ML20132F159

From kanterella
Jump to navigation Jump to search
Forwards Westinghouse Rept, Long-Term Corrosion Test Program of Nuclear Steam Generator Tubing Samples from TMI-1, Vols 1 & 2,per .Vol 1 Contains Summary of Final Exams.Vol 2 Contains Three Related Repts
ML20132F159
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/29/1985
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20132F163 List:
References
0288A, 288A, 5211-85-2106, NUDOCS 8508020197
Download: ML20132F159 (1)


Text

V GPU Nuclear Corporation g

gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

July 29, 1985 5211-85-2106 Office of Nuclear Reactor Regulation Attn:

J. F. Stolz, Chief Operating Reactor Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Final Report on the Long Term Corrosion Test Program I

Enclosed is the final report for the THI-1 Steam Generator Long Term Corrosion Test Program, which we committed to provide in our letter of January 4,1985.

Volume 1 contains a summary of all operations and a description of the final examinations. Volume 2 contains the three other reports generated during the program.

Sincerely, H. D. lu fil Director, TMI-1 HDH/SM0/spb cc: Dr. T. Murley h

Enclosure CM 0288A B508020197 e50729

)

PDR ADOCK 050 9

P s

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

'