Text
_. _.
Mr. Lew W. Myers December 24, 1996 MO j
Vice PresidInt Nuclear S
L Centerior Service Company
(
P.O. Box 97, A200 l
Perry, OH 44081 i
SUBJECT:
~ PERRY NUCLEAR PLANT DESIGN INSPECTION
Dear Mr. Myers:
The purpose of this letter is to inform you of our plans to conduct a design i
L inspection of the Perry Nuclear Plant. We have scheduled the on-site inspection for the weeks of February 17, March 3 through 14, and March 24, 1997. Your staff has indicated that there are no major conflicts with on-site activities during this period.. The NRC team leader and the lead contract engineer will visit the site between January 29 and 31, 1997, to review administrative aspects of,the inspection and to collect documentation l
necessary for in-office review and on-site inspection'.
l i
.Recent NRC inspections.at nuclear power reactor facilities have identified
~
numerous findings where.the plant configuration or operations were inconsistent with the design basis, licensing basis, or.the UFSAR. Therefore, the NRC has decided to perform design; inspections.at nuclear power reactor facilities utilizing Inspection Procedure (IP) 93801, " Safety System i
Functional Inspection.". System selection is.in progress and the team leader will contact your staff and notify'them regarding the systems selected.
Mr. Morris Branch, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster Engineering l
Corporation (SWEC) who have been contracted by the NRC for this purpose.
Mr. Robert Najuch of SWEC who is part of the five person team will be the lead j
contractor engineer..
i We will be in contact with your staff regarding additional details for the t
inspection. Should you have any questions, please contact Mr. Branch at (301) 415-1279 or.me at (301) 415-1111.
r Sincerely,-
Original signed by:
j Gail H. Marcus, Project Director, PDIII-3
""'i'i " f "'t ' " Jt*
310041 Office of Nuclear Reactor Regulation f
cc:-See attached list g
j Distribution:
h D'
Central Files FPGillespie, NRR VMcCree JRoe EAdensas GMarcus 1
MBranch PSIB R/F JCaldwell, RIII
.PDR.
MRign, RIII j
DOCUMENT NAME: G:\\PERANNOUN.LET
- Previously concurred i
v.
y w ed. 2 =n inacew in e. box: *C* = Copy wit es T = Copy with enclosures 0FFICE DISP /NRR DISP /NRR DI$lt/URR c)
DRPE/NRR j
NAME MWBranch*
DPNorkin*
RMM)1o GHMarcus Gi#1
$ 2 ] o g p M 40 12/23/96 12ff\\/96 12/24/96 DATE 12/23/96 FICIAL RECORD CO)Y 4
~, _ _ -
gg g hh y
e N
Mr. Lew W. Myers December 24, 1996
)
Vice President - Nuclear m.
" Centerior Service Company P.O. Box 97, A200 Perry, OH 44081
SUBJECT:
PERRY NUCLEAR PLANT DESIGN INSPECTION i
Dear Mr. Myers:
The purpose of this letter is to inform you of our plans to conduct a design inspection of the Perry Nuclear Plant. We have scheduled the on-site inspection for the weeks of February 17, March 3 through 14, and March 24, 1997. Your staff has indicated that there are no major conflicts with on-site activities during this period. The NRC team leader and the lead contract I
engineer will visit the site between January 29 and 31, 1997, to review administrative aspects of the inspection and to collect documentation necessary for in-office review and on-site inspection.
Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the plant configuration or operations were inconsistent with the design basis, licensing basis, or the UFSAR. Therefore, the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspeaion Procedure (IP) 93801,." Safety System Functional Inspection." System selection is in progress and the team leader will contact your staff and notify them regarding the systems selected.
Mr. Morris Branch, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster Engineering Corporation (SWEC) who have been contracted by the NRC for this purpose.
j Mr. Robert Najuch of SWEC who is part of the five person team will be the lead 1
contractor engineer.
We will be in contact with your staff regarding additional details for the inspection.
Should you have any questions, please contact Mr. Branch at (301) 415-1279 or me at (301) 415-1111.
Sincerely, Original signed by:
Gail H. Marcus, Project Director, PDIII-3 Division of Reactor Projects Office of Nuclear Reactor Regulation cc: See attached list Distribution:
Central Files FPGillespie, NRR VMcCree JRoe EAdensam GMarcus MBranch PSIB R/F JCaldwell, RIII PDR MRign, RIII DOCUMENT NAME: G:\\PERANNOUN.LET
- Previously concurred To reeshe e espy of this doousnent, ind6este in the box: 'C' = Copy wit res *E" = Copy with enclosures n = wecopy 0FFICE DISP /NRR DISP /NRR DI$t/lptR c)
DRPE/NRR NAME MWBranch*
DPNorkin*
RMh)1o GHMarcus Gi#1 DATE 12/23/96 12/23/96 12ff\\/96 12/24/96 0FFICIAL RECORD CO)Y
- Perry Nuclear Power Plant Unit Nos. I and 2 a
Centerior Service Company cc:
Mr. James D. Kloosterman Mr. Richard D. Brandt, Plant Manager Regulatory Affairs Manager Cleveland Electric Illuminating Co.
C1cveland Electric Illuminating Co.
Perry Nuclear Power Plant Perry Nuclear Power Plant P.O. Box 97, SB306 P.O. Box 97, A210 Perry, Ohio 44081 Perry, Ohio 44081 Mr. James W. Harris, Director Jay E. Silberg, Esq.
Division of Power Generation Shaw, Pittman, Potts & Trowbridge Ohio Dept. of Industrial Relations 2300 N Street, N.W.
P.O. Box 825 Washington, D.C.
20037 Columbus, Ohio 43216 Ms. Mary E. O'Reilly Centerior Energy Corporation Mayor, Village of Perry 300 Madison Avenue 4203 Harper Street Toledo, Ohio 43652 Perry, Ohio 44081 Resident Inspector's Office U.S. Nuclear Regulatory Commission Mayor, Village of North Perry Parmly at Center Road North Perry Village Hall Perry, Ohio 44081 4778 Lockwood Road North Perry Village, Ohio 44081 Regional Administrator i
U.S. NRC, Region III Attorney General 801 Warrenville Road Department of Attorney General Lisle, Illinois 60532-4531 30 East Broad Street Columbus, Ohio 43216 Lake County Prosecuter Lake County Administration Bldg.
Radiological Health Program 105 Main Street Ohio Department of Health Painesville, Ohio 44077 P. O. Box 118 Columbus, Ohio 43266-0118 Ms. Sue Hiatt DCRE Interim Representative Ohio Environmental Protection Agency i
8275 Munson DERR--Compliance Unit Memtor, Ohio 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Terry J. Lodge, Esq.
Columbus, Ohio 43266-0149 618 N. Michigan Street, Suite 105 Toledo, Ohio 43624 Chairman Perry Township Board of Trustees Ashtabula County Prosecutor 3750 Center Rd., Box 65 25 West Jefferson Street Perry, Ohio 44081 Jefferson, Ohio 44047 Mr. Lew W. Myers Vice President - Nuclear, Perry State of Ohio Centerior Service Company Public Utilities Commission P.O. Box 97, A200 East Broad Street Perry, Ohio 44081 Columbus, Ohio 43266-0573 James R. Williams, Chief of Staff Ohio Emergency Management Agency 2855 West Dublin Grarceille Road Columbus, Ohio 43223-2205
'