Forwards QA Program Insp Rept 99900521/85-01 on 850204-08. No Noncompliance Noted
ML20132H037
Person / Time
Issue date: 08/01/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hinkleman L
BECHTEL GROUP, INC.
Shared Package
ML20132H042 List:
References
REF-QA-99900521 NUDOCS 8508050230
Download: ML20132H037 (2)


Text

,

/

UNITED STATES 8"

N NUCLEAR REGULATORY COMMISSION h

WASHINGTON, D. C. 20555 s

i

\\..... /

August 1, 1985 Docket No. 99900521/85-01 Bechtel Power Corporation Western Power Division / Houston Project Office ATTN: Mr. L. G. Hinkleman, Vice President and General Manager Post Office Box 60650 Terminal Annex Los Angeles, California 90060 Gentlemen:

This refers to the inspection conducted by Mr. P. D. Milano, R. L. Cilimberg, T. L. Bridges, and K. A. Ward of this office on February 4-8, 1985, of your facility at the South Texas Project site and to the discussions of our findings with Mr. J. Gatewood and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to review the site procurement control process. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

While no items of nonconformance were identified, the adequacy of Bechtel receipt inspection activities was an area of concern identified during this inspection. This includes implementation of receipt inspection requirements and the resolution of nonconformance reports.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

/

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

?

\\

dv Gar ech,'t ief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

/[O

Enclosure:

/

Inspection Report 99900521/85-01 FO' OS PROCESSING

$8o5023 original document not available to me 999004798e!!a*P e

Ph certified bdbtAJLt

.MO

Bechtel Power Corporation August 1, 1985 Western Power Division / Houston Project Office 99900521/85-01 DISTRIBUTION:

DMB:IE:09 VPB Reading DQAVT Reading RVollmer JStone GHolahan,' NRR/0RAB

'JCraig RPettis-RCilimberg Region IV Resident Inspector / South Texas Licensee:

Houston Lighting and Power Company ATTN: Mr. J. H. Goldberg Group.Vice President, Nuclear Post Office Box 1700 Houston, Texas 77001 I

  • See Previous Cohcu re ce
D AVT
DQAVT PB:DQAVT E:DQAVT JCraig h

KGrimes

  • RPet is:th 7/3/85