONEE 2 INCURRED 2 SHUTDOWNS AND 2 PONER REDUCTItNS IN JULY AS NOTED ABOVE. M

SUMMARY

M EMMMMMMMMMM Tvon Rea son __ Met ho d System & Comoonent F-Forced A-Equip Fallure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation c/ D-Regula to rv Restriction 4-Continued Data Entry Sheet E-Operator eraining 5-Reduced Load Licensee Event Report

                                   & Lice..se Examination       9-Other               (LER) File (NUREG-0161)

PAGE 2-221

l I 6 i I ECUMMNNNMMMNNNNMMMMMMMNNMNNNMMMMMMMM < M DCONEE 2 M 6 c=cumuuuuuuuuuuuuuuummununummm1mumMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTIDN UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA L ICENSEE . . . . . . . . . . . . . . . . . DUK E P ONER COUNTY.................. 0CONEE CORPORATE ADDRESS. . . . . . . 422 SOUTH CHURCH STREET

  • CHARLOTTE, NORTH CAROLINA 28242

, DIST AND DIRECTION FROM l NEAREST PDPULATION CTR.. 30 MI N OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE 8 BECHTEL TYPE OF REACTOR............fMR HUC STEAM SYS SUPPLIER... BABCOCK & NILC0X 2 DATE INITIAL CRITICALITY... NOVEMBER 11, 1973 CONSTRUCTOR.............. DUKE PONER DATE ELEC ENER 1ST GENER... DECEMBER 5, 1973 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 9, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD. . .ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING NATER.... LAKE KEONEE IE RESIDENT INSPECTOR......J. 3RYANT ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....H. NICCLARAS COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER........... 50-270 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-47, OCTOBER 6, 1973 PUBLIC DOCUMENT RODM...... 0CONEE COUNTY LIBRARY 1 501 H. SOUTH BROAD ST. HALHALLA, SOUTH CAROLINA 29691 INSPECTION STATUS IN3r>ECTION SUP91ARY

   + INSPECTION MAY 13 - JUNE 10 (85-12): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 78 RESIDENT INSPECTOR HOURS ONSITE IN THE
  • AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE. INSPECTOR FOLLONUP ITEMS, AND FOLLONUP OF EVENTS. OF THE.FIVE AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS NERE IDENTIFIED.

INSPECTION JUNE 17-20 (85-15): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 56 INSPECTOR-HOURS ONSITE IN THE AREA 0F EMERGENCY PREPAREDNESS EXERCISE. NO VIOLATIONS OR DEVIATIONS NERE IDENTIFIED. INSPECTION JUNE 18-23 (85-16): THIS ROUTINE, ANNOUNCED INSPECTIOJ INVOLVED 19.5 INSPECTOR-HOURS ONSITE IN THE AREAS OF STEAM GENERATOR CLEANTNG. NO VIOLATIONS OR DEVIATIONS NERE IDENTIFIED. INSPECTION JUNE 11 - JULY 8 (85-17): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 73 RESIDENT INSPECTOR HOURS ONSITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE, AND STATION DRILLS. OF THE FOUR AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS NERE IDENTIFIED. ENFORCEMENT Suf91ARY M3NE PAGE 2-222

                                                          =                 = 3 A
                                                         =                  = 2
                                                          =                 3 2
                                                          =                 E  -
                                                          =                 E 2 MMM                                                  =                 =

M M = E E M M = = G M M E = A M M E P M M _ E M M . _ E M M 3 = M M 3 2 M M 3 M M = 2 M M = = M M = = M M = E M M = E M2M = = M M = 3 MEM = 2 MEM = =

 -   MNM                                                 =                  =

MOM = E MCM = E MOM E E M M E M M  : E M M  : 2 M M  : = M M  : 2 M M  : = M M  : E M M  : 3 M M  : 3 M M = 3 M M = 3 M M = 3 MMM = 3

                                                         =                 3
                                                         =                 3
                                                         =                 3
                                                         =        _        E
                                                         =        _        E E            _        3 E                 3
        )                                            E =                   3 D                                                                  3 E                                            S :                   s U                                                :                 s N                                            N :                   3 I                                                :                 s T                                            E s                   :

N E s O C : E C E = ( I = 3

                                                         =                 :

L = 3

         -                                               =                 3
                                                         =                 3
                                                         =                 5 S                                            M                     :
3 U 0 = E
 -                                                       =                 s T                                            R =                   3 E                 3 A                                            F s                   3
                                                         =                 E T                                                 E                 E s                 E S                                            S s                   E
                                              +          E                 =

T s R 5 = E 8 R = E 9 = R N 1 O = =

                                                         =                 E O                                       ,    P =                   E 8          =                 3 I                                             E =                   d Y          =                 E T                                      L      R =                   E U          E                 E C                                      J          E                 E
                                                         =   T             =

E - = C E

                                                         =   E             3 P                :                     1          =   J             =
                        )                     1   +      =   B             E S                S                                =   U             E E                     E 7        E   S             E N                R                     N   1      s                 E U                     U    -     =                 E I                D                     J 5        =                 =
E 8 = E S C / = FT =

M O  : 0 = OR E E R E 7 = O 3 L P T 2 = EP 3 B A - = TE 3 O D D 0 = AR 3 R N 5 = D E P A N = = m O = E T S I  : = = 5 N N T O = E 8 E A C N = F E 9 N L E = OT = 1 O P P T = N E P ( S . S R = EE E L M M N N O = TV E U O S E O I P = AE s J C M T  : I E s D = E I S T E R  : 3 d D T U A T  : E , o N I L A T R I N  : s E - i S A A E S O E r M Y I T P I s R E e E S T R S O E T s E . s P T M I E I C  : B E E E . L . G . T R E  : M N = t I_ T E I E A E N E T P  : U O E r R S N C N N N A N S S  : N N 3 - o p E Y O A O A O L D A N  : 3 s - M S N F N M N P P L I - e T -

  • R Q
1. Docket 50-287 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M OCONEE 3 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

J. A. REAVIS (704) 373-7567 AVERAGE DAILY P0HER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 2568 OCOPEE 3
5. Nameplate Rating (Gross MHe): 1038 X 0.9 = 934
6. Design Electrical Rating (Net MHe): 887
7. Maximum Dopendable Capacity (Gross MHe): 899 1888
8. Maximum Dependable Capacity (Het MHe): 860 I

[

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

                                      ,10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE MONTH YEAR CUMULATIVE
12. Report Period Hrs 744.0 5,087.0 93,145.0
                                                                                                                                                            ~~~~
13. Hours Reactor Critical 735.2 4,824.7 68,055.3

[r

14. Rx Reserve Shtdwn Hrs .A .0 .0 66,864.7 -so
15. Hrs Generator On-Line 720.6 4,805.9 l
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MHH) 1,542,032 11,873,008 16.L f70,048 ,,,, -so
18. Gross Elec Ener (MHH) 525,230 4,077.710 56,502,644
19. Het Elec Ener (MWM) 500,405 3,900,705 53.822,078
30. Unit Service Factor 96.9 94.5 71.8
31. Unit Avail Factor 96.9 94.5 71.8
                                                                                                                                                                    -20
22. Unit Cap Factor (MDC Net) 78.2 89.2 67.0M
23. Unit Cap Factor (DER Net) 75.8 86.4 65.2M
24. Unit Forced Dutage Rate 3.1 5.5 13.7 0,- g }., .

3 ,- g .g g 0

25. Forced Outage Hours 23.4 281.1 10,828.3 DHYS
36. Shutdowns Sched Dver Next 6 Months (Type,Date, Duration):

JULY 1ess REFUELING - AUGUST 8, 1985 - 8 HEEKS

27. If Currently Shutriown Estimated Startup Date s N/A N Item calculated with a Helohted Average PAGE 2-224

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS X DCONEE 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date 1535 Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 17-P 07/02/85 F 0.0 A 5 CB PUMPXX LOH OIL LEVEL IN THE (382) REACTOR COOLANT PUMP MOTOR. 2 07/02/85 F' 8.3 A 1 CB PUMPXX LON DIL LEVEL IN THE (3B2) REACTOR COOLANT PUMP MOTOR. 18-P 07/14/85 F 0.0 A 5 CB PUMPXX LOH OIL LEVEL IN THE (382) REACTOR COOLANT PUMP MOTOR. 3 07/23/85- F 15.1 A 3 CH INSTRU LOSS OF FEEDHATER FLON INDICATION. 19-P 07/23/85 F 0.0 A 5 CH VALVEX PERFORM REPAIRS ON (3B2) HEATER LEVEL CONTROL VALVE. 20-P 07/24/85 F 0.0 A 5 CB PUMPXX LOW OIL LEVEL IN THE (382) REACTOR COOLANT PUMP MOTOR. MuuMMMMMMMM OCONEE 3 EXPERIENCED 2 SHUTDOHNS AND 4 POWER REDUCTIONS IN JULY AS DISCUSSED ABOVE. M

SUMMARY

M ME%MMMMMMMM Tvon Rea son Met ho d Svstem 8 Commonent F-Ferced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refuelino H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

              & License Examination         9-Other         (LER) File (NUREG-0161)

PAGE 2-225

DOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM R OCONEE 3 M DMDMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STAT E. . . . . . . . . . . . . . . . . . . . SOUTH CAROL I NA LICENSEE................. DUKE POWER COUNTY.................. 0CONEE CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 30 MI H OF CONTRACTOR GREENVILLE, SC ARCHITECT / ENGINEER....... DUKE & BECHTEL TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...BABC0CK 8 HILCOX DATE INITIAL CRITICALITY... SEPTEMBER 5, 1974 CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER IST GENER... SEPTEMBER 18, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 16, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... LAKE KE0 HEE IE RESIDENT INSPECTOR......J. BRYANT

       ' ELECTRIC RELIABILITY                                                            LICENSING PROJ MANAGER.....H. NICOLARAS COUNCIL.................. SOUTHEASTERN ELECTRIC                                  DOCKET NUMBER........... 50-287 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-55, JULY 19, 1974 PUBLIC DOCUMENT R00M...... 0CONEE COUNTY LIBRARY 501 H. SOUTH BROAD ST.

HALHALLA, SOUTH CAROLINA 29691 INSPECTION STATUS INSPECTION

SUMMARY

        + INSPECTION MAY 13 - JUNE 10 (85-12): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 78 RESIDENT INSPECTOR HOURS ONSITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE. INSPECTOR FOLLOHUP ITEMS, AND FOLLOHUP OF EVENTS. OF THE FIVE AREAS INSPECTED, H0 ITEMS OF NDHCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

INSPECTION JUNE 17-20 (85-15): THIS ROUTINE, ANNOUNCED INSPECTION ENTAILED 56 INSPECTOR-HOURS ONSITE IN THE AREA 0F EMERGENCY PREPAREDNESS EXERCISE. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 18-23 (85-16): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 20 INSPECTOR-H0'JRS ONSITE IN THE AREAS OF STEAM GENERATOR CLEANING. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION JUNE 11 - JULY 8 (85-17): THIS ROUTINE, UNANNOUNCED INSPECTION ENTAILED 73 RESIDENT INSPECTOR HOURS ONSITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE, AND STATION DRILLS. OF THE FOUR AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE PAGE 2-226

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M OCONEE 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE. FACILITY ITEMS (PLA:S AND PROCEDURES): NONE. MANAGERIAL ITEMS: NONE. PLANT STATUS: POWER OPERATION. LAST IE SITE INSPECTION DATE: JUNE 11 - JULY 8, 1985 + INSPECTION REPORT ND: 50-287/85-17 + REPORTS F R.0 M LICENSEE

 ======3==3=3333==============3==S=333==========3===E===========================333=====3=====E===========3=========3==============

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ _____ -_-_ _ _ _ _ - _ _ __- =___ _ NONE.

 ==================================================================================================================================

PAGE 2-227

1. Dock et 50-219 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M OYSTER CREEK 1 M
2. Reporting Period: 07/01/85 Outage + On-line Hrs 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

JOSEPH R. MOLNAR (609) 971-4699 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1930 OYSTER CREIK 1
5. Nameplate Rating (Gross MWe): 722 X .9 = 650
6. Design Electrical Ratino (Net MHe): 650
7. Maximum Dependable Capacity (Gross MWe): 650 1500
8. Maximum Dependable Capacity (Net MHe): 620 MI" M* EI" " "

W. OEPDC. ORP. - 830 (100X)

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Not MHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 136,799.0
13. Hours Reactor Critical 495.3 4,042.4 90,366.3 h
14. Rx Reserve Shtdwn Hrs .0 289.8 759.5
15. Hrs Generator On-Line 486.4 3,857.9 87,394.6 ISO ofE8 EE ENDIREED LSEER CPTIfut. 0581738 5
                                                  .0       572.4          57 5.1                                      -           --                    - 100 1G. Unit Reserve Shtdwn Hrs
17. Gross Therm Ener (MHH) 813,200 6,695.140 144,034,000 500- -so
18. Gross Elec Ener (MHH) 273,330 2,275,190 48,658,185
19. Het Elec Ener (MHH) 269,541 2,181,476 46,745,936 - eD
20. Unit Service Factor 65.4 75.8 63.9
21. Unit Avail Factor 65.4 87.t 64.3
22. Unit Cap Factor (MDC Net) 56.5 69.2 55.IM
23. Unit Cap Factor (DER Net) 53.9 66.0 52.6 W k o
24. Unit Forced Outage Rate 34.6 23.9 12.6 0 -

0 5 to 15 30 35 30

25. Forced Outage Hours 257.6 1,209.5 10,606.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

MAINTENANCE: 10/01/85 - 1 MONTH

27. If Currently Shutdown Estimated Startup Date: 08/08/85 M Item calculated with a Heighted Average PAGE 2-228

Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0HNS / REDUCTIONS M OYSTER CREEK 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tine Hours Neason Method LER Number svatem comonnent Cause & Corrective Action to Prevent Recurrence 38 07/08/85 F 36.4 A 3 REACTOR SCRAM ON LOW CONDENSER VACUUM DUE TO FAILURE OF 1-1 STEAM JET EJECTOR DRAIN TANK PUMP CASING. 39 07/22/85 F 221.2 D 1 ESH PIPE INSPECTION, CLEANING AND FLUSHING. 4 EMMMMMMMMMM OYSTER CREEK 1 OPERATED HITH 2 OUTAGES DURING JULY, AND SHUT DOHN ON THE 22ND FOR INSPECTION AND u

SUMMARY

M MAINTENANCE. MMMMMMMMMMM Tvon Reason Met ho d ly;; em & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refuelino H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Trainino 5-Reduced Load Licensee Event Report

                                  & License Examination                                  9-Other         (LER) File L NUREG-0161)

PAGE 2-229 1

MOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM D OYSTER CREEK 1 M , DacMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY ST AT E . . . . . . . . . . . . . . . . . . . . N EH J E RS EY LICENSEE.................GPU HUCLEAR CORPORATION COUNTY.................. 0CEAN CORPORATE ADDRESS....... 100 INTERPACE PARKHAY PARSIPPANY, NEW JERSEY 07054 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 9 MI S OF CONTRACTOR TOMS RIVER, NJ ARCHITECT / ENGINEER....... BURNS & ROE TYPE OF REACTOR............BNR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...MAY 3, 1969 CONSTRUCTOR.............. BURNS & ROE DATE ELEC ENER IST GENER... SEPTEMBER 23, 1969 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 1, 1969 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....BARNEGAT BAY IE RESIDENT INSPECTOR......H. BATEMAN ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....J. DON 0 HEN COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-219 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-16, AUGUST 1, 1969 PUBLIC DOCUMENT R00M...... 0CEAN COUNTY LIBRARY 101 NASHINGTON STREET TOMS RIVER, NEM JERSEY 08753 INSPECTION STATUS IN3PECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. PAGE 2-230

_ _ _ _ _ _ _ _ _ _ - - _ _ . . -- _. . . - . . , . .. _ . - _ _ . - - _ _ _ ._ - , _ . .. - . . . , . . . _ .- - - ~ _- _ Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION STATUS - (CONTINUED) M OYSTER CREEK 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS: NO INPUT PROVIDED.

   .                                  PLANT STATUS:

1 NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE q

                                      ===z=z= ==m=ss==z3=mazzzazzs = =zzazzz zz ====a zza zzzzz=sas azzazz saz=zzzazz azzzs=s s=zzaz==zzs====szz3===sz==3 mas sa zamazzas s==sz z= szzz==

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED. 33m=3:33333 sz==z==E===z33 333zz==z==3:3=3===z==333=3=3=33333333s=3E==z:=E==333S==z===z33Es======E=3===E==3=====33==3==3===3===3== i 1 PAGE 2-231 i e

1. Docket: 50-255 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M PALISADES M
2. Reporting Period: 07/01/85 Outage + Cn-line Hrst 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

P. A. SMITH (616) 764-8913 AVERAGE DAILY P0HER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2530 PALISADES
5. Nameplate Rating (Gross MWe): 955 X 0.85 = 812
6. Desion Electrical Rating (Net MWe): 805 I"
7. Maximum Dependable Capacity (Gross MWe): 675
8. Maximum Dependable Capacity (Net MHe): 635 _,_, [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 119,366.0
                                                                                          "        """"I"
13. Hours Reactor Critical 744.0 5.087.0 65.897.2 h
14. Rx Reserve Shtdwn Hrs
                                         .0         .0           .0                           _
15. Hrs Generator On-Line 744.0 5.061.7 62.676.5
                                                                                                          ~~~~~~~         ~
16. Unit Reserve Shtdwn Hrs .0 .0 .0 g
17. Gross Therm Ener (MWH) 1.823.376 12.203.928 130.286.880 son- -so
18. Gross Elec Ener (MHH) 572.260 3.897.220 40.515.010
                                                                                                                          - so
19. Net Elec Ener (MHH) 542.394 3.696.468 38.136.031
20. Unit Service Factor 100.0 99.5 52.5
                                                                                                                          - 40
21. Unit Avail Factor 100.0 99.5 52.5
22. Unit Cap Factor (MDC Net) 114.8 114.4 50.3 _m
23. Unit Cap Factor (DER Net) 90.6 90.3 39.7 8

a' 's' 's

                                                                                        ~
24. Unit Forced Outage Rate .0 .5 31.6 s io' t's ' 'is' 25.5 14.924.3 DAYS
25. Forced Outage Hours .0
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 REFUELING. DECEMBER 1. 1985.

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-232
     ?                         i 3

3 2 MMM 2 M M E M- M e - G M M c A a M M n P M M e M M r P M M r M M M u U M M c P M M e E M M R TC M M NN

.      M    M    t    AA M    M     n   LN MSM        e   OE MEM        v   OT MDM        e   CN MAM        r      I MSM      P     YA
.      MIM            RM MLM        o   A MAM      t     MS MPM            IU M    M     n   RD M    M     o   PE M    M   i        N M    M   t     OA M    M     c   TL M    M   A        L M    M         LE M    M     e   IC O    M     v   OS M    M   i        I C    M   t     DM MMM        c   D e   AM r      R r   OO S       o   TF C        R
   -      N           NE a     OP O           I e   TO                   .

I s CT . E u U S V T a DDE O ) C ENI B 1 C RAT A t6 I r1 U RDV D o0 E0I E t p-D W5T S n eG OC S e r tRE E PPA U n o e R R t C o ffetU S o H ohnN n I m s Se( e D o &nn v

          /      n                             C        o o yE e o                      S          Fiir            l o                       A      &       tttei S      m                                 t c a n eF o                      Y       m  i u rE s N    C                        L       e  bra           n)

U t it p a eR W e m J s hsetcE y xnraiL 0 t N S EIPDL( s I D v

              $                         N                       d T                                           .m O               a       a U     r                       I T

rm o cadL e C Sre H b U cud m D llSne S u E aa icr N R d uuotue R o nntndh T E R h aauoet L E t MMACRO I N e - O M 123459

 -       N     d                       P o                       i               r U     h 5                                     o t                       D               r e                      E               r M                       C              E n                      N            n rn n

- o E ireo o s 8 I mehi i R d pt t t a E AOOc a e P ign R X FGH r ni s E tim 0 sna r S et eix u 0 E rs RaE o D ue r 5 N A lT yT e 8 S gr s 9 e I i arnorn 1 E S L F oit o e v A l at c L T P pt el ai U n inuurL J 5 o uif g e 8 s q a e e p& d e / a EMRRO . o t 8 e - - - i a 2 MMM R ABCDE r D / M M e 6 MYM P 0 MRM d MAM ed t r MMM ce MMM rh o p MUM m oc o MSM o FS . e N M M v - R 4 MMM T FS i l I, i a

HMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u PALISADES M ExMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION -UTILITY ST AT E. . . . . . . . . . . . . . . . . . . . MICHIGAN LICENSEE................. CONSUMERS P0HER COUNTY...................VANBUREN CORPORATE ADDRESS....... 212 HEST MICHIGAN AVENUE JACKSON, MICHIGAN 49201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF CONTRACTOR SOUTH HAVEN, MI ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...MAY 24, 1971 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 31, 1971 TURBINE SUPPLIER.. ......HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 31, 1971 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING 10HERS IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......E. SHANSON ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. HAMBACH COUNCIL.................. EAST CENTRAL AREA DOCKET NUMBER........... 50-255 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-23, OCTOBER 16, 1972 PUBLIC DOCUMENT R00M....... VAN ZOEREN LIBRARY HOPE COLLEGE HOLLAND, MICHIGAN 49425 49007 INSPECTION STATUS INSPECTION

SUMMARY

NONE l ENFORCEMENT

SUMMARY

NONE i OThER ITEMS SYSTEMS AND COMPONENT PROBLEMS: CONTINUED INVESTIGATION AND REPAIR OF PRIMARY COOLANT PUMP P-50C: IMPELLER SEPARATION DUE TO FATIGUE FAILURE OF THE BOLTS, CAUSE BELIEVED TO BE PUMP-UNIQUE, ASSEMBLE ERROR AND INADEQUATE TORQUE. A FINAL INVESTIGATION REPORT WILL BE DOCKETED BY THE LICENSEE. FACILrFY ITEMS (PLANS AND PROCEDURES): PAGE 2-234

                                             =              = 5
                                             =              = 3 E              = 2
                                             =              =  -

E = 2 MMM E = M M = = E M M = E G M M = = A M M E = P M M E = M M = = M M = = M M E = M M E = M M E = M M E = M M = = M M = = M M = = MSM = E MEM E = MDM E = MAM = = MSM = = MIh E =

-  MLM MAM F
                                            =
                                                           =
                                                           =

MPM = = M M E = M M E = M M E = M M E = M M = _ = M M = _

                                                           =

M M = = M M E = M M = = M M = = M M = = MMM = =

                                            =              =

E =

                                            =              =

E = E = E = =

                                            =              =
       )                                E =                =

D E = E S E = U R = N N = = I E = T E E = N E = O C = = C = = ( I E = E = L E =

        -                                   E              =

E =

                                            =              =

S M = =

                                            =              =

U 0 = =

                                            =              =

T R E E

                                            =              =

A F = =

                                            =         S =

T E T = R N = S S = E =

                                            =         N =

T = O =

                                            =         P    E R =           M =
                                            =         O =

N 5 0 = C = 8 E E O 9 P = F = 1 = S = I E = E =

                                    ,       =              E T                           0     R =           E    E 3         =         L    =

C = B =

                                   -        = T       A =

E = C R = 7 E E E = P = J P = T = B O =

     $                            S         3   U     N =

U 3 S I = N G = = U E = I A = = E 5 = E FT 8 =

= OR / =

E 0 E O 2 = T 2 E EP 2 = Y A 0 E TE / = L D 5 E AR 7 = L 8 = D 0 = A N E = MO = = R I  : E E 5 O T O = 5 = 8 N C N = F 8 = 9 E = OT / = 1  : G P T = N 1 = S N S R E EE 2 = L M I N O E TV / = U E T I P E AE 6 = J T  : A E 3 D 0 = I S R E R E = d U E T E = o L T P I N E = i S A A O S O = = r M I T I E R = e E R S S E T = E 7 = P t T I E A E G T E N T T P I I C E

                                            =

E

                                            = U B

M 0

                                                       - =

5 =

                                                           =

r R M N N A I S S = N 8 = o p E O A O L N A N E E H N M N P U L I = = e T R O

                                                                 ,l

6 3 2 2 E G A P h 0 0 0 0 , 0 1 8 8 2 MMM T ) o M M O  % I M M L 0 M M P 0 M M 1 M M ) ( M M e s M M H 00 i M M M 77 M M ( 22 1 1 M M M M L M M E 1 - - o M1M V d E M MEM M L E D MP I M 5 8 MDM S 9 MRM R R MEM MVM H V E E MC . '5R 1 Y 1 Y M M 0 . O - D L MOM P O U MLM L D P J MAM MPM Y L 8 P MED - g M M I 2 M M M M M M A D M. I D E M M M M G MCW f M M A . M M R . M M E - M M V - MMM A - g 0 0 0 5 1 oy 3y 0 E6 6 0 5 0 7 0 1 1 5 V . 0 0 6 8 S 4 I6 1 0 6 2, 6, 6  : / 4  : T2 2 6 6 ) 7 U 7 s A2 8 6 7 5 6 5 n 2 n L 1 9 2 o / T o U1 8 1 1 i 8

0 0 4 0 0 0 s M t 0 A s 0 0 0 7 7 7 a  : U a r 3 8 3 2 2 2 e ) C r T H 5 3 1 1 1 1 R e L u
               -                                          H                                                                          A N                        D, S e 2                                               e    M                  6      6     0    5       0   7      0   1          N   I      O             1 n    3                                     v                                             .

