_ _ _ _ _ _ -. _. _ _ _ _...- - _. - _. -
Decembar 24, 1996 l
Mr. Lew W. Myers l
Vice President - Nuclear l
-Centerior Service Company i
P. O. Box 97, A200 Perry, OH 44081 i
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - PERRY NUCLEAR POWER PLANT l
4 i
Dear Mr. Myers:
i On November 6,1996, the NRC staff completed the semiannual Plant Performance j
Review (PPR) of Perry Nuclear Power Plant. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding i
i of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Perry l
l Nuclear Power Plant involved the participation of all Region III technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from March 1996 through j
October 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of i
Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter Mvises you of our planned inspection effort resulting from the l
Perry Nuclea: Power Plant PPR review. The information is provided to enable l
appropriate consideration of the resource impact on your staff, and to permit-1 scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection i
plan for approximately the next 6 months. The rationale or basis for each inspection outside the " Core" inspection program is provided so that you are l
aware of the reason for emphasis in these program areas. Resident
{
inspections, as well as periodic inspections by other assigned members of our j
staff, may occur at any time in support of the Core inspection program.
l~
We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments.
If changes are necessary, you will be informed.
If you have any questions, please contact me at (708) 829-9736.
j Sincerely, I bn h. N hEo ChfN Reactor Projects Branch 4 l
i
Enclosure:
Inspection Plan i
g g
....,....--. wi.... sn. 6 c
cw.isw.is-mi i c - cm. ism.is-m/w
=-
i 0FFICE RIII G-RIII k
RIII h
RIII E
NAME Ring M Nibb CreedIl'/,/
Jacobson DATE 12/v1/96 12/13 /96 12/t3 /9b i12/0596 0FFICIAL RECORD COPY 1
9612310019 961224 PDR ADOCK 05000440 0
Lew W. Myers.
>cket No. 50-440 Docket No. 50-441 cc w/ encl:
J. P. Stetz, Senior Vice President - Nuclear L. W. Worley, Director, Nuclear Services Department J. D. Kloosterman, Manager, Regulatory Affairs W. R. Kanda, Director, Perry Nuclear Assurance Department N. L. Bonner, Director, Perry Nuclear Engineering Dept.
H. Ray Caldwell, General Superintendent Nuclear Operations R. D. Brandt, General Manager Operations Terry J. Lodge, Esq.
State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio, Public Utilities Commission Distribution:
Docket File w/ encl SRI Perry w/ encl PUBLIC IE-01 w/ encl DRP w/ encl OC/LFDCB w/ encl RIII PRR w/ encl Project Manager, NRR w/ encl CAA1 w/enci (E-mail)
A. B. Beach, w/ encl B. L. Burgess, w/ enc 1 W. L. Axelson, w/ encl i
)
/
310000 1
j
PERRY NUCLEAR PONER PLANT INSPECTION PLAN IP - Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants).
INSPECTION TITLE /
NUNBER OF PLANNED TYPE OF INSPECTION -
PROGRAN AREA INSPECTORS INSPECTION DATES CONNENTS IP 39801 Safety System 2/17-21/97 Headquarters Initiative Functional Inspection 6
3/3-14/97 3/24-28/97 IP 84750 Radiation Protection 1
3/3-7/96 Core Inspection TI 2515/133 Effluents, Transportation Temporary Instruction IP 81700 Security Inspection 1
4/7-11/97 Core _ Inspection IP 84750 Chemistry, REMP 1
4/14-18/97 Core Inspection J
t
[
..