ML20133A722
| ML20133A722 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/18/1996 |
| From: | Walter MacFarland PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9701020074 | |
| Download: ML20133A722 (2) | |
Text
..
Wattsr G. Mact-erlind, lV, P.E.
g..
Vice President Limerick Generatng Station l
l.
PECO NUCLEAR erm %ev PO Box 2300 A UNir or PECO ENERCY Sanatoga, PA 19464-0920 610 718 3000 Fax 610 718 3008 Pager 1800 672 2285 #8320 l
l l
10CFR50. 74 (a) l December 18, 1996 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S.
Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Units 1 and 2 Notification of Change in Operhtor Status l
l.
Gentlemen:
This letter provides formal notification, in accordance with L
the requirements of 10CFR50.74 (a), of a change in status of the following Senior Operator license.
l Name Docket No.
License No.
Robert C.
Braun 55-61609 SOP-11089 As a result of permanent reassignment, this license is no longer necessary as originally certified under I
10CFR55. 31 (a) (3 ).
1 Thank you for you attention to this matter.
j Very truly yours, p
/
cc:
H.
J.
Miller, Administrator, Region I, USNRC N.
S.
Perry, USNRC Senior Resident Inspector, LGS a
4003 0
'Q (b i3 n n m i
9701020074 961218 PDR ADOCK 05000352 y
PDR' i
Docket Nos. 50-352 and 50-353 December 18, 1996 Page 2 bcc:
D. M.
Smith - 63C-3 G.
R.
Rainey - 63C-3 T.
J. Niessen - 63C-3 W. G.'MacFarland - SMB1-1 R. W.
Boyce - GML5-1 J. A.
Hutt;n - GML5-1 L. A.
Hopkins - LTC1-1 G. A.
Hunger,.Jr. - 62A-1 C. A. Mengers - SSB4-3 T.
J.
Dougherty - LTC1-1 J.
L.
Kantner - SSB2-4 Medical - PPC2-1 Correspondence Release Point - SMB1-2 PA DER BRP Inspector - SSB2-4 DAC - SMB1-2