0 0 6 I C I e  : i 9 i t R6 1 0 6 2, 6 R T 6 t e l G e A2 2 6 T E A 6 a t G - ) N E2 8 6 7 5 6 O M R 5 a n 2 , ( Y.1 1 9 2 N M E D. D N O 0  : t y 8 1 1 O P e 6 ) r C O p p I + ( e : o n y u H ) p A T t T e N M e e ( r g O  : H R f 0 0 0 5 0 6 0 9 5 a A a S ) s M I . 8 0 6 s t t D e s t  : H4 7 7 7, 0, 8, 6 h S R u R W o t s . y T4 9 8 5 t O A M r e a d n N7 3 2 8 5 5 4 n d E H G N L e A O 8 3 9 o e C  : : t ( ( t M 4 1 M t P I ) ) e e c f a 5 R t e N y y c i I 6 m 0 8 H H ( t t n r i

        /        .

MM i i i t , ) ) t t 1 P ( g c c S s s t t x s 0 s n a p ap e e n s e e e e E

        /     Y      r s i                                R       o                 l                   r  )                         N N          t             N 7      R      e o t           a     a v                   i                    a s e H H                   )                                 a                    n 0     A M

w r a C C o h c c t c r n H H C R R r w o G R b i H i n M H ) r D E s e o P ( e e A i i t L w ( M H o M D e rg vu d

l l l h r s i n - d ( H t r ( ( O t d s l a

g a b b r n c a a u W ts r r w n t r M c o a o u 8 o t M C d O h e r ( a t r r t H d h 2 i c m i i d d c o e t S n e F c o o u e S 5 r a r t r n n c T R o r h r E n r a t t O e h

  -      e t         e  a     t      e e O                                     o o S            o     e           E     e e F          c c                  g c          y 0

5 P n h R c p p o T e e e s l e o r l t r c e a r t r c E i v m n c l a a d a S F F e t l t g C e l D D e v f e a v r e e e l c r av p pi r O c u s n n d t E g e P e r e s h n e

i y e a m m n L s R e n e T E e e v a a o w r t t t s l n u u a n t s e R l S A C C F d o r e r i n p g m m h o l r o r s e G s s E s s e d u k e e i i i C e s E o r R t t t t t t c t E C c p i c m s x x w a N p u s i o o t i i i i i r u N o e t i a e a a f o e O e o x r n r r e n n n n n o h O f D R U L N D M M I P R N R H R H U G G N U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 3 1 4 51 6 17 8 1 9 01 1 2 3 4 5 6 7 1 1 1 1 1 2 2 2 2 2 2 2 2

7 _ 3 2 _ 2 uMM n M E u M e G G s M c L G N A u M n O NR . I P n M e R IO D K u M r . H T RF R C u M r RP G N U N A A

   = M        u    OO        I      O         DDI         O P
   = M        c    FR        H      C            EH       B s M        e       D                      TMT                D n M      R      D         A       1       IRI           Y E

. n M EE MOW R C u1M t SR S C IF O A n M n UU A I LRN M L

   =EM        e       S             L            EE       E P nDM        v    SS        H. U        CPH          M E uRM        e    PE        ET A            EET                R              .

uEM r MR RM R PR D D nVM P UP E D S S E N n M P HE Y EA C . 2 uOM o H TH H HRW A G 2 sLM t HG T 0 CU L N uAM FI N R EDE P I Y nPM n H . WN T TET E K L u M o N D OO C CA R C U c M i OAE D E ROR A J u M t L LS L ERK P n M c SGL 0G *E VPA . N u M A RNA 0N O E C P O x M EIT CI D .L A M x M e NSS R E E E U E x M v IUN FA D TES C P R n M i AAI OE L ARL U u M t RC B E RUA N G L nMM c T E E H KDV O N I e SDR TL E AER I A r EE AA R ECE D G F r NKH RR LOT R R S o OC E . RN . A A . T C IOS EV G SPIS O HP N N TLR VE N C T B CM E

           &      CBE IS            I       RFEI                    U       M

_ O U N S K OMM Y MP P

-            e    SEI SN A                  D      II    R O                I I      s       RA EO E                EETL O RG                       U u    HER C             L       IC           M FN               Q T      a    SHT XN                    FNTC E                  I       E                         )

C E S EO S IANE M SG 1

-     C           MP           I    A       TMEP               AR           R                      t6
-                    UR OT          H.      NRRS Y NA                       O                       r1 U           LTE TA                 E EOE           T          H       F                       o0 LRP          R DV DFFH                 L     KC                  t                p-D           AAO EB            LL      IRFC U A                        N       n               eG MTR       UI      EA      NEIE A EN                       H       e       r tRE E           SSP DV NV UPDT F LO                                       O       n       o e R D       o    ffetU R    t                                                                T       o H ohnN n                                                              U       m       s S e(

e X M H a 8nn v

      /      n                              X            P                  S      C        o o yE e o

p P C Fiir l M T D & tttei S m U N N tcaneF o P I A m i u rE s N D e bra n)

                                                                              ,    t  it p a eR W   ne      G                         F            D Y       s y

hsetcE L xnraiL 0 t B C B U S EIPDL(

          's      H                         P            I                  J D      v 5                                                                 N               m      d T                                                                      I               a      a U      r                                                               S rm cadL o

- e N Sre

-    H     b     0                          0            0                  H                 cud m    0                          0            0                  O         llSne S      u      -                          -            -                D          aa icr

. N 3 2 9 T d uuotue . 4 4 4 U o nntndh R 0 0 0 H h aauoet . T E - - - S t MMACRO L 5 5 5 e - I 8 8 8 6 M 123459 . N d D o E r U h 3 1 1 1 3 1 C o t N r . e E r M I E R n rn n n E ireo o o P mehi i s A 0 A A A A X d pt t t a E AOOc a e - - ign R 1 FGH r ni tim s 3 r 7 0 0 2 3 E D sna et eix u 1 5 3 2 4 0 R rs RaE H o 3 3 1 0 4 3 E ue r yT e 5 1 2 V lT 8 i gr s 9 n o F F F F F F O arnorn 1 L F oit o e v A latc L Y P ptelai U n inuurL J 5 5 5 5 5 5 o uif o e 8 8 8 8 8 8 s q a e e p& d e / / / / / / a EMRRO o t 1 4 8 1 7 2 e - - - i a 0 0 0 1 1 2 MMM R ABCDE r D / / / / / / M M e 7 7 7 7 7 7 MYM P 0 0 0 0 0 0 MRM d MAM ed t MMM ce r MMM rh o p MUM m oc o MSM o FS e N M M v - R 2 3 4 5 6 7 MMM T FS

                                                                      !t Ii              1;

S 8 N L 3 5 E O D 2 8 R R E - 9 C DLT Z 2 1 S EAN I GR SNO FL E L NU SOC OI G U IO UI T A J TH CTE ENU P A- SAHR HO d RR IRTO TIE o E0 DE F TR i P1 PN YAE r OC EOIN BGH e E R O I P EP EESI NTS HS HVTT OSR t TN ONA IEE r I MREM TVT o 6 4 F APMR CNP p 3 Y 0 O7 EMEO EIA e E 0 G RD0 4 TIVF P H R C 5 N AA5 N4 ON S ,C . I 8 I 5 NRO8 O NORI NS S V R 8 ABR ID OTP ITLR R A E 9 ZII TE I MF NAO E N E 1 TRLLA CV T ,IO EEUT S O N C IA LN EL CE TNNC Z I I , RRCEO PO EUDL IOAE C 6I G R 1 OBINZ SV PNEA SPMP 6R N MILOI NN SIDV NM I L 6A E T C N E LBDR II NTEE OO N .S B U 1 N E A M A N E UCA U MN INEI ONR ,C E.I P 2, X O L E R R J ISPM, NT AO LC T EDIC XI I E T ANXTZ EI A OE NE R A ON L T L L M I , FEISI TT IOTR ITSN H BE E S E A M C8 1 EMNAN C CT TAU 0 O T U T R I I2 4 TUEEE DE E Y, ULOT Z .H H B H E Z L5 - SCO O EP PDL) OEIN N I C M C N - F OH2H CS SELS RRRE O R O. P E O E E . 0 P SDP1P NN TAN AD I G AI ECPO AYVI T A. P. B. C. B. V. R. E. 5 N. M. H HEII T S A . . . . . . . . . . . . NE TPCT E E M . . . . . . . . . . . . EH XNA :F .R R . . . R . . . . . . . . T YEIC DA1 O . . . E . . . . . E . B RI ES10 F . . . I . . . . R . C .  : EPN T /H N . . . L . . E R E . N . D . SR U CO2T I . R P . . N L O G . A M EG NAEM ET1

                . S              E   P         . .      O    B T A             . U 0                    TN         . O TM           P 5Y R      . S              E   U         . R   I    I     C N         . S 0                    CIS TDAO                    SD2B O      . E            N   S         . E T         S E A . S R                              S   ETT TNLC                     NE T      . R              I             . I   A    N P         M . I                            PSN AAE                     IT        E C      . D              G S           . L   M    O S            R             T           U   SEA V             ,R D          A    .T A      . D              N Y           . P R      P N         JE E N                           NTT R                  N    SLOI R      .

A E S R P O S I OB T E T I L ENDA AENS A T . / 0 U F E RM A M RU SEN ER N N . E T M 1 S N R T PU D U A SES BKA , . R NO T O E T RC A C I N N C AWN OA SS ASO C E A OE E U E N E G & O T EOO T,SN DIS A S R TT T R N Y O D NT D RPC TEO )RTR 8 YN O CI S T I R I I IE E S A .CRNI 7OCU . D TE P AH S B O G S SK S C WC DROTT 1CUO D Y IC R RC C N R T E E NC N I )OR EEPRA ERH E T LI O TR U O U A R R EO E L 2LN IHEER 5RT- I I IL C NA N C T L CD C B 1 F RLE 8 SR F Y L T O U E E I I U DR IS AP /YNO I I U C G I I L L P N 5NU TNE O 8 TIT T T T E 8AO NOHR 2I C N U R O / F EITOR 5 LYE E I 8P DT TO ARP D I 2UY ICTAF 0UAS I L 5TB AUR 5QRN T R E OET OI E I 0AS RDHPR R C 5TR ENGOO .F P E OM8 C SU HAU O E6 H E O O P,PNHT4 A L .LH S .RSU E S I P OA NNHLS TICD N F C NIN OOTE RVRE O N S TO II VG OENV I M U TII TTDEN PR L T M O N RNT AAELI E FO A M T C OIC IRS R RGOV I M N S I P E VESEE (N N V M E E MG EGP EDUSE ITI E 5 M GM EN RNS DIC1N 5DU D - 5 8 M A T TI (IN SSdI 8UON Z 8 9 M H A ST RI RNING 9L O R FA 9 1 M E E YA 5U OOD N 1CEI O _ O 1 M S R SN 8D0 C NE NST _ A , , M T I 9 1 E EI ,IOC E MMM A P HX , o M D HD 1S2 CRR R 9 LE C M M N 0 I 5 t M E E RR ,E NIANO 2 ,C P N M M O C IN 2 M T G EO ID AE OT S S A M M Z I ME E M A A TO 5TN TC ERDN _ M M M M I R A R O R Y N 6H H A U M M E R R E SC E EV IA IHS.TA LT' P PCE UTA NONI I L P _ M M NIL MRIVR JC E M _ M M A. M. 3. P P. M. J. M. T. S. H. UTE OOTE E6H O M M . . . . . . . . . . JCM CFAED P0T C _ M M . . M . . . . . . . . AP N VRN S0 N M M M M

                . . OR
                .     . RT
                                         . Y R
                                         . T E E O R
                                                          . D        .         .
                                                                                                            -      0 OTR TS NNE             ,A   8N-2IA        .

O N M M . . FC . I N T H E . 2RR ES ., N M1M . . . L E A T T . 2OE N LT5O F M MEM M . . NN . A G R E A Y. . PP FMBG.O OEO IN8I O

                . . OO                   . C          E M H            T                                YP               G     EI RE T

_ MDM N . . II . I T P I . AUC SAE(T PDVC S MRM O . . TT . T S O G G L . MSR MNS A AIRE M MEM I . . CA . I 1 N N I . Y H EAETU S P E MVM T . . EL R R L I I B . R NL TMHNL NE .S T M M P . RU O C R A L L A . A OAE I TEA OR N I MOM I . . IP T E I O O I . M NN E MV OI MLM R . . DO C L N C O O L . M NOI OE NE NNN O MAM C . . P A A E R C C E . U OIN NS .O OO S N MPM S . . D E I E R . S IT NSRT IINI M M E . . NT R T C M R R L TAY EEIN TTOH M M D N . Y AS I E M E E CI N CRB : CIVE CCIT  : M M OE T E F N L O S S IC O EE SITNV EUT S M M Y IT N TR O I E C N N RN I EPE TLIEE PRAG T M M T TA U SA E E TU T SOT L V - STGN L M M I AT O IE E E E E D D CO C N I UHIMT NSEI U M M L CS C DN P T T T N N EC E IDS STTOS INLR S M M I O Y A A A O O L P NN EICOO OLU E M M C L T D D D C C E S +AO RHARP + CAD R M M A N MMM F I

NMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M PALO VERDE 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

                                   + INSPECTION nN JUNE 3-7,     1985 (REPORT NO.       50-528/85-20) REPORT BEING FREPAREDs TO BE REPORTED NEXT MONTH.
                                   + INSPECTION ON JUNE 3 - JULY 28, 1985 (REPORT NO.                  50-528/85-21) REPORT BEING PREPAREDs TO BE REPORTED NEXT MONTH.
                                   + INSPECTION ON JUNE 24 - JULY 31, 1985 (REPORT NO.                     50-528/85-22) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF STARTUP TESTING PROGRAM FOR RADIATION PROTECTION AND CHEMISTRY. THE INSPECTION INVOLVED 150 INSPECTOR-HOURS ONSITE BY FOUR NRC INSPECTORS. DURING THIS INSPECTION, VARIOUS 18E INSPECTION MODULES HERE PERFORMED.

RESULTS: OF THE 12 AREAS INSPECTED, ONE VIOLATION IN ONE AREA (TECHNICAL SPECIFICATION, SECTION 6.8 - FAILURE TO IMPLEMENT THE POST ACCIDENT SAMPLING PROGRAM) IS DESCRIBED IN THIS REPORT.

                                   + INSPECTION ON JUNE 30 - AUGUST 5,      1985 (REPORT NO.                   50-528/85-23) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
                                   + INSPECTION ON JULY 15-19, 1985 (REPORT NO.           50-528/85-24) REPORT BEING PREPARED; TO BE REPORTED HEXT MONTH.
                                   + INSPECTION ON JUNE 24 - JULY 24, 1985 (REPORT NO.                     50-528/85-25) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION BY A REGIONALLY BASED INSPECTOR OF LICENSEE ACTION ON LER/ DER INTERFACE, PONER ASCENSION TEST DATA AT 20 PERCENT P0HER PLATEAU, AND CONTROL ROOM ACTIVITIES. VARIOUS HRC INSPECTION PROCEDURES HERE COVERED. THE INSPECTION INVOLVED 35 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR.

RESULTS: NO ITEMS bF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. j + INSPECTION ON JULY 29 - SEPTEMBER 1, 1985 (REPORT NO. 50-528/85-26) REPORT BEING PREPARED; TO BE REPORTED AT A LATER DATE. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS , SYSTEMS AND COMPONENT PROBLEMS: MICROBIOLOGICAL INDUCED CORROSION ISSUE IN SPRAY POND IS BEING RESOLVED BY HRR. FACILITY ITEMS (PLANS AND PROCEDURES): NONE l MANAGERIAL ITEMS: NONE PLANT STATUS:

                                    + THE PLANT ACHIEVED INITIAL CRITICALITY ON MAY 25, 1985. THE PLANT ACHIEVED Sox PONER ON JULY 7,                                   1985. POWER ASCENSION TEST IS CURRENTLY ONGOING.

PAGE 2-239

    > t                                                             l-C 5                        0
.                                               5                        4 E                        2 E                         -

E 2 MMM E M M 3 E -. M M 3 G . M M E A M M E P M M E M M = M M E M M E M M E - M M E M M E M~ M E - M1M E M M = MEM = . MDM E MRM E MEM 3 MVM 3 M M 3 . MDM 3 MLM 3 MAM 3 - MPM 3 M M E M M 3 M M = M M = M M E M M E M M = M M 3 M M 3 M M - E MMM E E

                                                =
                                                =
                                                =
                                                =

E E E

          )                       E             =

D = E S = U = N N E

 -        I                                     =

T E E _ N = O C 3 C 3 ( I 3 3 L 3

            -                                   3 3

3 S M 3

 -                                              3 U                       O             =

3 T R 3 3 A F 3 3 T = 3 S S 3

                                                =

T 3 3 R 3 3 N O =

                                                =
.-        O                       P             =

3 I + E = 5 E T 8 R = ~ / =

 .        C                1                    =

0 T =

 ..       E                /        C           3 9        E           =

- P 0 J =

                            -       B           =

S 9 + U = 2 6 S = ._ N / 2 3 7 - = I 0 5 = 8 3

                               /    FT          =
8 OR =

E 2 O = T 5 EP E A - TE 3 D 0 AR .

                                        .       E 5    D           =

N = O = - I  : = 5 T O = 8 C N F = - 9 1 E P T OT N

                                                =
                                                =

. S R EE = L N O TV = U I P AE = J E D = E R 3 d T 3 o I N 3 i S S O 3 . r M I R 3 - e E E T E 3 P T I C B E = I E M N 3 t T P U O = r R S S N N E o p E A N 3 - N L I 3 - e T R O -< l!l1 '

                                                 , ! i i i1 T   1 i    2

mw= w THIS PAGE INTENTIONALLY LEFT BLANK l l PAGE 2-241 1

                                                              .-           - - - ~
1. Dockett 50-277 0PERATING STATUS ununuunuunununuunnumwwumwuuuuuunnunu M PEACH BOTTOM 2 M
2. Reporting Period 07/01/85 Outage + On-line Hrst 744.0 MMMunuuuuummuwmununummuwwwwwwwununmx
3. Utility

Contact:

H. M. Alden (215) 841-5022 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 3293 PEACH BOTTOM 2
5. Nameplate Rating (Gross MHe): 1280 X 0.9 = 1152
6. Design Electrical Rating (Net MWe): 1065
7. Maximun Dependable Capacity (Gross MHe): 1098 1500
8. Maximum Dependable Capacity (Net MWe): 1051 DESIGN ELEC. MTING - 1085
                                                                                           ..-.. MX . DEPDC. Ofr. - 1051 1100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NOME

10. Power Level To Which Restricted, If Any (Net MWe):
11. Reasons for Restrictions, If Anyt NONE
                                                                                          '---~~~-               -           --    - ----     -100 1000-MONTH        YEAR      CUMULATIVE
12. Report Period Hrs 744.0 5,087.0 97,079.0
13. Hours Reactor Critical 534.4 534.4 62,817.4 -so h
14. Rx Reserve Shtchn Hrs .0 .0 .0
15. Hrs Generator On-Line 324.1 324.t 60,880.7
                                                                                                                                              -80
10. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Thern Ener (MHH) 775.224 775.224 179,195.225
18. Gross Elec Ener (MHH) 212,150 212.150 58,930,810 N
                                                                                                                                              -to
19. Net Elec Ener (MHH) 194,021 145,780 56,408.118
20. Unit Service Factor 43.6 6.4 62.7
21. Unit Avail Factor 43.6 6.4 62.7 3n
22. Unit Cap Factor (MDC Net) 24.8 2.7 55.3
23. Unit Cap Factor (DER Net) 24.5 2.7 54.6
20. Unit Forced Outage Rate .0 .0 12.4 0 -
                                                                                                   ,      ,       ,     ,.       ,         ,   0 0         5      to      15    20       25        30
25. Forced Outage Hours .0 .0 8,628.6 DAYS
26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):

I NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-242

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0MNS / REDUCTIONS M PEACH BOTTOM 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Data TvEe Hours Raanon Method LER Mumber System Component Cause & Corrective Action to Prevent Recurrence 1 04/27/84 5 310.0 C 4 RC FUELXX SHUTDOWN FOR SIXTH REFUELING, MAINTENANCE, AND MAJOR MODIFICATION OUTAGE. 2 07/18/85 S 52.4 A 1 2-85-01 HA TURBIN SHUTDOWN TO BALANCE TURBINE DUE TO HIGH VIBRATIONS. 5 07/22/85 S 57.5 A 1 2-85-02 CH PIPEXX CORRECT INSTRUMENT TEST TAP LEAK ON 'C' FEED PUMP DISCHARGE LINE. 4 07/27/85 5 0.0 B 5 RC ZZZZZZ LOAD REDUCTION FOR kOD PATTERN ADJUSTMENT. 5 07/30/85 F 0.0 D 5 MC ZZZZZZ LDAD REDUCTION DUE TO MAIN STEAM LINE HIGH RADIATION DUE TO RESIN INJECTION. 6 07/31/85 F 0.0 A 5 CH PUMPXX LOAD REDUCTION DUE TO A REACTOR FEED PUMP EXHAUST RUPTURE DISC LEAK. n:MMMMMMMMM PEACH BOTTDM 2 EXPERIENCED 3 SHUTDOWNS AND 3 PDHER REDUCITONS IN JULY AS DISCUSSED ABOVE. O

SUMMARY

M EZMMMMMMMMM Tvom Reannn Met ho d . svst em 8 Co-aanant 1 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulato n Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                      & License Examination               9-Other          (LER) File (NUREG-0161)

PAGE 2-243

_ _ _ _ - - . . - . - - - - . - . - - - ~ . - - . - - - - - . -- - - - C%MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u PEACH BOTTOM 2 M n:MMMMMMMMMMMMMMMMMMMMMMM.9MMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE................. PHILADELPHIA ELECTRIC COUNTY................... YORK CORPORATE ADDRESS....... 2301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 DIST AND DIRECTION FROM NEAREST POPULATION CTR..19 MI S OF CONTRACTOR LANCASTER, PA ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITI AL CRITICALITY.. . SEPTEMBER 16, 1973 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... FEBRUARY 18, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JULY 5, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......T. JOHNSON ELECTRIC RELIABILITY LICENSINC PROJ MANAGER.....G. GEARS COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-277 3 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-44, DECEMBER 14, 1973 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY OF PENNSYLVANIA FORUM BUILDING COMMONNEALTH AND HALNUT STREET HARRISBURG, PENNSYLVANIA 17105 INSPECTION 5TATUS INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

l NONE OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): PAGE 2-244

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION $TATUS - (CONTINUED) M PEACH BOTTOM 2 N MMMMMMMMMMMMMM.MMMMMMMMMMMMMMMMMMMMMM OTHER ITENS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE 333333E==E=333333 3333=E==3333=3E==33333E33===33333333333333353=3553=3 3=3333333==EEEEEEEE=EE=EEER=EE=5=3=E==3E===33==EE=3=E===3== NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ NO INPUT PACVIDED.

