ML20132E777

From kanterella
Jump to navigation Jump to search
Forwards Draft Staff Technical Position, Testing & Insp Plans During Const of DOE Remedial Action at U Mill Tailing Sites, for Review & Comment.Paper Describes Practices, Testing & Insp Re Geotechnical Activities
ML20132E777
Person / Time
Issue date: 07/10/1985
From: Higginbotham L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Themelis J
ENERGY, DEPT. OF
Shared Package
ML20132E781 List:
References
REF-WM-39 NUDOCS 8508020096
Download: ML20132E777 (1)


Text

_

~

WM Rccord fila WM Prcject 37 Docket No. _

JUL 101985 paa _-

WM39/85/DMG/85/06/28 Distribution:

_y_

(Rr.dum tof/fi,T6dd)

~ ~ ~ ~

Distribution:

[AM r/f JT Greeves WMLU r/f MR Knapp J0 Bunting RD Smith, URF0 MJ Bell PO /2.

Mr. John G. Themelis RE Browning UMTRA Project Office GN Gnugnoli U.S. Department of Energy DE Martin Post Office Box 5400 DM Gillen Albuquerque, New Mexico 87115

Dear Mr. Themelis:

In order to facilitate our reviews of Remedial Action Inspection Plans (RAIPs) as part of our concurrence in performance of remedial actions, we have developed a staff technical postion (STP) on testing and inspection. The STP describes the engineering practices, testing, inspection, record keeping and i

}

corrective action activities considered satisfactory for the performance of the geotechnical activities of remedial action construction.

Enclosed is a draft of this STP for your review and comment. Should you have any questions in this matter, please contact Dan Gillen of my staff at (FTS)427-4160.

Sincerely, orignal damed by Im B. Illapahoehans Leo B. Higginbotham, Chief Low-Level Waste and Uranium Recovery Projects Branch Division of Waste Management

Enclosure:

As stated 8500020096 850710 PDR WASTE WM-39 PDR WMI L

f OFC :WMLU:rb WM t' h --- :: h


:----- g M ::

4


 : ------------ : ------------ : --.L) g'g i n bo t h am NAME :DM Gillen

DEJd rtin
85/ q/ f p :------------:------------:------------:-----------

DATE :85/08/c3

85/0f/J