{{#Wiki_filter:_ t e l JOSEPli M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS JULY, 1985 During the month of July, there were two (2) automatic shutdowns which occurred on 7-15-85 and 7-17-85. Following the automatic shutdown which occurred on 7-15-85, the atmospheric relief valves on all three main r. team lines opened. Both circulating water pumps were unavailable following the shutdown. This caused the loss of the steam dump system. Therefore, the atmospheric reliefs were required to reduce the steam pressure. The atmos-pheric relief valves operated per design. l l The following major safety-related maintenance was performed in the l month of July: i l 1. Miscellaneous corrective and preventive maintenance was l performed on the diesel generators. 1 2. The replacement of containment vertical tendon V31 was completed. l l l l l 0510010495 a50731 1 PDR ADOCK 05000364 R PDR l(YI t
i I OPERATING DATA REPORT ,,j DOCKET NO. 5 0 - 16 'a DATE Br-ns ~ COMPLETED BY J. D. Woodard TELEPHONE (20s) 899-5156 OPERATING STAT 1'S NOI"
- 1. Unit Name:
Jmish Ff. Farlev - l'n i t 2
- 2. Reporting Period:
3"!v-1085
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
26'2 7-30-81, date of 860
- 4. Nameplate Rating (Gross MWe):
commercial operation.
- 5. Design Electrical Rating (Net MWe):
820 m.2
- 6. Maximum Dependable Capacity (Gross MWe):
807.2
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:
N/A ^
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/A (} \\d This Month Yr..to.Date Cumulative 744 s nq7 15,112
- 11. Hours la Reporting Penod
- 12. Number Of Hours Reactor Was Cntical 71 r, t 1.279.9 30.196.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 tag,o
- 14. Hours Generator On.Line 692.4 3.211.4 29.789.s 00 0.0 0.0
- 15. Unit Reserve Shutdown Hours H.030.S19
/4,883,267
- 16. Gross Thermal Energy Generatea iMWH)
- 1. ? n o _ n v.
- 17. Gross Electrical Energy Generated (MWH) 5H7,200
, u,s snn 2'. 611.Hr.8 5Sb'936 2.509.022 21.177,9'.4
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Semce Factor 93.I 61.1 H4.H
- 20. Unit Availability Factor 9 't. I 63.I 84.8
- 21. Unit Capacity Factor IUsing MDC Net) 42.7 01 1 62 0
- 22. Unit Capacity Factor (Using DER Net) 90.'l 59 s 80.1 69
?.4 S.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
il/ A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved p 5-6-81 5-8-81 k/ INITIA L CRITICALITY INITIAL ELECTRICITY 5 - 2 '* - M 1 s-7bal COMMERCIAL OPER A TION H-1-HI 7-10-81
- guj77,
DOCKET NO. 50-164 Lh!T I DATE Aucust 2, 1985 COStPLETED BY J I' ' ""'t a r.t TELIP!!ONE /'osi H99-s1 % 310tml July, 1985 DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (SlWe Net) (5lWe Net) g, 824 g7 0 2 822 13 '2 11 y f, y g9 790 4 H19
- g H18 820 3
21 8l7 6 816 g H24 7 R17 8b g3 821 g 3 826 O9 = "2' 10 H l '* 16 8?1 27 n'7 g; H2h 3 817 827 l3
- g H21 822 g,g 30 8 2 /.
gg 679 823 3g 16 0 l CGTRUGONS On this format. list the aversge daily unit puwer levet in AlWe Net fut esch day in the reporting rnunth. CJmpute 10 , the neare-t whule me;2 watt. @@7) l l l
O O O' UNIT SHU1 DOWNS AND POWER REIMM'llONS DOCKET NO. 55-364 UNIT NAME J.M. Farlev - Unit 2 s DATE ^"mst 2. 1985 i COMPLETED BY J _ n L'nndard REPORT MONTH Juiv. 1985 TELEPl80NE Dos) A99-51sr> 1 -k Cause & Cussc(sive .$ 7 } hY Lkcascc Ev, 'k N... thase k E! 2sx Evens
- r. T 3
Acil.wi so sE F C5k R#E'"' # P*"' N*#"'*"'" 3 2 d 005 850715 F 42.1 H 3 85-010-00 N/A N/A A reactor trip occurred due to the loss of power in two rod control systes power cabinets. This was caused by lightning. 006 850717 F 9.5 A~ 3 85-011-00 SJ P A reactor trip occurred due to low-low level in the 2C steam generator follow-ing a stea= generator feed pu=p and main turbine trip caused by high level in the 2A steam generator. The high stean eenerator level occurred due to a feedwater regulating valve which apparently failed to respond in manual control. The valve was exercised, checked thoroughly and returned to service. I 1 3 4 F: Fus cJ Reason: MethoJ: Eslobis G. Insecuccions S. Ssheduled A-Eanuspencas Fasiuss(Emplais) 1 -Manual fos Pacpanation of Dana B Maineenance of T.se - 2 Manual Scsaen. Enesy Sheets for iisensee C Refuelwag 3-Autoenatic Scsans. Event Rep *xt (if R) file INUREG-D Reguiasiny Reusicas.mi 4-Oslees (Emplane) 0161) E Opesasus Training & ticcuse Emaniinattua F-AJaantusasive 5 6 Openalumsal I.:s.a (tiaptaia) Esinibit t. Sainie S4nssa 19f77) II Othes (Eaplain) ~
O Mailing Address I P Alabama Power Company 600 North 18tn Street Post Office Box 2641 Birmingham, Alabama 35291 l d l Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Fhntndge Butiding /\\l{]f)d[1}3 h0WCf -{ ,v: o, m c., cs. + l August 12, 1985 Docket No. 50-364 Director, Office of Resource-Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l
Dear Sir:
1 RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report i j Attached are two (2) copies of the July 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of l Appendix A of the Technical Specifications. j If you have any questions, please advise. Yours ve
- truly,
{ky .I 1 R. P. Mcdonald l f RPM /SNK:nac/F-2 l Enclosures xc: Director, IE (10 copies) j Director, RII (1 copy) i j i l 1 l l i 1 l l I l}}