                   =========3==E=E=3======33=================E==E=======E==3E===ES===================================================================

1 PAGE 2-245

6 4 2 2 E G A g P 0 0

                                                                                             ,             o             O             0 1                               s
  • 2 o uxm T ~

n u O ,0 u n L - _3 n n P u u - u u ) " u u e - u u H 5 .,25 u u M u u ( 8 0 - u u 1 u u L 3 u3u E =~ - u u V uMu E N G * - .0

                                                                                                                                                           ,2 uOu         L        O                     N uTu                  T                     I                         -                                                                                             5 8

uTu R T T uOu E O R - _ y 3 9 1 uBu W R u u O B * - ,5 1 g uHu P H O - O uCu uAu uEu YL C A D L E - m uPu I E 4

                                                                                                                                                         ,o u u A u u D P                    W                          ~                                                                                t I
  • u u u u E S ~

E u u G D ~ u u A _ u u R ~ - ,5 u u E ~ n n uuu A V

                                                      ~                    -
                                                      ~                    -
                                                                                                                  -                                         0 o                                                                    n                                   0 m                                                                    u 3

E 0 E0 5 0 4 0 4 0 3 2 9 9 8 0 1 6 5 S 4 5 V . 6 7 4 . 8 I5 3 4 6 1 1 1 3 2  : 4 1 T7 1 5 6, , 7 7 7 6

                                                                                                                                                                     )
                                                                                                                                                                               /

U 7 1 s 6 6 2 7 A9 6, 8, 6 3 0 1 n 1 n L 9 9 3 . o / T = o U2 8 6 9 9, 4, 5 i 0

3 5 8 5 s M9 6 6 t 1 A s 9 9 6 9 3 a  :

U 4 3 1 a r 2 0 0 0 e ) C 9 6 6 r T H 3 0 1 1 1 R e 1 u H S e X e M 0 7 0 3 0 6 0 1 4 4 1 3 8 5 D, n v . . 5 3 4 . e i 2 0 t R7 5 l 2 8 i G e A8 5 9 8 1 8, 8 8 3 1 1 t e G - 0 2 N E0 8 , 7 7 6 6 3 a t n 5 1 , ( 0, 9, 6 6 0 D, a N O -  : Y. 9 8 2 D t 5 4 3 4 3 e 1 ) r y 7, . p p I + 4 e : o n 0 3 3 y u 8 H ) p A 1 T e M e e T ( t r g )  : WR f 0 0 0 0 0 0 A a 5 ) 6 6 2 2 1 3 0 0 a s M I . 5 3 1 s t 1 e s t  : H4 1 6 2 5 5 8 7 h t S R u 2 W o t s , y T4 5 3 2, 5, 4 4 2 2 O ( M r e a t E d n N7 3 3 9 6 6 n d G N L e A O 7 3 1 o e n  : : t ( ( t M 7 2 2 M P e ) ) e e c f t 5 d t e N y y c i I a 0 8 l HW ( t t n r 6 m

           /     A        MM               i i i             t        ,
                                                                                                                                          )     )                    t i

t 1 ( o c c S s s t t x s 0 M s n a p ap r s i e e n s e e e e E

           /                                                 R       o                   l                 r  )                           N   N       t              N 7

0 e o t a a v i a s e H H ) a n w r a C C o h t c r n H H C R R r W o G R b c c i H i n M H ) r D E s e w o P ( e e A o

l l l i i h r s i t

n - L d w ( M H ( H t r M ( D ( e c u O r v d t d  : l g a b b r W ts r r w n r 8 o t a n c a dad u H C d O h e r t M c o a o u 7 i c m c o e ( a t r r t H d h 2 r a r t i i r n n c t S n e F c o o u e _ S

     -      e    t         e a      t       e e O T R                  d r h r o e E

E n r a t t O e h 0 P n h R c p p o o S e e F c c g c y 5 o T e e e s l e o r i t r c e a r r c E t v n n c a a d a S l g C e e i l F F e t t n d t E l D D g v f e P e ae rv ers eh e e l v i c r a p p r O c u s n y e a m m n s n e t

     . i t t             s l       n u u a L

n t R e n e T E s e R l e Se AvC aC Fa d oo w r r e r i n p g m m h e e r o r s e G s s E e d u c p o i c m s x x _ k l i i i C E e s E o u r R t s s _ N w a f p s i t t t t t c t E C e o y r n r r e no no nt ni ni oih iO i r u N r _ _ o e t i a e a a f O o e 0 f D R U L N D M M I N P R N R H R H U G G N U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 3 1 4 51 6 17 31 9 0 1 2 3 4 5 6 7 1 1 1 1 1 1 2 2 2 2 2 2 2 2 i,

l 7 0 2 2 MMM E M M G M M e A M M c P M M n M M e R M M r M M M r F M M u X . M M c E M M e Y G M M R B A M3M T M M t D U MMM n E O MOM e S MTM v U E MTM e A C MOM r C N MBM P A M M M N MHM o U E MCM t U T MAM C . N . MEM n AT I E MPM o VL A V M M i U M O M M t FA / B M M c OF G A M M A N M M SD I D

 -   M     M   e   SN     L          E M     M   v   OU E              S M     M i     LO U              S M     M t        R F            U MMM       c   OG E              C e   T      R          S r      O              I r   ET H              D
  -    $       o   U      T C     DE X              S N              U   I A

8 ND S O O Y e IP R I T s u a TI CR F UT O L U J ) 1

-            C     D      N          N                            t6 C           ER W              I                             r1 RE O                                            o0 U              K D            N          t                  p-DA T              O           n                 eG D           AE U              I           e       r tRE OR H              T           n       o e R E           LB S              C           o       ffetU U           o  H ohnN R     t                       D           m       s Se(

n E o &nn v e Z L R C o o yE e

       /       n Z        E                         Fiir              l o Z        U          R          8        tttei p Z        F          E              tcaneF S       m Z        E o Z        R          N           m  i     u rE s N     C                       O           e  bra it p a eR n)

P t N m s hsetcE 1 y xnraiL e S EIPDL( 0 t G C D s E R D y N s A m d T a a N rm o U r W cadL Sre - e O H b D cud m T llSne S u U aa icr N H d uuotue S o nntndh - R h aauoet T E 1 t MMACRO . L e - I D M 123459 E N d C o N r U h 5 1 E o t I r e R r E E M P n rn n n X ireo o E mehi i o d ptt t s A C 3 AOOc a a ign e M FGHrni R O tim s 0 0 T sna r T et ei x u 0 8 O rs R aE o 0 B ue r yT e h lT 5 4 H i gr s 8 9 ] C arnorn 1 3 F S A F oit o e E latc 5 P pt el ai L 1 n i n u u rL U a uif g e J 5 5 m q a e e p& 5 8 a EMRRO _ d e / / a - - o t 9 4 MMM R ABCDE i a 0 1 M M r D / / MYM e 7 7 MRM d P 0 0 MAM ed t MMM ce r MMM rh o MUM e oc FS p MSM o _ o M M v - e N 2 3 MMM T FS R 1 1 i

! t :J

_ _ _ . -_ _- --. - _ . - .. ~ _ - - - . . __. . _ - .- .- - -- -- - - - EUMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u PEACH BOTTOM 3 M n:MMMMMMMMMMMMMMMMMMMMMuMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY a CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... PENNSYLVANIA LICENSEE................. PHILADELPHIA ELECTRIC COUNTY................... YORK CORPORATE ADDRESS....... 2301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 4 DIST AND DIRECTION'FROM NEAREST POPULATION CTR.. 19 MI S OF CONTRACTOR 4 LANCASTER, PA ARCHITECT / ENGINEER.......BECHTEL j TYPE OF REACTOR............BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC j DATE INITIAL CRITICALITY... AUGUST 7, 1974 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... SEPTEMBER 1, 1974 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 23, 1974 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE., ...I CONDENSER COOLING HATER....SUSQUEHANNA RIVER IE RESIDENT INSPECTOR......T. JOHNSON ! ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. GEARS COUNCIL..................MID-ATLANTIC DOCKET NUMBER........... 50-278 1 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-56, JULY 2, 1974 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION l' STATE LIBRARY OF PENNSYLVANIA FORUM BUILDING COMMONWEALTH AND HALNUT STREET HARRISBURG, PENNSYLVANIA 17105 INSPECTION STATUS j INSPECTION

SUMMARY

NO INSPECTION INPUT PROVIDED. ENFORCEMENT

SUMMARY

NONE 1 OTHER ITEMS SYSTEMS AND COMPONENTS: NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): J PAGE 2-248

1 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M PEACH BOTTOM 3- M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED.

  • PLA.4T STATUS:

NO INPUT PROVIDED. LAST IE SITE INSPECTION DATER NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. :i REPORTS FR0M LICENSEE E33E=333===3333333=3333333=3==3=======3=3==E=33==E=333333==3333EESE==E==3=EE3333=EEE3=ES=E====EE33E==E=3==3===EE33=33=E=E=EEE33=== NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED. i 33333E==E333333=E=33===E33=3 3====3===E====3333========3E=3=E=E=33=E3===E=33==3=E=E=33====E=3E=========3=====3:33=========3===E=EE a L k PAGE 2-249 2 r,. --

0 5 2 2 E G A P l 0 MMM T 0 1 0 8 0 4 0 3 0 - M M O ) 0 M M L  % 3 M M M M M M M M M M P

                  )

H e 60 0 0 1 ( - y -

                                                                                                                                                          -s M     M    M                       57
                                                                                                                                                          .a M     M    (                       88                                                      -

M M - M M L - M M M M M M E V E 1

                                           =-

G . V -0

                                                                                                                                                         -3 M1M        L                       Nr M     M                            I   f MMM R           M MIM        E    I                                                                                                                                         S MRM        WR                      WO                                                                                                             -1f5l   Y MGM O G                                     .

MLM P L .e D MIM I D MPMM Y L P M MED P M M M M I A N .o t M M D O M M X M M E 1 M M M M G A MPW M M R .s M M M M E V MMM A -

                                                                      -                                         -                                             0 0                                0                                         0                                      0 0                                0                                         0 9                                0                                         8 1                                1 0                                                            E0       7    0   4            0             4         2 0 S 4                   8 V

6 7 4 f_ 6 . . j 7 3 7 I1 7 6 3 0 0 5 5 4 5 9 5  : 4 7 s T3 1 5 6 6 5 5 8 ) U 7 6 s A8 5 0 1 0 7 3 n n L 8 7 2 o A T = o U0 4 2 6 0 4 7 /

8 5 0 0 s M1 7 7 i

t N a _ A s 9 7 5 9 7  : U1 5 2 0 a r 9 8 6 6 6 e ) C 2 4 4 _ r T H 1 R e 1 u S e 0 e W D, M 0 5 0 3 0 0 0 3 5 5 6 9 8 2 n X v . . . 0 3 3 . e s i 0 t R7 l 0 0 i G e A8 3 0 4 8 1 8 8 0 1 0 3 t e O - 9 8 N E0 1 0 . 8 8 8 8 1 4 a t n 7 7 , ( 6 5 9 7 0 5 D, a Y. . 4 3 3 D N O -  : t 5 4 4 2 8 7 e 6 ) r y p p I + 4 e  : o n 8 2 2 y u 7 H ) p A T t T e M e e ( r g )  : WR f 0 0 0 A a 7 ) s M I 0 0 2 0 6 0 0 9 2 0 0 a e s 3 7 9 . . s t t 1 t  : H4 4 4 0 7 1 0 0 6 9 h S R u 6 H o t s , y T4 4 4 . 0 0 9 9 t O ( M r e a d n N7 7 7 6 1 3 1 1 n d E G N L e A O 5 0 8 o e N  : : t ( ( t M 4 5 4 M t P O ) ) e e c f a 5 T t e N y y c i I 1 0 8 L HW ( t t n r 6 m

           /     I    MM            i i i .                t       .                                                                        )     )                    t i

t 1 M ( g c c S D s s t t x s 0 A s n a a E e n s e e e e E

           /     H     r s i p p e T                       R      o              l                      r  )                                N N t                      N 7           e o t         a a v A                    i                 a s e H H                          )                                 a                       n
  -        0 P

w r a C C o U o G R b h t c c c r n H H C R R r w P ( e e A A L i M i n M H ) r D E s e o l l l V i i h r s i t n - L d w ( M H4 o ( t r M D ( ( e g u O r v d t d  : l g a b b r E W ts r r w n t r G c o 3 o t a n c a dad uc E- H C d O h e r P a o u ( a t r r t H d _ h 9 2 i c m r a r t i i o e t S n e F c o o u e S r n n c R T R d r h r E n r a t t O e h P e t e a t e e O o o S o e E e e F c c g c y 0 5 n h R c p p o T e e e s 8 l e o r i t t r c e a r r c E i v n n c l a a d a S l e F F e t t - g C n d t E l D D e 8 g v f e e a v r e e e l v i c u s n y e a P e r e s h c r a p p r O n e

._  : i                              m m n 7               L     s               R     e n e T E                           e  e       v    a    a   o                   w      r t t t              s  l      n  u u a                         n        t           s e R                              l   S A C C F d o                                    r e r i n p g m m h S o l         e e i i i C M r   o e s E r s e G                         s s E                                                 e d          u k

c p i c m s x x o r R t s s t t t t t c t E C . E w a N p u s i o o t i i i i i r u N o e t i a e a a f T o e O e o x r n r r e n n n n n o h O f _ D R U L N D M M I I P R N R H R H U G G N U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 3 1 4 51 6 17 81 9 10 1 2 3 4 5 6 7 1 1 1 - 1 1 2 2 2 2 2 2 2 2

                                                                                                                  ,!                                                              l

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS /

  • EDUCTIONS M PILGRIM 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i

No. Date ]55UE Hourn Reason LER Number Svntam Commonant Caum. A Corrective Action to Pr ev en t Recurrence I l NONE l l I c:MMMMMMMMM PILGRIM 1 OPERATED ROUTINELY IN JULY HITH NO SHUTD0HNS OR P0HER REDUCTIONS REPORTED. n

SUMMARY

M UCMMMMMMMMM Two. Raaman Met hod System & Canonnent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Door Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scram Preparation of D-Regulatory Restriction 4-Continued . Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                 & License Examination                             9-Other            (LER) File (NUREG-0161)

PAGE 2-251

U=%MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u PILGRIM 1 M c==MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STAT E. . . . . . . . . . . . . . . . . . . . MASSACHUS ETTS -LICENSEE.................BDSTON EDISON COUNTY...................PLfM0UTH CORPPPATE ADDRESS....... 800 BOYLSTON STREET BOSTON, MASSACHUSETTS 02199 DIST AND DIRECTION FROM , NEAREST POPULATION CTR.. 4 MI SE OF CONTRACTOR

'                                                       PLYMOUTH, MASS                            ARCHIT ECT/ ENGINE ER . . . . . . . BECHT EL TYPE OF REACTOR. . . . . . . . . . . . BWR                                                 HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JUNE 16, 1972                                                  CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 19, 1972                                                  TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. .. DECEMBER 1,                            1972               REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU                                                    IE REGION RESPONSIBLE......I CONDENSER COOLING WATER.... CAPE C0D BAY                                                IE RESIDENT INSPECTOR......J. JOHNSON ELECTRIC RELIABILITY                                                                    LICENSING PROJ MANAGER.....P. LEECH COUNCIL..................N0RTHEAST POWER                                                 DOCKET HUMBER........... 50-293 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-3S, SEPTEHBER 15, 1972 PUBLIC DOCUMENT ROOM....... PLYMOUTH PUBLIC LIBRARY 11 NORTH STREET PLYMOUTH, MASSACHUSETTS 02360
                                                                        ~

INSPECTION STATUS INSPECTION

SUMMARY

NO INSPECTION I:.PUT PROVIDED. ENFORCEMENT

SUMMARY

j CONTRARY TO TECH SPEC 4.7.B.6.1, DIOCTYL PHTHALATE (DO*) TESTING HAS NOT PERFORMED FOLLOHING MAINTENANCE TO HEPA FILTER SYSTEM HOUSING IN THE "A" STANDBY GAS TREATEMENT SYSTEM TRAIN. l (8500 4) , ! CONTRARY TO TECH SPEC 1.0.V AND TABLE 4.1.2, A LOCAL PONER RANGE MONITOR (LPRM) WAS NOT CALIBRATED PRIOR TO BEING DECLARED 1 OPERABLE. l (8500 5) , ! OTHER ITEMS SYSTEMS AND COMPONENTS PAGE 2-252 s 0

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M PILGRIM 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS NO INPUT PROVIDED. FACILITY ITEMS (PLANS AND PROCEDURES): NO INPUT PROVIDED. MANAGERIAL ITEMS: NO INPUT PROVIDED. PLANT STATUS: NO INPUT PROVIDED. LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED. INSPECTION REPORT NO: NO INPUT PROVIDED. REP 0RTS FR0M LICENSEE F:33333333333333333333333333333EEEE=EEE=E33=EE3=EEEEEEB333333EEEEEEEEEEEEEEEE=E=33==EE=E=EEEEEEEE3333==33EE=E=E E=33333EE=33333333 NUMBER DATE OF DATE OF SUBJECT EVENT REPORT NO INPUT PROVIDED.

 =3  2333=E=EE3B=3333333      2333E5E333=3=EEEEEEE=====E==E=33E==EE==E=3==E=EE3==333333EEEEE=EEE=====EE===EE==EE==3=3=E=E=E==EEEEEEEEEEEE PAGE 2-253

0 5 3 2 E G A P h mxx u u O T

                                              )
                                                                                                               ~     4so     -

ot

                                                                                                                                     -      ~

0

                                                                                                                                                    ,0 n    n        L                             %                                                                "                                       3 n    n P                                    0 u    u                                      0                                                         e      ~

1 s ~ u u ) ( o u u e I T

                                                                                                                                                    ,5 u    u H                                76                                                            I 2

u u M 90 e e u u ( 44 o g u u c u u L . a u u E u r u1u V 1

                                           =-                                                           s
                                                                                                                                                    ,0                  e u                                                                                                     u                                              2                v uHuu EL H G .                                                           r                                                             A C                    NP                                                            r uCu                                     IR                                                            a uAu          RE   AE                    TO R

t S d e uEu R e . Y uBu W B . e s

                                                                                                                                                     ,5 1 A          t h

u u O u D O.C uTu P T

                                                                                                               ~
                                                                                                               ~

g uNu uIu Y N I DP m u i e uOu L I O DED s u .,o H uPu u u u D u A P I N G u m i Y t a u u I SX e ~ h u u E s ~ t u u G Em Dr i u u A u r

                                                                                                               ~                                     ,5                 w n    n   R                                    .
                                                .                                                       c ~

u u E . c d n n V . e e t uuu A . p a

                                                .                                                                                                                     l 0                u 0                              0                                                                              0                     c 0                               0                                                                                                  l 5                              0                                                                                                    a 1                              1 c

m e e t I u u 0 E0 6 4 7 0 6 0 2 4 0 8 6 5 4 V . 8 0 7 . . S 4 I7 5 4 3 4 2, 7, 0 8 9 9 8 2 3  : 4 4  : T6 0 3 4 0 7 7 6 6 1 ) U 7 2 s A1 8, 6 2, 8 6 8 8 4, n 5 n L , 0 7 3 o A T : o U9 3 1 7, 2, 0, 2 i / s = 7 9 5 s M2 0 0 t N A s 1 9 0 8 a  : U1 1 1 7 6 4 a r 5 9 4 5 4 e ) C 3 4 4 r T H 1 R e 1 j u 0 H D, S e e M 0 0 7 2 5 9 0 2 0 0 5 7 2 1 n 1 X v 0 6 8 . . . e i 0 i t R7 7 4 6 1 3 4, 9, 4 4 3 1 7 t se l 0 2 G e A8 0 5 , 6 6 6 6 a t G - 2 8 N E0 5 2 7 3 0 D, a n - 5 , ( Y , 5 3 6 e D N O 7  : t 5 3 3 7, 6, 5, 7 ) r y p p I + 2 e : o p n 4 1 1 y u H ) A T t T e ) M e e ( r g 4  : WR f 0 0 0 0 0 8 0 8 0 0 7 3 0 0 a A a 1 ) s M I . . . 9 5 5 . . s t t 4 e s t H4 4 4 7, 8, 4 0 0 0 8 h S R u ( H o t s , y T4 4 4 0 0 0 9 t O M r e a d n N7 7 7 4 9 3 1 1 1 n d E E G N L e A O 0 7 6 o e S  : : t ( ( t M 1 3 3 M t P U ) ) e e c f , a 5 A t e N y y c i I 1 6 m 0 8 R H H ( t t n r i

         /      K    MM             i i i               t        ,                                                                     )      )                 t      t 1           (          g c c S                  s s                                                                           t t                        x      s 0        .

s n a a e n s e e e e E

         /      H     r s i p p e                       R        o                l                  r   )                             N N         t            N 7             e o t          a a v                    i                    a s e H H                    )                                    a                  n 0        .

w r a C C o h t c r n H H C R R r w C o G R b c c i H i n M H ) r D E s e o P ( e e A i i t L w ( M H o M D e r v d l l l h r s i n - d ( H t r ( ( g u O t d  : l g a b b r W t r r w n t r M c o a o u 6 o t a n c a a u s H C d O h e r ( a t r r t H d h 6 i c m i i d d c o e t S n e F c o o u e - S 2 r a r t r n n c T R d r h r E n re a t t O e h

   -       e    t      e a     t      e e O                                o o S             o e                 E        e F            c c                g c          y 0

5 P n h R o T c p p e e e s l e o r i t r c e a r r c t E i v m n c l a a d a S F F e t l t g C e l D D e v f e a v r e e e v i c u s n n d t E g e P e r e s h l c r a p p r O n e i y e a m m n L s R e n e T E e e v a a o w r t t t s l n u u a n t s e R l S A C C F d o r e r i n p g m m h r o r s e G s s E e d u k o l e e i i i C E e s E o p r R u t s s t t t t t c t E C c p i c m s x x N w a N s i o o t i i i i i r u N _ o e t i a e a a f O N o e O e o x r n r r e n n n n n o h O f D R U L N D M M I P R N R H R H U G G N U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 3 14 5 6 7 8 9 0 1 2 3 4 5 6 7 1 1 1 1 1 1 1 1 1 2 2 2 7 2 2 2 2

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0HN$ / REDUCTIONS M POINT BEACH 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Yvne Hours Reason LER Number system domponent Cause & Corrective Action to P rev en t Recurrence NONE DOOMMMMMMMM POINT BEACH 1 OPERATED ROUTINELY IN JULY HITH NO SHUTDOHNS OR POWER REDUCTIONS REPORTED. O

SUMMARY

M ODDMMMMMMMM Iyge Reason Met hod Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-R e fu eli n g H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

             & License Examination        9-Other           (LER) Flie (NUREG-0161)

PAGE 2-255

    ;                                                             "                        t;        :Fl             *          :i        L*

6 . 5 5 R EYD 2 8 O AHCN - 9 N TNA 2 1 S O T E

  • N AGG, h .

L O S HNRN 0

-         U                                                                                                               )        I       N                    TIEO A
-         J                                                                                                               IET              OE                E NMI P SHA              IH                HSIES d                                                                                                               ITL              TT                TEM S o         Y                                                                                                  (        O       C                    RRGI i            N                                                                                                           I       AT                TIENM

- r A N .V A EUTIM e P 1 OT S EQEDO P M 1 4 INO 'S MEDUC O 0 2 TEN ER R L t C 2 Y 4 CM EU H RCE r 3 R 5 EE SOD CEONH o p R T5 A PC . NHT I FIT E E 0 R SAR E- HX e W EN 7 B N NLO CRG WIS,, R O RI 9 I I IPT ION DNDS - P TS 1 L S EC LTI SNAEE SN N ERE CT NEEBI C O , C O C P EEA APMIC I NC 5 I C INS HPL LP RN R AS L S VIN TSE PAECE T GI R B I RPI NR HSG C IN E U .H E FI YFTEA - E H B PT STC O D C0 D L C, E E O S, NIR 2E N E E IE S S T N S ILN S1I :ET ME U U N C NHR P R F EB.GBA G

-                     N         K              O             O                       R            O ATE                   NSE              ODI               RVN T I      TU                H             H                E U                        M6V              E N              TNT               EIILS S SA               L'    G L G                          U B                   ,         1I          IDO              CAN               M NL              .

N EH E N E N G L6 4 H R VN E E ENOAD O NL T I T I A O6 2 P6 EAY PED OLHN .

 .                    C         I        H T H T                              H C2                 -     E10              R B              STI               TILSA
 -             N      S 1M               C S C S                        I                  -      R S5H                        ;           NI                CTO O      I      3           E E E E                        I        .        0 P            O1T              OS ,             ISS               ECFLL TNE                 NA I

T H. 2 B. N. B. H. I.. . R.. . .T..5 D. J. OT LOH FE AA FSEIC A . . . . . . NII A E HRO - M OTS NSN R O

                                           . R         . .
                                                                          . . . . . .                                     IAF              ORO               N   .TEL T
                         . .               . E         . .                . . . . E                        .              TCF              IUI               I)HAF F         . .               . I       . .                . .        R .          C        .              CIO              GOT                  BTMO
  -            N         . .               . L         . .              E R E . N                          .              EF               EHA               N(I I         . .             R P           . . N L O G.       . A M                     PIS              RI                I7 WEN R

O

                         . S
                         . S
                         . E E P E U N S R

O B T A I I E T S E A . S R C N . S 0 U 0 S STR NRU IEO 0OE HTD RV A4.EII T N0CTT VO T . R I . I A N P M. I CH TC I5NCA C . D G S . L M O S R T U Y - EE A AAP A . D N Y . P R P N JE E N TLR YPN MFI0I R . A E S R P O S I OB T E T EEO BSO OLIC A T . / O U F E RM A M FNT N D PDI N . E T M T S N R T PU D U A ANC NI NSMAT T O E T RC A C I N N C SOE O . ADORR C E A LE E U E N E G & O T SP I0D RC A A S R TT T R N Y O D NT D DRS T5E NA FP

               & YN O                 CI S T                I     R     I     I     IE E                           S     EEN               C S               ODEO
-         D        TE ?               AH             S B O G S SK S C                                                     CPI              EFO               LNT D
-              Y IC k                 RC C N R T E E NC N                                                I                N                POL               LAAEN             -

T LI u TR U O U A R R EO E L U ,6 S C OTRSA I IL C NA N C T L CD C B O)1 NL FSTA Y L T O U E E I I U NE IAE SEN , I U C G I I L L P N NDD TR SGNLO T T E ANN DOE ENOEI U R O N(A ETH EIMRT I U C SNE A L I

                                                                                                                             ,SNTE         NA4 1             NNDEC U                 EA       HI I

T EOI OD, CLOTF

.                                                                                                                         NIS              NE                IPT        I
-                                                                                                                  C      ITN              NVD               L        FT C                                                                                                               TAO              ALE                  ENOO E      UN                  OH             RHO N A                                                                                                               OIS                ,VE             OTIT
.                                                                                                                  P      RMR              ENI               T TCR
-         F                                                                                                                    AU          NIV               CDAAO K                  S           XO          I     E           ANMPF
-                                                                                               R                          :EH             TNR               EARM 0                             O                  N      )         -      UO                R OIA 0 0 7                                      H                         8ER              OIS                  0F       I
-                                        C           7 7 9                                      T                  I      0VO              RTG         . R5NER             -

S 9 9 1 E 0IT CNS E IHE I 1 1 N N 5TC EIR HT TT H , A 8CE  : PDO DRE I

                                                       , ,         1 G           AL                              (UP              )SNT              PADGR F,             2 6 2                    I           CO                                   RS          9NIC                 PUNC N C             OC                                U H               IO                              6TN              0IFE              R     LI I      O           O           R R R R C                            RP                                   SI          0         P       ARCSS

- MMM S H NN E E E H I ER EE 5E7S EFNSA M M N 0 O B B B T M ME ND4 8H1N LCIE M M 0 T IT M M M AT UN1 (T I C SD M M C I MI E E E E E - N JO E U0LSE M M S N N R V V C C K DI NF 2 HF N1LA; M M I A 5A H O O E N A M M 1M I D N ,O - 1 .TO S TOHY A u M M H. M. . P. N. N. D. O. L. M. ASL . DGFN ATSLE M M . . . . . . . . . . EAD NNOO H LB - M M . . M. . . . . . . . 0ITE AI I TESA M M . . OR . Y R . D . . 3TOI D T NUo M M . . RT . T E E O R . ITF ,N .A SXANT . M M . . FC . I N T H E , M1M

                                                                                              .                           9V          I    7ISC              EILI
                         . .        .            . L       E A T T                          .                           2IAT               - FRI           RDPTE M   M              . . NN                  . A G R E A                                  .                                T N 4 EF                               NR MHM MCM N
                         . . OO                  . C              E M M              Y.

