Forwards Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted
ML20132G467
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 12/20/1996
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20132G468 List:
References
EA-96-243, NUDOCS 9612260265
Download: ML20132G467 (4)


See also: IR 05000277/1996011

Text

b, ,.

Decenber 20, 1996

EA 96-243

i

Mr. D. M. Smith, President

PECO Nuclear '

Nuclear Group Headquarters '

Correspondence Control Desk

P. O. Box 195 i

Wayne, Pennsylvania 19087-0195 I

SUBJECT: NRC COMBINED INSPECTION REPORT NOS. 50-277/96-11, 50-278/96-11, j

50-352/96-08 AND 50-353/96-08

Dear Mr. Smith:  !

i

This refers to the inspection conducted by Mr. G. C. Smith of this office on October 3-  !

November 27,1996 at the Chesterbrook Engineering information Center. Areas examined

during the inspection are identified in the enclosed report. The inspection consisted of

interviews and examination of selected procedures and representative records. The

findings were discussed with members of your staff identified in the enclosed report by Mr.

Smith at the conclusion of the inspection.

l

Based on the results of this inspection, an apparent violation was identified and is being '

considered for escalated enforcement action in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600.

The apparent violation concerned the failure to control safeguards information in

accordance with NRC requirements. The circumstances surrounding this apparent

violation, the significance of the issue, and the need for lasting and effective corrective

action were discussed with members of your staff at the inspection exit meeting on

November 27,1996. As a result, it may not be necessary to conduct a predecisional

enforcement conference in order to enable the NRC to make an enforcement decision.

However, a Notice of Violation (Notice) is not presently being issued for these inspection

findings. Before the NRC makes its enforcement decision, we are providing you an

opportunity to either (1) respond to the apparent violation addressed in this inspection

report within 30 days of the date of this letter, or (2) request a predecisional enforcement

conference.

Your response should be clearly marked as a " Response to An Apparent Violation in

inspection Report Nos. 50-277/96-11, 50-278/96-11, 50-352/96-08 and 50-353/96-08"

and should include: (1) the reason for the apparent violation, or, if contested, the basis for

disputing the apparent violation, (2) the corrective steps that have been taken and the

results achieved, (3) the corrective steps that will be taken to avoid further violations, and

(4) the date when full compliance will be achieved. Your response should be submitted  ;

under oath or affirmation and may reference or include previous docketed correspondence, l

l

9612260265 961220

PDR ADOCK 05000277 'd$I)} ! j I

'

G PDR

.. .. - . -- _

_ -.

. .

!

Mr. D. M. Smith 2

if the correspondence adequately addresses the required response. If an adequate

response is not received within the time specified or an extension of time has not been

granted by the NRC, the NRC will proceed with its enforcement decision or schedule a

predecisional enforcement conference.

j

If you choose riot to provide a response and would prefer participating in a predecisional

enforcement conference, please contact Walter Pasciak at (610) 337-5258 within one

week of the date of this report.  !

In addition, please be advised that the number and characterization of apparent violations

described in the enclosed inspection report may change as a result of further NRC review.

You will be advised by separate correspondence of the results of our deliberations on this

matter.

I

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure, and your response (if you choose to provide one) will be placed in the NRC  ;

Public Document Room (PDR). To the extent possible, your response should not include .

any personal privacy, proprietary, or safeguards information so that it can be placed in the l

PDR without redaction. '

i

Also, on June 13,1996, in Inspection Report No. 50-352/96-03 and 50-353/96-03, the

NRC forwarded to you another apparent violation also concerning the failure to control

safeguards information. In your letter, dated July 15,1996, you responded to that

apparent violation and chose not to participate in an enforcement conference. Our decision

regarding the appropriate enforcement action for that apparent violation is pending and will

be issued at the same time action is taken on the issues identified in this report. .

!

Sincerely,

' W&ned$y

Amer'I

L Siruder,

James T. Wiggins, Director

Division of Reactor Safety

Docket Nos. 50-277; 50-278; 50-352; 50-353

License Nos. NPF-39, NPF-85

Attachment: As stated

- . _ . . . _ ._ _ _ _ . _ _ _ __ - __ _ .. _ _ _ _ _ _ _ _ - _ .

i

.

c

Mr. D. M. Smith 3

l

l cc w/ encl:

G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing

I W. MacFarland, Vice President - Limerick Generating Station

l J. L. Kantner, Regulatory Engineer - Limerick Generating Station

l Secretary, Nuclear Committee of the Board

l

T. Mitchell, Vice President, Peach Bottom Atomic Power Station

i G. Rainey, Senior Vice President, Nuclear Operations '

l D. 8. Fetters, Vice President, Nuclear Station Support

!

T. Niessen, Director, Nuclear Quality Assurance

C. D. Schaefer, External Operations - Delmarva Power & Light Co. ,

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station l

G. J. Lengyel, Manager, Experience Assessment i

J. W. Durham, Sr., Senior Vice President and General Counsel

)

P. MacFarland Goelz, Manager, Joint Generation, Atlantic Electri 1

B. W. Gorman, Manager, External Affairs '

R. McLean, Power Plant Siting, Nuclear Evaluations

)

J. Vannoy, Acting Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland ,

L. Jacobson, Peach Bottom Alliance  !

l

Commonwealth of Pennsylvania l

Nuclear Safety Information Center (NSIC)  !

State of Maryland

TMI - Alert (TMIA) j

)

1

)

i

i

!

_ _ _

_ _ _ _ _

l

_ . . . _ _ _ _ __ _ ~ _ ._. __ ._-

- .

i

Mr. D. M. Smith 4

f

!

Distribution w/ encl:

,

Region 1 Docket Room (with concurrences)

J. Wiggins, DRS

K. Gallagher, DRP

r

Nuclear Safety information Center (NSIC) '

D. Screnci, PAO

NRC Resident inspector

PUBLIC

C. Miskey, DRS

DRS Files (4)

l

Distribution w/ encl: (Via E-Mail) 1

W. Dean, OEDO

J.Shea,NRR ,

J. Stolz, PDl-2, NRR '

F. Rinaldi, NRR i

L. Cunningham, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR j

R. Frahm, Jr., NRR l

l

l

1

I

I

DOCUMENT NAME: G:\EP&SB\ SMITH \PB11 IM8. INS

T. r.c.i . cpy pj. oocum.ni. indic.i. in in. box: c - con ithoutbehyng.ncio.ur. s - copy with .it. chm.nt/.nclosur. *N - No copy

0FFICE 4 )23S l RI/DRfV/J V[ Rh(QQ L 1l RI/E0 & l Rl/DRS l

NAME Ghhh WPaso"a%( FKeimij:hhh DHolody M 4H JWiggin V

DATE 13/19/96 12/ 6 /96'~ ' 12 4 /96 it 12/IS/96 12/ 2 0/96

5

0FFICIAL RECORD COPY