ML20133B278
| ML20133B278 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/16/1985 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20133B282 | List: |
| References | |
| NUDOCS 8510030146 | |
| Download: ML20133B278 (1) | |
Text
__
M:ihng Address Alabama Power Company 600 North 16th Strect Post Oth e Box 2641 Beming5am. Atacama 35291 Telephone 205 783-6090 R. P. Mcdonald.
b Seruar Oce Presdent Fhntodge Build.ng Alabama Power Docket No. 50-364
~
~
~
September 16, 1985 Dr. J. N. Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta-Street, N. W.
Atlanta, Georgia 30303 Joseph M. Farley Nuclear Plant - Unit 2 Containment Five Year Tendon Surveillance Report
~ Gentlemen:
Pursuant to Technical Specification 3/4.6.1.6, Alabama Power Company has completed the five year tendon surveillance for Farley Nuclear Plant Unit-2.
The results indicate that, within the scope of this surveillance, the post-tensioning system exhibits no signs of abnormal degradation and that the system is performing its intended design function with a margin of safety.
Enclosed for your information are eight (8) copies of the Containment Five-Year Tendon Surveillance Report, Volumes One and Two. This report includes a description of the tendon and concrete condition,.the inspection procedure and the related tolerances. Additional information regarding this surveillance is available at the Farley Nuclear Plant for review upon xquest.
Yours truly,
/
i./
]
R. P. Mcdonald
/
RPM / STB:drs/D-362 0{
h Enclosures p
cc:
Mr. L. B. Long w/1 enclosure Mr. ' S." AnVarga r7w/1 Tenclosure c a l
g Mr. E. A. Reeves w/l enclosure Mr. W. H. Bradford w/o enclosures 8510030146 850916 PDR ADOCK 05000364 p
-m