T LCDE NTI IN UEYOA

                         . .      II             . I       T P                     I .                                  IAED EORT                          QPCC
. MAM O              . . TT                  . T   S    O G     G              L .                                  R VI NIAR                      Y EPN T MEM      I         . . CA                  . I       1          N N          I .                             Y PKL                 UTUE          R RAERA MBM T              . . EL                R R                 L    I     I      B .                             R AROE JCQC                         A         GOH M   M    P         . . RU                O   C R     A            L L A .                                      A         OVR            ED/        M )FRFT MTM      I         . . IP                T             E    I     O O          I  .                             M NHNE NFAN                        M GOE MNM R              . . DO                C   L N     C O   O                   L .                              M O ,I H OSEO                      U   (     MDS MIM      C         . .          P        A   A E     R C   C E .                                                U                        NHI       S 4SENL MOM      S         . .      D            E     I            E                  R .                              S NSNS NI T                               T AE MPM M   M E

D N

                         . . NT Y AS R   T C     M R   R E M E E CI L                               OEON O EA                      T   5.N S       V
                         .                           I                                                                N   IRIO             ISTC          N   0E M   M        OE T               E        F   N         L     O S S IC                                           O TUTI TUAI                        E   5 M E' DL EE M-M      Y IT          N TR              O     I       E C N N RN                                               I   CDCT CORF                      M      EEU M   M    T TA U SA                                                E E TU                                        T EEEA               EIOI          E RRSTN M   M    I   AT O IE                     E   E   E    E D D CO                                                  C PCPI PVPL                        C FINIO M   M    L   CS C DN                     P   T   T   T N N EC                                                  E SOSV SERA                         R CUENI

- M M I O Y A A A O O L P NRNE NROU O QCGT M M C L T D D D C C E S IPID IPCQ F 0EIAC M M A N N 1RLMA MMM F I E

                      !1                                                               ,'                    i'I          ii
~

_ 7 F T 5 Y OD A F ,T 2

.                         L        N H           O      Y SC                                                  -

FNYLEATTG TONE 2 MMM 0OCAL E N E SIHOT M M NIBHESI P NRNIO E M M Y OO TR G M M E0.EETATMEN V DGIPL RIGETFIH ,AP A M M I6ARNAAHIMNH 0TTSD P M M T MEICECURITT CUTNO M M CR M NHIQED M M EEEEEI HETU H A0.AANET EM M M TTB H CHRELSH5EDDMY M M OP ETEI DCE VNNOR M M RALH RLSE NIDNIAECA M M PHLTEEBN RICNOT TED M M CI VHUAXO NAICYNRN M1M F ,E U OF HFA,PLIF TETI

-     M      M              OH        PD DGNCTIRNO MHM              0S        ST NSEAEEOLEOB MCM          E NYONCYENB                  HSRIPI MAM                 OTHOECPAIEH PBUTE MEM          P0.IINITNPERT Y                                   ISCT MBM M      M T5TR CO   ,TOEAMCAG ARG
                                                    .ES STNYTNT S AI MTM          TNAHSDPRFEESITIOFN MNM          AO TTN E0HD NESPIOE MIM          HIEUNEOM T DIFFSHIH MOM MPM          HTVAEMTEB.

CI DM ENMAFESTT BARSOR C M M DETDNOYTV: E ,EE M M NSCNECRCIGLLTDREETD M M A EATEAE* NLAENOHVOI M M T NRDFNIACDAFTORS M M N .OYI NFOHHO BPT M M EYRTRNUEIOSLRHSEA U M M HTPIEOO TL OTNV EO M M HE LPIBNCLLFFLOAET

. M      M         FEIUT IEOAO AIHHID MMM          GATBSCE SFI                  DET TSE NSII         ATN         RNEHAL FR I      SST      II     EEOS DLOFE NDFNFHSA .HTIUTNITOD

- INFOID T) TAT CEH I MAOPHIENB MAEEM YES

-                  R        SSTHI(H           PBTMTRKN EHRE CTA7TEI OONAAO
         )         TTOR        ,E         IVCORCERMC
.        D E

ELF ETE DA EVODD0 TT M4.HIITPEDT RNNOE U ESHORIN5ECREO EOTB N RHNTBPSA CAARTTTC I O O A T FN0PA AN RD T N O FTIE EUNOAI CTVETOO IDDTRTR DEAAHI LSLANAA ENAO YHI .EL GU C ETDHTSDLDPRAHDTPONH

-        (         SON          FEORM           TNRUIAS URELOFRFAOFN UASTM PMLTOE DCOOSOP U S
           -       E MI            DSN        ILB      TLTE BOOHYEIEAEETE NFORR

- S TC RKSETTSAVEIIVOU O ETAANSSAACET HEPS TYRNRMON REILISS PA U R ET CEGTLF SE YUE

 -                 EATDNO CNSEIN TECSM T         RDANOTEIINRTOEAHN ANHEC BLNO OIHTTEYE A              UTT R            NMENTTS GCV                                                   5 C

T TO N .EDRAEH ABTI GLOLDTRAENAEET TRNI 8 9 H RRNAUTP O DAHMGC 1 S TEAEONOC OFFYILTERE TPPIAHAETO CSP ET , SI UTMSLH ANT TNMO 0 LSNSU RTNTIEUYUAER 3 E I LTS OCRGOCB P VE TORERDIAER N FE R N EHSFVORENTPTEDE ,O H F E LTEIEPUWAAMIMNGR TO B O TH PSO MIREAREG M NEASYUAP0R C EGNFE E I ODT CSE 5OE ENMAIOP T IISEN MR FHSHIENN Y P T TS HEY ATNTATH ANYT E CTNTGCEERI TTMIT S C AUA RNVLA GDDIN GIT DLTEEICPENENHATERA - E Y PAMGTU DISA LRBOH P CD NNYTHERCNRUSU,DPO EE FLS E PETHH  : 1 . EAC NMTTCCEESRRPHUD ) T . S G NTAEOA NSBEEAUTAN S S RNEU RHoIS IDES A E U N EIGBFEPTt AOCIL TD R G MHR ,O H L TNSCYANN U U I ETE TFSoLY ENUC AE D A IMRG OETALEGONNR H  : E . EHEENF R HLRAC EEYH S C Y H GIOEIESAA HGGT M O L  : TDTAN PU U LECRAIG E R L E 5 ENNNYYQXSNTABAENLN L P A T 1 DRAAITTEINIAR EMAII B M A 0 NELMGI RDATHEDBEMBN O D R D 5 ADP ERT NLNTDL II . R N O 8 - I TBOA)EPO EUTETSMY P A N N

                     ,SRR       HHQP CSFONHRNRT                                                       O
-                  SNAOETH(PY                 L    HITOOEE             T      S                   G   I    :

5 EOEPHU 4ACRERSO PPTF H N N T O 8 NOVE PYPSEA E A I C N 9 1 ICLPTAD5.FEFEHS C CU Y NEUSTDA0OG LTEE SR N BUEDS N O L P  : T E A P T R EBN AN 5 RD ORHY FD P ( S R S R L A G Y AN SENN UTLYLON M M E N O U M ADHCR ERTMAODS NCA A O S E P I P J M LCNEYHFNE INAFONIE C M T  : O E U LUAEGTHCE ETAE0 ETLH E I S E R d S AOEGAI NSDC,M EGIBT D T U S T o UA DRNAL N I L T I I N i r T R H B EAIN1R ES R N L G 0 E'E T NE N D TMMBI IEIYOV6MM AE 0.AEIPA S M A Y A I A T T S O I e EECH) E S T R S I E T P E ESNE IN .USNCII M FEI TSI QNGNSTRE HN 4 T M I E N I C E E ROERNMYEEAESCEBETIC I E L G T U t C RUPHOORTRCMGIET H I0 T E I E A E N T P r R ES TPPEE I RMTPLTEEL0 R S N C N N N A E S S o p O HAE PSTFELEEMOAL VRB5 E Y O A O A O L H A N F TEHYUEEAH HMORHIFAEU8 H S N F N M N P T L I e N OMTBSRDSTATECPCH0 HHP ( T R E O f

    !                                                       '                    '       h

_ . . ~ - - m . _. _ . 5 H W tt M 40 at II N N te I N N N MMM N H E E H H W X X N N O M E N N 4

         .E        E N                   N                                         A E        E H                   IS E       R H                   N N        E N                   N X        X H                   H E        E N                   H M       M II                  G8 -

X X 40 80 X X H H j ewe H 80 g E E H H EZE N N XQE H H

 !        R(X        n          9        N NME        H          ll       N E$E        N          -l       W X        X N                   H 3l W X     N                   tl REX       N                   N MMM       N                   H WQE        N                   H EAE       N                   II E        E N                   H E       E M                   la E       X N                   GE R       E H                   H E       E N                   H
,          E       E N          I        N i         R       E N                   N X       X H          I N

N N $1 i 80 XXX M II N 88 N 95 H H H N N N _ H I8 4 H If H H H H H I H H ll H H W H ll H H H kJ 80 H H H M II H 08 N 2 II H H 89 W 08 50 N M Q 80 H 05 N M N N H H ad M 89 N N H N N N E 08 -M 08 M Q N N N N N N H N N k N H H H H H N H M N tl n I N

              >=     N                   88 H                   H M      N                   N N                    N O      M                    98 M                   N
              &      se >                80 -

H Q ll H W N laJ l M N 7 I H E N M I 18 N 3.3 H N M i 49 6t I- ti H i 68 H H H 10 - If AH 90 M QEl H H Ql H H WA- Of . s0 w uJ - H H (M i H H Q ff N SS M N H H IO N H E0 at A .H (> ft Q > l' N H 2l H N l&Ji&J l H j . J N W 3D i H 3 H (laJ $ H 7 N Q I 08 H H T H H o el N og i

            . es=    fo I               L     H   E                N O     H   kJ               18 A      10  S                N

( H E N W H 3 H l b H 2 II O is i s0

               &     N                l   H M
                 ,                                   - - , c > , n ~   ,.      , .

att fta i N uJ O 4 A W Z 4

 .,a M

A taJ

 .J
 > a J

4 2 O M H Z kJ H Z M SLJ O 4 A to M Z H s l 1 l i l 1 l l 1 1 1

1. Docket 50-301 0PE. RATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M POINT BEACH 2 M
2. Reporting Period 07/01/85 Outage + On-line Hed 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts C. H. KRAUSE (414) 277-2001 AVERAGE DAILY POWER LEVEL (MWe) PLOT
4. Licensed Thermal Power (MHt): 1518 POINT BEACH 2
5. Nameplate Rating (Gross MWe): 582 X 0.9 = 524
6. Design Electrical Rating (Net MWe): 497
7. Maximum Dependable Capacity (Gross MHe): 509 1500 485 OESIGN ELEC. RRTING = 497
8. Maximum Dependable Capacity (Het MWe):
                                                                                                                                                                ......MRX. DEPEND. CRP. -           485 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Hhich Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 113,952.0 h
13. Hours Reactor Critical 744.0 5,087.0 101.059.4 y
14. Rx Reserve Shtdwn Hrs .0 .0 207.1 99,396.4
15. Hrs Generator On-Line 744.0 5,087.0
16. Unit Reserve Shtdwn Hrs .0 .0 198.1
17. Gross Therm Ener (MHH) 1,t04,022 7,640,060 139,393,0_12 rec Opus sc === lamat Orrrest Ocse2TroMs
                                                                                                                                                                                                    ---- v -       100
18. Gross Elec Ener (MHH) 375,770 2,602,690 47,242,830 358,746 2,488,862 45,006,500 - so
19. Het Elec Ener (MHH)
20. Unit Service Factor 100.0 100.0 87.2 -so
21. Unit Avail Factor 100.0 100.0 87.4
                                                                                                                                                                                                                 - 40
22. Unit Cap Factor (MDC Net) 99.4 100.9 __

80.4M

                                                                                                                                                                                                                 -20
23. Unit Cap Factor (DER Net) 97.0 98.4 79.5
24. Unit Forced Outage Rate .0 .0 1.3 0 , , , , , , o o 5 to 15 20 25 30
25. Forced Outage Hours .0 .0 697.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

I REFUELING. SEPTEMBER 18, 1985.

27. If Currently Shutdown Estimated Startup Date s N/A M Item calculated with a Holchted Average PAGE 2-260

m .~ Report Period JUL 1985 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM UNIT SHUTD0HNS / REDUCTIONS M POINT BEACH 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM l No. Date G E Reason LER Number System Comoonent cause & Corrective Action to Prevent Recurrence NONE MDMMMMMMMMM POINT BEACH 2 OPERATED ROUTINELY IN JULY HITH NO SHUTDOHNS OR POWER REDUCTIONS REPORTED. O

SUMMARY

M OGMMMMMMMMM Tyne Reason Method Svstem & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                                                                                & License Examination                                9-Other           (LER) File (HUREG-0161)

PAGE 2-261

MMDMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M POINT BEACH 2 M DuaMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 4 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATIQN LOCATION UTILITY STATE....................HISC0NSIN LICENSEE.......... ......HISCONSIN ELECTRIC POWER COMPANY CDUNTY................ ..MANITOHOC CORPORATE ADDRESS....... 231 HEST HICHIGAN STREET MILHAUKEE, HISCONSIN 53201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 15 MI N OF CONTRACTOR MANITOHOC, HISC ARCHITECT / ENGINEER.... .BECHTEL TYPE OF REACTOR............PWR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY...MAY 30, 1972 CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... AUGUST 2, 1972 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE... 0CTOBER 1, 1972 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... LAKE MICHIGAN IE RESIDENT INSPECTOR......R. HAGUE ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....T. COLBURN COUNCIL......... ........MID-AMERICA DOCKET NUMBER........... 50-301 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DFR-27, MARCH 8, 1975 PUBLIC DOCUMENT R00M.......JCSEPH MANN PUBLIC LIBRARY 1516 16TH ST. TH0 RIVF.RS, HISCONSIN 54241 I fl S P E C T I O N STATUS INSPECTION

SUMMARY

INSPECTION DN APRIL 29-30 AND JUNE 6 (85008): ROUTINE, UNANNOUNCED SAFETY INSPECTION TO REVIEW INSERVICE INSPECTION (ISI) PROCEDURES, HORK ACTIVITIES, NONDESTRUCTIVE EXAMINATIONS (NDE), PERSONNEL CERTIFICATIONS; AND SPLIT PIN REPLACEMENT. THE INSPECTION INVOLVED A TOTAL OF 14. INSPECTOR-HOURS ONSaTE AND 16 INSPECTOR-HOURS OFFSITE, BY ONE NRC INSPECTOR. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON JUNE 4-7, AND 12 (85009): ROUT!NE, ANNOUNCED INSPECTION DY TH0 REGIONAL INSPECTORS OF THE LICENSEE'S ACTIONS ON PREVIOUS INSPECTION FINDINGS. THE INSPECTION INVOLVED A TOTAL OF 50 INSPECTOR-HOURS ONSITE AND 12 INSPECTOR-HOURS AT THE CORPORATE HEADQUARTERS. OF THE 17 FINDINGS REVIEHED, 14 HERE CLOSED. ONE DEVIATION HAS IDENTIFIED RELATING TO QUALIFICATION / CERTIFICATION OF INSPECTORS. ENFORCEMENT SUMMARI NONE OTHER ITEMS

                                                                                                                                                                 ? AGE 2-262

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMmM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M POINT BEACH 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITEMS: NONE PLANT STATUS: THE UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: AUGUST 1 - SEPTEMBER 30, 1985 INSPECTION REPORT Nor '5013 REPORTS FR0M LICENSEE

                                                             ==33333E=353E533EE3333E=E3=3==3EE=333E===333==EE=======3==33=EER=E==3=====3===========3==E===E=E====================g===g=========

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT

                                                                             ===_                     =-        _--

___ __ = _ _ _ . __ _ _ _ _ = = E=====33=EE=EELE======3=M=EEE=3E=E=E==3=3EE3===3==E=E=3=EE==E=3EE==3============E===EE===========EEE===EEE=====E=======EE3E===EEEE PAGE 2-263

1. Docket: 50-282 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M PRAIRIE ISLAND 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts DAL E DUGSTAD (612) 388-1121 AVERAGE DAILY POWER LEVEL (MHe) PLOT
0. Licensed Thermal Power (MHt): 1650 PRRIRIE ISLRND 1
5. Nameplate Rating (Gross MHe): 659 X 0.9 = 593
6. Design Electrical Rating (Net MHe): 530 1500
7. Maximum Dependable Capacity (Gross MHe): 534
8. Maximum Dependable Capacity (Net MHe): 503 ,,,,,, [
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):

st. Reasons for Restrictions, If Any NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 101,903.0
13. Hours Reactor Critical 744.0 3.694.1 83.688.4 h
14. Rx Reserve Shtdwn Hrs .0 .0 5.571.1 cs
15. Hrs Generator On-Line 744.0 3,675.8 82.343.7 f
16. Unit Reserve Shtdwn Hrs .0 .0 .0 U Z feo cru8 EE === t.sent certreu coselftaus
17. Gross Therm Ener (MHH) 1.199,765 5.819.328 129,418.586  ?

500 - : V

                                                                                                                                                              --%..        .m
18. Gross Elec Ener (MHH) 393,190 1.909,910 42,202.010 so
19. Het Elec Ener (MHH) 369,082 1.789,046 39,539,864 100.0 72.3 80.8 - so
20. Unit Service Factor
21. Unit Avail Factor 100.0 72.3 80.8 ,,
             .22. Unit Cap Factor (MDC Net)                                    98.6       69.9          77.1
                                                                                                                                                                           -20
23. Unit Cap Factor (DER Net) 93.6 66.4 73.2 0

jo

                                                                                                                          ~
24. Unit Forced Outage Rate .0 .8 7.9 0 5 ' 1'a l's. a'o i 29.4 3.376.5 DAYS
25. Forced Dutagi Hours .0
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-264 l

Rrport Period JUL 1985 unuxzzunuuuuMunnunzu=nnuzug2MunxMucM UNIT SHUTD0HHS / REDUCTIONS M PRAIRIE ISLAND 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date 1533 hours Reason Method LER Number System Comoonent Cause a Corrective Action to Prevent Recurrence 07/14/85 S 0.0 5 5 TURIBNE VALVES TEST. MIMMMMMMMMM PRAIRIE ISLAND 1 OPERATED ROUTINELY IN JULY HITH 1 POWER REDUCTION REPORTED. M

SUMMARY

M MEMMMMMMMMM Tvon Rea son Met hod Svstem 8 Component F-Fo rced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Reculatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                             & License Examination          9-Other          -(LER) File (HUREG-0161)

PAGE 2-265

ODOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 0 PRAIRIE ISLAND 1 M acDOMMMMMMMMMMMMMuMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY ST AT E. . . . . . . . . . . . . . . . . . . . MI NN ES0T A LICENSEE................. NORTHERN STATES POWER COUNTY...................G00DHUE CORPORATE ADDRESS....... 414 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 28 MI SE OF CONTRACTOR MINNEAPOLIS, MINN ARCHITECT / ENGINEER....... FLUOR PIONEER, INC. TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... DECEMBER 1, 1973 CONSTRUCTOR.............. NORTHERN STATES PDHER COMPANY DATE ELEC ENER IST GENER... DECEMBER 4, 1973 TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 16, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING T0HERS IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......J. HARD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....D. DIIANNI COUNCIL..................MID-CONTINENT AREA DOCKET NUMBER........... 50-282 RELIABILITY COORDINATION AGREEMENT LICENSE & DATE ISSUANCE....DPR-42, APRIL 5, 1974 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY MINNEAPOLIS PUBLIC LIBRARY 300 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 INSPECTION STATUS INSPECTION

SUMMARY

INSPECTION ON APRIL 14 THROUGN JUNE 8 (85010): ROUTINE, UNANNOUNCED INSPECTION BY RESIDENT INSPECTORS OF PREVIOUS INSPECTION FINDINGS, PLANT DPERATIONAL SAFETY, MAINTENANCE, SURVEILLANCE. REGIONAL REQUESTS, MEETINGS HITH CORPORATE MANAGEMENT, PART 21 REPORT, APPENDIX R HORK, AND FOLLOHUP OF LICENSEE EVENT REPORTS. THE INSPECTION INVOLVED A TOTAL OF 368 INSPECTOR-HOURS BY TH0 NRC INSPECTORS INCLUDING 41 HOURS ONSITE DURING OFF-SHIFTS. NO VIOLATIONS HERE IDENTIFIED IN THE HINE AREAS INSPECTED. INSPECTION ON JUNE 10 THROUGN JUNE 20 (85012): ROUTINE, ANNOUNCED INSPECTION BY TH0 REGION BASED INSPECTORS OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS; FOLLOHUP OF IE BULLETIN 84-03; GENERAL EMPLOYEE TRAINING; IMPLEMENTATION OF THE LICENSEE'S INSERVICE TESTING PROGRAM; INSERVICE TESTING DATAs AND PERFORMANCE OF INSERVICE TESTING. THE INSPECTION INVOLVED 96 INSPECTOR-HOURS ONSITE BY TH0 NRC INSPECTORS INCLUDING 10 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS AND 1 INSPECTOR-HOUR IN THE REGIONAL OFFICE. OF THE SIX AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED IN FOUR AREAS. TWO VIOLATIONS HERE IDENTIFIED IN THE TH0 REMAINING AREAS (FAILURE TO IMPLEMENT AN INSERVICE TESTING PROGRAM PER SECTION XI REQUIREMENTSs FAILURE TO USE CONTROLLED EQUIPMENT FOR SURVEILLANCE TESTING). INSPECTION ON MAY 22 (85013): LICENSEE ACTION RELATIVE TO IE BULLETIN 80-11, " MASONRY HALL DESIGN." THE INSPECTION INVOLVED A TOTAL OF 12 INSPECTOR-HOURS BY ONE NRC INSPECTOR. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. PAGE 2-266

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M PRAIRIE ISLAND 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT

SUMMARY

10 CFR PART 50, APPENDIX B, CRITERION V AS IMPLEMENTED BY THE PRAIRIE ISLAND QUALITY ASSURANCE PLAN, REQUIRES THAT ACTIVITIES AFFECTING QUALITY SHALL BE PRESCRIBED BY DOCUMENTED INSTRUCTIONS, PROCEDURES, OR DRAHINGS, OF A TYPE APPROPRIATE TO THE CIRCUMSTANCES AND SHALL BE ACCOMPLISHED IN ACCORDANCE HITH THESE INSTRUCTIONS, PROCEDURES, OR DRAHINGS HHICH SHALL INCLUDE APPROPRIATE QUANTITATIVE OR QUALITATIVE ACCEPTANCE CRITERIA FOR DETERMINING THAT IMPORTANT ACTIVITIES HAVE BEEN SATISFACTORILY ACCOMPLISHED. CONTRARY TO THE ABOVE, THE PROCEDURES REQUIRED TO IMPLEMENT THE LEAK RATE TESTING REQUIRED BY TECHNICAL SPECIFICATIONS AND 10 CFR 50, APPENDIX J HERE NOT APPROPRIATE IN THAT: A. THE LICENSEE'S CONTAINMENT INTEGRATED LEAK RATE TEST (CILRT) PROCEDURE (S) DID NOT ADDRESS THE AREA TEMPERATURE SURVEY REQUIREMENTS OF ANSI N45.4-1972. B. THE LICENSEE'S CILRT PROCEDURE (S) DID NOT ADEQUATELY REFLECT THE REQUIRED 10 CFR PART 50, APPENDIX J ACCEPTANCE CRITERI A 0F 0.75 LT FOR THE BN-TOP-1 OR MASS POINT CALCULATED LEAKAGE AT THE UPPER 95% CONFIDENCE LEVEL. C. THE LICENSEE'S CILRT PROCEDURE (S) ALLOHED THE LICENSEE TO TERMINATE THE SUPPLEMENTAL VCRIFICATION TEST PORTION OF THE CILRT HITH THE BN-TOP-1 CALCULATED LEAKAGE OUTSIDE OF THE TEST ACCEPTANCE BAND. PRAIRIE ISLAND TECHNICAL SPECIFICATION 6.5 REQUIRES DETAILED HRITTEN PROCEDURES, INCLUDING THE APPLICABLE CHECK 0FF LISTS AND INSTRUCTIONS, COVERING SURVEILLANCE AND TESTING REQUIREMENTS THAT COULD HAVE AN EFFECT ON NUCLEAR SAFETY SHALL BE PREPARED AND FOLLOHED. CONTRARY TO THE ABOVE, PROCEDURE SP-1071(8) REVISION 0, STEP 3.15 REQUIRED A BN-TOP-1 SUPPLEMENTAL VERIFICATION TEST OF 11.25 HOURS, YET,1HE VERIFICATION TEST HAS ONLY 5 HOURS LONG AND THIS STEP OF THE PROCEDURE HAS SIGNED OFF. (8501 4) 10 CFR 50, APPENDIX J, PARAGRAPH III.A.1 REQUIRES THAT "DURING THE PERIOD BETHEEN THE INITIATION OF THE CONTAINMENT INSPECTION AND THE PERFORMANCE OF THE TYPE A TEST, NO REPAIRS OR ADJUSTMENTS SHALL BE MADE SO THAT ThE CONTAINMENT CAN BE TESTED IN AS CLOSE TO THE "AS IS" CONDITION AS PRACTICAL." 10 CFR 50, APPENDIX J, PARAGRAPH III.A.3.(A) REQUIRES THAT ALL TYPE A TESTS BE CONDUCTED IN ACCORDANCE HITH THE PROVISIONS OF ANSI N45.4-1972. ANSI N45.4-1972 PARAGRAPH 4.2 REQUIRES "FOR RETESTING, AN INITIAL RECORD PROOF TEST SHALL BE CONDUCTED AT TIME PERIODS AND PRESSURES ESTABLISHED BY THE RESPONSIBLE ORGANIZATION, BEFORE ANY PREPARATURY REPAIRS ARE MADE. THIS HILL gISCLOSE THE NORMAL STATE OF REPAIR OF THE CONTAINMENT STRUCTURE AND A RECORD OF THE RESULTS SHALL BE RETAINED.d CONTRARY Tb THE ABOVE, THE LICENSEE PERFORMED REPAIRS TO PENETRATIONS PRIOR TO PERFORMING THE TYPE A TEST ANL FAILED TO ADD THE PRE- AND POST-REPAIR DIFFERENTIAL LEAKAGE TO OBTAIN AN AS FOUND VALUE FOR CONTAINMENT LEAKAGE. (8501 5) i OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NONE FACILITY ITEMS (PLANS AND PROCEDURES): NONE MANAGERIAL ITCMS: NONE PLANT STATUS: THE UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: JUNE 25 - 26, 1985 INSPECTION REPORT NO: 85015 PAGE 2-267

