Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217F6321999-10-0707 October 1999 Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20212K9421999-10-0505 October 1999 Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage ML20212J0451999-09-21021 September 1999 Forwards Safety Evaluation of Licensee USI A-46 Program at Quad Cities Nuclear Power Station,Units 1 & 2,established in Response to GL 87-02 Through 10CFR50.54(f) Ltr ML20212D8231999-09-20020 September 1999 Informs That Effectieve 991101,NRC Region III Will Be Conducting Safety System Design & Performance Capability Pilot Insp at Quad Cities Nuclear Power Station.Insp Will Be Performed IAW NRC Pilot Insp Procedure 71111-21 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant ML20212C6961999-09-15015 September 1999 Forwards Insp Repts 50-254/99-17 & 50-265/99-17 on 990823- 0827.No Violations Noted B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 1999-09-30 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N8261999-10-25025 October 1999
[Table view]Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 9906301999-10-20020 October 1999 Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217K7011999-10-13013 October 1999 Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action1999-10-12012 October 1999 Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee1999-10-0707 October 1999 Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 SVP-99-189, Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage1999-09-22022 September 1999 Confirms Completion of Actions Identified During Review of NRC Safety Evaluation of Boiling Water Reactor Owners Group Rept, Utility Resolution Guidance of ECCS Suction Strainer Blockage 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 SVP-99-190, Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys1999-09-13013 September 1999 Clarifies Statement Contained in NRC Insp Repts 50-254/99-12 & 50-265/99-12,dtd 990813,paragraph 4OA1.3B, Observation & Findings, Re Sys Mod to DG Air Start Sys B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures B17851, Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d)1999-08-27027 August 1999 Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d) ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) B17855, Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.7901999-08-17017 August 1999 Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.790 B17849, Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr1999-08-16016 August 1999 Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr B17854, Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings1999-08-14014 August 1999 Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings SVP-99-170, Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety1999-08-13013 August 1999 Forwards Relief Requests CR-25,CR-26,CR-27,CR-28,PR-11, PR-12 & PR-13,on Basis That Compliance with Specified Requirements Would Result in Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality & Safety SVP-99-147, Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl1999-08-13013 August 1999 Notifies of Change to Bases of TS to Licenses DPR-29 & DPR- DPR-30.Change to TS Section 3/4.9 Provides Clarity & Consistency with Sys Design Description in Ufsar,Sections 8.3.2.1 & 8.3.2.2.TS Bases Page,Encl SVP-99-154, Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated1999-08-13013 August 1999 Notifies NRC That M Price,License SOP-31389,is No Longer Required to Maintain Operator License.Price Was Removed from Licensed Duty on 990729 & Comm Ed Requests License Be Terminated B17850, Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept1999-08-11011 August 1999 Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept B17837, Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl1999-08-0707 August 1999 Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes B17657, Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 19991999-08-0303 August 1999 Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 1999 B17845, Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered1999-08-0202 August 1999 Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed1999-07-29029 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed 1999-09-30 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML19325E9001989-10-19019 October 1989
