ML20132F805

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1985
ML20132F805
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1985
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP850026, NUDOCS 8510010417
Download: ML20132F805 (4)


Text

.

OPERATING MTA REPORT DOCKET NO 50-341 UNIT FERMI-2 DATE 08-14-85 COMPLETED BY L. Breani TELEPHONE (313) 586- 5313 OPERATING STATUS

1. REPORTING PERIOD July GROSS HOURS IN REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 165 MAX DEPEND CAPACITY (MWeNet)

DESIGN ELECTRICAL RATING (MWe Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5
4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS MONIH YR 10 DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 537.4 751.3 751.3
6. REACIOR RESERVE SHUTDOWN HOURS 0 0 0

-7. HOURS GENERATOR ON LINE 0 0 0

8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. CROSS THERMAL ENERGY GENERATED (MWH) 28,143 32,649 32,649
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
12. REACTOR SERVICE FACTOR N/A N/A il/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 WNIHS (TYPE, DATE, AND DURATION OF EACH)

Outage for scheduled modifications September / October, 1985.

~

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP N/A
21. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06-20-85 06-21-85 INITIAL ELECTRICITY 09-01-85 COMMERCIAL OPERATION 11-04-85 8510010417 850731 s
  • To be determined. (DR ADOCK 05 gi ghf i/i

AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI-2 DATE 08-14-85 COMPLETED BY L. Bregni TELEPHONE (313) 586 5313 MONTH July, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 - 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0

' 12 0 28 0 13 0 29 0 14 0 30 0 15 'O 31 0

' 16 0 i

[

i i

.,-,.~.,-._--..w- .-..<,n--,,, , , . , - , . , , - r, -.n., - - . ,- ,r,n.,g- - - -. .- , ,,-ng,,---r v,-,.-.m -.m n.e.~.w n,,- , - , ,,.m-.,,-,,,-

DCCKET NO, 50-341 UNIT SHUTDOWNS AND POWEk REDUCTIONS UNIT NAME Fermi-2 ,

DATE 08-14 COMPLETED BY L. P. Bregni .

RE, PORT MONTH July, 1985 TELEPHONE (313) 586 5313 8

' l 8

m "s a i e I w im owemxI  !

'  ! 9 2 4l 2"l 9!58"seE"l l 0 9 "l 88l Q*4!!

4' l' l 8l m

, NO DATE  !

E 'l @El C*l @8@dG"l CORRECTIVE ACTIONS / COMMENTS l 0" l "*l r l

OP ?l .

l l 1 .! 850701  ! F !10.3 ! G l 3 l Reactor trip which was caused by valving l l  ! l l l l l error. Reported by LER 85-030 dated l l l l l l l '; July 31, 1985. l l 2  ! 850705 l F l 9.6 l G l 3  ! Reactor trip resulted from a water level l

' l l  ! l l  ! l transient that occurred when the turbine l l l l l l l .l bypass valve controller malfunctioned and l l l l l l l l caused the v'a lves to close. Reported by l l

e l

a e

l l l l, LER 85-033 dated August 14, 1985. l s e ,

e l 3 l 850709 l F l 9.9 l H l 3 l Reactor trip resulting from a slow water l l l l l l l l level decrease that started when reactor l

! l l l l l l pressure was manually increased. l l l l l l l l Reported by LER 85-035 dated August 8, l l l l l l l l 1985. l i . i i e i l 4 l 850724 l S l176.8 l B l 1 l Maintenance outage. l l l l l l l l l l l l l l l l l l l l l l l l l

, l l l l l l l l l (1) REASONS f A. EQUIPMENT FAILURE (EXPLAIN) E. OPERATOR TRAINING AND LICENSE EXAMINATION 4

B. MAINT OR TEST F. ADMINISTRATIVE i C. REFUELING G. OPERATIONAL ERROR (EXPLAIN) j D. REGULATORY RESTRICTION H. OTHER (EXPLAIN) 1 (2) METHOD

l. MANUAL 3. AUTOMATIC SCRAM
2. MANUAL SCRAM 4. OTHER (EXPLAIN) i

LO DqhoJ1 balson55#i!!2= August 14, 1985 HP850026 U. S. Nuclear. Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 HRC Docket No. 50-341 HRC License No. HPF-43

Subject:

Monthlv Ooerating Status Reoort for July. lo85 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for July, 1985. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Pouer Reductions identified in URC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely,

/,/ <j R. S. Lenart Plant Manager Enclosure cc: P. M. Byron Regional Administrator USNRC Region III 799 Roosevelt Road Glen Ellyn, IL 60137 e 1 L