                        -                       .-       . - c          -        - n 5                      N                                         W M                     N                                        , @

H E N H H I H N N WMN N H E E N N W X X N H Q X X N II ( X X N BI A R X H H E E It H E X X et X X H H R X H H E E N N

       - X"E          H                     H M     M       H                     H EGE           N                     N MEX           N                     N E4X           N                     88 E AE          N              I      85 MME           N                     N EMM           IS                    H E     X       H                     H XWE           N                     H XMM           N                     N REE           H                     H EMX           H                     N X4*           tt                    N MEX           N                     H EAE           N                     98 E     E       BI                    If E     R       N                     N X     X       N                     H E     E       N                     90 X

E

            X E

N II ll H H X X N  ! M M M N 1. 88 MXX H I H H H H H N N N H N N W N I H N 1, H A l&J H I H Q H i H R&J M N I N D N. N E E N H M M II

          >     IRJ   Il            '

H E N 'l H Q Q H 08 O H H

          %a    M     88                    H H                     H I               J     N                     N l          H                     H H                     N N                     N
'I        M     E     N                     N 08                   il D     Q     H                     H H                    81 k     W'    N                    N 08                    N

( A N N H N

          >           H                     H H                     H 4

M M N N 4 H H H H tl N ss M H ll H M

   .      E     O     H                     H H                     et Q     A     N             I       H BI                    et M     161   fl                    H H                     H

!l H g H H H II O N H H H , N-RAJ H O 9 H H R&J l H A N 7 N c H A N 1 M N D BB 10 M N E it H j et - ts M 01 1 M N I et H lb H H H QW te H Q H H LAJ A et N H t&J H N (M H H A H H H 08 H H . N M N i N 80 H lb N O H QH H

          *           $$      E             N N   84J laJ           N                  .

A 10 M>i it i 3 H 4 4&J l N 7 N A l' N H ts "O H H o es H es= H H b N K Is O H AaJ 1s A N A et M E II 48 Il D H L H E H

     -     O          N                     N
           &          H                     st O

E 4 yr w rwri T ew-, sr --w

THIS PAGE INTENTIONALLY LEFT BLANK PAGE 2-269

1. Dock et : 50-306 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMAMMMMMMMMMM M PRAIRIE ISLAND 2 M
2. Reporting Period: 07/01/85 Outaca + On-line ifrs' 744,0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

DALE DUGSTAD (612) 388-1121 l AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): Ift10 PRfiIRIE ISLAND 2
5. Nameplate Rating (Gross MHe): 659 X 0.9 = 593
6. Design Electrical Rating (Net MHe): 530
7. Maximum Dependable Capacity (Gross MHe): 531 1500
8. Maximum Dependable Capacity (Net MHe): 500 MIM M. WING = m
                                                                                                   -----. fWlX. DEPDC. OM . - 500 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE 1000-MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 93,021.0
13. Hours Reactor Critical 744.0 5,087.0 81,181.5 h
14. Rx Reserve Shtdwn Hrs .0 .0 1,516.1
15. Hrs Genera'.or On-Line 744.0 5,087.0 80,211.5 g
16. Unit Reserve Shtdwn Hrs .0 .0 .0
17. Gross Therm Ener (MHH) 1,166,088 8,228,338 126,388.570 500 - -
                                                                                                                      -e -------------- -100
18. Gross Elec Ener (MHH) 380,910 2,728,370 40,965,270
19. Net Elec Ener (MHH) 358.115 2,582,007 38.462,846
20. Unit Service Factor 100.0 100.0 86.2 - 80
31. Unit Avail Factor 100.0 100.0 86.2
22. Unit Cap Factor (MDO Net) 96.3 101.5 82.7
23. Unit Cap Factor (DER Net) 90.8 95.8 78.0 0 0 24 Unit Forced Outags Rate .0 .0 3.8 g- gg g
25. Forced Outage Hours .0 .0 3,315.5 DAYS
30. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

TEN YEAR OUTAGE, SEPTEMBER 1985.

37. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-270 l

i______ - - _ _

Eucu=uscuuum=Muuruuuuuuuren=nuMuuntu Eaport Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M PRAIRIE ISLAND 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date TsEe Hours Reason Method LER Number System Comoonent Cause a Corrective Action to P rev en t Recurrence 07/07/85 S 0.0 B 5 TURBINE VALVES TEST. 1 uMMMMMMMMMM PRAIRIE ISLAND 2 DPERATED ROUTINELY IN JULY HITH 1 POWER REDUCTION REPORTED. H

SUMMARY

M MMMMMMMMMMM Tvon Reason Met ho d System 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                      & License Examination           9-Other         (LER) File (NUREG-0161)

PAGE 2-271 i l

2 7 5 S O 2 8 0 N T A - 9 H O E 2 1 N1T I HEE D O2 T TRR E E L I Y CS EU V G U TTB A' NHL L A J CR E I I O P Y EAS EE SA V d R PPR . ES RNF N o A S UD SN UO I i R N ,O E NE OI; r 1 B 1 ITHT EC6 HTS N e 0 Y I 0 NC CI9 AT O P 4 N L 4 SERE IL RLN I 5 A Y 5 UMOP L DOOE T t 5 P NR 5 OETS EETIM C r M OA IGCN FHVCVE E o p A O 4 IR VAEI OTLE R P T C 7 TB A ENP OP0I S e 0 9 AI T RASS SFVSHU N R R S R 1 VL O PMNA RONNTQ I E E E R S IE O II E H N . H , EC E FE R TN E D N C 0 9 SILN OT8A CON 1 .R H P LI N P 2 NLLN A6 EIO SI T LM I OBAI SR3E PTIDAX S A S R CUMM RO N SATNE E M, , E E P OPFI NTCARN T S R T B L T, TRON INE AO ". A TI E E A E O ASES CO EPS I N T EL E S T S T TILI ECLE DMSTRT G S LO N U S U I C NLLL P AH EENFUC I LP O O O N O EOOO SHTT, SLIIOE S . N OA I H N H N MPCP NTO AP HFS ED R CE P G R G D A , NAIA IITN BMES DE E IN N E N R I6 0 OENE H I IH NR I H NN R I H I A I0 6 RN N T A N TFIE LF T I O T T T H D3 - IN0N NS D O; F P LI N O R 4M1 O U S R S L E O E I I . 0

                                                                                 -     R P NM3M VI0I EGDE IG .OD DNEI GN                    EM AT HN IIVF          EIGGIA                   E I

T N. 4 F. H. N. N. I.. . J.. . .D.. 5 D. E. STLI RNNNFR YD A . . . . . . EEOT IIIIG RI M . . . . . . . . . . . . REVN 0ATRTO N R . . . R . . . . . . . . MNE HRSUNR OE O F

                                     . E I
                                                                  . . . . E
                                                                  . .        R     . C
                                                                                                .            Y,ID TTEDEP B        I          T D SR AE N      . .                  . L       .     .       E R E .                N        .               SN         YE EIG                MH I      . .               R    P          . . N         L     O G          . A M                   NTOE BEET N                         "
                . S            E    P          .     . O     B T A .                U O                   OSIR              YCIEI                S R      . S             E    U          . R     I   I     C N . S O                              IETE          NOISRT                  ,N O      . E             N    S          . E T         S   E A            . S R                 S   TUCH OLVNES                         1O T      . R            I               . I     A   N   P M            . I                     CQE           IPROHE                1I C      . D             G S             . L     M   O  S            R             T          U   EEPS TME                     T       - T A      . D             N Y             . P R       P   N JE E N                                 PRSN CESSS                          0A R      . A               E S R P O                     S     I      OB T E                      T   S NO E NRNE                         8I A T        .
                                  /             O U F           E            RM A M                          NLII          PLIUOC                   V N      . E            T M T S N                     R T PU D                       s         A   IA       T SA           OII         NE T O      E T             RC A C                        I         N         N             r                 NEA NRFHTV                       ID C    E A             OE E U E                          N E G                  & o               T   DOHL IEO                   AR       T A        S R             TT T R N Y                        O     D NT                    D              EITO              N     RIE         ER
         & YN O               CI     S   T            I     R   I     I      IE        E                 S   CG       I    DEEOVS                LO D     TE P               AH                S B O           G S SK S C                                   NE            EGCTEN Y IC R               RC     C   N R                T   E E NC N                      I              UR      .V    C NCDI L

US T LI O TR U O U A R R EO E L O SO N ;AE BN I IL C NA H C T L CD C B N ,T N U3MPRN O Y L T O U c E I I U NER D0RSOA EI I U C G I I L L P N ACO NON IT T T E NNP . N4 FIST A U 3 O UAES A8R NN OL I

                                                                                                              ,LRT               E0OE            TO I      L     F       ,NP1IM                I L                                                                                                       EITI          EI           TE       EV T   NENH NTDGAL                         V I                                                                               N                       IVES IENNLP                         IO O                   C   TRV-          TLAIOM                TN C                                                                               I                       UUEF UL                 DII . A T                   E   OS F OU;UV                       )  L A                                                                               A                       R EO RBAL OG E .

N P ,E TCOTN RR F I ESG EANN I O D S :CNN  : IDI ET NT AR )NEI ) ,RS OC N 4 4 4 R EO N 8ACR 9FGSDUE IE N 7 7 7 E RO 0NIU 0ONRELT TP I 9 9 9 V AC I 0 ELD 0 IOTI CS M 1 1 1 S I 5T 5PTTCAE AN R R TY 8NFE 8USCEFC I

                                    ,             , , , E                       NT                           (IOT          (NEEP(N               E FS                7     1     1   H     I         EIT                             A     I        OTPS A EC OI                1     2 2 0 P                   NLN                          8MPS 0L SNSL SR A                   L                             T P             IIE                                UN 2LENIAL NN T               EO                R R R                 I         TBM                          E ,H O            OCI         EI    E MMM          0 E             SP                E E E G S                       NAE                          NYO           EFI SRE CE M   M        S U                 A             B B B           N S             OIE                          UTLS N VCAAV                        IN M   M        E H             IE                M M M           I     I         CLR                          JELR          U;RRE R LO M   M        N D             MN                E E E           L     S          - EG                           FOU JSENRGU M   M        N 0                 N R C C C O S                                 DRA                          HAFO              GS ANS               Y M   M        I      0        8I          H E E E O                   I         I                            GS H HNNO                     I     : B M   M                                                          C                                            U D           GIIHXNR               )

M M M. G. 2. M P. D. D. D. M. M. OLN1 UD TIIO 0S M M . . . . . . . . . . RAA4 ON; SAF 1R M M M M M

                  .        OR Y R
                                                              . D        .
                                                                                   .                         HN,G RIMY TO            HFABEET 5O M           0U M2M            . .        RT               . T E E O R                            .                            IKN T R HRN 8H M   M          . .        FC               . I     N T H E                      .                         4TRI              NGET E            ( -

MDM . . . L E A T T . 1AOD 0OOT QM R MNM . . NN' . A G R E A RHU 1IRIFHP 2O MAM MLM N

                . . OO
                                            . C           E M H            Y.

T LE L TPSOTI 2T II . I T P I . IPRC EC N U C MSM O . . TT . T S O G G L . YE MIM M M I T CA EL R R I 1 N N I . Y RO N NEGO .EQ P XI UPN HE AP L I I B . R ATI JSISET MS MEM P . . RU O C R A L L A . A NDS NTRC D N MIM I . . IP T E I O O I . M NANR NISUINE NI MRM R . . DO C L N C O O L . M OLEO O EOFIL O MIM C . . P A A E R C C E . U PPT STHF L 2 MAM S . . D E I E R . S N PC NU ODO N1 MRM E . . NT R T C M R R L O ,AE OOER ER O MPM D N . Y AS I E M E E CI N IS P IICOLIT IF M M OE T E F N L O S S IC O TG,S TVITAFN TO _ M M Y IT N TR O I E C N N RN I CNTN CEVCNIO C . M M T TA U SA E E TU T EIRI ERREOTC EL M M I AT O IE E E E E D D CO C PDO PPEPIN PA _ M M L CS C DN P T T T N N EC E SNPC S SSGEE St M M I O Y A A A O O L P NIER NNNNEDS No - M M C L T D D D C C E S IFRN IOIIRIU IT M M A N MMM F I

t

                                                                   =               = 3  -
                                                                   =               = 7
                                                                   =               = 2  -
                                                                   =               E  - _
                                                                   =        _      = 2  _

MMM = E _ M M = E E _ M M = E G _ M M = = A - M M = = P M M = = M M = E M M = E M M = E M M = = M M = _ E M2M = _ = M M = E MDM = = MNM = = MAM = = MLM = = MSM = - = MIM = - = M M = _ = MEM = E MIM = = MRM = E _ MIM = = MAM = E MRM = = MPM = E M M = = M M = = M M = _ E M M 5 = _ = M M 8 = = M M 9 = _ = M -M 1 = _ = M M = _ = MMM , = _ E 5 = =

                                                                   =               =
                                                                   =               =
                                                       .           =               E

_ T = = P E = = E = =

 -        )                                          S         E =                 =

D = = E N S = _ = U O = _ = N N = _ = I E = = . T G E = E N A = = O T C = = C U = =

 .        (                                          O         I   =               =
                                                                   =               =

G L = _ = _ - N = = I = _ = L = R S E M = E U = E U F 0 = = E = = T R R = _ E

                                                                   =          _    E

_ A D F = . = E = . = T L = E U = _ E S D S = _ = _ E = _ E _ H T = = C = = S R = =

                                                                   =               =

N A 0 = E 5 = = O O 8 P = E T 9 = E I 1 E = = N = - = T H , R = . E O 8 = . E C D 2 = . =

                                                                   = T             E E                                          G -           = C            =

N = E = P  : I 5 = J E

                                    )                T 2           =   B           E S                         S                S             = U             E E                A E           =   S           =

N R O N = = U C U = = I D J = =

E , = E S C Y : = FT =

M O L = OR = E R L E 2 = O = L P A T 1 = EP = B M A 0 = TE E O D R D 5 = AR = R N O 8 = D = P A N N = = O = = T S G I  : = = 5 N N N T O = = 8 E A I C N = F = 9 N L T E = OT = 1 Y O P  : A P T = N = R P ( S R S R = EE = L A M M E N O = TV = U M O S E P I P = AE = _ E = D = J M C M T  : O U E I S E R = = d S D T U S T = E o N I L T I I N =  :

        - i      T     S    A             A      A       S O       =               E

_ r N M Y I T T I = R = _ e E E S T R S I E T = E = P M T M I E N I C = B = _ E I E L G T U E = M E t C E T E I E % E N T P = U = r R N R S N C N 4 N A E S S = N = o O O E Y O A O A O L H A N E = p F N H S N F N M N P T L I = = e N T R E O ll! .l

l l

1. Dock et 50-254 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M QUAD CITIES 1 M
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
3. Utility Contacts CAROL KRONICH (309) 654-2241 X193 AVERAGE DAILY P0HER LEVEL (MHe) PLOT Q. Licensed Thermal Power (MHt): 2511 OUA0 CITIES 1
5. Nameplate Rating (Gross MHe): 920 X 0.9 = 828
6. Design Electrical Rating (Net MHe): 789
7. Maximum Dependable Capacity (Gross MWe): 813 1500
8. Maximum Dependable Capacity (Net MHe): 769 MIGN M. MIM- 789
                                                                                                        .    ....MRX. DEPDO.      CM. -             789 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE o W

12. Report Period Hrs 744.0 5.087.0 115.895.0
13. Hours Reactor Critical 744.0 4,838.0 93,160.5 reo om se excessen umet ornwu. omernous h
14. Rx Reserve Shtdwn Hrs .0 .0 3.421.9 5
                                                                                                                                    -----                  -- - -             100
15. Hrs Generator On-Line 744.0 4.780.4 89.814.9 f
                                                                 .0           .0                                                                                     -80
13. Unit Reserve Shtdwn Hrs 909.2
17. Gross Therm Ener (MHH) 1,724,887 11,206.254 186,952,644
                                                                                                                                                                     - so
18. Gross Elec Ener (MHH) 561.727 3,695.572 60,473.135
19. Net Elec Ener (MHH) 537.014 3.537,590 56,492.585 100.0 94.0 77.5 - 90
20. Unit Service Factor
21. Unit Avail Factor 100.0 94.0 78.3
22. Unit Cap Factor (MDC Net) 93.9 90.4 63.4 - 30
23. Unit Cap Factor (DER Net) 91.5 88.1 61.8
                                                                 .0         5.6           5.8      0     ~
20. Unit Forced Outage Rate
                                                                                                               ~

0 s io t's do~ is do

25. Forced Outage Hours .0 281.3 3.137.1 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

JULY 1985 NONE

27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-274

5 7

                                             .                                                            2 T                                                                -

N O O 2 MMM E T T E M M M A M e T E E G M M c S U U A M M n U D D Y P M M e J T M M r . D T T I . M M r S C C A N N L S M M u E I I E E I E M M c C M M N M M B C M M e N O O R T T A N M M R A N N E S S R A M M L O . O T U U E L . M1M t L C R C T J J P L _ M M n I E E E A D D O I _ MSM e E H P A A N E MEM v V N C N I V _ MIM e R O T O D N N R MTM r U A O R R I U - MIM P S T P T R E E C S MCM I S I T T P M M o E N I N L T T L E MDM t N U D U O A A . N MAM I R P P O) I MUM n B E D E T TS B MQM o R C A C N D D R R M M i U A O A O O O EU U M M t T L L L C R R UO T M M c P P DH M M A R R R R R R M M O O E O O O O N7 O M M e F T . P T . F F F W8 F M M v ) ) O M M i E EC M EC E E . E . D2 E M M t H HG U HG H NS HS T- H MMM c M ME M ME M MM MM E U- M e ( I ( E HN r 0 0 N 0 G 0L 0L SH 0 r 0 5L I 9L 5 5B 5B O 0 S o 7 7O M 7O 5 5O 5O YDR 7 R C R R LT N O OT O OT O GP CP RU O a T TN T TN T T T EH T O O O T T DS e D DC D DC 3 DI DI R D I s A A A A A AM AM OD A u O ON O ON A OI OI E O . ) T a L LO L LO L LL LL DT L E 1 C I I EA C D DT D DT D DL DL CN D V t6 E EA E EA E EA EA NI E O r1 U C CR C CR C CM CM EM C B o0 A t p-U UE U UE U UR UR MR U n eG D D DN D DN D DE DE ME D L e r tRE E EE E EE E EH EH OT E I n o e R E R RG R RG R RT RT C( R A o ffetU R t T o H ohnH n E m s S e( e N Z Z Z D X X Z N D o &nn v

   /       n  I      Z      Z Z           O X        X        Z       I           C       o o yE e o  B Z           Z Z           R L        L        Z       B   N           Fiir            l o  R Z           Z Z           N E        E        Z       R   I       8       tttei S       m  U Z           Z Z           O U        U        Z       U               t c a n eF o  T Z           Z Z           C F        F        Z       T   D        m  i u rE s N     C                                                                E        e  bra it p a eR n)

T t W m S s h s et cE e I v xnraiL 0 t A X Z X C C C Z A L S EIPDL( s H X Z X R R R Z H D v S

         $                                                                N                m      d T                                                                      O                a       a I

T rm cadL o U r C Sre e H b U cud m D llSne S u E aa icr N R d uuotue 9 o n nt ndh R 0 9 h aauoet T E - t MMACRO L 5 H e - - I 8 T M 123459 I N d W r a 5 5 5 5 5 D o U h 5 5 5 5 E r i r a T A E h R n rn n n E ireo o o P mehi i D H O d pt t t s H H H H H H H AOOc a a 1 - ign e FGH r ni R S tim s 0 0 0 0 0 0 0 0 0 E sna r I et ei x u 0 0 0 0 0 0 0 0 0 T rs RaE o I ue r yT e 5 H C lT i gr s 8 9 i D arnorn 1 sS S S S S S S F 5 A F oit o e U latc s Q pt el ai L I n i n u u rL U o uif g e J 5 5 5 5 5 5 5 5 5 8 8 8 8 8 8 8 8 8 s q a e e p& d e / / / / / / / / / a EMRRO o t 6 9 0 6 1 3 4 5 8 e - - i a 0 0 1 1 2 2 2 2 2 MMM R ABCDE

                                                               /       /    M   M r   D     / /           / /           / /        /

MYM e 7 7 7 7 7 7 7 0 7 0 7 0 MRM d P 0 0 0 0 0 0 ed MAM _ t MMM ce r 4 5 6 7 8 9 0 1 2 MMM rh o 3 3 3 3 3 3 4 4 4 MUM m oc p

                                      -          -     -        -       -   MSM     o  FS o    -     -        -             -

5 5 M M v - e N 5 5 5 5 5 5 5 8 8 MMM T FS R 8 8 8 8 8 8 8

                                                                                                                                                   \

l EUMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u QUAD CITIES 1 M EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985 l FACILITY DESCRIPTION UTILITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS LICENSEE.................COMMONHEALTH EDISON COUNTY...................R0CK ISLAND CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLIN0IS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 20 MI NE OF CONTRACTOR MOLINE, ILL ARCHITECT / ENGINEER.......SARGENT & LUNDY TYPE OF REACTOR............BWR HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 18, 1971 CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER IST GENER... APRIL 12, 1972 TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 18, 1973 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING HATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......A. MADISON ELECTRIC RELIABILITY LICENSINC PROJ MANAGER.....R. BEVAN COUNCIL..................MID-AMERICA DOCKET NUMBER........... 50-254 INTERPOOL NETHORK LICENSE 3 DATE ISSUANCE....DPR-29, DECEMBER 14, 1972 PUBLIC DOCUMENT ROOM....... MOLINE PUBLIC LIBRARY 504 17TH STREET MOLINE, ILLINDIS 61265 INSPECTION STATUS 1RSPECTION

SUMMARY

INSPECTION ON APRIL 1 THROUGH MAY 31 (85012): ROUTINE, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTORS OF ACTIONS ON PREVIOUS INSPECTIONS FINDINGS; OPERATIONS; RADIOLOGICAL CONTROLS; MAINTENANCE / MODIFICATI0HS; SURVEILLANCE; HOUSEKEEPING; PROCEDURES; FIRE PROTECTION; EP!ERGENCY PREPAREDNESS; SECURITY; QUALITY ASSURANCE; QUALITY CONTROL; ADMINISTRATION; ROUTINE REPORTS; LER REVIEN; TMI ITEMS; REGIONAL REQUESTS; HEADQUARTERS REQUESTS; AND INDEPENDENT INSPECTION. THE INSPECTION INVOLVED A TOTAL OF 542 INSPECTOR-HOURS ONSITE BY THQ NRC INSPECTORS, INCLUDING 50 INSPECTOR-HOURS ONSITE DURING OFFSHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. MINOR AREAS OF CONCERN HERE IDENTIFIED IN OPERATIONS SURVEILLANCE, QUALITY ASSURANCE, AND PROCEDURES. OVERALL, THE LICENSEE'S PERFORMANCE HAS REMAINED STEADY. INSPECTION DN MARCH 21-22, 28, APRIL 3, 11-12, 15, 25, MAY 6, 7, 16, 31 (85016): ROUTINE, UNANNOUNCED INSPECTION OF INSERVICE INSPECTION (ISI) ACTIVITIES, IE BULLETIN 80-07, PREVIOUS INSPECTION FINDINGS AND CORRECTIVE ACTION RELATED TO HELDING ON THE TRANSFER PANELS. THIS INSPECTION INVOLVED A TOTAL OF 66 INSPECTOR-HOURS BY THREE NRC INSFECTORS INCLUDING FOUR INSPECTOR-HOURS DURING OFF-SHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE PAGE 2-276

b

                                                        =                            =     7
                                                        =                            =     7
                                                        =                            =     2
                                                        =                            =      -
                                                        =           -                =     2
                                                        =                            =

MMM = _ = E M M = G M M = _ M = _ = A M = = P M M = M M = M M = = M = = M = = M M = M M = M = = M = = M M = = M M = = M1M = = M M = MSM = __

                                                        =                            =

MEM = = MIM = = MTM = = MIM = = MCM = = M M

                                                        =            _               =

MDM = = MAM = = MUM = = MQM = = M M

                                                        =                            =

M M = M M =

                                                        =                            =

M M = - E = M M = L = M M

                                                        =                      B     =

M M M M = _ A =

                                                        =                      R     =

M M = E = MMM = P =

                                                        =         -
                                                                  -            O     =

m

                                                        =         -_           H =
                                                        =                      I     =
                                                        =                            =

E = P =

                                                        =                      M =
      )                                            E =                         U =

D = P = S = = E = R = U E = N N = I = T = T E = A = N O C =

                                                        =
                                                        =
                                                                    =H         E =
                                                                                    ==

C I = C = _ ( _ = I = L = V =

                                                        =                      R     =
        -                                               =                      E     =
                                                        =                      S =

M = _ = S = R = U 0 = H =

                                                        =                      R =

R = = T = B = 5 F = 1 = A 8 = = T 9 = D = 1 = N = S S = A =

                                            ,            =                            =

0 T = R =

 .                                                       =                     O =

3

.-                                      .          R =                          T     =
                                      )   R              =                      A =
 ._    N                              C E          O =               -

_ R = G B = - E = O E M P = - N = ( E = - E = I T E = G = L P = = T O E R = L = R S = E = T = S =

 ~

C N - = T E = E O = C I = C 1 = E D =

= J _ =

P = B 2 =

                     )                N T                                  -

S S O S = U -

                                                                                / =

E I U = S 1 = R T G = = N A U = = U = I D R A =

E E = 5 =

S C N = FT- 8 = M O E  : = OR- / = E R G E 4 = O.. . 0 = L P T 2 = EP _ 1 = B C A 0 = TE _ / = O D I D 5 = AR 7 = R N M 8 = D 0 = P A O N = = N O = = T S O I  : = = 5 N N C T O = 5 = E A E C N = F 8 = 8 E = OT_ / = 9 N L 1 O P P ( S N P T O S R

                                                          =
                                                          =     N.