[Table view]Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request Response ML19327A8441989-10-11011 October 1989 Forwards Pleadings,Motions & Orders Filed in Alchemie Reorganization Action.Alchemie Currently Preparing Reorganization Plan Which Will Serve as Framework for Future Company Business Activities ML19327B2491989-10-0606 October 1989 Forwards Justification for Extension of Applicability of 890807 SER Re Acceptance of BAW-10175, Rod Exchange Methodology Topical Rept. ML19327A8511989-10-0505 October 1989 Forwards Wh Arowood 890907 Ltr & Other Supplemental Info to Replace Info Previously Filed ML20247F4121989-08-31031 August 1989 Advises That Response to Order Modifying Licenses & Order to Show Cause Why Licenses Should Not Be Revoked Will Be Sent. Responses to NRC Three Basic Questions Re Status of Licensee Finances & Rationale for Having License Provided ML20246B1671989-08-0808 August 1989 Forwards Response to 890717 Request for Info Re Filings W/ Us Bankruptcy Court & Financial Capabilities.Ownership of Unclassified Equipment Remains Unchanged ML20247Q5521989-05-24024 May 1989 Notifies That J Smelser Contract Ended,Effective 890517. Mgt of Company by Listed Board of Director Members Will Continue Until New Chief Executive Officer Selected ML20247P8071989-04-0404 April 1989 Forwards Ltr in Which Concerns for Potential Significant Deficiency Under 10CFR21 Expressed ML20247G4991989-03-30030 March 1989 Forwards Proprietary BAW-10175P, Rod Exchange Methodology, Developed for Calculating Parameters While Performing Control Rod Measurements Using Rod Exchange Technique to Be Used at Plants.Rept Withheld (Ref 10CFR2.790) ML19324C3151989-02-20020 February 1989 Informs of Change in Vendor Plans for Inspecting Fuel Rods Containing Fuel Pellets Supplied by Ge.Ultrasonic Insp of Fuel Rods at Oconee 1 Found No Failed Rods in three-cycle, Discharged Fuel Assemblies ML20235M8971989-02-10010 February 1989 Requests Withholding of Proprietary WCAP 12125, Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per 10CFR2.790 ML20206D6241988-11-11011 November 1988 Forwards Projected Decommission Costs of Centrifuge Machines to Be Transferred to New Facility at Oliver Spring,Tn. Licensee Will Be Able to Offset Total Decommissioning Costs by Setting Aside Annual Decommissioning Cost Plus Reserve ML20205Q6331988-11-0202 November 1988 Forwards Revised Proprietary Pages to BAW-10164P, RELAP5/Mod2-B&W,Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis. Cso Film Boiling Correlation Replaced w/Condie-Bengston IV Correlation & Typos Corrected ML20205P9511988-11-0101 November 1988 Forwards Rev 6 to Security Plan for Alchemie Facility 1 - Cpdf,Oak Ridge,Tn & Rev 6 to Security Plan for Alchemie Facility 2 - Oliver Springs,Oliver Springs,Tn. Revs Withheld (Ref 10CFR2.790(d)) ML20195E4291988-10-31031 October 1988 Forwards Numbers 1-5 of Rev 5 to Alchemie Security Plans. Requests Replacement of Pages 23-25 & 35 & Encl Rev Page ML20205N3301988-10-27027 October 1988 Forwards Sketch of Feed Sys,Withdrawal Sys Refrigeration Cart & Typical Withdrawal,Large & Small,Pumping Stations ML20195B6091988-10-21021 October 1988 Forwards Summary of B&W Fuel Co Position Re Small Break LOCA Calculations Contained in Util FSARs for Upcoming Reload Cores Which Will Contain Fuel Mfg by B&W ML20155D4031988-09-21021 September 1988 Requests Withholding WCAP-11946, Safety Evaluation Supporting More Negative End-of-Life Moderator Temp Coefficient Tech Specs for Millstone Unit 3, (Ref 10CFR2.790) ML20154K3841988-09-12012 September 1988 Forwards Enhanced Facts Re Adequacy of Funding for Decontamination & Decommissioning (D&D) of Facilities. Intends to Establish Funded Reserve for D&D at Completion of Sale of Unclassified Equipment Not Needed for Production ML20154E6451988-08-31031 August 1988 Requests That 880722 & 0812 Ltrs Re Security Sys Components Be Withheld from Public Disclosure (Ref 10CFR2.790(d)) ML20207L7651988-08-30030 August 1988 Requests That Proprietary WCAP 11935, McGuire Unit 2 Evaluation for Tube Vibration Induced Fatigue, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20151H9381988-07-25025 July 1988 Forwards Proprietary BAW-10168P, B&W LOCA Evaluation Model for Recirculating Steam Generator Plants ML20151M9211988-07-20020 July 1988 Responds to 880621 Request for Addl Info Re Enrichment of Naturally Occurring radioisotopes.Te-123 Will Be Enriching Approx 60 G to About 50% ML20151L3321988-07-20020 July 1988 Forwards DOE Ltr Indicating Acceptance of Classified Matter. Licensee Agrees to Remove Any Toxic or Hazardous Matl from Classified Equipment Prior to Transfer to DOE for Disposal ML20151G9761988-07-14014 July 1988 Forwards Rev 2 to Security Plan for Shipment of Classified Matter.Rev Withheld (Ref 10CFR2.790) ML20150F1561988-07-0808 July 1988 Advises of Changes to Alchemie Board of Directors,Per 880618 Annual Stockholders Meeting ML20155F4441988-05-0404 May 1988 Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104 ML20151F7661988-03-29029 March 1988 Forwards Updated Pages to Proprietary BAW-10171P, REFLOD3B- Model for Multinode Core Reflooding Analysis, Per ECCS Methodology for Facilities Reloads.Mod Removes Henry Quench Temp Criteria & Potential Conflict in Logic.Pages Withheld