ML20132G754

From kanterella
Jump to navigation Jump to search
Forwards LERs 85-015-00 & 85-016-00
Date released: 05/25/2020 Download: ML20132G754


:on 850826,full Scram & Primary Containment Isolation Sys Groups II & III Initiated Due to Reactor Low Level Signal.Caused by Failure to Ensure That Pressure Transmitter Returned to Svc from 850822 Event
ML20132G817
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/20/1985
From: Birely W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20132G817 (3)
:on 850822,full Scram & Primary Containment Isolation Sys Groups II & III Initiated Due to Reactor Low Level Signal.Caused by Pressure Transmitter PT-53 Block Valve Leak.Block Valve Replaced
ML20132G800
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/20/1985
From: Birely W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20132G800 (3)
Forwards LERs 85-015-00 & 85-016-00
ML20132G751
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/20/1985
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20132G751 (1)