EE-7 = 1 = L M M N O = TV _ / = U O S E G I P = AE _ 6 = C M T  : N E = D 0 = J = = E I S I E R D U N T = = d T

                                                          =                            =

o N I L T O I N A A L S O = = i S A = R = r M Y I T L I e E S T R S O E T = E 8 = E C = B 0 = P T M I F I E = M - = I E L G T t T E I E A E N D T P = U 5 = R S N C N N N A A S SL = N 8 = r = = o E Y O A O A O O A N = p H S N F N M N P L L I = e T R O 4

1. Docket 50-265 0 P E R A T-I N G STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
2. Reporting Period: 07/01/85 M QUAD CITIES 2 M Outage + Cn-line Hrs: 744.0 MMMMMMMMMMMMMFMMMMMMMMMMMMMMMMMMMMMM
3. Utility

Contact:

CAROL KRONICH (309) 654-2241 X193 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 2511 QUA0 CITIES 2
5. Nameplate Rating (Gross MWe): 920 X 0.9 = 828
6. Design Electrical Rating (Not MWe): 729
7. Maximum Dependable Capacity (Gross MWe): 813 1800
8. Maximum Dependable Capacity (Het MWe): 769 DESIGN M. WM = 789
                                                                                         ......PMX. DEPDO. Cfr. - 789 (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Not MWe):
11. Reasons for Restrictions, If Any NONE 1000 -

MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 115,005.0
13. Hours Reactor Critical 744.0 2.975.9 87.882.1 m em M messo most ortset cenerttaus
14. Rx Reserve Shtdwn Hrs .0 .0 2.985.8 ---- - --
                                                                                                                                           -100
15. Hrs Generator On-Line 744.0 2.903.9 84,953.2 l
16. Unit Reserve Shtdwn Hrs .0 .0 702.9 - 80
17. Gross Thern Ener (NHH) 1,780,205 6.649,052 178,168,119
18. Gross Elec Ener (MHH) 575.235 2.161,801 56,815,190 - 80
19. Net Elec Ener (MHH) 550,535 2,065.632 53,384,431
20. Unit Service Factor 100.0 57.1 73.9 - to
21. Unit Avail Factor 100.0 57.1 74.5
22. Unit Cap Factor (MDC Net) 96.2 52.8 60.4 - 30
23. Unit Cap Factor (DER Net) 93.8 51.5 58.8
24. Unit Forced Outage Rate .0 6.2 8.3 0 , ,. , , , ., o 0 5 to 15 30 25 30
25. Forced Outage Hours .0 191.5 3,818.2 DAYS
26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
                               -                                                                                I NONE
27. If Currently Shutdown Estimated Startup Dates N/A PAGE 2-278

l MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Feriod JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M QUAD CITIES 2 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M l No. Data liii Hours Reason LER Number system domoonent cause a Corrective Action to Pr ev ent Recurrence 85-26 07/02/85 S 0.0 H 5 XX ZZZZZZ REDUCED LOAD TO 770 MNE TO PLACE UNIT DN ECONOMIC GENERATION CONTROL (EGC). 85-27 07/07/85 S 0.0 H 5 HA TURBIN REDUCED LDAD TO 700 MHE FOR TURBINE SURVEILLANCES. 85-28 07/09/85 5 0.0 H 5 XX ZZZZZZ REDUCED LOAD TO 750 MWE TO PLACE UNIT ON ECONOMIC GENERATION CONTROL (EGC). 85-29 07/10/85 S 0.0 H 5 ZZ ZZZZZZ REDUCED LOAD PER LOAD DISPATCHER. 85-30 07/11/85 S 0.0 H 5 ZZ ZZZZZZ REDUCED LOAD PER LOAD DISPATCHER. 5 0.0 H 5 HA TURBIN REDUCED LOAD TO 600 MHE FOR TURBINE SURVEILLANCES, AND 83-31 07/20/85 REMAINED AT 600 MHE FOR MAIN TRANSFORMER PROBLEMS AND TESTS. 85-32 07/27/85 S 0.0 H 5 HA TURBIN REDUCED LOAD TO 700 MNE FOR TURBINE SURVEILLANCES. l M:MMMMMMMMM QUAD CITIES 2 OPERATED HITH 7 REDUCTIONS LISTED IN DETAIL ABOVE. M

SUMMARY

M EMMMMMMMMMM Tvom Raaman Met hod Svstem & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 5-Auto Scran Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                             & License Examination        9-Other         (LER) File (NUREG-0161)

PAGE 2-279

                            ~

UKNMMMMMMMMMMMWMMMMMMMMMMMNMMMMMMMMM M OUAD CITIES 2 M EMMMMMMMMMMMMMMMwMKNMMMMMMMMMMMMMMMM FACILITY DATA- Report Period JUL 1985 FACILITY DESCRIPTION UTTLITY & CONTRACTOR INFORMATION LOCATION UTILITY STATE....................ILLIN0IS - LICENSEE.................COMMONNEALTH EDISON

                                                                             ~~

COUNTY...................RDCK ISLAND CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM . NEAREST PDFULATION CTR.. 20 MI NE OF CONTRACTOR MOLINE, ILL ARCHITECT / ENGINEER. . . . . . .SARGENT & LUNDY TYPE OF R EACT OR . . . s . . . . . . . . BNR NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC

                                                                    ~

DATE INITIAL CRITICALITY... APRIL 26, 1972 ' (ONSTRUCTOR..............UNITEDENG.& CONSTRUCTORS DATE ELEC ENER IST GENER...MAY 23, 1972 TURBINE SUPFLIER......... GENERAL ELECTRIC l l DATE COMMERCIAL OPERATE.... MARCH 10, 1973 REGULATORY INFORMATION CONDENSER COOLING MCTHOD...ONCE THRU IE REGION RESPONSIBLE......III CONDENSER COOLING MATER.... MISSISSIPPI RIVER IE RESIDENT INSPECTOR......A. MADISON r . ELECTRIC RELIABILITY _~ LICENSING PROJ MANAGER.....R. BEVAN COUNCIL..................MID-AMERICA DOCKET NUMBER. . . . . . . . . . . 50-26 5 INTERPOOL NETWORK

                                                                          <-      LICENSE & DATE ISSUANCE....DPR-30, DECEMBER 14, 1972
                                                                        ~

PUBLIC DOCUMENT ROOM....... MOLINE PUBLIC LIBRARY 504 17TH STREET MOLINE, ILLINOIS 61265 IN$PECTION STATUS INSPECTION

SUMMARY

INSPECTIONONAhRIL 1 THROUGH MAY 31 (85012):' ROUTINE, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTORS OF ACTIONS ON PREVIOUS INSPECTIONS FINDINGSs OPERATIONS RADIOLOGICAL CCNTROLS: MAINTENANCE / MODIFICATIONSs SURVEILLANCE; HOUSEKEEPING: PRDCEDURES; FIRE PROTECTIONs EMERGENCY PREPAREDNESS; SECURITYs GUALITY ASSURANCE; GUALITY CONTROL s ADMINISTRATIONS ROUTINE REPORTS; LER REVIENs TMI ITEMSs REGIONAL REQUESTS; HEADOUARTERS REQUESTS AND INDEPENDENT INSPECTION. THE INSPECTION INVOLVED A TOTAL OF 542 INSPECTOR-HOURS ONSITE BY TWO NRC INSPECTORS, INCLUDING 50 INSPECTOR-HOURS ONSITE DURING OFFSHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. MINOR AREAS OF CONCERN HERE IDENTIFIED IN OPERATIONS SURVEILLANCE, QUALITY ASSURANCE, AND PROCEDURES. DVERALL, l THE LICENSEE'S PERFORMANCE HAS REMAINED STEADY. INSPECTIDH DN MARCH 21-22, 28, APRIL 3, 11-12,-15, 25, MAY 6, 7, 16, 31 (85016): ROUTINE,' UNANNOUNCED INSPECTION OF INSERVICE INSPECTION (ISI) ACTIVITIES, IE BULLETIN 80-07. FREVIOUS INSPECTION FINDINGS AND CORRECTIVE ACTION RELATED TO NELDING ON THE TRANSFER PANELS. THIS INSPECTION INVOLVED A TOTAL OF 66 INSPECTOR-HOURS BY THREE NRC INSPECTORS INCLUDING FOUR. INSPECTOR-HOURS DURING OFF-SHIFTS. NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED. INSPECTION ON MAY 25 THROUGH JUNE 24 (85018): ROUTINE, ANNOUNCED INSPECTION BY REGION BASED INSPECTORS OF PREVIOUS INSPECTION FINDINGSs LICENSEE EVENT REPORTS CONTAINMENT INTEGRATED LEAK RATE TEST (CILRT): TECHNICAL SPECIFICATI0NSs LOCAL LEAK RATE RESULTS AND TEST PROCEDURES; AS FOUND CILRT RESULTS AND INDEPENDENT INSPECTION OF SAFETY RELATED TRANSMITTERS. THE INSPECTION INVOLVED 79 INSPECTOR-HOURS ONSITE BY TNO NRC INSPECTORS INCLUDING 23 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. AN ADDITIONAL 29 INSPECTOR-HOURS NERE EXPENDED IN THE REGION III 0FFICE. OF THE SEVEN AREAS INSPECTED, MO VIOLATIONS OR 3EVIATIONS HERE IDENTIFIED IN SIX AREAS. IN THE REMAINING AREA, ONE VIOLATION HAS IDENTIFIED; (FAILURE TO CONTROL A FIELD CHANGE HITH CONTROL MEASURES PAGE 2-280

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M QUAD CITIES 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

COMMENSURATE WITH THOSE APPLIED TO THE ORIGINAL DESIGN), ENFORCEMENT _

SUMMARY

NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: NOME FACILITY ITEMS (PLANS AND PROCEDURES): NDHE MANAGERIAL ITEMS: NONE PLANT STATUS: UNIT IS OPERATING NORMALLY. LAST IE SITE INSPECTION DATE: AUGUST 1 - SEPTEMBER 30, 1985 INSPECTION REPORT NO: 85027 REPQRTS FR0M LICENSEE

                                                    ==================================================================================================================================

NUMBER DATE OF DATE OF SUBJECT EVENT REPORT __ 85-15 06/28/85 07/19/85 'A' REACTOR BUILDING VENT MONITOR DRIFT & FAILURE OF TH0 VENT DAMPERS TO CLOSE

                                                    ==================================================================================================================================

PAGE 2-281

_ 2 8 2 2 E G A P h 0 0 8 0 MMM T ~ - e. M M O ) ~ 0 M M  % M M L P 0 H " 3 M M 0 T - M M ) 1 N " M M e ( O M M W 83 M ~ M M M -,35 M M ( 0W 1 S ~ - M M ~ I ~ M M L M M E 1 H ~ M1M V - - T " M M E O -0 MOM L C M.M T " -3 MCM I U MEM R E S E P " S MSM T M MOM O O M N MC . U "

                                                                                                                                                  ,51A Y

MHM .S O MCM P H D MNM Y C D R MAM MRM L Wf I 4 MEPD E W - M M A R O .o M M M M D M. I t P t M M E D T M M G W M M A F E M M R . N 5 M M E - M M V - O MMM A - N

                                                                                                            ,                                          0 0                                                                          ,

0 , 0 8 , 1 f 0 E0 9 7 7 2 0 9 3 6 0 8 4 2 5 5 V . . 9 8 6 . . 8 S 4 3 I2 8 7 1 0 4 9 8 4 6 8 6 9 9 8

                                                                                                                                                                      /

4 6  : T9 0 4 8 1 5 5 4 4 2 2 ) 1 U 7 9 s A1 4 6 2 2 0 3 1 2 n 3 n L . 4 0 3 o / T = o U0 1 0 9 1 0 8 4 0 i 8

2 8 7 3 s M9 5 1 4 2 t 0 A s 7 9 1 1 7 a  : U 2 0 8 a r 7 9 9 8 e ) C 2 4 3 r T H 2 0 R e 1 u

S e X e W D, M 0 5 5 2 0 3 6 8 8 8 0 6 8 8 n v . 7 4 8 . e : i 1 0 i t R7 8 5 8 9 8 9 1 1 9 7 8 6 t e l 1 7 G e A8 1 9 1 3 3 2 2 5 a t O - 2 0 N E0 7 4 6 6 6 9 1 a n 3 1 , ( Y. 6 6 8 D, D N O -  : t 5 1 1 0 3 2 e 2 ) r y . p p I + 5 e  : o n 4 1 1 y u T e 4 W ) p A T t g M e e ( r

             )              :             WR            f               0       0      0     0       0  0     0      0    0     R 0        0    0          0           a A a 6                      )      s M                  I                  .

s t t 1 e s t  : H4 h S R u 9 W o t s , y T4 t O ( M r e a d n N7 n d E G N L e A O o e O  : : t ( ( t M M t P B ) ) e e c f a 5 M t e N y y c i I 6 m 0 8 O HW ( t t n r i

        /    L    MM             i i i                  t        ,                                                                  )      )                      t   t 1     O    (          g c c S                     s s                                                                        t      t                        x   s 0     C          s n a a                           e n                                         s                              e e e                          e E
       /           r s i p p e                          R       o               l                     r )                           N    N      t                 N 7     N O

e o t a a v i a s e H H ) a n 0 w r a C C o h t c r n H H C R R r w P o G R b c c i H i n M H ) r D E s e o _ P ( e e A i i t L w ( M H o M D e r v d _ l l l h r s i n - d ( H t r ( ( g u O t 2 d o t

l g a b b a n c a a u r H t s

r r w n t r M c o a o u . H C d O h e r ( a t r r t H d h 1 i c m r a r i i d d c o e t S n e F c o o u e S 3 e t t r n n c T R d r h r E n r a t t O e h

  -                e a t c p p e e O                                  o  o       S         o    e         E       e e F          c c                     g c        y 0

5

       ". n h R o T            e e e s l

e o r i t r c e a r r c E i t v m n c l a a d a S F F e t l t g C e l D D e v f e ae rve rs he e e v l c u s n n d t E g e P l c r a p p r O n e i y e a m m n L s R e n e T E e e v a a o w r t t t s l n u u a n t s e R l S A C C F d o r k e r i n o l e p g m m h e i i i C E r e s o r s e G o r R s s E s s e d u t t t t t t c t E C c p i c m s x x N w a p u s i o o t i i i i i r u N o e t i a e a D R U a f O o e e o x r n r r e n n n n n o h O f L N D M M I N P R R H R H U G G N U U U U U F S N I 1 2 3 4 5 6 7 8 9 0 1 2 1 3 1 4 51 6 7 8 9 01 1 2 3 4 5 6 7 1 1 1 1 1 1 2 2 2 2 2 2 2 2

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0NNS / REDUCTIONS M RANCHO SECO 1 M MMMMMMMMMMMMkMMMMMMMMMMMMMMMMMMMMMMM No. Data E Hours Reason Method LER Number $vstem domoonent Cause & Corrective Action to Prevent Recurrence 5 05/15/85 S 744.0 C 1 RC FUELXX SHUTDONN FOR REFUELING & MAINTENANCE CONTINUES. t 00MMMMMMMMM RANCHO SECO 1 REMAINS SHUTDOWN IN A CONTINUING REFUELING /MAINTCHANCE OUTAGE. M

SUMMARY

M OOMMMMMMMMM Tvon Reason Method System & Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-McInt or Test G-Oper Error 2-Manual Scram Instructions for C-Refuelina H-Other 5-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load ' Li censee Event Report

                             & License Examination       9-Other           (LER) File (NUREG-0161)

PAGE 2-283

DOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

D RANCHO SECO 1 . M DOOMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMX FACILITY D'A.T A Report Period JUL~1985 FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION- UTILITY STATE.................... CALIF 0RNIA L ICENSEE. . . . . . . . . . . . . . . . . SACRAMENTO MUN. UTIL . DISTRICT COUNTY................... SACRAMENTO CORPORATE ADDRESS. . . . . . . 6201 S STREET P.O. BOX 15830 SACRAMENTO, CALIFORNIA 95813 4 DIST AND DIRECTION FROM 1
                     . NEAREST POPULATION CTR.. 25 MI-SE OF                                         CONTRACTOR SACRAMENTO, CA                                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PHR                                                      NUC STEAM SYS SUPPLIER... BABCOCK & HILCOX BATE INITIAL CRITICALITY... SEPTEMBER ~16,     1974                                 CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER.. 0CTOBER 13, 1974                                         TURBINE SUPPLIER.........HESTINGHOUSE DATE COMMERCIAL OPERATE.... APRIL 17, 1975                                     REGdLATORY INFORMATION CONDENSER COGi!NG METHOD... COOLING T0HERS                                       IE REGION RESPONSIBLE......V z

CONDENSER COOLING HATER....FOLSDM CANAL IE RESIDENT INSPECTOR......J. ECKHARD ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....S. MINER COUNCIL..................NESTERN SYSTEMS DOCKET NUMBER........... 50-312 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-54, AUGUST 16, 1974 PUELIC DOCUMENT ROOM....... BUSINESS AND MUNICIPAL DEPARTMENT SACRAMENTO CITY - COUNTY LIBRARY

  • 828 I STREET SACRAMENTO, CALIFORNIA 95814 INSPECTION STATUS INSPECTION

SUMMARY

                   + INSPECTION ON MAY 4 - JULY 19, 1985 (REPORT NO.                     50-312/8S-13) AREAS INSPECTEb                      THIS ROUTINE INSPECTION BY THE RESIDENT

' INSPECTORS INVOLVED THE AREAS OF OPERATIONAL SAFETY VERIFICATION, MAINTENANCE, RErUELING, AND SURVEILLANCE ACTIVITIES. DURING

                  .THIS INSPECTION, VARIOUS INSPECTION PROCEDURES HERE COVERED. THE INSPECTION INVOLVED 152 INSPECTOR-HOURS ONSITE BY TH0 RESIDENT NRC INSPECTORS.                                                                                                                                                                        .

t I RESULTSi NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

                   + INSPECTION DN MAY 20-24, 1985 (REPORT NO.            50-312/85-14) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
                   + INSPECTION ON MAY 13 - JUNE 17, 1985 (REPORT NO. 50-312/85-15) AREAS INSPECTED: A ROUTINE, UNANNOUNCED INSPECTION OF KNONLEDGE

- AND PERFORMANCE OF DUTIES (TRAINING), STAFFING, AND LICENSEE AUDITS. THE INSPECTION INVOLVED 36 INSPECTOR-HOURS ONSITE BY ONE NRC

           - y     INSPECTOR.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED. O INSPECTION ON JUNE 1 - JULY 31, 1985 (REPORT NO. 50-312/85-16) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH. O INSPECTION OH JUNE 24-28, 1985 (REPORT NO. 50-312/85-17) AREAS INSPECTED: AN UNANNOUNCED, SAFETY INSPECTION BY A REGIONALLY PAGE 2-284 I'

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M RANCHO SECO 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION

SUMMARY

BASED NRC INSPECTOR AND TWO NRC CONSULTANTS FOR THE FOLLONUP OF GENERIC LETTER 83-28, " REQUIRED ACTIONS BASED ON GENERIC IMPLICATIONS OF SALEM ATHS EVENTS", TI 2515/64 REV. 1, "NEAR-TERM INSPECTION FOLLOHUP TO GENERIC LETTER 83-28", ANC IE BULLETING. THE INSPECTION INVOLVED 39 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR AND 73 HOURS BY THQ NRC CONSULTANTS. RELULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS HERE IDENTIFIED.

                             + INSPECTION ON JUNE 3 - NOVEMBER 29, 1985 (REPORT NO.                          50-312/85-18) REPORT BEING PREPARED; TO BE REPORTED AT A LATER DATE.
                             + INSPECTION DN JUNE 23 - AUGUST 9,                      1985 (REPORT NO. 50-312/85-19) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
                              + INSPECTION ON JULY 8-11, 1985 (REPORT NO.                       50-312/85-20) RE*0RT BEING PREPARED; TO BE REPORTED NEXT MONTH.
                             + INSPECTION ON JULY 8-26, 1985 (REPORT NO.                        50-312/85-21) REPORT BEING PREFARED; TO BE REPORTED NEXT MONTH.
                              + INSPECTION ON AUGUST 12-16, 1985 (REPORT NO.                       50-312/85-22) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
                              + INSPECTION ON HAY 16-23, 1985 (REPORT NO.                       50-312/85-23) AREAS INSPECTED: THIS ANNOUNCED INSPECTION CONSISTED OF A REVIEW OF THE PROGRAM PLAN, PROCEDURES AND RECORDS PERTAINING TO THE RANCHO SECO INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES. THE INSPECTION INVOLVED 66 INSPECTOR-HOURS ONSITE BY ONE NRC CONSULTANT.

RESULTS: IN THE AREAS INSPECTED, TWO VIOLATIONS CF NRC REQUIREMENTS HERE IDENTIFIED (FAILURE TO FOLLON PROCEDURES FOR CALIBRATION OF GAUGES, AND FAILURE TO FOLLON PROCEDURES FOR TESTING OF RELIEF / SAFETY VALVES), AND ONE UNRESOLVED ITEM HAS IDENTIFIED (ADEQUACY OF PROCEDURES TO IMPLEMENT SER AND CODE REQUIREMENTS).

                               + INSPECTION ON JULY 22-25, 1985 (REPORT NO.                      50-312/85-24) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

ENFORCEMENT

SUMMARY

TECHNICAL SPECIFICATION 6.8.1 REQUIRES THAT HRITTEN PROCEDURES BE ESTABLISHED, IMPLEMENTED, AND MAINTAINED COVERING ACTIVITIES INCLUDING SURVEILLANCE AND TEST ACTIVITIES OF SAFETY RELATED EQUIPMENT. ALSD, TECHNICAL SPECIFICATION 4.6.4 REQUIRES IN PART, ...

                       " BATTERIES IN THE 125 V DC SYSTEMS SHALL BE TESTED AS FOLLOHS: ...C. EACH TIME DATA ARE RECORDED, NEN DATA SHALL BE COMPARED HITH OLD TO DETECT SIGNS OF DETERIORATION". CONTRARY TO THE REQUIREMENTS, THE PROCEDURES FOR EATTERY TESTING (SP 206.04, EM.                                  104, EM.

