Forwards List Summarizing Issues Associated W/Recent Licensing Submittals Discussed During Teleconference Conducted on 961115
ML20133B406
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/31/1996
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
NUDOCS 9701030161
Download: ML20133B406 (4)


Text

. . . _ _ _

* - '- December 31, 1996 Mr. Roger 0. Anderson, Director ,

! Licensing and Management Issues {

Northern States Power Company r 414 Nicollet Mall )

j

Minneapolis, Minnesota 55401  ;

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - ISSUES

} WITH RECENT LICENSING SUBMITTALS DISCUSSED DURING TELECONFERENCE  !

i \

f

Dear Mr. Anderson:

l The enclosed list summarizes the issues associated with recent licensing l

, submittals that were discussed during a teleconference conducted on j November 15, 1996, with you and your staff. We understand that you are i

working to prevent the occurrence of any such issues in the future. If you i

have any questions, please call me at (301) 415-1355. l Sincerely,  ;

i Original signed by {

+ =

i Beth A. Wetzel, Project Manager .

] Project Directorate III-1 d j Division of Reactor Projects - III/IV i

Office of Nuclear Reactor Regulation I Docket Nos. 50-282 and 50-306 .

1 j

Enclosure:

As stated l

l cc w/ encl: Su next page l

i DISTRIBUTION-

] iDocket: File- J. Roe ACRS PUBLIC E. Adensam (EGA1) OGC PD3-1 R/F J. M. Jacobson, DRP/RIII DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \PI1296.LTR To receive a copy of this document, Indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment /enetosure N =

N3 copy 0FFICE PM:PD3-1 E3 LA:PD3-1 E D:PD3-I-1 NE BWetZel:sp I CJamersonhJbb ,

DATE /2 /d/g6 /S//$/g6. / L/21/96 OI ;i 0FFICIAL F.ECORD COPY  ;

0s00;g .NRC FE.E CENTER COPY 9701030161 961231 -

PCR ADOCK 05000282 l P PDR l

, on n:o y \ UNITED STATES g ,g NUCLEAR RE2ULATORY COMMISSION WASHINGTON, D.C. mt

/ December 31, 1996 l l

Mr. Roger 0. Anderson, Director l Licensing and Management Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - ISSUES WITH RECENT LICENSING SUBMITTALS DISCUSSED DURING TELECONFERENCE l Dear Mr. Anderson.

The enclosed list summarizes the issues associated with recent licensing submittals that were discussed during a teleconference conducted on November 15, 1996, with you and your staff. We understand that you are

! working to prevent the occurrence of any such issues in the future. If you have any questions, please call me at (301) 415-1355.

s Sincerely, Du h.(

Beth A. Wetzel, Project Manager 1

Project Directorate 111-1 i Division of Reactor Projects - III/IV  !

Office of Nuclear Reactor Regulation 4

Docket Nos. 50-282 and 50-306 I

Enclosure:

As stated cc w/ enc 1: See next page I

t

l I

Mr. Roger 0. Anderson, Director Prairie Island Nuclear Generating  !

Northern States Power Company Plant ,

i i i CC; l

J. E. Silberg, Esquire Tribal Council

Shaw, Pittman, Potts and Trowbridge Prairie Island Indian Community )

2300 N Street, N. W. ATTN: Environmental Department Washington DC 20037 5636 Sturgeon Lake Road Welch, Minnesota 55089 Plant Manager .

Prairie Island Nuclear Generating '

Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 Adonis A. Nebiett Assistant Attorney General Office of the Attorney General 455 Minnesota Street Suite 900 St. Paul, Minnesota 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse l Box 408 l Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner .

Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 ,

Site Licensing i Prairie Island Nuclear Generating Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 w e im

.. j i

i CONTENT-ISSUES ASSOCIATED WITH~

RECENT PRAIRIE ISLAND LICENSING SUBMITTALS  !

1. Issues associated with Code Case N-521:

. Timeliness with response to the staff's request for information was not ,

appropriate. The staff asked for additional information to support use  ;

of the code case in December 1995. The licensee did not provide the l information until July 1996.

. Submittals were not complete in content. The licensee did not clarify [

the scope of the relief needed. Not enough information was submitted to  :

support use of the code case. ,

t

2. Timeliness of submittals:  !

. Elevated F-star amendment was submitted on September 24, 1996, for use during the next refueling outage, which starts January 25, 1997. l Typically, licensees should allow at least 6 months for staff review of '

amendments.

. Appendix J, Option B was submitted on October 25, 1996, and netded for l the next refueling outage. j 1

. Cooling water systems amendment was submitted November 6, 1996, for use j during the next refueling outage.

3. . Content of cooling water amendment:

. In the first version of this amendment, submitteC on September 11, 1996, the significant hazards questions compared amendment change ta the 1992 condition of the system, not the current system condition.

4. Other recent licensing administrative oversights:

. Submittal of LER No.14 (autostart of diesel driven cooling water pump) was missed. The LER was submitted 41 days after the event instead of the required 30 days. The LER was written following a senior resident inquiry.

. The annual radiation report submittal was missed. The report was submitted following project manager's inquiry into the report's whereabouts.

5. Issues associated with the inservice inspection (ISI) program:

. The content of recent ISI submittals has not been complete and accurate.

Some examples of these are Code Case N-521 and the last ISI 10-year update.

ENCLOSURE l

.. .