Forwards Insp Repts 50-010/96-11,50-237/96-11 & 50-249/96-11 on 960731-0830 & Nov.Violations Have Been Corrected & Actions Reviewed During Insp
ML20132G333
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/19/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML20132G335 List:
References
NUDOCS 9612260236
Download: ML20132G333 (2)


See also: IR 05000010/1996011

Text

a

'l

'

September 19, 1996

Mr. J. S. Perry

Site Vice President

Dresden Nuclear Power Station

Commonwealth Edison Company

6500 North Dresden Road

Morris, IL 60450

SUBJECT:

NRC INSPECTION REPORTS NO. 50-010/960ll(DRS); 50-237/960ll(DRS);

50-249/96011(DRS) AND NOTICE OF VIOLATION

Dear Mr. Perry:

On August 30, 1996, the NRC completed a security inspection at your Dresden

i

reactor facilities. The enclosed report presents the results of that

inspection.

During the inspection period, security activities observed or reviewed were

conducted in an adequate manner. We are concerned, however, about three NRC

identified violations.

In the firste. instance, an NRC inspector identified a

deficiency in your vehicle barrier system that was missed during several

reviews by both security and engineering staff.

In the second instance, an

NRC inspector identified thlit, an individual was improperly granted unescorted

access,duetothemisinterhretationofsecurityscreeningrequirements.

In

the third instance, an NRC inspector identified that a " Sea Van" shipping

contair.::r was not searched, due to misinterpretation of security searching

reouirements.

Wher, these violations were identified, security management

'

implemented corrective measures that should prevent recurrence.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in the enclosed report.

We noted that the violations had been corrected and these actions, including

your root cause analysis, were reviewed during the inspection.

Therefore, no

response to these violations are required.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to 10 CFR 73.21(c)(2). This information must be

handled and protected in accordance with the provisions of 10 CFR 73.21.

Consequently, the enclosure to this letter and our report of this inspection

will not be placed in the NRC Public Document Room.

}

-

SAT

h attvil

260049

9612260236 961219

PDR

ADOCK 05000010

G

PDR

.

S

'

J. S. Perry

2

September 19, 1996

1

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Brent Clayton

Geoffrey E. Grant, Director

Division of Reactor Safety

l

Enclosures:

1.

Notice of Violation

.

2

/9b11(DRS

SEP 26 A10 @

2

(SAFEGUARDS INFORMATION)

cc w/encls:

D. A. Sager, Vice President,

DNT 150.

Generation Support

H. W. Keiser, Chief Nu lear

Operating Officer

T. Nauman, Station Manager, Unit 1

M. Heffley, Sh ion Manager, Units 2 and 3

)

F. Spangenbr

'egulatory Assurance

i

Superviso.

NRR/DRIS/RSGB90

'

NMSS/HIGDON/4E4

.

OE Director

e

cc w/encls, w/o

4

i

SAFEGUARDS INFORMATION:

D> Farrar, Nuclear Regulatory

i

Services Manager

.

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/o encls

A. B. Beach, RIII w/o encls

FUCLIC IE-04 w/o encls

SRIs, Dresden, LaSclle.

RIII PRR w/o encls

Quad Cities w/o encls

OC/LFDCB w/o encls

Enf. Coordinator, RIII w/o encls

LPM, NRR w/o encls

R. A. Capra, NRR w/o encls

DRP w/o encls

C. Pederson, RIII w/o encls

E-Mail CAA1 w/o encls

W. L. Axelson, RIII w/o encls

DRS w/o encls

e ive

is

indicate in the box "C" = Copy w/o attach /enci *E" = Copy w/ attach /enct *K = No copy

0FFICE

RIJJ :_DRS

l6

RIII:DRP.

l#

Ril1QM ; I

RIII:DRS &.l#

NAME

MMri A lle

Hiland // # 4.f

Crettf u

Clayton/ Grant

DATE

9//1/96

9// f/96'

9/(3/96

9//9 /96

0FFICIAL RECORD COPY

encionuro contains

SAFP MR

I

it

a

f

vi.amtrollod