105, AND EM. 106) CONTAINED PROCEDURAL ERRORS, INCORRECT DATA, AND IN SOME CASES, THE REQUIRED COMPARISON OF NEH DATA TO OLD DATA HAS NOT SATISFACTORILY IMPLEMENTED. (8500 4) CODE OF FEDERAL REGULATIONS, PART 50, APPENDIX B. CRITERIA II, QUALITY ASSURANCE PROGRAM REQUIRES, IN PART, THAT THE QUALITY ASSURANCE "... PROGRAM SHALL BE DOCUMENTED BY HRITTEN POLICIES, PROCEDURES OR INSTRUCTIONS AND SHALL BE CARRIED CUT THROUGHOUT PLANT LIFE IN ACCORDANCE HITH THOSE POLICIES, PROCEDURES, OR INSTRUCTIONS". QUALITY CONTROL INSTRUCTION NO. 1, ' PROCESSING OF NONCONFORMING REPORTS-NCRS', STATES "THE ASSIGNED COGNIZANT ENGINEER IS RESPONSIBLE FOR IDENTIFYING ON THE NCR ALL ASSOCIATED DRAHINGS THAT MUST BE UPDATED AS A RESULT OF DISPOSITION". CONTRARY TO THE REQUIREMENT, SEVEN DRAHINGS FOR THE AUXILIARY BUILDING HVAC SYSTEM HERE NOT IDENTIFIED FOR UPDATING ON NCR 4435, REV. 1. DATED APRIL 5, 1985. (8500 5) PARAGRAPH 6.8.1 0F RANCHO SE00 UNIT 1 TECHNICAL SPECTFICATIONS STATES, IN PART: "HRITTEN PROCEDURES SHtLL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED COVERINc THE ACTIVITIES REFERENCED BELOH:

H. PROCEDURE

S FOR CONTROL OF MEASURING AND TEST EQUIPMENT.

1. PROCEDURES OF A TYPE APPROPRIATE TO THE CIRCUMSTANCFS SHOULD BE PROVIDED TO ASSURE THAT TOOLS, GAUGES, INSTRUMENTS, CONTROLS AND OTHER MEASURING AND TESTING DEVICES ARE PROPERLY CONTROLLED, CALIBRATED, AND ADJUSTED AT SPECIFIED PERIODS TO MAINTAIN ACCURACY", CONTRARY TO THE REQUIREMENT, AT THE TIME OF THE INSPECTION, THQ PLANT GAUGES (PI-261C3 AND PI-26143) FOR THE LOW PAGE 2-285

_ _ . _ - _ =- MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 INSPECTION STATUS - (CONTINUED) M RANCHO SECO 1 x MMMMMMMMMMMMMMMMMMMMMMMMAMMMMMMMMMMX ENFORCEMENT

SUMMARY

PRESSURE INJECTION PUMPS HERE NOT IN THE SITE C.iLIBRATION PROGRAM. IN ADDITION, TP0 GAUGES (PI-23804 AND PI-23848) IN THE SITE CALIBRATION PROGRAM HAD NO CALIBRATION RECORDS. PARAGRAPH 4.2.2 0F RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS STATES, IN PART: "AN INSERVICE INSPECTION SHALL BE MADE CONFORMING AS CLOSELY AS DESIGN PERMITS TO THE RULES OF THE ASME BOILER AND PRESSURE VESSEL CODE SECTION XI, ...". ASME SECTION XI, SUBSECTION INV-3513 ADDITIONAL TESTS STATES, IN PART: "HHEN ANY VALVE IN A SYSTEM FAILS TO FUNCTION PROPERLY DURING A REGULAR TEST, ADDITIONAL VALVES IN THE SYSTEM SHALL BE TESTED....". CONTRARY TO THE REQUIREMENT, IN FEBRUARY 1980, VALVES PSV-50015 AND PSV-50016 FAILED TESTS, IN MARCH 1983, VALVE 26030 FAILED TESTS AND IN MAY 1983, VALVE 31800 FAILED TESTS AND ADDITIONAL VALVES HERE NOT TESTED IN ACCORIs.NCE HITH IHV-3513 REQUIREMENTS. (8502 4) OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS: ON' JUNE 5, A REACTOR TRIP BREAKER FAILED TO OPEN DURING SURVEILLANCE TESTING OF THE UNDERVOLTAGE TRIP. THE BREAKER DID OPEN ON ACTUATION OF THE SHUNT TRIP. THE LICENSEE REPLACED THE FAILED GE AK2-25 BREAKER AND INITIATED INVESTIGATION OF THE CAUSE. THE LICENSEE DETERMINED THAT THE 20 GPM LEAK IN THE 1 INCH DIAMETER, "B" HOT LEG VENT HAS CAUSED BY FATIGUE CRACKING RESULTING FROM MISSING SUPPORTS IN QUALITY CLASS 2 SECTIONS OF THE VENT PIPING. TO INSURE THAT OTHER PIPING SUPPCRTS HFRE ADEQUATE, THE LICENSEE INITIATED A HALKDOWN OF ALL SAFETY RELATED PIPING MODIFIED SINCE THE SYSTEMS HERE PREVIOUSLY INSPECTED 19 1979 IN RESPONSE TO INFORMATION BULLETIN 79-14. FACILITY ITEMS (PLANS AND PROCEDURES): REFUELING: MARCH 15, 1985 - JUNE 15, 1985 (THREE MONTHS) MAE%GERIAL ITEMS: NONE PLANT STATUS: o THE PLANT HAS IN COLD SHUTDOHN FOR THE ENTIRE MONTH FOR REPAIR OF THE HOT LEG VENT AND ADDITIONAL HALKDOWNS OF SYSTEM PIPING. LAST IE SITE INSPECTION DATE: 06/03-11/29/85 INSPECTION REPORT NO: 50-312/85-18 PAGE 2-286

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 REPORTS FR0M LICENSEE M RANCHO SECO 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM NUMBER DATE OF DATE OF SUBJECT EVENT REPORT 85-08-LO C3-21-85 06-17-85 UNDERVOLTAGE RELAY CALIBRATION FOUND OUT OF SPEC 85-11-Lo 06-12-85 07-10-85 RPS CHANNEL TRIP DN HIGH PRESSURE SETPOINT (1820 PSI) 0F SHUTDOWN BYPASS DUE TO OPERATOR ERROR 85-12-LO 06-16-85 07-17-85 LOSS OF REACTOR BUILDING INTEGRITY DUE TO UNSECURED OUTER HATCH - PERSONNEL ERROR - SUPPLEMENT 10/31

 ==================================================================================================================================

PAGE 2-287

1. Docket 50 *261 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ROBINSON 2 M
2. Reporting Period 07/01/85 Outage + Dn-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMhMMMMMMM
3. Utility Contacts ANITA E. SCOTT (803) 383-4524 AVERAGE DAILY P0HER LEVEL (MHe) PLOT
4. Licensed Thermal Power (MHt): 2500 ROBINSON 2
5. Nameplate Rating (Gross MHe): 854 X 0.9 = 769
6. Design Electrical Rating (Net MWe): 700
7. Maximum Dependable Capacity (Gross MWe): 700 1500 DESIGN ELEO. RRTINS = 700
8. Maximum Dependable Capacity (Net MWe): 665
                                                                                                                                                                                                 ....PMX.       OEPDE). Dr. - 686 (100X)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MHe):
11. Reasons for Restrictions, If Any:

NONE loco - MONTH YEAR CUMULATIVE

12. Report Period Mrs 744.0 5,087.0 126,317.0
13. Hours Reactor Critical 728.9 4.243.9 88.440.7 h 2,598.5 reo one at smuungo immet massu. cose 7:ee
14. Rx Reserve Shtdwn Hrs 15.1 816.3 '

m .- -

15. Hrs Generator On-Line 727.8 4,121.3 86.187.2 , , _ , ____ ___,___ ,
13. Unit Reserva Shtchn Hrs .0 .0 23.2
17. Gross Therm Ener (MHH) 1,631.778 8.951.584 171,826.764 -so 500 -
18. Gross Elec Ener (MHH) 529.264 2.933.245 55.278,121
                                                                                                                                                                                                                                                 ~"
19. Net Elec Ener (MHH) 504.030 2.782.182 52,191,843
20. Unit Service Factor 97.8 81.0 68.2
                                                                                                                                                                                                                                                 -40
21. Unit Avail Factor 97.8 81.0 68.2
22. Unit Cap Factor (MDC Net) 101.9 82.2 62.1 -20
23. Unit Cap Factor (DER Net) 96.8 78.1 59.0 2.2 15.1 14.6 0 .
                                                                                                                                                                                                   .,        .,         ...   ...       _..  ,     o
20. Unit Forced Outage Rate o s 10 15 20 25 30
25. Forced Outage Hours 16.2 733.7 8.967.2 DAYS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):

Jul.Y 1986 NONE

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-288

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M ROBINSON 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Tvoe Bours keason Met hod LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence 0701 07/04/85 S 0.0 8 5 ZZ ZZZZZZ RAMPING DOWN TO 10% P0HER TO REPACK FEEDHATER REGULATING VALVES. 0702 07/05/85 F 16.2 B 3 85-15 1A INSTRU NHILE RAMPING DOWN FOR MAINTENANCE ON THE FEEDWATER REGULATING VALVES, THE REACTOR TRIPPED ON "C" STEAM GENERATOR LOH-LEVEL COINCIDENT HITH A STEAM FLON/ FEED FLOW (SF/FF) MISMATCH. THE LOH-LEVEL HAS DUE TO A BLOCKAGE IN A LEVEL TRANSMITTER. UMMMMMMMMMM ROBINSON 2 OPERATED WITH 1 OUTAGE AND 1 REDUCTION DURING JULY. n

SUMMARY

M U"MMMMMMMMM Tvom Rea son Met hod Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

                      & License Examination         9-Other         (LERJ File (NUREG-0161)

PAGE 2-289

CUL*MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M ROBINSON 2 M un=MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACIL ITY DATA Report Period JUL 1985 FACILITY DESCRIPTION ETILITY 8 CONTRACTOR INFORMATION LOCATION UTILITY STATE.................... SOUTH CAROLINA LICENSEE................. CAROLINA P0HER & LIGHT COUNTY...................DARLINGTON CORPORATE ADDRESS....... 411 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601 DIST AND DIRECTION FROM NEAREST POPULATIDH CTR.. 5 MI NH OF CONTRACTOR HARTSVILLE, SC ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............PHR HUC STEAM SYS SUPPLIER...HESTINGHOUSE DATE INITIAL CRITICALITY... SEPTEMBER 20, 1970 CONSTRUCTOR..............EBASCO DATE ELEC ENER 1ST GENER. .. SEPTEMBER 26, 1970 TURBINE SUPPLIER... .....HESTINGHOUSE DATE COMMERCIAL OPERATE.... MARCH 7, 1971 REGULATORY INFORMATION CONDENSER COOLING METHOD... RECIRCULATION IE REGION RESPONSIBLE......II CONDENSER COOLING HATER.... ROBINSON IMPOUNDMENT IE RESIDENT INSPECTOR......P. KRUG ELECTRIC RELIABILITY LICENSING PROJ MANAGER.....G. REQUA COUNCIL.................. SOUTHEASTERN ELECTRIC DOCKET NUMBER....... ... 50-261 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-23, SEPTEMBER 23, 1970 PUBLIC DOCUMENT ROOM. . . . . . .HARTSVILL E MEMORI AL LIBRARY 220 H. FIFTH ST. HARTSVILLE, SOUTH CAROLINA 29550 INSPECTION STATUS INSPECTION

SUMMARY

 + INSPECTION JUNE 11 - JULY 10 (85-21)                           THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 334 RESIDENT INSPECTOR-HOURS ONSITE IN THE AREAS OF TECHNICAL SPECIFICATION COMPLIANCE, PLANT TOUR, OPERATIONS PERFORMANCE, REPORTABLE OCCURRENCES, HOUSEKEEPING, SITE SECURITY, SURVEILLANCE ACTIVITIES, MAINTENANCE ACTIVITIES, QUALITY ASSURANCE PRACTICES, RADIATION CONTROL ACTIVITIES, OUTSTANDING ITEMS REVIEH, IE BULLETIN AND IE NOTICE FOLLOHUP, ORGANIZATION AND ADMINISTRATION, INDEPENDENT INSPECTION AND ENFORCEMENT ACTION FOLLOWUP. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED.

INSPECTION JUNE 24-28 (85-22) THIS ROUTINE, UNANNDUNCED INSPECTIDF ENTAILED 42 INSPECTOR-HOURS ONSITE IN THE AREAS OF LICENSEE ACTION ON PREVIOUS ENFORCEMENT MATTERS (927025), SERVICE HATER PIPIP.G DEGRADATION (927068), INSERVICE TESTING OF PUMPS AND VALVES, AND INSPECTOR FOLLOHUP ITEMS. ONE VIOLATION HAS IDENTIFIED " FAILURE TO PERFORM IST IN ACCORDANCE HITH ASME SECTION XI - PARAGRAPH 7A. NO DEVIATIONS HERE IDENTIFIED. ENFORCEMENT

SUMMARY

NONE OTHER ITEMS PAGE 2-290

                                                              =                        =     1
                                                              =                        =     9
                                                              =              R         =     2
                                                              =              O         =      -
                                                              =              F         =     2 MMM                                                    =                        =

M M = T = E M M = F = G M M = I = A M M = H = P M M = S = M M = = M M = _ N = M M = _ O = M M = _

                                                                                       =
.      M     M                                               =            _  R         =
 .                                                                                     =

M M = O M M = T = M M = A = M2M = R = M M = E = MNM = _ P = MOM = - O = MSM = _ = MNM = L = MIM = O = MBM = R = MOM = T = MRM = N = 4 M M = - O = M M = - C = M M = - = M M = - S = M M = - S =

-      M     M                                               =              E          =

M M = L = M M = = M M = 1 = M M = _ = M M = , =

.      MMM                                                   =              N          =
                                                             =              O         =
                                                             =              I         =
                                                             =              T          =
                                                             =              A         =
                                                             =        -     R         =

E = - E- =

                                                             =              P         =
          )                                              E =                O         =

D = = E S = T =

  -       U                                                  =              O         =

N N = H = I = = T E = - G = N = _ N = O C = _ I = C = _ R = ( I = - U =

                                                             =              D         =

L = =

           -                                                 =              T         =
                                                             =              N         =
                                                             =              E         =

S M = M =

                                                             =              E         =

U 0 = L '=

                                                             =              P         =

T R = M =

                                                             =              O         =

A F = C =

                                                             =                     . =

T = TS =

                                                             =              FE =

S + S = IT =

                                                             =              HU =

5 T = SN = 8 = I = 9 R = DM = 1 = E = N O = R5 =

                                                    ,        =              I1        =

O 0 P = U = 1 = _ QY = I E = _ EL = Y = - RE = T L R = - T = U = NA = C J = AM =

                                                             = T            hI        =

E - = C TX = _ = E O = P  : 1 = J SR =

                          )                       1   +      =    B         SP        =

S S = U EP = E E 1

                                                             = S            LA        =

N R N 2 = = U U - = = I D J 5 = =

E 8 = 5 =

S C / = FT 8 = M O s 1 = OR / = E R E 6 = O 9 = L P T 2 = EP 0 = _ B A - = TE / = O D D 0 = AR 7 = R N 5 = D 0 = P A N = = O = = T S I  : = = 5 N N T O = 5 = 8 E A C N = F 8 = . 9 N L E = OT / = 1 O P  : . P T = N 0 = P ( S N S R = EE 1 = L M M O N O = TV / = U O S E I I P = AE 6 = . J C M T  : T E = D 0 = E I S A E R = = d D T U R T = = o N I L T E I N =

                                                             =
                                                                                      =
                                                                                      =

i S A A A P S O r M Y I T O I = R 4 = e E S T R S E T = E 1 = P T M I E L I C = B 0 = I E . L . G . T A E = M - = - t T E I E A E N M T P = U 5 = r R S N C N N M A R S S = N 8 = o p E Y O A O A O L O A N =

                                                             =
                                                                                      =
                                                                                      =

N S N F N M N P N L I e T R O _m A <

2 9 2 2 E G A P h 0 0 0 1 0 e , a 0 mMu T ,0 u w O ) - u k L  % - _3 u w P 0 - u u 0 - 1 x n ) ( w u e _5 w n H 09 ,2 w u M 07 - u w n w ( 00 1 1 u u L - w n E -

                                                                                                                                                                    -0 w u V                                      - -                                                                                                                         3 w w E                                            .

w w L 5 w1w w w R 1 M "N , S 8 9 1 wMu E M MC - Y wEu W E . _ 5A 1 Y uLu O L .O D L mAu P A U uSu w u Y S D _ J P w u L E 0 w u I D 1 w u A w u D M u M.X , M M E m M M M M M M w G A R E P

                                                                                                                                                                       -5 M

w - uMM A M V - g 0 0 0 0 0 0 5 0 1 1 l 0 E0 1 4 1 0 8 8 0 3 3 2 7 2 3

          .               0                                                      V             .           .

8 1 5 . . . . I6 3 8 5 5 5 9 8 1 5  : S 4 7 1  : T9 9 8 2 5, 7, 7, 5 5 4 4 3 9 ) 4 U 7 5 s A 0 5 4 6 0 n L 8, 5 1 n 8, 2, 2 5 1 o A T = o U0 0 3 9 8 i / 4 4 8 0 4 9 s M7 4 3 6, 6, 6, 1 t N A s X 3 9 9 2 7 a  : U 9 9 7 a r 3 . 0 1 0 e ) C 1 3 3 r T H 0 3 0 1 1 1 R e 1 u 0 e W 5 5 4 3 D. S e 0 X M 0 6 0 7 0 5 0 8 6 6 e r n 6 v 8 7 6 . . e i - 0 i t R7 9 6 3, 8, 2, 9 9 0 9 0 t l 5 0 G e A8 6 6 9 9 0 9 2 a t G - N 5 0 8 1 a 3 3

                                                      ,     (                    E Y 0,       0,          0,            5      4       1                                             D.        D n 9              1 5                           5                                                e N O                                   :            t                               5       5                         8,     7
              )                        )              r       y                                                                                                                      p        p I      +     9                          e . op               n                                                       6      5      5                                                y        u 0                       W )                   A                                                         1                                                            T

( t r T e g6  : M e ( W Re f 0 0 0 0 0 4 0 9 0 0 7 7 0 0 s t a A a ) s M I . . 9 5 6 . t Y e s t H4 4 4 9 5, 3 0 0 9 8 h S R u V H o t s , y T4 4 4 , 0 0 9 9 t O L M r o a d n N7 7 7 8 3 0 1 1 n d E A G N L e A O 8 3 0 o e F  : : t ( ( t M 8 8 M t P A ) ) e e c f a 5 N O t H H e N y y c ( t t n i r I _42 6 i m 0 8 ) ) t t

        /     R      MM                i i i                 t       ,

x s 1 ( g c c S s s t t 0 . s n a p ap e n s e e et e E

        /     P       r s   i                   e            R      o                        l                     r   )                                 N N                        N 7              e o t              a a v                     i                          a s e H H                       )                                         a                      n 0         .

w r a C C o h t c r n H H C R R r w J o G R b c c i H i n M H ) r D E s e o P ( e e A i i t L w ( M H o M D e r v d l l l h r s i n - d ( H t r ( ( g u O t d  : l g a b b r H t r r w n t r M c o a o u 2 o t a n c a a u s H C d O h e r ( a t r r t il d h 7 i c m i i d d c o e t S n e F c o ot uO e S 2 r a r t r n n c T R d r h r E n r a t e h g c y

  -      e t          e a t              e e O                                        o o S                o e                E        e e F               c c 0     P       n   h R            c p p                      l       r              i t                   t         v m                n c                 a a d a S                          l 5             o   T              e e e s                      e o                    r c e a r r c E i                                              l    F F            e t c u s t

n g C e l D D e g v f e P e ae rve r s h e e e v i c r a p p r O n e n y d t E l e e v a a o r i e a m m n L s n R e n e T E S A C C F d o w r t t t s l n u u a t s e R l u e r i n p g m m h r o r s e G s s E s s t t t t t e d c t E C k o l e e i i i C E e s E o p r u R t c p i c m s x x N w a N s i o o t i i i i i r u N o e t i a e a a f O o e O e o x r n r r e n n n n n o h O f D R U L N D M M I N P R N R H R H U G G H U U U U U F S N I _ 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

Report Period JUL 1985 UNIT SHUTD0WNS / REDUCTIONS M SALEM 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date Yvon Hours Reason Method LER Number $vstem domoonent Cause & Corrective Action to Prevent Recu rence NONE utMMMMMMMMM SALEM i OPERATED AT OR NEAR FULL 80Wtn C. DING JULY.
        ,u SUMMA 1Y M EZMMMMMMMMM Tvom       Rea ean                          Met he.            Svntem a Comoonent F-Forced A-Equip Failure F-Admin            1-M aval           Exhibit F & H S-Sched    B-Maint or Test G-Oper Error 2 'anual Scram Instructions for C-Refueling        H-Other
  • Auto Scram Preparation of D-Reoulatory Restriction 4-Conti sed Data Entry Sheet E-Operator Training 5-Redeced Load Licensee Event Report
                        & License Examination        9 - O t ' .e r     (LER) File (NUREG-0161)

PAGE 2-293 i l x

4 9 5 2 8 2 9 1 E L G U A J P d i o r e S P A G t 1 S r & 0 . R Y 9 o 1 O O 6 R 7 p C 7 C T 7 A 0 e I 0 C 9 R 8 B 0 R R S U 1 T Y A R I C E G T , L E S S 1 YY L R & N CAE E E O R IHS J S C E LDR E E B BAE C EN C & M UOJ I CE I E E E PR V AH V S . S E C BN R L R U G U L R E E E E P , E O N O L E D ETH S K S H E H I H RS, KR G G V C , FE C RA C N D N N S2 0 NM I AH I I E I I I7 7 M E L PE L T T T L F2 - E2L N B N B S I S - R L1A O U 0 U E N E . 0 P A1S I T P. 8 P. H. U. H. I.. T. D. 5 D. S. A M . . . . . . . . . . . . R . . . R . . . . . . . . O . . . E . . . . . . E . F . . . I . . . . R . C . N . . . L . . E R E . N . I . . R P . . N L O G . A M

                 . S              E   P           . . O             B T A .               U O R       . S           E   U           . R       I     I     C N . S O O       . E              N   S           . E T             S E A . S R                        S T       . R              I               . I       A      N P        M.        I C       . D              G S             . L       M      O S           R            T      U A       . D              N Y             . P R              P N JE E N R       . A              E S R P O                          S    I     OB T E                 T A T         .                /            O U F                 E          RM A M N       . E              T M T S N                          R T PU D U                        A T O       E T            RC A C                          I            N       N            C C     E A            OE E U E                               N E G                & O          T A         S R            TT T R N Y                             O D NT                     D
         &  YN O              CI S T                  I       R      I     I    IE E                   S D      TE P              AH               S B O                 G S SK S C Y  IC R              RC C N R T                             E E NC N                   I T  LI        O       TR U O U A                             R R EO E                   L I  IL        C       NA N C T                        L                 CD C B Y   L  T                 O                               U      E E        I         I     U I  U                 C                               G      I     I    L         L     P      N T T                                                      E U                                                    R                                        O I

I L T I C C E A P F S 6 6 N 7 7 L 9 9 I E 1 1 R L D 7 E I

                                                  , , 7                    V       CC
                                    ,          1       5 9                 I       IN
  • Y FN 1 2 1 R TU )

E OO U NO S S T R R , R E AC E MMM R SG E E 0 H R L R M M E N B B 3 T A TA U M M J M II MM W AE D E M M E MM E E E E A R M M N L L P. C C N C L DA C M M E A 0I H E E U N E I . O M M D R M M N. S. 2. H P. D. D. J. O. D. M. E P _ M M . . . . . . . . . . D - M M . . M. . . . . . . . I D M M . . OR . Y R . D . . V N M M . . RT . T E E O R . O  : A M M . . FC . I N T H E . R S - M M M M

                 . . NN
                                           . L E A
                                           . A G R T T E A P         T N

S N M M . . OO . C E M W Y. T T E A M1M N . . II . I T P I . U N . L . M M O . . TT . T S O G G L . P Y O D P D, MMM I . . CA . I 1 N N I . Y N R P E ( E MEM T . . EL R R L I I B . R I A M D D MLM P . . RU O C R A L L A . A M O I S I MAM I . . IP T E I O O I . M N M C V M V MSM R . . DO C L N C O O L . MO U O E O M M C . . P A A E R C C E . U I S D R T R M M S . . D E I E R . S T N P I P M M E . . NT R T C M R R L C T S A M M D N . Y AS I E M E E CI N E N M T Y T M M OE T E F N L O S S IC O P E E S U T U - M M Y IT N TR O I E C N N RN I S M T M P I P . M M T TA U SA E E TU T N E I E N L N M M I AT O IE E E E E D D CO C I C E T I I I _ M M L CS C DN P T T T N N EC E R N R S C M M I O Y A A A O O L P O O O E Y O A O M M C L T D D D C C E S N F N H S N F N M M A N N T MMM F I E O

                                                                    '                               '    .             !     l
                                          =         _        = 5
                                          =         _        = 9
                                          =                  = 2
                                          =                  =  -
                                          =          _       = 2 MMM                                    =                  =

M M = = E M M = _ = G M M = = A M M = = P M M = = _ M M = = _ M M = = _ M M = = M M = = _ M M = = _ M M = = M M = = M M = = M M = = M M = = M1M = _

                                                             =

M M = = MMM = = MEM = = MLM = = MAM = = MSM = = M M = = M M = = M M = = M M = = M M = _ = M M = = M M = = M M = = M M = = M M = = M M = = M M = = MMM = =

                                         =                  4
                                         =                  5
                                         =                  =
                                         =                  =
                                         =                  =

E = =

                                         =                  =
      )                              E =                    =

D = = E S = = U = = N N = = I = = T E = = N = = O C = = C = = ( I = =

                                         =                  =

L = =

       -                                 =                  =
                                         =                  =
                                         =                  =

S M = =

                                         =                  =

U 0 = =

                                         =                  =

T R = =

                                         =                  =

A F = =

                                         =                  =

T = =

                                         =                  =

S S =6 =

                                         =                  =

T = =

                                         =         _        =

R = =

                                         =                  =

N O = =

                               .         =                  =

O D P = = E = = I D E = = I = = T V R = = O = = C R = = P . = T = E D = C = T E = E = P U D = J = P I = B = S N V = U = I O = S = N R = = O P = = I N = = T = = U = FT =

P = =

E N = OOR .- = T I = EP = A = TE = D O = AR = N = D = N = = O = = I  : = = 5 T O = . = 8 C N = F D = 9 . . E = OT E = 1  : D D P T = N D = S E E S R = EE I = L M D D N O = TV V = U E I I I P = AE O = J T V

  • V E = D R =

_ I O S O E R = P = d R U R T = = o L P T P I N = T = i S A A S O = U = r M I T T T I = R P = _ e E R U S U E T = E N = P T E P P I C = B I = _ I G N T N E = M = t A I N I T P = U O F r R N A S S = N N = o E A O L O A N = = p N M N P N L I = = e T R O

1. Docket 50-311 0PERATING STATUS MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M SALEM 2 x
2. Reporting Period 07/01/85 Outage + On-line Hrs: 744.0 MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ,
3. Utility

Contact:

J. P. RONAFALVY (609) 935-6000 X4455 AVERAGE DAILY POWER LEVEL (MHe) PLOT

4. Licensed Thermal Power (MHt): 3411 SALEM 2
5. Nameplate Rating (Gross MWe): 1162
6. Design Electrical Rating (Net MWe): 1115 1149 1"
7. Maximum Dependable Capacity (Gross MWe):
                                                                                                                                                                                    ~
8. Maximum Dependable Capacity (Net MWe): 1106 .--... .

