Text

. . . _ .-. . __ . - _ . - ... - . . .. _ _ . -

b December 20,1996 Mr. James Knubel Vice President and Director, TMl

GPU Nuclear Corporation Three Mile Island Nuclear Station Post Office Box 480 Middletown, PA 17057-0191

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - TMl

Dear Mr. Knubel:

I

, On November 6,1996, the NRC staff completed the semiannual Plant Performance Review (PPR) of Three Mile Island Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection  !

resources. The PPR for TMl involved the participation of all technical divisions in evaluating j inspection results and safety performance information for the period August 4,1996, to  ;

November 6,1996. PPRs provide NRC management with a current summary of licensee i performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance l

(SALP) and senior management meeting (SMM) reviews, i This letter advises you of our planned inspection effort resulting from the TMI PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The i enclosure details our inspection plan for the next six months. The rationale or basis for each l inspection outside the core inspection program is provided so the.t you are aware of the reason l for emphasis ir.these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact me et (610) 337-5234.

Sincerely, l

Original Signed By: l Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects l

Docket No. 50-289 License No. DPR-50 f 1

Enclosure:

Inspection Plan 9612300020 961220 /; Cl PDR ADOCK 05000289 f/

0 PDR

Mr. James Knubel 2 cc w/ encl: I E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

J. C. Fornicola, Director, Licensing and Regulatory Affairs -

M. J. Ross, Director, Operations and Maintenance i TMI-Alert (TMIA)

J. S. Wetmore, Menager, TMI Licensing Department ]

Commonwealth of Pennsylvania  !

Distribution w/ encl:

Region 1 Docket Room (with concurrences)

PUBLIC NRC Resident inspector Nuclear Safety information Center (NSIC)

DRS Director, Region i DRS Deputy Director, Region 1 DRS Branch Chiefs, Region i DRP Director, Region 1 DRP Deputy Director, Region i DRP Branch Chiefs, Region i D. Haverkamp, DRP B. Welling, DRP C. O'Daniell, DRP Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO J. Norris, NRR J. Stolz, NRR inspection Program Branch, NRR (IPAS) 1

)

i f

DOCUMENT NAME: G:\ BRANCH 7\TMi\PPRLTR1.TMl Ts receive e copy of this document, indicate in the boa: *C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure *N" = No copy OFFICE ' RI\DRP 6 Ri\Dpp & l f BWelling SV PW l 12/li/96 12/11/96 i

t

. ~

l Enclosure SIX MONTH INSPECTION PLAN FOR THREE MILE ISLAND l IP-Inspection Procedure

Tl - Temporary instruction l CO - Core inspection SI - Safety issue inspection RI - Regional Initiative inspection INSPECTION TITLE / START TYPE OF INSPECTION / l PROGRAM AREA DATE COMMENTS IP 86750 Solid Radwaste Management and 1/6/97 CO Transportation Tl 2515-133 Implementation of Revised 49 CFR Parts 100- 1/6/97 SI 179 and 10 CFR Part 71 IP 82302 Review EP exercise objectives and scenario 1/6/97 CO IP 37550 Engineering - Visit 1 1/13/97 CO, Focus on Engineerng department reorganization, program oversight, and effectiveness of corrective actions taken for the RCS drain line modification.

IP 82301 EP Exercise-full participation 3/3/97 CO, Focus on previously noted areas of weakness.

IP 83750 Occupational Radiation Exposure 3/10/97 CO, Focus on previously noted areas of weakness and the effectiveness of licensee ,

corrective actions.

IP 37550 Engineering - Visit 2 5/5/97 CO IP 92904 Plant Support - Followup TBD Rl, Followup on repetitive problems with High Rad Area controls and worker adherence to procedures.