ML20133A348

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-266/96-13 & 50-301/96-13 on 961003-1115.No Violations Noted
Date released: 05/26/2020 Download: ML20133A348


Insp Repts 50-266/96-13 & 50-301/96-13 on 961003-1115.No Violations Noted.Major Areas Inspected:Reviews of Interim Operability Determinations for Selected Pumps & Portions of Related Design Basis Calculations
ML20133A354
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/20/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20133A354 (9)
Forwards Insp Repts 50-266/96-13 & 50-301/96-13 on 961003-1115.No Violations Noted
ML20133A345
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/20/1996
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: PATULSKI S A
WISCONSIN ELECTRIC POWER CO.
References
Download: ML20133A345 (5)