ML20132G916

From kanterella
Jump to navigation Jump to search
Forwards Byron Unit 2 SG Eddy Current Insp Rept Cycle 6 Refueling Outage,Aug-Oct 1996
ML20132G916
Person / Time
Site: Byron Constellation icon.png
Issue date: 12/17/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132G920 List:
References
BYRON-96-5197, NUDOCS 9612270082
Download: ML20132G916 (1)


Text

-

O>mmonwealth Ediwan Q>mpany ll)ron Generating $tation 4 ISO North German Church Road llyron, 11.61010 991 Tel H15-234-5441 December 17,1996 LTR:

BYRON-96-5197 FILE: 3.11.0530 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission i

Washington, DC 20555

\\

ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit 2 Steam Generator Eddy Current i

Examination During B2F17 & B2R06 - 90 Day Summary Report i

Byron Nuclear Power Station, Unit 2 Facility Operating License NPF-66 NRC Docket No. 50-455 Please find attached a report for the Byron Unit 2 Steam Generator examination performed during Cycle 6 forced (B2F17) and refueling outage (B2R06) during August 1996. This report is being submitted in compliance with the requirements of Mandatory Appendix IV of Section XI of the ASME Boiler and Pressure Vessel Code,1983 Editio1 through Summer 1983 Addenda in accordance with Byron Technical Specification 4.0.5.

If there are any additional questions, please contact Marcia Lesniak, Nuclear Licensing Administrator at (630)663-6484.

Sincerely, 9

\\

I s

avid U Wozniak Site Engineering Manager Byron Nuclear Power Station DBW/cb Attachment cc:

A. B. Beach, NRC Regional Administrator, Rill G. F. Dick, Jr., Byron Project Manager - NRR k

S. D. Burgess, Senior Resident inspector, Byron

\\

Office of Nuclear Safety -IDNS 9612270082 961217 PDR ADOCK 05000455 O

PDR

'" b - ~ ~G

  • A 11nicum o>mpany