Forwards Simplification of Power Ascension Test 20, Pressure Regulator & Simplification of Power Ascension Feedwater Sys Response Testing - Test 21A, for NRC Expedited review.Marked-up FSAR Pages Re Test Mods Encl
ML20133A352
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/30/1985
From: Mittl R
Public Service Enterprise Group
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML20133A355 List:
References
NUDOCS 8510020195
Download: ML20133A352 (4)


Text

.

g.

PS 7 Pubhc Service Electoc and Gas Commni 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation September 30, 1985 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:

Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing Gentlemen:

POWER ASCENSION PROGRAM CHANGES HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) hereby submits the following. detailed justifications on power ascension test modifications (attached) for NRC consideration:

-1.

Test Number 20 - Pressure Regulator 2.

Test Number 21A - Feedwater System Response Testing consists of General Electric Company's technical analysis and PSE&G's safety evaluation for each of the afore-mentioned items.

The conclusion for each item shows the proposed modifications pose no increase in risk to the health and safety of the public.or an unreviewed safety question.

The Station Operation Review Committee (SORC) has reviewed each evaluation and concurs with the conclusions reached therein. consists of marked up FSAR pages applicable to the proposed testing modifications.

These FSAR changes will be included as an amendment to the FSAR pending approval for._ implementation from the NRC.

8510020195 850930 jh00 DR ADOCK 05000354

\\l PDR The Energy Peopka 1

osam m.o 4 84

(

Director of Nuclear 2

9/30/85 Reactor Regulation The balance of justifications associated with the power ascension test modifications are in the detailed review process in support of the safety evaluation and will be submitted as soon as possible.

Since the enclosed modifications impact finalizing the related power ascension testing detailed procedures, an expedited review is requested.

PSE&G is ready to meet with cognizant NRC personnel to discuss the proposed modifications should you require additional information.

Very truly yours, r

.L.'R i

I*

a

,g--

Attachments C

D.H. Wagner USNRC Licensing Project Manager A.R. Blough USNRC Senior Resident Inspector l

l i

l 6

Director of Nuclear 3

9/30/85 Reactor Regulation BC Vice President - Nuclear Vice President - E&C General Manager - Hope Creek Operations Assistant General Manager - Hope Creek Operations Project Manager - Hope Creek Site Engineering Manager - Hope Creek Power Ascension Director - Hope Creek Project Manager - General Electric Company Project Manager - Bechtel Power Corporation Manager - Nuclear Licensing and Regulation Associate General Solicitor Conner & Wetterhahn R. Green (NJ State Bureau of Rad. Prot.)

PSE&G Bethesda Office R.F. Drewnowski STAIRS NAR Dept. File (yel'ow) l Lic. File