Core Operating Limits Rept for Zion Unit 2 Cycle 15
ML20133A743
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 12/27/1996
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20133A740 List:
References
NUDOCS 9701020088
Download: ML20133A743 (7)


Text

. _. _ _ _. _ _.. _.. _. _ _ _ _..... _ _. _.. _ _ -

i i

Attachment A Core Operating Limits Report for Zion Unit 2 Cycle 15 I

t I

I l

I l

i

(

l l

l 9701020088 961227 PDR ADOCK 05000304 '

P PDR

m.__

Nf?C LEAR FUEL SERVICES DEPARTMENT NDIT No 960151

~ NUCLEAR DESIGN INFORMATION TRANSMITTAL Rev.No.

0 Page 2 of 7 Core Operating Limits Report (COLR) 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Zion Unit 2 Cycle 15 has been prepared in accordance with the requirements of Zion Technical Specification 6.6.1.F.

l The Technical Specifications affected by this report are:

LCO 3.2.1.C.3 Shutdown Bank Insertion Limits l

3.2.1.D.1 LCO 3.2.1.C.3 Control Bank Insertion Limits f

3.2.1.D.1 LCO 3.2.2.A. I.1 Heat Flux Hot Channel Factor - Fn(Z)

I N

I LCO 3.2 2.A.l.1 Nuclear Enthalpy Rise Hot Channel Factor - F g l

LCO 3.2.2 A.2.2.c(2)

Axial Flux Difference (Al Target Band)_

3.2.2.A.4 I

3.2.2.A.6.1 l

]

l l

l l

i l

i

-m m

NUCLEAR FUEL SERVICES DEPARTMENT NDIT No.

960151 l

NUCLEAR DESIGN INFORMATION TRANSMITTAL Rev. No.

O i

Page.1 of 7 2.0

' OPERATING LIMITS l

The cycle specific parameter limits for the LCOs specified in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC approved methodologies spe@ d in Technical Specification 6.6.1.F.

2.1 shutdawn n=nk Insertion I imits (LCO 3.2.1.C.3 and 3.2.1.D.1) i ne Shutdown Banks shall be fully withdrawn when the reactor is appro. '. ng critict"ty or is critical.

l 2.2 control nank Insertion I imits (LCO 3.2.1.C.3 and 3.2.1.D.1) i I

The Control Bank Insertion Limits are specified by Figure 2.2-1.

The sequence for Control Bank Withdrawal shall be Control Bank A.

Control Bank B, Control Bank C, and Control Bank D.

l Successive Control Banks shall overlap by 50 steps.

)

i l

l l

I i

l i

l F

a

~ - - ~....

e t

t NUCLEAR FUEL SERVICES DEPARTMENT NDiT No

% 0151 i

NUCLEAR DESIGN INFORMAT!ON TRANSMITTAL Rev No 0

Page 4 of 7 I

Zion Unit 2 Cycle IS Banks A and B Fully Withdrawn f

l 230 220 (27,228) Bank C l

210 200 (100,185)

Bank D l

190 l

180 l

(0,178) 170 l

i 160 e

i

! 150 1

4 6 140 i

!ii

&. '30 l

@ 120 cC 110 g

2 100 t

e l

5 M e

l 1 M 5

70 1

l e

i 50 I

e 30 20 (0,0) i 10 i

0 I

O 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 i

Power Level (% of Rated Thermal Power) 1 Figure 2.2-1 Control Bank Insertion Limits I

vs. rated Thermal Power I

i 4

1 4

i

?

i 4

)

?

.. ~. ~. = -.

- ~

~... - _... ~.....

-. ~ -

... - - - -... _.... ~...

l

  • NUCLEAR FUEL SERVICES DEPARTMENT NDIT Ns.

960151 NUCLEAR DESIGN INFORMATION TRANSMITTAL Rev.No.

0 Page 5 of 7

{

i 2.3 Hear Flux Hot Channel Factor - F (Z) (FQ Methodology)

Q (LCO 3.2.2.A.I.1) 1 F""

o F (Z) s

  • K(Z) for P > 0.5 o

P F""

o F (Z) s

  • K(Z) for P s 0.5 n

O.5 i

where:

F "T' = 2.@

Q THERMAL POWER p,

RATED THERMAL POWER i

K(Z)is provided in Figure 2.3-1 i

t ll' s

a I

NUCLEAR FUEL SERVICES DEPARTMENT NDIT No.

960!$1 NUCLEAR DESIGN INFORMATION TRANSMITTAL Rev. No.

O Page 6 of 7 Zion Unit 2 Cycle 15 K(Z) l 1.20 1.00."."

(0.0,1 0)

(6.0,1.D)

(12.0,0.925)

N i

i 0.80 5

E 1

E I

0.60 E.

E 0.40 i

0.20 0.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 1

Core Elevation (ft) i Figure 2.3 1 K(Z)- Normalized F (Z) as a Function of Core Height Q

l

m

._m._

=

NUCLEAR FUEL SERVICES DEPARTMENT NDIT NA 960!$1 NUCLEAR DESIGN INFGRMATION TRANSMITTAL Rev. No.

0 Page 7 of 7 l

1

]

N 2.4 Nuclamr Fnthminy Rise Hot Channel Factor - F yg (LCO 3.2.2.A.I.1) i FE 's Ff7 * (1 + PF, * (1 - P))

l I

I where: Fl7 = 1.65

.PF, = 0.3 i

t i

THERMAL POWER i

P=

4 RATED THERMAL POWER 4

for 0.02 s P s 1.00 2.5 Arial Flur DiMerence (Al Tarnet Rand) i (LCO 3.2.2.A.2.2.c(2),3.2.2.A.4 and 3.2.2.A.6.1) i 2.5A.1 De AXIAL FLUX DIFFERENCE (AFD) target band is +6%, -7% of the target flux i

~

difference.

2.5A.2.

The AFD acceptance operation limits are an envelope bounded by +y percent and -y percent at a power of 90% of P and increasing by +1 percent and -1 percent for each 2 percent of j

T rated power below P. y = 10.8% of P rounded to the nearest percent.

T T

R r

.