ML20132G855
| ML20132G855 | |
| Person / Time | |
|---|---|
| Issue date: | 07/15/1985 |
| From: | Stello V Committee To Review Generic Requirements |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-1.153, TASK-IC-609-5, TASK-RE NUDOCS 8508050164 | |
| Download: ML20132G855 (3) | |
Text
r-8 JUL 151985 f
MEMORANDUM FOR:
William J. Dircks Executive Director for Operations FROM:
Victor Stello, Jr., Chairman Connittee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 76 The Connittee to Review Generic Requirements (CRGP,) met on Wednesday, May 29, 1985 from 1 5 p.m.
A list of attendees for this meeting is enclosed (Enclosure 1).
1.
G. Arlotto and A. Hintze (RES) presented for CRGR review a proposed Regulatory Guide (IC 609-5) entitled " Criteria for Power, Instrumentation and Control Portions of Safety Systems." This proposed Guide has received public comment and RES intends its issuance as an endorsement (with ex.
ceptions) of IEEE Std. 603-1980. This IEEE Std is a broad acre standard integrating a number of existing IEEE standards and would supersede IEEE Std. 279(1968 and 1971). Enclosure 2 sunnarizes this matter (Category 2 Item).
2.
J. Richardson, G. Arndt and J. Glynn (RES) completed the CRGR briefing on the proposed Revision of Appendix J (Primary Reactor Containment Leakage Testing for Water _ Cooled Power Reactors) of 10 CFR Part 50 and the related Regulatory Guide (Task No. MS 0215) entitled " Containment System Leakage
-Testing" which is intended to endorse with exceptions the ANSI /ANS 56-8 1981 standard for leakage testing. Enclosure 3 summarizes this matter (Category 2 Item).
Enclosures 2 and 3 of this document contain predecisional information and there-fore will not be released to the Public Document Room until the NRC has con.
sidered (in a public forum) or decided the matters addressed by the information.
Questions concerning these meeting minutes should be referred to Walt Schwink (492-8639).
Original Signed by V. Stello Victor Stello, Jr., Chairman
/
Connittee to Review Generic Requirements 3r/q As Stated
/
Enclosure {,:
8508050164 850715 cc: See next page PDR REVGP NROCRGR
/,,
MEETING 076 PDR 0FC :ROGR 5
- ROGR
- DEDROGR
! NAME :MT
.JHS, zek
- VStello
- y/jy85._3_,_______:6/
/85
_ _ _ _ : _... _ _ _ _ _ _ _ _ j:
' DATE :6/28/85 i
c o l-cc: Commission (5)~
.SECY Office Directors Regional Administrators CRGR Members G. Cunningham J. Richardson G. Arndt G. Arlotto A. Hintze.
J. Glynn Distribution:
VStello JRoe ROGR Staff.
JHSniezek WLittle Central File RHernon EFox JPhilips JHenry RErickson ETriner JZwetzig FHebdon PDR(NRG/CRGR)
I
o LIST OF ATTENDEES CRGR MEETING NO. 76 May-29, 1985 CRGR MEMBERS V. Stello R. Bernero E. Jordan J. Scinto T. Ippolito (for J. Heltemes)
D. Ross R. Cunningham OTHERS W. Schwink J. Ricitardson G. Arndt S. McNeil J. Burns J. Shapaker J. Huang M. Taylor R. Hernan B. Morris A. Hintze G. Arlotto D. Sullivan G. Marcus F. Rosa J. Watt R. A. Rohrbacher A. Tse E. Shomaker M. Ernst P. Williams S. Brown W. Houston J. Slynn l