ML20148S3561988-01-13013 January 1988 Requests That Evaluation of Margin to Steam Generator Overfill Be Withheld (Ref 10CFR2.790).Matl of Same Technical Type as Matl Submitted in Encl Affidavit AW-76-031 ML20234C2231987-12-28028 December 1987 Forwards Proprietary BAW-10164P, RELAP5/MOD2-B&W,Advanced Program for LWR LOCA & Non-LOCA Transient Analysis. Rept Describes Computer Code Used to Analyze RCS Behavior During Blowdown Phase of LOCA Transient.Rept Withheld ML20234D1101987-12-14014 December 1987 Forwards Proprietary BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis. Rept Describes Computer Code That B&W Will Be Using to Analyze RCS Behavior During Refill of LOCA Transient.Rept Withheld ML20237C3611987-11-24024 November 1987 Requests That Proprietary Rev 2 to WCAP-11386, Byron/ Braidwood T-Hot Reduction Final Licensing Rept, Be Withheld (Ref 10CFR2.790(b)(4)) ML20236C0261987-10-22022 October 1987 Forwards Proprietary BAW-10165P, FRAP-T6-B&W:Computer Code for Transient Analysis of LWR Fuel Rods. Rept Describes Computer Code That B&W Will Be Using for Future Transient Analyses of LWR Fuel Rods.Rept Withheld (Ref 10CFR2.790) LD-87-056, Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request1987-09-18018 September 1987 Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request ML20238E3871987-08-26026 August 1987 Confirms Points Discussed in Telcon.Study Conducted at Univ of Michigan to Characterize Effects of Radiation on Shrinkage in Boraflex Used Boraflex Produced W/Same Procedures as Used in Plants ML20236H4971987-07-29029 July 1987 Forwards Draft Proprietary Topical Rept BAW-10166P, Beach Computer Code for Reflood Heat Transfer During Loca. Draft Submitted to Permit Interaction Between B&W,Nrc & Util. Affidavit for Withholding Encl.Fee Paid ML20238E3221987-07-29029 July 1987 Comments on Draft NRC Info Notice Re Gaps in Neutron Absorbing Matl in High Density Spent Fuel Storage Racks. Encl Redrafted Version of Notice Includes Changes to Reflect Actual Composition of Boraflex ML20236B4141987-07-13013 July 1987 Forwards Proprietary Draft 1 of BAW-10168P, ...B&W LOCA Evaluation Model for Recirculating Steam Generator Plants, to Be Used for LOCA Analysis of Catawba & McGuire Reload Fuel Cycles.Rept Withheld (Ref 10CFR2.790).Fee Paid ML20238E2621987-07-10010 July 1987 Forwards Rev 0 to NS-1-050, Irradiation Study of Boraflex Neutron Absorber, Interim Technical Rept,Summarizing Irradiation Performance Data Received to Date.Rept Will Be Supplemented as Addl Data Becomes Available ML20196K1621987-07-0909 July 1987 Partially Deleted Ltr Submitting Addl Info in Response to NRC 861230 & 870211 Requests Re 860918 Application for Exemption from Requirement to Convert from High Enriched U to Low Enriched U for Reactor Fuel,Per Generic Ltr 86-12 ML20238F0261987-06-26026 June 1987 Requests That Proprietary WCAP-11496, Resistance Temp Detector Bypass Elimination Licensing Rept for Millstone Unit 3, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20215L0591987-06-22022 June 1987 Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl ML20215D4081987-05-15015 May 1987 FOIA Request for Reactor Vessel Surveillance Capsule Repts for Turkey Point 4,Zion 2 & DC Cook 1 ML20237D2761987-04-27027 April 1987 Forwards List of 200 Parameters That Company Will Provide to Offsite Agencies,Per Request to D Schultz.List of Parameters That Will Be Available to NRC Via Zion Data Link During Coming Federal Field Exercise & Dryrun Also Encl ML20212R4711987-04-15015 April 1987 Forward Proprietary Draft 1 to BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis, for Review of ECCS Methodology for Plants Fuel Reloads,Per . W/Affidavit.Draft Withheld (Ref 10CFR2.790).Fee Paid LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days1987-04-10010 April 1987 Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days ML20206E7851987-04-0202 April 1987 Confirms Intention to Use FOAM2 Computer Program as Part of ECCS Evaluation Model for Westinghouse Designed Plants. Review of Applicability of Code to Westinghouse Designed Plants Requested Prior to 880701 ML20237D6431987-03-25025 March 1987 Forwards Technical & Cost Proposal for Task Order 009, Continuing Exercise Support to NRC Operations Ctr, Electronic Transmission of Plant Parameters During Exercises, Under Contract NRC-05-86-170 ML20237D6681987-03-0404 March 1987 Forwards Revised Draft Statement of Work Proposed for Task Order 009, Continuing Exercise Support to NRC Operations Ctr,Electronic Transmission of Plant Parameters During Exercises, for Contract NRC-05-86-170 ML20237D6881987-02-14014 February 1987 Forwards Parameters & Computer Points That Author Will Be Attempting to Get Util to Make Available for Transmission to NRC During Federal Field Exercise - 2 1989-08-08 |
Text
. - - ._ -
. r.