11 (100%)

9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Het MHe): NIC CRM SE Nm" ISSER OPf1RN. CGSIT!Ge 100
11. Reasons for Restrictions, If Any:

W NONE 1000 - MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5.087.0 33,312.0
13. Hours Reactor Critical 501.7 2.221.4 17.315.9 h
                                                                                                         .0       .d        3,533.6
10. Rx Reserve Shtdwn H. s 16,571.3
15. Hrs Generator On-Line 468.0 1.959.2 f , . ,
10. Unit Reserve Shtdwn Hrs .0 .0 .~
17. Gross Therm Ener (MHH) 1,485.823 5,971.880 49.698.916 g, 497,780 1.967.980 16.245.630 -to
18. Gross Elec Ener (MHH) 469,089 1,833.560 15,351,407
19. Het Elec Ener (MHH)
20. Unit Service Factor 62.9 38.5 49.7 49.7 - 20
21. Unit Avail Factor 62.9 38.5
22. Unit Cap Factor (MDC Net) 57.0 32.6 41.7
23. Unit Cap Factor (DER Net) 56.5 32.3 41.3 I

0

24. Unit Forced Outage Rate 37.1 59.0 43.2 0 5 l'O l's do is 60 12.588.1 DAYS
25. Forced Outage Hours 276.0 2.815.8
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration): JA.Y 1985

- NONE

27. If Currently Shutdown Estimated Startup Date N/A PAGE 2-296

k 7 9 2 MMM .

                                                '                                                          2  -

M M T C _ M M e N G _ M M c A A - M M n L P - M M e O M M r O M M r C M M u M M c R M M e O M M R T M M C M M t A M M n E M M e R M2M v S M M e S . E MMM r E S G MEM P V M A MLM L E . T MAM o A L P U MSM t V B U O-M M O N M M n Y R A L M M o T P E A M M i E L N M M t F R C O M M c A O , I M M A S T . . . R T M M A E E E E I M M e D R N N N T D M M v E E I I I A D M F i T N B B B . . H . A

-   M    M   t      A E R R R S S                                     E MMM        c    R G U U U E E R H                                          2 e    E            T        T T V             I    O    I r    P M                             L       L    T B           H r   O A S S S A B C R                                           T S      o             E E E E V M A U                                    I N

C R T V V V E S L L L T S R E E T W

             &     N             A A A N S                            S       D O           O R V V V A A S E                                          E e    P E                             L            K V           T I      s    N H P P P O D N                                    L       A u    O T O O O O O A A                                          R T      a    N O T T T C R T V                                          E                         )

C S S S P 1

-      C           R R                             R       L    R     L       O                      t6 A    A T T T O O A O                                                               r1 U           E    E A A A T R E R                                       D                       o0 L        L    E E E C T                      L     T       N        t              p-D           C    C H H H A N C N                                       A         n             eG

. U U E E E E O U O e r tRE E N N R R R R C N C H n o e R T o ffetU R t 9 o H oh nH n m s Se( e X A X X X X D U X Y o &nn v

       /      n  E    R    E    E E     E O M E                               L        C      o o yE e o

p V E V V V V R U V U Fiir l L N L L L L N C L J & tttei S m A E A A A A O C A tcaneF . o V G V V V V C A V N m i u rE s N C O e bra n) t itsaeR =. N m E s h s et cE e G v xnraiL 0 t s J C D F D J A G B A S EIPDL( C C C C C C R C H T D v U S O m d T a a U r R I rm cadL o e A Sre H b P cud m E llSne S u R aa icr N d uuotue R A o nntndh E

                                                                                   . h   aauoet T                                                                       MY       t  MMACRO I

L OL e - RU M 123459 N d FJ - o EG r U h 4 3 5 5 5 1 5 5 5 NN o t II r e LR r M NU E n OD n rn n o ireo o DS mehi i s A A B B B 5 A B B EN d ptt t a NO AOOc a e RI - ion R UT FGH r ni s TC tim r 0 6 0 0 0 4 0 0 0 EU sna RD et eix u 9 5 0 0 0 1 0 0 0 E rs RaE o 1 2 3 2R ue r 5 H 2 lT yT e 8 M6 i gr s 9 1 i sF F F F F F F F F E LD arnorn F oit o e i AN latc L l SA pt el ai U n i n u u rL J 5 5 5 5 5 5 5 5 5 o uif g e 8 8 8 2 8 8 8 8 8 s q a e e p& d e / / / / / / / / / a EMRRO o t 8 7 9 2 3 0 1 3 4 e - i a 2 0 0 1 1 2 2 2 2 MMM R ABCDE r D / / / / / / / / / M M e 6 7 7 7 7 7 7 7 7 MYM P 0 0 0 0 0 0 0 0 0 MRM d MAM ed ce t 0 2 8 6 8 4 6 8 2 MMM r 3 3 3 4 14 6 6 6 7 MMM rh o p

             . 1        1             1     1   1       1    1     1        MUM       n oc o     - - - -                      -   - -          -     -       MSM       o FS e    N     5 5 5 5 5 5 5 5 5                                            M      M  v - -

R 8 8 8 8 8 8 8 8 8 MMM T FS l

8 S E 9 9 A C 3 2 8 H NN NA H D - 9 AA O .C L 2 1 L R EID RR O AEUOHTE EA H E L NDSTTAS ,EMN G U GAS RUMN IN A J IMA ,TE Ah O P S SAPERGODI d SYTHOBGN OE,ET o NAfNT BC i OHlE RLR EIE . r I lNDALPEVRPS e S TTAOEEA COCST P A AIUPILHNNBSNN G C QMFCSOAAEII t 1 S IT OIU IR D O r & 0 . R Y 9 DAECTNSTUE OP o 1 O O R 7 NHH N TCSHSN p C 7 C T A 0 ITTDEGNESTN D e I 0 C R 8 OEL R R S U B 0 NH" N D &IP A OIRO OC,AIEOS T Y A R 1 I SPNYTTEH C E G T 8 L IUT ,RP IT AH E S S 9 YY TSRSO N IYC N L R & N 1 CAE I AMT O3LRIEO E E O IHS S4PEC .I- AAFRI J S C , LDR O8 TELT5URIET E E 0 BAE P9NSPOA QTLHC C EW C & 2 UOJ 1IYSRCP NATE I CE I E E PR D SNTIAFOU P E Y BW O S R4E,S ,INFQTCQ V AN V S . S R L R U G U L R A E E OI :N

                                                                                                                                              .I E P ,

S K E O N O S H E H L I E H M ETN RS ,2TSECT AEH S

                                                                                                                                                   .CTI IA KR                G              G                  V C                , FE ,                 2TTRTEN             OA.YSMHF C RA              C N D N                                  N      S1        5          WM            0SSU           ,C       QBTSTO AH                       E       I                  I      I1        7 M E                        U T NN                   NI g

I L PE I L I T T T L F3 R

                                                                                            -    E2L L1A 0.GMC5AONTIENK 1UAU8RIOPASIC B         N       B S           I       S                             -

g U 0 U E N E . 0 P A1S .ARR9UTIER A GT1SCTCTO3L 1 1 P. 8 P. H. U. H. I.. . T.. . .D. 5 D. S. 8. DOS ,SEAXST-DNR APTEE 5E A . . . . . . . M . . . . . . SS RD H R

                                    . k          . .                  . . . . .                     .               P.APD8      E2YN    D EPT O       . .                . E          . .                  . . . . E                     .               14EI             TIEECLA F       . .               . I        . .                  . . R . C                     .               28CFHI" HVILQR N       . .                . L          . .                E R E . N                       .

9NICL ,TIMA O I . . R P . . N L O G . A M E1ATRA ASTNF

                 . S            E P             . . O              B T A . U O                                     R,UEMQRBRNAUTYHISI R       . S            E U             . R         I      I     C N . S O                                 U                            EN H O       . E             N S            . E T              S E A . S R                           S         D2SD                A ESIDO T       . R            I               . I     A      N P          M.        I                        E SINTPDB                          EL C       . D             G S             . L        M      O S             R            T        U         CEA OU E DSTL A       . D             N Y            . P R          P N JE E N                                      ON E ONVTNAAA R       . A            E S R P O                          S     I      OB T E                   T         RUYHEHIIOAHE O U F                E            RM A M                             PJTTVT                             NO OISH AN, HIT A T         .                /

N . E T M T S N R T PU D U A T O E T RC A C I N N C T .I LFBHE YSCL C E A OE E U E N E G & O T S3AOA TSANIED A S R TT T R N Y O D NT D E8U DASMOHDE

         &  YN O              CI S T                   I     R      I     I      IE E                     S         T9QYEETE          IH T D      TE P              AH               S B O                G S SK S C                                          1       THLSLST(SN Y  IC R              RC C N R T                            E E NC N                      I                 3       IITL             NTA NE O       TR U O U A                            R R EO E                      L 3.1 AOTMA"INCIU         U NDKO M T  LI                                                                                                            ,IL I  IL        C       NA N C T                       L                   CD C B Y   L  T                 O                              U      E E I                  I      U                  11NUTSATOUASC I  U                 C                              G      I     I      L         L P            N                 OQ NRNPORIO T T                                                     E                                                      EYI YIGE F VD U                                                   R                                            O         DRRER OMD TO I                                                                                                              IAEHASRULNRRE I         URTTRAPCOOOPR L                                                                                                              GUI TH OH P E T             BRGN ND EPEH I                                                                                                              YECNO,O NUUH C         RF ICYITOQSTS C                                                                                                              O         ,T      TTAIR               R E                           ECHTOYHE A

P TNBC".FETCTRTV AO L E XFYAP E EII F UDIFTSSFPTTHA S GEDAE N0SLT H EGN FOI NOAM N R N E S A T" 1IB B R O 1 APES ON L 8 I DHPI T ,TGFEF E 0 9 R L NCATON3NNOHN , D E A EI TOD S V,ITA 8 1 I 9 1 V CC T5MHN CN HOOT A Y FN

                                    ,          1       8 9 3
                                                                ,         I R

IN TU 8.A0IER H5TCOPCLIAT E OO , 1 1 U NO 6 CNPAALTHO; S T 8 R E AC TRAAMQTOATNE MMM R SG , R H R L NIF TI TFC R M M E N T 3 E T A TA O CRR EA IDDU _ M M J M II S B H AE IT EOER EFEID M M E MM U E O E A R TA0VPRUNHIIDE M M M E WE A L 0I L R G N T C L H U U C N E DA I . AH1OMUDITRF C CT ITE M M N. S. 2. H P. A. J. 0 O. D. M. D E I FN .L ORUOE C C D",VT0R EI3 O M M N0P M M . . . . . . . . . . D IICRIRRTTSE2 M M . . M. . . . . . . . I C ETETPARID N M M . . OR . Y R . D . . V EDPNHS EA ICO _ M M . . RT . T E E O R . O PESOT LNPS EI M M . . FC . I N T H E . R SN C AAI TR2T M M M M

                 . . NN
                                           . L E A T T
                                           . A G R E A P         IH LACET NEIITTL H,ULNNO A M    M          . . OO                    . C                E M H               Y.

T T ATEDIKAD OCSL _ M2M N . . II . I T P I U CNTIHCM SPEEA M M O . . TT . T S O G G L P Y II V A KE PUT MMM I . . CA . I 1 N N I . Y N R NAHOTRERTDSQS _ MEM T . . EL R R L I I B . R I A HMTRN COALNEN MLM P . . RU O C R A L L A . A M C IPETNHTOIRI MAM I . . IP T E I O O I . t e N M EYH TRA SH MSM R . . DO C L N C O O L . f O U TL LSORR EEE M M C . . P A A E R C C E . U I S ETLIPUO1EHGH M M S . . D E I E R . S T OTNASPSF STNT M M E . . NT R T C M R R L C T TAEPNUS UTSOSAMNH,A TE M M D N . Y AS I E M E E CI N E N HN M M OE T E F N L D S S IC O P E YQ$ C UET5CI M M Y IT N TR O I E C N N RN I S M REIM YYMM 8 M M T TA U SA E E TU T N E ADSATRTIHF9NS _ M M I AT O IE E E E E D D CO C I C RANRNEINCO1GT M M L CS C DN P T T T N N EC E R T OGETLIA IN _ M M I O Y A A A O O L P O O NTCOTTAMTE,SI M M C L T D D D C C E S N F OONRXAU TN8EO M M A N N CNIPEBQAAO2DP MMM F I E I

                                                              =                 = 9
                                                              =                 = 9
                                                              =                 = 2
                                                              =                 =  -
                                                              =                 = 2 MMM                                                          =                 =

M M = = E M M = = G M M = _ = A M N u _ = P M M = _

                                                                                =

M M = __ = M M = = M M = = M M = = M M = _ = M M = = M M = .

                                                                                =

M M = . = M M = . = M M = _ = M2M = _ = M M = = MMM = _ = MER = _ = MLM = = MAM = = MSM = = M M = = M M = = M M = _ = M M = - = M M = = M M = = - M M = - = M M = - = M M = - = M M = = M M = = M M = = MMM = =

                                                              =                 =
                                                              =                 =
                                                              =                 =
                                                              =                 =
                                                              =                 =

E = =

                                                              =                 =
    )                                                     E =                   =

D = = E S = = U = = N . N = = I ) = = T I E = = N = = O T C = = C N = = ( E I = = M = = F L = =

     -     L                                                  =                 =

P = = P = = S U M = = S = = U ( 0 = =

                                                              =                 =

T N R = = _ O = = A I F = = T = = T A = = L = _ = S O S = _ = I = = V T = =

                                                              =                 =

V R = = I = = N 0 = = L . = = O E D P = = V E = _ = I E D E = _ = L I = = T V R = = Y O = = C T R = = I P . = T = E R D = C = E T E = E _ = P V  : U D = J = E ) P I = B = S S S N V = U _ = E I O = S _ = N A R R = _ = U O P = _ = I E D N = = T E T = = U C U = FT = T )  : P = OR = I E' E N = O _ = T P T I = EP = S A = TE = N D D O = AR = O N N = D = C  : A N = = S O = = E T S I  : = = 5 V N N T O = . = 8 O E A C N = F D = 9 B N . L . . . E = OT E = 1 Y A C D P D  : D D P T = N D = R P E ( E S E E S R = EE I = L A E M D D M D D N O = TV V = U M H O I S I E I I I P = AE O = J M T C V M V T V  : V E = D R = U O E O I O S O E R = P = d S Y D R T R R U R T = = o L N P I P L P T P I N =

                                                              =

T = i T E S A A A S O U = r N V M T Y T I T T T I = R P = e E I) E S U T U R U S U E T = E N = P M T4 T M P I P E P P I C = B I = E C I E N L N G N T N E = M = t C E0 T I I I A I N I T P = U O = r R L0 R S O N A S S = N N = o O L5 E Y D A O A O L O A N = = p F O8 H S M F N M N P N L I = = e N C( T R E Q

t. Docket 50-206 0PERA~ING STATUS MMMM*MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M SAN ONOFRE 1 M
2. Reporting Period: 07/01/85 Uutage + On-line Hrs: 744.0 MMMMEMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM J. Utility

Contact:

E. R. SIACOR (714) 492-7700 X56223 AVERAGE DAILY POWER LEVEL (MWe) PLOT

4. Licensed Thermal Power (MHt): 1347 SFIN ONOFRE 1
5. Nameplate Rating (Gross MHe): 500 X 0.9 = 450
6. Design Electrical Rating (Net MWe): 436
7. Maximum Dependable' Capacity (Gross MHe): 456 1500 436 I
  • EI"
  • M
8. Maximum Depe..dable Capacity (Net MWe):
                                                                                                             . -. fWIX. IEPDC. Ofr. - m (100%)
9. If Changes Occur Above Since Last Report, Give Reasons:

NONE

10. Power Level To Which Restricted, If Any (Net MWe): 390 t1. Reasons for Restrictions, If Any:

STEAM GENERATOR TUBE CORROSION. MONTH YEAR CUMULATIVE

12. Report Period Hrs 744.0 5,087.0 158.911.0
13. Hours Reactor Critical 744.0 4.420.3 93,749.7 h
14. Rx Resa rve Shtdwn Mrs .0 .0 .0
15. Mrs Generator On-Line 744.0 4,385.3 90,029.9 l
10. Unit Reserve Shtdwn Mrs .0 .0 .0 g
17. Gross Thern Ener (MHH) 892.419 5,270.758 114.458.972 ,,,.
18. Gross Elec Ener (MHH) 288,600 1,711,800 38,922,434 100
19. Net Elec Ener (MHH) 270.881 1,609,801 36,813,116 y
20. Unit Service Factor 100.0 86.2 56.6
                                                                                                                                                        -80
21. Unit Avail Factor 100.0 86.2 56.6
22. Unit Cap Factor (MDC Net) 83.5 72.6 53.1 83.5 72.6 53.t
23. Unit Cap Factor (DER Net) 21.3 0 ~
20. Unit forced Outage Rate 13.0
                                                                .0                                         0      ~d'       iO'     1'5 '  $0' 'is 'io
25. Forced Outage Hours .0 653.1 11.831.4 OfWS
26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
                                                                                                                                .AA.Y 1906 MAINTENANCE 8 REPAIRS: 08/23/85 - 1 HEEK
27. If Currently Shutdown Estimated Startup Date s N/A PAGE 2-300
                                                                                              ,i 1

0 3 2 MMM M M E M M e G M M c A M M n R P M M e E M M r T M M r A M M u M M c H. M M e GE M M R NG M M IA M1M t TR M M n AE MEM e LP MRM v UM MFM e CA MOM r R MNM P IR MOM CO M M o T MNM t HO MAM TM MSM n R M M o OG M M i NN M M t I M M c ET M M A TA M M AU M M e GT M M v IC M M i TU M M t SL MMM c EF e V r ND r IN S o A C O N T, a N O RO e EI I s WT u OA ) T a PR C B 1 C DI t6 r1 EV U C o0 p-UP t D DM n eG EU e r tRE E RP n o e R o ffetU R t o H ohnH n m s S e( . e 3 &nn v

    /       n                                       . C             o o yE e o                                      Y               Fiir             l p                                      L       a             tttei S       m                                      U               t c a n eF

_ o P J m i u rE s N C e bra n) G t it p a eR N ne h s h s et cE I v xnraiL 0 t E R S EIPDL( s K U D y D S m d T N a a _ O rm cadL o U r I e T Sre H b C cud m U llSne S u D aa icr N E d uuotue R o n nt n oh R h aauoet T E 1 t MMACRO _ L e - - I H M 123459 T N I W r U 5 o D r E r T E A n rn n n R ireo o o E mehi i s B P d ptt t a O AOOc a e - ign S 1 FGH r ni _ tim s 0 E sna r R et eix u 0 F rs RaE o O ue r 5 H N lT yT e 8 O i gr s 9 e N arnorn 1 E F F oit o e v A latc pt el ai L Y S U n i n u u rL J 5 o uif ge t s qaeep& d e / a EMRRO o t 4 e - - i a 0 MMM R ABCDE r D / M M _ e 7 MYM P 0 MRM d MAM ed t MMM ce r MMM rh o . MUM e oc p o MSM o FS e N 8 M t v - R 8 MMM T FS llI1 lIllIlll ll(lll l!l lll > fIlll(ll l1!

  - . - .    . _ _ _ . m. _ _ _ _ _ - . _ _ _ . _ _ _ . . . _ - _ _ .                      ..._.__.___mm             ..       , _ - _ _ _ _ _ _ _ . - . _ _ . _ . . _ _ _ . _ . ~ _ - ~ . . . _                         _ . , - _ _

i f EGMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 4 M SAN ONOFRE 1 M i c MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM FACILITY DATA Report Period JUL 1985

                                                                        ~

FACILITY DESCRIPTION UTILITY 8 CONTRACTOR INFORMATI0lf LOCATION UTILITY STATE.................... CALIF 0RNIA  : LICENSEE..... ........... SOUTHERN CALIFORNIA EDISON COUNTY...................SRM DIEGO CORPORATE ADDRESS....... 2244 NALNUT GROVE AVENUE kOSEMEAD, CALIFORNIA 91770 DIST AND DIRECTION FROM  !

,                    NEAREST POPULATION CTR.. 5 MI S OF                                                         CONTRACTOR SAN CLEMENTE, CA                          ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                                        NUC STEAM SYS SUPPLIER...NESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 14, 1967                                                             CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 16, 1967                                                             TURBINE SUPPLIER......... WESTINGHOUSE i

DATE CofgIERCIAL OPERATE. . . . JANUARY 1, 1964 REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......V CONDENSER COOLING MATER.... PACIFIC OCEAN IE RESIDENT INSPECTOR. . . . . . A. DANGELO 7

!             ELECTRIC RELIABILITY                                                                              LICENSING PROJ MANAGER.....N. PAULSUN j                    COUNCIL..................NESTERN SYSTEMS                                                        DOCKET NUMBER...........                                        50-206                                              '

i COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-15, MARCH 27, 1967 ! PUBLIC DOCUMENT R00M....... SAN CLEMENTE BRANCH LIBRARY j 242 AVENIDA DEL MAR SAN CLEMENTE, CALIFORNIA 92672 INSPECTION $TATUS . INSPECTION SUpWEARY ,

              + INSPECTION ON MARCH 23 - MAY 21, 1985 (REPORT No.                                         50-206/85-14) AREAS INSPECTED: ROUTINE, RESIDENT INSPECTION OF OPERATIONS PROGRAM INCLUDING THE FOLLONING AREAS: OPERATIONAL SAFETY VERIFICATION, EVALUATIGN OF PLANT TRIPS AND EVENTS, MONTHLY i             SURVEILLANCE ACTIVITIES, MONTHLY MAINTENANCE ACTIVITIES, REFUELING ACTIVITIES, INDEPENDENT INSPECTION, LICENSEE EVENT REPORT REVIEW AND FOLLOWUP OF PREVIOUSLY IDENTIFIED ITEMS. THE INSPECTION INVOLVED 329 INSPECTOR-HOURS ONSITE BY FOUR NRC INSPECTOR.

RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS NERE IDENTIFIED. l + INSPECTION ON MAY 22 - JULY 26, 1985 (REPORT NO. 50-206/85-20) AREAS INSPECTED: ROUTINE, RESIDENT INSPECTION OF OPERATIONS PROGRAM INCLUDING THE FOLLONING AREAS: OPERATIONAL SAFETY VERIFICATION, EVALUATION OF PLANT TRIPS AND EVENTS, MONTHLY SURVEILLANCE ACTIVITIES, MONTHLY MAINTENANCE ACTIVITIES, ENGINEERED SAFETY FEATURE HALKDOWN, REFUELING ACTIVITIES, INDEPENDENT INSPECTION, LICENSEE EVENT REPORT REVIEN AND FOLLOWUP OF PREVIOUSLY IDENTIFIED ITEMS. THE INSPECTION INVOLVED 111 INSPECTOR-HOURS , ONSITE BY FIVE NRC INSPECTORS. RESULTS OF THE NINE AREAS EXAMINED, ONE VIOLATION HAS IDENTIFIED: FAILURE TO FOLLON AN APPROVED STATION PROCEDURE.

             + INSPECTION ON JUNE 24 - JULY 18, 1985 (REPORT NO.                                          50-206/85-22) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
              + INSPECTION ON gUCUST 12-16, 1985 (REPORT NO.                                    50-206/85-23) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.

PAGE 2-302 4

                                                                               ;     ,                    is       I; i

3 0 3 2 MMM L M M A E M M EI G M M RR A M M EE P M M HT M M . A = M M E . . SM M M T H H D M M A T T UN M M D N N TE M M O O SN M M R N N M1M E}}