a e

D e l 20, 1996 Mr. W. T. Subalusky, Jr.

Site Vice President LaSalle County Station ,

Commonwealth Edison Company 2601 North 21st Road Marseilles, IL 61341

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - LASALLE

Dear Mr. Subalusky:

On November 7,1996, NRC Region ill management and staff completed the semiannual Plant Performance Review (PPR) of the LaSalle Nuclear Power Plant. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for the LaSalle Nuclear Power Plant involved the participation of all Region ill technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from March through October 1996. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic <

Assessment of Licensee Performance (SALP) and senior management meeting (SMM) I reviews.

This letter advises you of our planned inspection effort resulting from the l LaSalle Nuclear Power Plant PPR review. The information is provided to enable appropriate I consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The  ;

enclosure details our inspection plan for approximately the next 6 months. The rationale l or basis for each inspection outside the " Core" inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections, as well as periodic inspections by other assigned members of our inspection staff, may occur at any time in support of the Core inspection program.

t

..9612310011 961220 PDR ADOCK 05000373

[w % I G pyg i

l l

l

- )

\

' I W. T. Subalusky l We are interested in feedback on this program, including the need for any changes in the ,

inspection plan, and we invite your questions or comments. If changes are necessary, you '

will be informed. If you have any questions or comments, please contact me at l 630/829-9628.

Sincerely, l

/s/ Marc L. Dapas Marc L. Dapas, Chief Reactor Projects Branch 2

)

Docket Nos. 50-373: 50-374 License Nos. NPF-11; NPF-18 i

Enclosure:

Inspection Plan l cc w/ encl: T. J. Maiman, Senior Vice President Nuclear Operations Division j D. A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer l D. J. Ray, Station Manager  !

J. Burns, Regulatory Assurance '

Supervisor

1. Johnson, Acting Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce Commission Document Control Desk-Licensing Distributiom ,

Docket File w/ encl DRP w/enct I PUBLIC IE-01 w/enct Rlli PRR w/enci OC/LFDCB w/enct SRI LaSalle, Dresden, CAA1 w/enci (E-mail) Quad Cities w/enct Project Manager, NRR w/ encl A. B. Beach, w/enct RAC1 (E-Mail) W. L. Axelson, w/ encl B. L. Burgess, w/enci l OFFICE RIII ,

6 RII,I a , b< RIII, . lI RIII/DRP 8 NAME Ing/Leachb Kkp/CM KozI([Garker Dapas DATE 12//)/96 12/V /96 12/ F1/96 12/@/96 0FFICIAL RECORD COPY

s 6

EASAILE INSPECTION PLAN i

INSPECTION TITLE / NUMBER OF PLANNED TYPE OF PROGRAM AREA INSPECTORS INSPECTION INSPECTION -

DATES COMMENTS IP 81700 Physical Security Program 1 1/13-17/97 Core Inspection IP 83750 Occupational Radiation 1 2/24-28/97 Core Inspection Exposure NUREG 1021 Licensed Operator 3 4/21-25/97 Initial Examinations - Initial Examinations IP 84750 Radwaste 1 5/19-23/97 Core Inspection Effluent / Environmental Monitoring  !

IP 81700 Physical Security Program 1 6/9-13/97 Core Inspection IP 37550 Engineering and Technical To Ba. 7/14-8/1/97 Core Inspection Support Determined

  • Enclosure IP - Inspection Procedure  ;

TI - Temporary Instruction i Core Inspection - Minimum NRC Inspection Program (mandatory all plants) l l