Forwards Rept for Byron Unit 2 Inservice Insps Performed During Cycle 6 Refueling Outage During Aug-Oct 1996
ML20133B903
Person / Time
Site: Byron Constellation icon.png
Issue date: 12/27/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133B906 List:
References
BYRON-96-5199, NUDOCS 9701060267
Download: ML20133B903 (1)


Text

_

Commonweahh Ilhmn Company llyron Generating Mation 4 450 North German Church Road Ilyron.11,6i01n979i Tel 815-23 65 6 41 December 27,1996 LTR:

BYRON-96-5199 FILE:

3.11.0321 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit 2 Inservice inspection Report for Interval 1, Period 3, Outage 2 (B2R06) 1 Byron Nuclear Power Station, Unit 2 Facility Operating License NPF 66 NRC Docket No. 50-455 Please find attached a report for the Byron Unit 2 Inservice inspections performed during Cycle 6 refueling outage (B2R06) during August-October 1996. This report is being submitted in compliance with the requirements of ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, 1983 Edition through Summer 1983 Addenda and in accordance with Byron Technical Specification 4.0.5.

If there are any additional questions, please contract Marcia Lesniak, Nuclear Licensing Administrator at (630)663-6484.

i Sincerely, 4r)

David B. Wozn' Site Engineeri Manager Byron Nuclear Power Station l

i Llh DBW/jrt 9701060267 961227 i

PDR ADOCK 05000455 G

PDR Attachment cc:

A.B. Beach, NRC Regional Administrator, Rill G.F. Dick, Jr., Byron Project Manager - NRR 1

S. D. Burgess, Senior Resident inspector, Byron Office of Nuclear Safety -lDNS hAbyritr\\96-5199 A l'nicum Company