l l AS E A- ATO M Var handleggare-Dealt with by Vast datum-Our date Var beteckmng-Our reference l Christer E Hammarlund, +46 (21) 107056 September 24,1985 MB 057/85 Er handleggare-For the attention of Ett datum-Your date Er beteckrung -Your reference Document Control Desk US Nuclear Regulatory Commission Washington, D.C. 20555 l
SUBJECT:
TOPICAL REPORT - ASEA-ATOM CONTROL BLADES FOR U.S. BWRs Enclosed you will find nineteen (19) copies of the subject report, which is submitted for docketing and review. Also the application fee of USD 150.- has been attached.
We respectfully request that the subject report be reviewed by the NRC in terms of generic approval of the general use of the types of ASEA-ATOM control blades specified herein in Bolling Water Reactors in the U.S. The subject report has been prepared as an update of the report that was submitted to the NRC in connection with the licensing of the use of eight control blades in Dresden-3, AA Report TR BR 82-98 rev.1.
There is urgency connected with the review of this topical report in that the licensing of reload no 9 for Quad Cities unit 1, as well as the Millstone unit I reload, depends on its approval.
If we can provide any further information please contact:
Mr Harold Thornburg Product Manager, ASEA,Inc.
Four New King Street White Plains, NY 10604 Telephone no.: (301) 829-1744 (914) 428-6000 Thank you for your consideration.
Very truly yours,
[
Erland Tenerz Vice President and General Manager 40\0 i
Fuel Division 8510030130 850924 PDR ADOCK 05000245 M ,1j d egec( J p .o O P PDR 99263
AS E A- ATO M var herwsecoere-osan we by vart oatum-our date var tetecknma - our reference Christer E Hammarlund, +46 (21) 107056 September 24,1985 MB 057/85 Er handleggere-For the ettention of Ett datum-Your date Er betecknmg - Your reference i...
Mr Harold Bernard Mail Stop 3404 US Nuclear Regulatory Commission Washington, D.C. 20555 1
SUBJECT:
TOPICAL REPORT - ASEA-ATOM CONTROL BLADES FOR U.S. BWRs Enclosed you will find one (1) copy of the subject report, which is submitted for docketing and review. The application fee of USD 150.- has been sent directly to the Document Control Desk. '
We respectfully request that the subject report be reviewed by the NRC in terms of generic approval of the general use of the l
' -- types of ASEA-ATOM control blades specified herein in Bolling Water Reactors in the U.S. The subject report has been prepared as an update of the report that was submitted to the NRC in connection with the licensing of the use of eight control blades in Dresden-3, AA Report TR BR 82-98 rev.1.
' There is urgency connected with the review of this topical report in that the licensing of reload no 9 for Quad Cities unit 1, as well as the Millstone unit 1 reload, depends on its approval.
If we can provide any further information please contact:
Mr Harold Thornburg Product Manager, ASEA,Inc. ,
i Four New King Street I White Plains, NY 10604 '
Telephone no.: (301) 829-1744 l
l (914) 428-6000
(
Thank you for your consideration.
Very truly yours,
~
8 #W &
Erland Tenerz l
I Vice President and General Manager Fuel Division po i
! \\D
=
i E